Worksheet for Dye Penetrant Examination

Information Supplied by Client

Client : CLP Power Hong Kong Ltd.


Client Address : GED Office, Black Point Power Station, Yung Long Road,
Lung Kwu Tan, Tuen Mun, N.T., Hong Kong
Project : Provision of Specialized Service - NDT
Location of test : Black Point Power Station Unit: C7 Plant: Turbine
Component description : Diffuse Casing Deflector Bottom Side
Welding process : M.M.A.W
Component Material : Steel
Acceptance Standard : All indications to be reported
Outline Agreement :
P.O. Number :

Laboratory Information
Date tested : 29-11 & 11-12-2023
Inspection procedure : MI-17.5.1-N019
Surface condition : As Smooth, Dry and clean
Viewing condition: :: ( ³1000 Lux) Artificial Light
Pre-cleaning : Cleaning the surface with clean cloths & rag

Equipment ID. & Consumable Use :-


- Penetrant : SHERWIN DP-50
- Remover : SHERWIN DR-60
- Developer : SHERWIN D-100

Remarks : 1. All test results are as at time of testing.


2. All test locations are as directed by the client.
3. See the attached sketch for test locations.

Results Summary:
Parts with deviation :
Parts with no deviation : :
Remarks :

NT-R-78 (25/10/2008) P.1


Lab Code No. : CNT Page 2 of 5
Report No. : 0

Worksheet for Dye Penetrant Examination

Test Results

Description of Test Item : C7 Turbine - Diffuse Casing Deflector


Item Location Tested Indication No. Assessment Remark
East Wall - Bottom Side
PIN A 100% Weld Tested #1 50mm in length of crack
#2 40mm in length of crack
#3 25mm in length of crack
Area A 100% Weld Tested -- No Recordable Indication
Area B 100% Weld Tested #1 90mm in length of crack
#2 75mm in length of crack
Area C 100% Weld Tested -- No Recordable Indication
Area D 100% Weld Tested #1 180mm in length of crack
#2 65mm in length of crack
#3 60mm in length of crack
Area E 100% Weld Tested #1 150mm in length of crack
#2 200mm in length of crack
Area F 100% Weld Tested #1 55mm in length of crack
Area G 100% Weld Tested #1 120mm in length of crack
Area H 100% Weld Tested #1 130mm in length of crack

West Wall - Bottom Side


PIN A 100% Weld Tested #1 60mm in length of crack
#2 40mm in length of crack
Area A 100% Weld Tested #1 95mm in length of crack
Area B 100% Weld Tested -- No Recordable Indication
Area C 100% Weld Tested -- No Recordable Indication
Area D 100% Weld Tested #1 200mm in length of crack
#2 200mm in length of crack
Area E 100% Weld Tested #1 90mm in length of crack
#2 60mm in length of crack
Area F 100% Weld Tested -- No Recordable Indication
Area G 100% Weld Tested -- No Recordable Indication
Area H 100% Weld Tested #1 140mm in length of crack

29-11 & 11-


Tested by : C.W.Kung Qualification : ASNT-SNT-TC-1A-Level II Date : 12-2023

Authorized by : Position : Manager - NDT Welding Date :


ASNT-PT-Level 3

NT-R-78 (25/10/2008) P.2


Lab Code No. : CNT Page 3 of 5
Report No. : 0

Worksheet for Dye Penetrant Examination

Test Results

Description of Test Item : C7 Turbine - Diffuse Casing Deflector


Item Location Tested Indication No. Assessment Remark
East Wall - Bottom Side
PIN A #1 to #3 -- No Recordable Indication (After Repaired)
Area B #1 & #2 -- No Recordable Indication (After Repaired)
Area D #1 to #3 -- No Recordable Indication (After Repaired)
Area E #1 & #2 -- No Recordable Indication (After Repaired)
Area F #1 -- No Recordable Indication (After Repaired)
Area G #1 -- No Recordable Indication (After Repaired)
Area H #1 -- No Recordable Indication (After Repaired)

West Wall - Bottom Side


PIN A #1 & #2 -- No Recordable Indication (After Repaired)
Area A #1 -- No Recordable Indication (After Repaired)
Area D #1 & #2 -- No Recordable Indication (After Repaired)
Area E #1 & #2 -- No Recordable Indication (After Repaired)
Area H #1 -- No Recordable Indication (After Repaired)

**End**

29-11 & 11-


Tested by : C.W.Kung Qualification : ASNT-SNT-TC-1A-Level II Date : 12-2023

Authorized by : Position : Manager - NDT Welding Date :


BABU, Vinodh Kumar ASNT-PT-Level 3

NT-R-78 (25/10/2008) P.2


Lab Code No. : CNT Page 4 of 5
Report No. : 0

Worksheet for Dye Penetrant Examination

C7 Turbine - Diffuse Casing Deflector

Area A Area B Area A Area B

PIN A PIN A

Area C Area F Area C


PIN C PIN B Area F
PIN E PIN C PIN B
PIN D PIN E
PIN D
Area D Area E Area D Area E

East Wall - Top Side (Area A to F) West Wall - Top Side (Area A to F)

#3 #1
#2 #1 #1

Area A Area B Area A Area B

PIN A #1 PIN A
#4 #2 #1 #2 #2
#1 #2 #1

Area C Area F Area C Area F


PIN C PIN B PIN C PIN B
PIN E PIN E
PIN D PIN D

Area D Area E Area D Area E

#2
#3 #2 #1
#1
East Wall - Bottom Side (Area A to F) West Wall - Bottom Side (Area A to F)

Indication Location for Diffuse Casing Deflector for East Wall - Bottom Side (PIN A, Area B,D,E & F )
and West Wall - Bottom Side (PIN A, Area A, D & E)

Remark : This sketch is not in scale.


Tested Area
Indication Location

NT-R-78 (25/10/2008) P.3


Lab Code No. : CNT Page 5 of 5
Report No. : 0

Worksheet for Dye Penetrant Examination

C7 Turbine - Diffuse Casing Deflector

T op S ide

E ast S ide W est S ide A rea C Area E

B ottom S ide

A rea H Area G
A rea D Area F

A rea G Area H Area C


A rea E
A rea F Area D

East Wall - Top Side (Area G & H) West Wall - Top Side (Area G & H)

Area D Area F
Area C Area E
Area G Area G

#1
Area F Area D Area H
Area H

#1
#1

Area C
Area E

East Wall - Bottom Side (Area G & H) West Wall - Bottom Side (Area G & H)

Indication Location for Diffuse Casing Deflector for East Wall - Bottom Side (Area G & H)
and West Wall - Bottom Side (Area H )

Remark : This sketch is not in scale.


Tested Area
Indication Location

NT-R-78 (25/10/2008) P.3