Professional Documents
Culture Documents
Juniad Quotation
Juniad Quotation
CONSTRUCTION
Date: 12/06/23
Construction quotation for grey structure:
Covered area =3450sq.ft. approx.
Approximate cost = Rs.7935000/-
Rate: Rs.2300/sq.ft.
Excavation:
Excavation of foundations and backfilling with
compaction as per drawings.
Foundation:
Strip foundation, steel reinforcement and concrete
ratio as per drawings.
Structure:
As per drawings, B.B work with 1:6 cm,
R.C.C columns and tie beams with 1:2:4 in structure.
Roofs:
R.C.C slabs reinforcement and concrete ratio as per
drawings.
Plasters:
Inside with 1:6 cm and outside with 1:5 cm.
Electrification:
Concealed Turk plast conduits or equivalent.
Page-1/3
E-mail: junaid.ibrahim76@gmail.com, Address: shop no-3, 1st floor cantt market Kohat
BIN JUNAID
CONSTRUCTION
Plumbing:
• Master or equivalent PPR pipes & fittings inside
washrooms.
• Master or equivalent Upvc pipes & fittings inside
washrooms.
Floors:
Well compacted earth with 3”PCC 1:4:8, 2” PCC 1:2:4
And termite treatment.
Building materials:
A-quality 40 grade steel.
Fouji cement or equivalent.
Peshawar A class brick.
Regards,
Junaid Ahmed
0333-9619110
Page-2/3
E-mail: junaid.ibrahim76@gmail.com, Address: shop no-3, 1st floor cantt market Kohat
BIN JUNAID
CONSTRUCTION
9”brick wall:
Rate: Rs.400/sq.ft.
As per drawings with DPC and two sides plaster.
4 ½”brick wall:
Rate: Rs.360/sq.ft.
As per drawings with DPC and two sides plaster.
Concrete in open areas:
Rate: Rs.160/sqft.
Well compected earth, 3” thick PCC 1:4:8
and 2” thick PCC 1:2:4.
Regards,
Junaid Ahmed
0333-9619110
Page-3/3