The document provides a status update of 7 drawing reviews from SBDE. The reviews range from 1 to 79 days in progress and are all currently marked as "Not Done". The drawings include proposed ROB structures, minor bridges, box culverts, and bearing/joint designs. Most reviews are still undergoing with remarks like "Under Review" or additional data needed.
The document provides a status update of 7 drawing reviews from SBDE. The reviews range from 1 to 79 days in progress and are all currently marked as "Not Done". The drawings include proposed ROB structures, minor bridges, box culverts, and bearing/joint designs. Most reviews are still undergoing with remarks like "Under Review" or additional data needed.
The document provides a status update of 7 drawing reviews from SBDE. The reviews range from 1 to 79 days in progress and are all currently marked as "Not Done". The drawings include proposed ROB structures, minor bridges, box culverts, and bearing/joint designs. Most reviews are still undergoing with remarks like "Under Review" or additional data needed.
Sl. No. Description of Drawings Pkg. No. Review Date Age in Days Remark date Review SSI Rerport of Proposed ROB at Km. 1 RI-3 28-09-2023 Not Done 16-12-2023 79 Data for Dwg. Sl. No. 4 18+740 Bore log data & DPR Drawings for Gave reply for RI-5 MNB 17+588 (48 2 the Review of Minor Bridge 2+600, RI-6 16-11-2023 Not Done 16-12-2023 30 m span) to this mail 5+858 & 8+104 Working Drawing of Major Bridge 3 RI-6 28-11-2023 Not Done 16-12-2023 18 Resent after proof checking (CH.06+894) 4 GAD for ROB at Km. 18+740 RI-3 04-12-2023 Not Done 16-12-2023 12 Under Review Test Pile Drawing for minor bridge 5 RI-3 06-12-2023 Not Done 16-12-2023 10 Under Review 14+390 Working Drawings for the Box 6 RI-4 15-12-2023 Not Done 16-12-2023 1 Under Review culvert at km 4+511/ km 4+480 Bearing & Exp. Joints 7 manufacturer's design and RI-4 15-12-2023 Not Done 16-12-2023 1 Under Review drawings.