Permit-to-Work Systems (PTW) are used to control hazardous work. They adhere to eight principles: (1) hazards are eliminated if possible to avoid needing permits, (2) the site manager is responsible for overall safety, (3) the permit overrides other instructions until cancelled, (4) permits provide detailed safety information, (5) permits remain in effect until work is complete, (6) only authorized work is allowed, (7) changes require permit cancellation and reissuance, and (8) plant responsibilities must be defined at all stages.
Permit-to-Work Systems (PTW) are used to control hazardous work. They adhere to eight principles: (1) hazards are eliminated if possible to avoid needing permits, (2) the site manager is responsible for overall safety, (3) the permit overrides other instructions until cancelled, (4) permits provide detailed safety information, (5) permits remain in effect until work is complete, (6) only authorized work is allowed, (7) changes require permit cancellation and reissuance, and (8) plant responsibilities must be defined at all stages.
Permit-to-Work Systems (PTW) are used to control hazardous work. They adhere to eight principles: (1) hazards are eliminated if possible to avoid needing permits, (2) the site manager is responsible for overall safety, (3) the permit overrides other instructions until cancelled, (4) permits provide detailed safety information, (5) permits remain in effect until work is complete, (6) only authorized work is allowed, (7) changes require permit cancellation and reissuance, and (8) plant responsibilities must be defined at all stages.
Permit systems must adhere to the following eight principles:
The permit is the ultimate
Hazards should be The Site Manager holds The permit applies to instruction that overrides eliminated to allow safe overall responsibility for everyone, including all other instructions until work without permits. safety. contractors. cancellation.
The permit remains in
The permit must provide Only authorized work is force until work detailed and accurate allowed under the permit, The plant responsibility completion, and information about safe and changes require must be defined in all cancellation is done by equipment, allowed work, cancellation and re- stages. the issuer or management and effective time. issuance. nominee.