This document summarizes the quantities of concrete and rebar needed for the foundations, columns, and beams/slabs of a building. It lists the volumes of different strength concrete required for each foundation element, as well as the kilograms of rebar. The totals show over 68 cubic meters of C16/20 concrete, 4.5 cubic meters of C8/10 concrete, and over 3,800 kilograms of BSt500S rebar will be needed, with 10% added for losses.
This document summarizes the quantities of concrete and rebar needed for the foundations, columns, and beams/slabs of a building. It lists the volumes of different strength concrete required for each foundation element, as well as the kilograms of rebar. The totals show over 68 cubic meters of C16/20 concrete, 4.5 cubic meters of C8/10 concrete, and over 3,800 kilograms of BSt500S rebar will be needed, with 10% added for losses.
This document summarizes the quantities of concrete and rebar needed for the foundations, columns, and beams/slabs of a building. It lists the volumes of different strength concrete required for each foundation element, as well as the kilograms of rebar. The totals show over 68 cubic meters of C16/20 concrete, 4.5 cubic meters of C8/10 concrete, and over 3,800 kilograms of BSt500S rebar will be needed, with 10% added for losses.
Fundatii Bet egalizare 4.50 mc C8/10 Talpa fundatii 22.50 mc C16/20 Soclu de beton 25.65 mc C16/20 Placa de beton cota 0.00 10.00 mc C16/20 Armatura 2481 kg BSt500S
Stalpi Vol beton 3.1 mc C16/20 Armatura 458 kg BSt500S
Grinzi si centuri peste parter
Vol beton 6.9 mc C16/20 Armatura 921 kg BSt500S
Cant. Pierderi 10%
Total beton C16/20 68.11 6.81 Total beton C8/10 4.50 0.45 Total Armatura BSt500S 3860.00 386.00