You are on page 1of 1

Document Number

SWPLP001/019
Revision Number
SAFE WORK PROCEDURE FOR INSTALLATION OF LIGHTNING PROTECTION 001
Date
17 OCT 2019

WRITTEN BY REVIEWED BY APPROVED BY


NAME G PANKHURST
SIGNATURE EMBALENHLE SDS OFFICES
DATE WRITTEN 17 OCT 2019 Document No
REVIEW DATE 17 OCT 2020 Contract No

HAZARD IDENTIFIED AS PER ABOVEMENTIONED BOUNDARY


RISK CURRENT AND PROPOSED ACTIONS
ACTIVITY HAZARD

 Installation of earth rods  Unsafe tools.  Injury to employees  Set standards of tools to be bought by buying
 Damage to property department.
 Checklists.
 Feedback from site regarding standard of tools

 Installation of Earthing cable  Excavations  Injury to employees  Do excavation checks.


 DSTI
 Register to be kept up to date with inspections

 Installation of conduit  Heights  Falling from heights  Working on heights competency.


 Fatality  Harness checklist
 Keep record of training.
 Keep record of checklists.
 DSTI

 Hand tools
 Hand tools falling  Injury to employee  Ensure all employees using equipment are trained.
 Damage to equipment  Attach tools to bag.
 Keep record of all training

Doc Creation Date Revision Number Review Date Document Number Page Number
17/10/2019 001 17/10/2020 SWPLP001/019 Page 1 of 1
This document was drawn up & is the property of Phoenix Safety Consultants.

You might also like