Project Details Meydan D1

Project Name : Gurmeet Villa


CODE : A99

For The month of OCTOBER 2023


Contractors
TOTAL Percentage Prvious Work Done 1ST WEEK 2ND WEEK 3RD WEEK 4TH WEEK 5th WEEK
Sr. No Contractors Name WORK DETAILS (100%) % PERCENTAGE PERCENTAGE PERCENTAGE PERCENTAGE PERCENTAGE
REMARKS

1 AUTOMECH DEWATERING Monthly (Work Completed) 100 1


2 MIDDLE EAST SURVEY ENGINEERING Monthly Visit 100 10 Site Visit
3 GULF PILING LLC Work Completed 100 1
4 AL REHANA INSULATION MATERIALS FIXING LLC Horizontal surfaces on raft area 100 1
5 AL REHANA INSULATION MATERIALS FIXING LLC Vertical surface for RCC wall 100 0.9
6 GEOSPATIAL TECHNICAL SERVICES LLC Monthly Visit (Work Completed) 100 3 Site Visit 1 Site Visit
7 BABER TECH SERVICE RAFT PERIPHERY & WALL WITH SECANT PILE 100 1
8 ADAM KHAN TECHNICAL SERVICES LLC RAFT REINFORCEMENT WORK 100 1
9 ADAM KHAN TECHNICAL SERVICES LLC BF TO GF COLUNS & RCC WALL REINFORCEMENT WORK 100 1
10 ADAM KHAN TECHNICAL SERVICES LLC BF TO GF COLUNS & RCC WALL FORMWORK WORK 100 1
11 ADAM KHAN TECHNICAL SERVICES LLC GF Slab Formwork 100 1
12 ADAM KHAN TECHNICAL SERVICES LLC GF Slab Reinforcement 100 1
13 GREEN FUTURE RAFT AREA MEP WORK (LL Drainaige) 100 1
14 Sarah Contracting LLC RAFT FORM WORK 100 1
15 Sarah Contracting LLC Raft Concrete Casting 100 1
16 Sarah Contracting LLC BF to GF Columns & RCC Wall Casting 100 1
17 Sarah Contracting LLC BF to GF Staircase Formwork 100 1
18 Sarah Contracting LLC BF to GF Staircase Reinforcement 100 1
19 Sarah Contracting LLC Front Elevation Footing PCC 100 1
20 Sarah Contracting LLC Front Elevation 6 Footing Reinforcement 100 1
21 Sarah Contracting LLC Front Elevation 6 Footing Formwork 100 1
22 Sarah Contracting LLC GF Slab Concrete Casting 100 1
23 Sarah Contracting LLC Front Elevation 6 Footing Casting 100 1
24 Sarah Contracting LLC Front Elevation Neck Columns Reinfprcement 100 1
25 Sarah Contracting LLC Front Elevation Neck Columns Formwork 100 1
26 Sarah Contracting LLC Front Elevation Neck Columns Casting 100 1
27 ADAM KHAN TECHNICAL SERVICES LLC GF to FF Colums Reinforcement Work 100 1
28 ADAM KHAN TECHNICAL SERVICES LLC GF to FF Colums Formwork 100 1
29 Sarah Contracting LLC GF to FF Columns Casting 100 1
30 Sarah Contracting LLC Block Work for Front Elevation Tie Beams 100 1
31 Sarah Contracting LLC Ramp Area Backfilling 100 1
32 Sarah Contracting LLC Front Elevation Backfilling for Grade Slab - upto tie beam level 100 1
33 Sarah Contracting LLC Front Elevation Tie Beams Reinforcement - 2nd Casting 100 1
34 Sarah Contracting LLC Front Elevation Tie Beams Formwork - 2nd Casting 100 1
35 Sarah Contracting LLC Front Elevation Tie Beams Casting - 2nd Casting 100 1
36 ADAM KHAN TECHNICAL SERVICES LLC FF Slab Formwork 100 0.98
37 Sarah Contracting LLC Front Elevation Tie Beams Reinforcement - 3rd Casting 100 1
38 Sarah Contracting LLC Front Elevation Tie Beams Formwork - 3rd Casting 100 1
39 Sarah Contracting LLC Front Elevation Tie Beams Casting - 3rd Casting 100 1
40 ADAM KHAN TECHNICAL SERVICES LLC FF Slab Beam Reinforcement work 100 2
41 ADAM KHAN TECHNICAL SERVICES LLC FF Slab Bottom Layer Reinforcement work 100 2
42 ADAM KHAN TECHNICAL SERVICES LLC FF Slab Top Layer Reinforcement work 100 2
43 Sarah Contracting LLC GF to FF Service Staircase Shuttering Work 100 1
44 Sarah Contracting LLC GF to FF Service Staircase Reinforcement Work 100 1
45 Wimpy Lab Compaction test on site 100 3 site Visit
46 GREEN FUTURE FF Slab MEP WORK (LL Drainaige) 100 1
47 GREEN FUTURE Fire Alaram in FF Slab 100 1
48 Sarah Contracting LLC FF Slab Casting 100 1
49 Sarah Contracting LLC GF to FF Service Staircase Concrete casting 100 1
50 ADAM KHAN TECHNICAL SERVICES LLC FF to RF columns Reinforcement work 100 1
51 ADAM KHAN TECHNICAL SERVICES LLC FF to RF columns Shuttering work 100 1
TOTAL Percentage Prvious Work Done 1ST WEEK 2ND WEEK 3RD WEEK 4TH WEEK 5th WEEK
Sr. No Contractors Name WORK DETAILS (100%) % PERCENTAGE PERCENTAGE PERCENTAGE PERCENTAGE PERCENTAGE
REMARKS

