PROCEDURE
Explanation to the Sketches:
Energized:
120-07-BC-0-001 & 120-07-BC-0-002 110 VDC Supply System Devices UPS 30KVA
NORMAL OPERATION:
1. Close Q001 of both mains and verify it feed Rectifier1(120-07-BC-0-001A) and Rectifier2(120-07-
BC-0-001B)
2. Adjust charging voltage from Rectifier1(120-07-BC-0-001A) and Rectifier2(120-07-BC-0-001B)
3. Close Q004(Q005) and verify that the connected batteries are kept on standby (Float Charge)
4. Close Qxxx(Q003) and make sure output voltages are available
5. Close Q100 & Q200 Distribution 1 and 2 input switches.
6. Close Couple switch Q300 is in close position
The Load sharing is no longer active if one Qxxx(Q003) is open. Indication on Front panel «Load
sharing fault»
Boost charging of 120-07-BC-0-001B can be performed in same manner Vice-Versa.
120-07-UPS-0-001C1 & 120-07-UPS-0-001C2 (Telecom UPS) 15KVA
NORMAL OPERATION:
Normally, the load is supplied from both inverters in parallel/redundant operation via the static
switch EA
Please make sure all breakers positions are as per Normal Operations after
batteries are replaced
120-07-UPS-0-002A Emergency Lighting UPS 15KVA
NORMAL OPERATION:
Concerns Status
Rectifier Mains Available
Q001 Closed
Bypass Mains Available
Q090 Closed
Q050 AUTO Position
Battery Available
Q004(Q005) Closed
Rectifier ON
Inverter ON
Static Switch EN OFF
Output Voltage Available
BATTERY REPLACEMENT PROCEDURE:
Concerns Status
Rectifier Mains Available
Q001 Closed
Bypass Mains Available
Q090 Closed
Q050 AUTO Position
Battery Available
Q004(Q005) Closed
Rectifier ON
Inverter ON
Static Switch EN OFF
Output Voltage Available
BATTERY REPLACEMENT PROCEDURE: