1 Introduction .......................................................................................................................... 2
2 Scope of Works ..................................................................................................................... 2
3 LEED documentation submission ......................................................................................... 2
4 Implementation ..................................................................................................................... 3
4.1 Pollution Prevention ................................................................................................................ 3
5 Progress Photographs ........................................................................................................... 3
6 Monitoring during this month .............................................................................................. 3
China Harbour Engineering Company Ltd Havelock City Colombo, ‐ Office & Shopping Mall
LEED Report January & February 2019
1 Introduction
The Havelock City Commercial Development project site is located in Colombo 05, Sri Lanka,
bordering the main Havelock road. The site less than 10km away from the Colombo city center.
Project is to develop an office tower of 49 stories high and a shopping Mall of 5 stories high,
in addition, there are two basements for car parks.
The Office Tower provides premium office space and is designed to be a LEED certified
building and will be built to the highest standards. The Shopping center is developed as a
community level shopping mall serving the lifestyle needs of the catchment. The mega mall
comprises five floors of leading brands and retail stores, dining and entertainment experiences
amidst a state-of-the-art multiplex cinema.
2 Scope of Works
The Works to be executed under the Contract include but are not limited to the construction,
completion and maintenance of the proposed commercial development comprising of an office
tower 49 stories high with a gross floor area of approximately 73,000sq.m, and a shopping Mall
of 5 stories high, covering an area of approximately 26,000sq .m. In addition, there will be two
basements for car parks totaling approximately 33,000sq.m for the use of approximately 750
car parking slots.
Erosion and Sedimentation Control Plan has been submitted for review and consent. Erosion
and Sedimentation Control Plan submission details are given in following table.
Engineer’s
No. Version Ref. No Submitted date Consent Consent Date
status
China Harbour Engineering Company Ltd Havelock City Colombo, ‐ Office & Shopping Mall
LEED Report January & February 2019
4 Implementation
During the reporting period following measures were taken at site to prevent pollution and
erosion
5 Progress Photographs
Progress photographs for month of January & February 2019 is shown in Annexure A
Stabilized Area
Street Sweeping
House Keeping
Dust Control
Toilet (de sludge)
Above mention items has been covered up through a checklist shown in Annexure B
China Harbour Engineering Company Ltd Havelock City Colombo, ‐ Office & Shopping Mall
LEED Report January & February 2019
ANNEXURE A
PROGRESS PHOTOGRAPHS
China Harbour Engineering Company Ltd Havelock City Colombo, ‐ Office & Shopping Mall
LEED Report January & February 2019
Havelock
Location
road
entrance
Reuse of dewatering water for wheels washing at washing bay to prevent air
Description
pollution from dust and particulate matter
Location
Site Limit
Protecting excavated slopes by covering to prevent loss of soil by storm water runoff
Description
and wind erosion
China Harbour Engineering Company Ltd Havelock City Colombo, ‐ Office & Shopping Mall
LEED Report January & February 2019
Location
Site Limit
Location
Site Limit
China Harbour Engineering Company Ltd Havelock City Colombo, ‐ Office & Shopping Mall
LEED Report January & February 2019
Location
Site Limit
Location
Site Limit
China Harbour Engineering Company Ltd Havelock City Colombo, ‐ Office & Shopping Mall
LEED Report January & February 2019
Location
Site Limit
Location
Site Limit
China Harbour Engineering Company Ltd Havelock City Colombo, ‐ Office & Shopping Mall
LEED Report January & February 2019
Location
Site Limit
Description Reuse of silt collected in sedimentation tank for backfill for temporary site access
Havelock
Location
road
entrance
Description Reuse of silt collected in sedimentation tank for backfill for temporary site access
China Harbour Engineering Company Ltd Havelock City Colombo, ‐ Office & Shopping Mall
LEED Report January & February 2019
Havelock
Location
road
entrance
Reuse of dewatering water for wheels washing at washing bay to prevent air
Description
pollution from dust and particulate matter
Havelock
Location
road
entrance
Reuse of dewatering water for wheels washing at washing bay to prevent air pollution
Description
from dust and particulate matter
China Harbour Engineering Company Ltd Havelock City Colombo, ‐ Office & Shopping Mall
LEED Report January & February 2019
Location
Site Limit
Description Soil transporting dump truck trailers covered to prevent air pollution with dust
Site Limit
Location
Description Soil transporting dump truck trailers covered to prevent air pollution with dust
China Harbour Engineering Company Ltd Havelock City Colombo, ‐ Office & Shopping Mall
LEED Report January & February 2019
ANNEXURE B
ENVIRONMENTAL MANAGEMENT AND
MONITORING WEEKLY JOIN INSPECTION
SHEET
China Harbour Engineering Company Ltd Havelock City Colombo, ‐ Office & Shopping Mall