TRAINEE’S PROGRESS SHEET

Name : WAHAMIL M. JAMIL Trainer : WAHAMIL M. JAMIL


Nominal
Qualification : Carpentry NC II : 301 hours
Duration
Training Date Date Trainee’s Supervisor’s
Units of Competency Training Activity Rating
Duration Started Finished Initial Initial
Fabricate And Install 1. Used Personal 40 hrs Novemb Decembe Competent
Wooden Stairs protective equipment er 2023 r 2023
(PPE) in accordance
with Rule 1080 of
Occupational Safety
and Health
Standards.
2. Secured the List of
materials, tools and
equipment and
followed according to
job requirements.
3. Prepared
Materials, tools and
equipment are
selected, and
inspected the
consistent with job

Date Developed: Document No. NTTA-TM1-07


November 2023 Issued by:
Date Revised:
CARPENTRY NCII 2023 Page 1 of 8
Developed by: TTPTC
WAHAMIL M. JAMIL
Revision # 01
requirements.
4. Cleaned the
Working area
according to safety
and environmental
regulations
5. Completed the
Required output in
specified by the
immediate supervisor
based on work
schedule.
6. Erected Scaffold
systems and stability
is to ensured based
on work
requirements and
safety standards.
8. Including the
Exact location of
stairs, riser and
thread are marked
based on working
drawings.
9. Marked the Exact
location of handrails
and balusters are
based on working
Date Developed: Document No. NTTA-TM1-07
November 2023 Issued by:
Date Revised:
CARPENTRY NCII 2023 Page 2 of 8
Developed by: TTPTC
WAHAMIL M. JAMIL
Revision # 01
drawings.
10. Fabricate
Wooden stringers and
cut based on working
drawing or actual
requirements.
11. Fixed the Wooden
stringer and thread
in same positioned
and based on
working drawings.
12. Installed the
Handrails and
balusters based on
working drawings.
13. Assembly Wooden
stairs and checked
for stability and
firmness.
14. Prepared Tools
for dismantling and
temporary storage
area.
15. Cleaned and
removed the Scaffold
components are
sorted and stored
Date Developed: Document No. NTTA-TM1-07
November 2023 Issued by:
Date Revised:
CARPENTRY NCII 2023 Page 3 of 8
Developed by: TTPTC
WAHAMIL M. JAMIL
Revision # 01
accordingly for re-use
16. Excess/un-used
materials are
recovered and
stockpiled according
to company rules and
procedures.
17. Cleaned the
Working area
according to safety
and environmental
regulations.
18. Cleaned the Tools
and other materials
after using.

1.Prepare materials,
tools and equipment
2.Erect scaffolds
3.Layout location and
stair elevation
4.Place wooden
stringer, threads,
handrails and baluster
5.Dismantle scaffolds

Date Developed: Document No. NTTA-TM1-07


November 2023 Issued by:
Date Revised:
CARPENTRY NCII 2023 Page 4 of 8
Developed by: TTPTC
WAHAMIL M. JAMIL
Revision # 01
6.Perform housekeeping
Note: The trainee and the supervisor must have a copy of this form. The column for rating maybe used either by giving a numerical rating
or simply indicating competent or not yet competent. For purposes of analysis, you may require industry supervisors to give a numerical
rating for the performance of your trainees. Please take note however that in TESDA, we do not use numerical ratings

Date Developed: Document No. NTTA-TM1-07


November 2023 Issued by:
Date Revised:
CARPENTRY NCII 2023 Page 5 of 8
Developed by: TTPTC
WAHAMIL M. JAMIL
Revision # 01