PERMIT KEBENARAN MASUK

Tidak termasuk Pejabat Kawasan

No. Rujukan Status


PTE/2023/9327 Approved
Rujukan

(A) REQUESTER DETAILS


Nama* No. Pekerja
Stanely Gunsalam 90000253
*
Division * Department
Bahagian Penjanaan GX ASSET OPERAT
*
Position * Gred *
Penolong Jurutera (E07/08) E09
No. Tel Emel
­ stanelyg@sesb.com.my
Pejabat
No. Tel
0135507456
Bimbit

Name list of Person(s) to Enter :


Name Dept. / Company : Staff / IC No. :

KHAIRUL AZMI B.KHAIRUDDIN QALIFAH ENTERPRISE 900929125333

Mohd Ridzwan Bin Jusidin QALIFAH ENTERPRISE 960517­12­6481

Click on the link below to download the PTE Name List Sample file:

PTE Name list Sample File

Note: The download attribute is not supported in Edge version 12, IE, Safari 10 (and earlier), or Opera version 12 (and earlier).

List of Vehicle(s) :
Vehicle No Vehicle Type

SYZ 4307 PERODUA BEZZA

Click on the link below to download the PTE Vehicle List Sample file:

PTE Vehicle List Sample File

Note: The download attribute is not supported in Edge version 12, IE, Safari 10 (and earlier), or Opera version 12 (and earlier).

Enter Time & Date :


From To

 09 Jan 2024 08:00  09 Jan 2024 17:00

(B) ENTRANCE DETAILS & PURPOSE


Activity / Purpose :
Kerja­kerja pembersihan stesen (Meracun Rumput) oleh kontraktor JHT

(C) LOCATION DETAILS


Location (SJ / PMU / PPU / SO/
SJ
HR / ICT):
SJ Area / Station
Generation Asset Operation

SJ Sub Area / Sub Station


SJ Ranau

SJ Inspection Type
External

Info! Inspection Type :


Internal : Security checking by Polis Bantuan SESB prior entering to site.

External : Security checking by Security Guard prior entering to site. (kindly bring along copy of approved PTE for checking).
Info! Inspection Type :
Internal : Security checking by Polis Bantuan SESB prior entering to site.

External : Security checking by Security Guard prior entering to site. (kindly bring along copy of approved PTE for checking).

Area To Enter Battery Room Cable Cellar Communication Room Control Room
LVAC Room Office Switchgear Room Switchyard
Others
Station Compound

(D) PERSONAL PROTECTION EQUIPMENT (PPE) Details


PPE Required
Safety Shoes

Head Protection (Helmet)

PPE Required (Optional)


Eyes, ears or face protection Hands Protection Head Protection (Helmet) Safety Belt or Harness
Safety Shoes
Others

(E) SAFETY RULES & SAFETY CLEARANCE


The visitor shall take note that work inside SESB premises which are LIVE and DANGEROUS shall be in accordance with SESB SAFETY
REGULATIONS and the Safety Laws of Malaysia.

I/We Staff No.

Stanely Gunsalam 90000253

hereby agree and understand the general guideline stated and will ensure visitors to abide and obey the SESB Safety Regulations and the
Safety Laws of Malaysia. All information stated is true, based on the information given to the applicant.

The approval to enter the premises are not relief the visitor’s responsibility of observing and take necessary precaution for
him/herself and those under his/her charge all safety measure.

To be completed by Polis Bantuan / Pengawal Keselamatan

(F) INSPECTION BY SECURITY (EXTERNAL)


Approval Yes No Vehicle Yes No
Permit: Check
Registration Before:
Yes No
at Security Vehicle Yes No
Post: Check After:
PPE Yes No COVID 19 Yes No
Inspection: Compliance:

Comment External:

Checked By : Polis Bantuan ­ Security Officer / Guard

GENERAL GUIDELINES FOR VISITOR TO ENTER SITE ON EXISTING SESB HIGH VOLTAGE SUBSTATIONS

The following guidelines are meant for the smooth and safe operation in carrying out any works in and around the main intake
live substations

1. Notification of shutdown The contractor shall keep the site on which he erects, or
stores, reasonably clean, removing all work materials
Any interfacing work and any work involving the shutdown of resulting from the work as it accumulated. On completion of
the daily operation of SESB equipment must be proposed in the work, the site shall be left clean and tidy to the
writing to Jabatan Perancangan Operasi, Bah. Sistem satisfaction of the engineer. Any damage to buildings,
Operasi for consideration and further action at least ten (10) structures, switchyard stone chipping contaminated by earth
working days in advance, except for emergency case, which and plant or property belonging to SESB shall be made
will be considered on case by case basis. good by contractor. Packing materials, cement bags,
polystyrene lunch boxes and other loose materials, which
2. Security Arrangement
may be dispersed by wind or animal, must be disposed off
Checked By : Polis Bantuan ­ Security Officer / Guard

GENERAL GUIDELINES FOR VISITOR TO ENTER SITE ON EXISTING SESB HIGH VOLTAGE SUBSTATIONS

The following guidelines are meant for the smooth and safe operation in carrying out any works in and around the main intake
live substations

1. Notification of shutdown The contractor shall keep the site on which he erects, or
stores, reasonably clean, removing all work materials
Any interfacing work and any work involving the shutdown of resulting from the work as it accumulated. On completion of
the daily operation of SESB equipment must be proposed in the work, the site shall be left clean and tidy to the
writing to Jabatan Perancangan Operasi, Bah. Sistem satisfaction of the engineer. Any damage to buildings,
Operasi for consideration and further action at least ten (10) structures, switchyard stone chipping contaminated by earth
working days in advance, except for emergency case, which and plant or property belonging to SESB shall be made
will be considered on case by case basis. good by contractor. Packing materials, cement bags,
polystyrene lunch boxes and other loose materials, which
2. Security Arrangement
may be dispersed by wind or animal, must be disposed off
To submit manpower and vehicle lists for the duration of the promptly and properly on a daily basis.
works at the substation. Site staff shall have legal
10. Vehicles in High Voltage Zones
identification documents (e.g Company ID). All site
personnel and vehicles will be subjected to security checks. No vehicles are allowed to move about, load or unload in a
The site personnel shall register themselves at SESB High Voltage Zone except approved by the Person in
security gate and obtain a day­pass, which will be valid for a Charge of the zone. Where cranes or other equipment such
whole day. This pass must be surrendered to the security as platform scaffolding are taken into or out of a substation
guard at the end of each working day. or switching station, the route to be followed shall be agreed
and defined on site by the Authorized Person. The limits of
3. Competent Person for Safety and Health Aspect
operation of such equipment shall be defined by the
To station a EC registered competent person at the Authorized Person to the EC Competent Person in charge of
substation to ensure that works are carried out with due the work and thereafter the equipment shall be erected or
care and follow proper safety and health procedures. This is moved within this limits under the direct supervision of the
to avoid any damages to existing plant equipment and to EC Competent Person in charge of the work.
cause danger to human lives. The competent person must
11. Access to Confined Space
be present throughout the period during which any person
engaged in the work is at the work sites within the No person shall enter any confined space without the
substation. All contractor need to submit C.V of the consent of an Authorized Person. Smoking and exposed
competent person for SESB reviews and approval. flames are prohibited in such places. Where dangerous
fumes are liable to be present, these precautions shall
4. Discipline
include testing for by means of an approved detector. When
All site staff shall behave themselves by not loitering around one or more persons are required to enter or work in any
the substation. They should observe the SESB safety rules confined space having a restricted access, an extra person
and regulations. Misbehaved personnel will be removed shall be kept on duty outside the confined space and such
from site by the security guard. person shall keep in touch with those inside the confined
space. Where artificial ventilation or breathing apparatus is
5. Legally­registered Site Staff required, they must be provided by the person in charge.

The contractor shall employ site staff with proper work 12. Day to day works schedule
passes and legal documents.
SESB has no objection to the contractor staff working extra
6. Temporary site office, water, electricity supply and hours outside normal working hours. However, the
toilets. contractor has to submit day­to­day work schedule for SESB
information and security arrangement.
These are the responsibilities of the contractor. The
contractor shall apply to Jabatan Air and SESB for water 13. Existing security fences
electricity supplies respectively.
For security reasons, the contractor shall not remove any
7. Designated equipment storage­areas existing boundary fences until new boundary fences are
erected.
Generally the contractor shall have his own store outside
the substation for storage of his project materials. The 14. Site supervisor
contractor shall only be allowed to bring equipment and
materials which are to be erected and used very soon after, The supervisor on site shall be identified and his contact
in which case these equipment or materials would only be number be made known to SESB. He shall be responsible
stored for a short time at the designated areas approved by for the contractor’s workmen on site.
SESB. These shall be indicated clearly in the substation
15. Site personnel
layout drawing for SESB perusal and approval. The short­
term storage of plant equipment and materials at the site Only personnel specifically engaged in this project may be
shall be at the risks of the owner/contractor. The permitted access to the substation compound and building
contractor/owner shall provide any necessary protection under contractor’s supervision following prior arrangement
and watchman to safeguard the equipment and materials in with SESB.
the areas allocated to him.
16. Any other safety condition
8. Demarcation of Construction Areas
Any other safety condition will may be imposed from time to
The contractor shall demarcate the working areas such that time.
there is no hindrance of access for SESB normal
maintenance. Danger sign and safety notices must be in 17. Contravention of above conditions
Any other safety condition will may be imposed from time to
The contractor shall demarcate the working areas such that time.
there is no hindrance of access for SESB normal
maintenance. Danger sign and safety notices must be in 17. Contravention of above conditions
Bahasa Melayu and English. These areas shall be indicated
clearly in the switchyard layout drawings for SESB perusal If at any time contractor is found not complying with the
and approval. The contractor site staffs are not allowed to above condition permission to enter site shall be
work outside the demarcated area, which are LIVE and immediately revoked and the contractor must leave the site
DANGEROUS. until he has complied with the aforesaid condition(s).

