You are on page 1of 2

CANVASS EXEMPTION FORM

Name: JUAN RODRIGO SALITA Date: December 01, 2023


Position: EE & ME Supervisor Project: VRC

Particular/s: 2-sets of Parking Carlifts @ VRC - Basement 2

Reason/s: Upon several attempts of reconciliation with the previous supplier, the work remains incomplete.
We decided to look for other contractors that will complete the full installation of the said parking lifts
however, no other contractors are willing to complete the works done by the previous contractor
because they cannot guarantee the materials and equipmen the latter had used.

Thus, we are seeking approval for the replacement of the existing parking lifts with intent to use
new materials and equipments as recommended by the specialty contractor. Cost implications of the
dismantling of existing equipment is included.

Prepared by: Checked by: Endorsed by: Recommended by: Approved by:

JSS TCP ACD TCP FBF / JGC


Employee CDG Audit Manager CDG Head
SITE INSTRUCTION REFERENCE No. MONITORING

ITEM # DESCRIPTION CONCERN SUBCON REMARKS

Site Instruction # 80 Replacement of SPH from Up-right to Pendent Mc Gentech Builders Corp.

Installation of G.I sheet cover for Busduct run at Should be deducted


Site Instruction # 81 Mc Gentech Builders Corp.
2nd floor to Megapower