You are on page 1of 16

LEED Report January & February 2019

Contents
1 Introduction .......................................................................................................................... 2
2 Scope of Works ..................................................................................................................... 2
3 LEED documentation submission ......................................................................................... 2
4 Implementation ..................................................................................................................... 3
4.1 Pollution Prevention ................................................................................................................ 3
5 Progress Photographs ........................................................................................................... 3
6 Monitoring during this month .............................................................................................. 3

Table 1 : LEED documentation submission summary ............................................................................. 2

ANNEXURE A: PROGRESS PHOTOGRAPHS


ANNEXURE B: ENVIRONMENTAL MANAGEMENT AND MONITORING WEEKLY JOIN INSPECTION
SHEET

China Harbour Engineering Company Ltd Havelock City Colombo, ‐ Office & Shopping Mall
LEED Report January & February 2019

1 Introduction

The Havelock City Commercial Development project site is located in Colombo 05, Sri Lanka,
bordering the main Havelock road. The site less than 10km away from the Colombo city center.

Project is to develop an office tower of 49 stories high and a shopping Mall of 5 stories high,
in addition, there are two basements for car parks.

The Office Tower provides premium office space and is designed to be a LEED certified
building and will be built to the highest standards. The Shopping center is developed as a
community level shopping mall serving the lifestyle needs of the catchment. The mega mall
comprises five floors of leading brands and retail stores, dining and entertainment experiences
amidst a state-of-the-art multiplex cinema.

2 Scope of Works

The Works to be executed under the Contract include but are not limited to the construction,
completion and maintenance of the proposed commercial development comprising of an office
tower 49 stories high with a gross floor area of approximately 73,000sq.m, and a shopping Mall
of 5 stories high, covering an area of approximately 26,000sq .m. In addition, there will be two
basements for car parks totaling approximately 33,000sq.m for the use of approximately 750
car parking slots.

3 LEED documentation submission

Erosion and Sedimentation Control Plan has been submitted for review and consent. Erosion
and Sedimentation Control Plan submission details are given in following table.

Table 1 : LEED documentation submission summary

Engineer’s
No. Version Ref. No Submitted date Consent Consent Date
status

Erosion and Sedimentation CHEC/HLCP/01.21/


01 18-July-2018
Control Plan O/000221

China Harbour Engineering Company Ltd Havelock City Colombo, ‐ Office & Shopping Mall
LEED Report January & February 2019

4 Implementation

4.1 Pollution Prevention

During the reporting period following measures were taken at site to prevent pollution and
erosion

 Currently sum pits are using for as a sedimentation tank.


 Contractor has been working on a procedure for waste management to address the waste,
controlling on site and office. After finalizing the draft construction waste management
plan (CWMP) by CHEC, will issue to the Engineer for his review.
 For surface water drain out, it has been improved the drainage system to flow out the water
to sump pits on identifying locations during the excavation
 To prevent loss of soil during construction by storm water runoff and wind erosion,
excavated topsoil is stock piled before transportation for reuse, stock pile is covered with
mesh for further protection.
 Wheels of the vehicles going out of the site are washed in a washing bay before exiting
the site as measures to minimize the environment pollution issues in the adjacent roads.
 Soil transporting vehicles trailers are covered with polyethylene sheets while
transportation in order to control air pollution with dust and particulate matter.
 Water spraying on roads (internal and gate areas) and site area were carried out as dust
control measure.
 Periodical monitoring and site inspection have been carried out.

5 Progress Photographs

Progress photographs for month of January & February 2019 is shown in Annexure A

6 Monitoring during this month

According to the maintenance schedule of Erosion and Sedimentation Control Plan,


following criterion were monitored at site and office during the reporting period.

 Stabilized Area
 Street Sweeping
 House Keeping
 Dust Control
 Toilet (de sludge)
Above mention items has been covered up through a checklist shown in Annexure B

China Harbour Engineering Company Ltd Havelock City Colombo, ‐ Office & Shopping Mall
LEED Report January & February 2019

ANNEXURE A
PROGRESS PHOTOGRAPHS

China Harbour Engineering Company Ltd Havelock City Colombo, ‐ Office & Shopping Mall
LEED Report January & February 2019

Havelock

Location
road
entrance

Reuse of dewatering water for wheels washing at washing bay to prevent air
Description
pollution from dust and particulate matter

Location

Site Limit

Protecting excavated slopes by covering to prevent loss of soil by storm water runoff
Description
and wind erosion

China Harbour Engineering Company Ltd Havelock City Colombo, ‐ Office & Shopping Mall
LEED Report January & February 2019

Location
Site Limit

Protecting excavated slopes by covering to prevent loss of soil by storm


Description
water runoff and wind erosion

Location

Site Limit

Protecting excavated slopes by covering to prevent loss of soil by storm


Description
water runoff and wind erosion

China Harbour Engineering Company Ltd Havelock City Colombo, ‐ Office & Shopping Mall
LEED Report January & February 2019

Location
Site Limit

Description B2 Sump pit used as temporary sediment trap

Location

Site Limit

Description Routine cleaning silt from sediment trap

China Harbour Engineering Company Ltd Havelock City Colombo, ‐ Office & Shopping Mall
LEED Report January & February 2019

Location
Site Limit

Description Water spraying in the site roads for dust control

Location

Site Limit

Description Water spraying in the site roads for dust control

China Harbour Engineering Company Ltd Havelock City Colombo, ‐ Office & Shopping Mall
LEED Report January & February 2019

Location
Site Limit

Description Reuse of silt collected in sedimentation tank for backfill for temporary site access

Havelock
Location

road
entrance

Description Reuse of silt collected in sedimentation tank for backfill for temporary site access

China Harbour Engineering Company Ltd Havelock City Colombo, ‐ Office & Shopping Mall
LEED Report January & February 2019

Havelock

Location
road
entrance

Reuse of dewatering water for wheels washing at washing bay to prevent air
Description
pollution from dust and particulate matter

Havelock
Location

road
entrance

Reuse of dewatering water for wheels washing at washing bay to prevent air pollution
Description
from dust and particulate matter

China Harbour Engineering Company Ltd Havelock City Colombo, ‐ Office & Shopping Mall
LEED Report January & February 2019

Location
Site Limit

Description Soil transporting dump truck trailers covered to prevent air pollution with dust

Site Limit
Location

Description Soil transporting dump truck trailers covered to prevent air pollution with dust

China Harbour Engineering Company Ltd Havelock City Colombo, ‐ Office & Shopping Mall
LEED Report January & February 2019

ANNEXURE B
ENVIRONMENTAL MANAGEMENT AND
MONITORING WEEKLY JOIN INSPECTION
SHEET

China Harbour Engineering Company Ltd Havelock City Colombo, ‐ Office & Shopping Mall