9. Good Housekeeping

The site staffs are not allowed to use SESB toilets, water,
etc. no cooking and littering are allowed.

NOTIS PERINGATAN : LANGKAH KAWALAN DAN PENCEGAHAN JANGKITAN COVID­19

Sebagai langkah kawalan dan pencegahan jangkitan COVID­19 dikalangan warga kerja, semua warga kerja adalah dikehendaki
mematuhi SOP yang telah dikeluarkan oleh Pihak Pengurusan.

1. KERAP MEMBASUH TANGAN

Any interfacing work and any work involving the shutdown of the daily operation of SESB equipment must be proposed in writing to
Jabatan Perancangan Operasi, Bah. Sistem Operasi for consideration and further action at least ten (10) working days in advance,
except for emergency case, which will be considered on case by case basis.

2. PENJARAKAN SOSIAL

To submit manpower and vehicle lists for the duration of the works at the substation. Site staff shall have legal identification documents
(e.g Company ID). All site personnel and vehicles will be subjected to security checks. The site personnel shall register themselves at
SESB security gate and obtain a day­pass, which will be valid for a whole day. This pass must be surrendered to the security guard at
the end of each working day.

3. GUNAKAN PELITUP MUKA (FACE MASK)

To station a EC registered competent person at the substation to ensure that works are carried out with due care and follow proper
safety and health procedures. This is to avoid any damages to existing plant equipment and to cause danger to human lives. The
competent person must be present throughout the period during which any person engaged in the work is at the work sites within the
substation. All contractor need to submit C.V of the competent person for SESB reviews and approval.

ELAKKAN :­

4. TEMPAT YANG SESAK (CROWDED PLACES)

All site staff shall behave themselves by not loitering around the substation. They should observe the SESB safety rules and
regulations. Misbehaved personnel will be removed from site by the security guard.

5. TEMPAT YANG SEMPIT DAN TERTUTUP (CONFINED SPACE)

The contractor shall employ site staff with proper work passes and legal documents.

6. BERSEMBANG DEKAT­DEKAT (CLOSE CONVERSATION)

These are the responsibilities of the contractor. The contractor shall apply to Jabatan Air and SESB for water electricity supplies
respectively.

TANGGUNGJAWAB BERSAMA MEMUTUSKAN RANTAIAN COVID­19

1. Memastikan keperluan perundangan dan prosedur kerja selamat berkaitan COVID­19

2. Memastikan setakat yang praktik tempat kerja dalam keadaan selamat dan tanpa risiko jangkitan COVID­19 kepada pekerja dan
orang awam yang berurusan

3. Memastikan setakat yang praktik kaedah keluar masuk dari tempat kerja adalah selamat tanpa risiko jangkitan COVID­19

ELAKKAN :­

4. Memastikan kemudahan dan kebajikan pekerja berkaitan kawalan risiko COVID­19 serta sumber yang mencukupi disediakan.

5. Memastikan maklumat, latihan dan pengawasan berkaitan COVID­19 disedia dan disebar.

6. Mewujudkan rekod setiap orang yang memasuki tempat kerja

7. Individu bertanggungjawab bagi keselamatan dan kesihatan diri sendiri, rakan sekerja dan orang sekeliling yang mungkin terjejas
semasa menjalankan kerja termasuk membuat pengakuan kendiri (self­declaration) berkaitan status kesihatan.

8. Mematuhi prosedur kerja selamat dan memakai PPE yang ditetapkan semasa bekerja atau melawat.

9. Pemakaian pelindung muka (face shield) digalakkan apabila menjalankan kerja yang melibatkan orang awam

10. Pekerja yang mempunyai gejala COVID­19 hendaklah dengan segera memaklumkan dengan majikan, Penyelia atau Penyelaras
etc. no cooking and littering are allowed.

NOTIS PERINGATAN : LANGKAH KAWALAN DAN PENCEGAHAN JANGKITAN COVID­19

Sebagai langkah kawalan dan pencegahan jangkitan COVID­19 dikalangan warga kerja, semua warga kerja adalah dikehendaki
mematuhi SOP yang telah dikeluarkan oleh Pihak Pengurusan.