52 ADAM KHAN TECHNICAL SERVICES LLC FF to RF columns Concrete Casting 100 1


53 ADAM KHAN TECHNICAL SERVICES LLC RF slab formwork 100 1
ADAM KHAN TECHNICAL SERVICES LLC / SARAH
54 RF slab Beam reinforcement 100 1
CONTRACTING
ADAM KHAN TECHNICAL SERVICES LLC / SARAH
55 RF slab bottom layer reinforcement 100 1
CONTRACTING
ADAM KHAN TECHNICAL SERVICES LLC / SARAH
56 RF slab top layer reinforcement 100 1
CONTRACTING
57 SARAH CONTRACTING FF TO RF SERVICE STAIRCASE SHUTTERING WORK 100 1
58 SARAH CONTRACTING FF TO RF SERVICE STAIRCASE REINFORCEMENT WORK 100 1
59 GREEN FUTURE RF Slab MEP WORK (LL Drainaige) 100 1
60 GREEN FUTURE Fire Alaram in RF Slab 100 1
61 Sarah Contracting LLC RF Slab Casting 100 1
62 Sarah Contracting LLC FF to RF Service Staircase Concrete casting 100 1
63 Sarah Contracting LLC RF to URF Columns reinforcement work 100 1
64 ADAM KHAN TECHNICAL SERVICES LLC RF to URF Columns shuttering work 100 1
65 Sarah Contracting LLC RF to URF Lift core wall reinforcement work 100 1
66 ADAM KHAN TECHNICAL SERVICES LLC RF to URF Lift core wall shuttering work 100 1
67 Sarah Contracting LLC Ramp Area Backfilling and compaction soil final layer 100 1
68 Sarah Contracting LLC Ramp Area Backfilling and compaction roadbase final layer 100 1
69 GREEN FUTURE plumbing work on SOG for ground floor grade slab 100 1
70 Sarah Contracting LLC RF to URF Columns Concrete casting 100 1
71 Sarah Contracting LLC RF to URF Lift core wall Concrete casting 100 1
72 Sarah Contracting LLC PCC Below Ramp Slab 100 1
73 Sarah Contracting LLC Ground floor grade slab road base final layer compaction 100 1
74 Sarah Contracting LLC Ground floor grade slab road base final layer compaction test 100 1
75 Sarah Contracting LLC Ramp slab reinforcement work 100 1
76 ADAM KHAN TECHNICAL SERVICES LLC Roof slab deshuttering wor 100 1
77 ADAM KHAN TECHNICAL SERVICES LLC upper roof slab formwork 100 1
78 Sarah Contracting LLC upper roof Beam Reinforcement work 100 1
79 Sarah Contracting LLC upper roof Slab Reinforcement work 100 1
80 Sarah Contracting LLC upper roof Slab Concrete casting 100 1
81 Sarah Contracting LLC Ramp slab concrete casting 100 1
82 Sarah Contracting LLC GF Block work layout 100 1
85 ADAM KHAN TECHNICAL SERVICES LLC URF slab Deshuttering 100 0.1 0.85 0.02
83 Sarah Contracting LLC GF Block work 100 0.15 0.2 0.3 0.15
84 Sarah Contracting LLC GF to FF Helical / Main Straircas Block work lay out 100 1
85 Sarah Contracting LLC GF to FF Helical / Main Straircas Shuttering work 100 0.6 0.1 0.2
86 Sarah Contracting LLC Basement floor wall cutting and chasing for MEP works 100 0.25 0.55 0.1
87 Sarah Contracting LLC GF to FF Helical / Main Straircas rebar work 100 0.15
88 Sarah Contracting LLC Cabana footings excavation and compaction 100 1
89 Sarah Contracting LLC PCC Below cabana footing 100 1
90 Sarah Contracting LLC Left elevation Boundary wall Footings Excavation 100 0.5
91 Sarah Contracting LLC Rear elevation Boundary wall Footings Excavation 100 0.5
92 Sarah Contracting LLC FF Block work layout 100 0.5 0.5
93 Sarah Contracting LLC Ramp RCC wall rebar work 100 0.35 0.45
94 Sarah Contracting LLC Ramp RCC wall Shuttering work 100 0.1 0.15
95
96
97
98
TOTAL AMOUNT

Note : Work done percentage shall be consider as per LPO Issued