1. KERAP MEMBASUH TANGAN

Any interfacing work and any work involving the shutdown of the daily operation of SESB equipment must be proposed in writing to
Jabatan Perancangan Operasi, Bah. Sistem Operasi for consideration and further action at least ten (10) working days in advance,
except for emergency case, which will be considered on case by case basis.

2. PENJARAKAN SOSIAL

To submit manpower and vehicle lists for the duration of the works at the substation. Site staff shall have legal identification documents
(e.g Company ID). All site personnel and vehicles will be subjected to security checks. The site personnel shall register themselves at
SESB security gate and obtain a day­pass, which will be valid for a whole day. This pass must be surrendered to the security guard at
the end of each working day.

3. GUNAKAN PELITUP MUKA (FACE MASK)

To station a EC registered competent person at the substation to ensure that works are carried out with due care and follow proper
safety and health procedures. This is to avoid any damages to existing plant equipment and to cause danger to human lives. The
competent person must be present throughout the period during which any person engaged in the work is at the work sites within the
substation. All contractor need to submit C.V of the competent person for SESB reviews and approval.

ELAKKAN :­

4. TEMPAT YANG SESAK (CROWDED PLACES)

All site staff shall behave themselves by not loitering around the substation. They should observe the SESB safety rules and
regulations. Misbehaved personnel will be removed from site by the security guard.

5. TEMPAT YANG SEMPIT DAN TERTUTUP (CONFINED SPACE)

The contractor shall employ site staff with proper work passes and legal documents.

6. BERSEMBANG DEKAT­DEKAT (CLOSE CONVERSATION)

These are the responsibilities of the contractor. The contractor shall apply to Jabatan Air and SESB for water electricity supplies
respectively.

TANGGUNGJAWAB BERSAMA MEMUTUSKAN RANTAIAN COVID­19

1. Memastikan keperluan perundangan dan prosedur kerja selamat berkaitan COVID­19

2. Memastikan setakat yang praktik tempat kerja dalam keadaan selamat dan tanpa risiko jangkitan COVID­19 kepada pekerja dan
orang awam yang berurusan

3. Memastikan setakat yang praktik kaedah keluar masuk dari tempat kerja adalah selamat tanpa risiko jangkitan COVID­19

ELAKKAN :­

4. Memastikan kemudahan dan kebajikan pekerja berkaitan kawalan risiko COVID­19 serta sumber yang mencukupi disediakan.

5. Memastikan maklumat, latihan dan pengawasan berkaitan COVID­19 disedia dan disebar.

6. Mewujudkan rekod setiap orang yang memasuki tempat kerja

7. Individu bertanggungjawab bagi keselamatan dan kesihatan diri sendiri, rakan sekerja dan orang sekeliling yang mungkin terjejas
semasa menjalankan kerja termasuk membuat pengakuan kendiri (self­declaration) berkaitan status kesihatan.

8. Mematuhi prosedur kerja selamat dan memakai PPE yang ditetapkan semasa bekerja atau melawat.

9. Pemakaian pelindung muka (face shield) digalakkan apabila menjalankan kerja yang melibatkan orang awam

10. Pekerja yang mempunyai gejala COVID­19 hendaklah dengan segera memaklumkan dengan majikan, Penyelia atau Penyelaras
bagi tindakan lanjut.

11. Mematuhi apa­apa peraturan dan arahan yang ditetapkan oleh majikan berkaitan COVID­19 dan mana­mana panduan yang
ditetapkan oleh KKM, WHO, ILO dan agensi yang berkaitan.

Sumber rujukan:

1. Notis Peringatan:Langkah Kawalan dan Pencegahan Jangkitan COVID­19 SESB

2. Prosedur Kerja Selamat Pencegahan COVID­19 di Tempat Kerja https://www.dosh.gov.my/index.php/prosedur­kerja­selamat­


pencegahan­covid­19­di­tempat­kerja/file

Note: Please attach your relevant document .


pencegahan­covid­19­di­tempat­kerja/file

Note: Please attach your relevant document .

Attachments No files have been uploaded!


* Sila hubungi ICT Service desk jika e­borang anda tidak dapat dihantar.

Workflow History
Actioned
Stage Name Action Date Actioned By Comment

Area Based Approved 5/01/2024 Borhan @ Julukan Bin Kebenaran untuk Kerja­kerja pembersihan stesen (Meracun Rumput)
Approval 18:52:39 Siangau @ Angau oleh kontraktor JHT di SJ Ranau

Requester Submit 5/01/2024 Stanely Gunsalam


13:26:05

Area Based Reject 3/01/2024 Borhan @ Julukan Bin SIla pohon semula
Approval 10:00:10 Siangau @ Angau

Requestor Submitted 25/12/2023 Stanely Gunsalam


Submission 21:08:10