WCL/CIL MODEL GUIDLINE /CHECKLISFOR MONSOON ACTIONPLAN- 2024

NAME OF AREA:- WANI


NORTH AREA NAME OF MINES :- UKNI, JUNAD, KOLARPIMPRI,PIMPALGAON,GHONSAAND RAJUR INCLINE
SN RAJUR UG TOTAL
MAJOR ACTIVTIES UKNI OCM JUNAD OCM KPOCM PPG OCM GHONSA OCM
i. MINE DRAINAGE SYSTEMS
Total length of Garland Drains 3000 500 54660
(existing) (in metres)
Total length of Garland Drains to be
32000 3000 8160 8000
500 21500
3000
Total length of Garland Drains to be repaired/cleaned (existing) (in metres)
10000 1000 5000 2000
2000 NIL 13230
constructed new (in metres) 8000 0 1230 2000
d Total length of Garland Drains to be repaired (existing) & 500 34730
4000 5000
constructed new (in metres) b+c 18000 1000 6230
e |Total proposed length of Garland Drains before onset of monsoon (in metres) atc 40000 3000 9390 10000 5000 500 67890
f Total nos. of Culverts (existing) (in nos. 3 8 26
2
Total nos. of Culverts to be repaired (existing) (in 2
nos.) 9 0
h Total nos. of Culverts to be constructed new (in nos.) 1
Total nos. of Culverts to be repaired (existing) & constructed new (in nos.) g+h 3 12
0
Total length of proposed diversion of River/Nullah/Jore or any water body (in metres). 0
ii PUMPING MANAGEMENT
Total Pumping Capacity installed (in GPM) 7000 5200 6000 4000 5500 5500 33200

b Additional Pumping Capacity to be installed (in GPM) 13000 5000 9000 2000 2000 31000

C Total a+b (in GPM) 20000 10200 15000 6000 7500 5500 64200
d Nos. of total existing pumps installed (in nos. 4 5 2 4 3 27
e Nos. of additional pumps to be installed (in nos.) 2 4 1 17
f Nos. of total pumps to be installed (in nos.) d+e 13 6 5 8

|Nos. of new pumps to be procured (in nos.) 9 2 4 1 1 17

8"-2000 m 3"=100Om

h Total length of new pipe ranges to be procured & to be installed (in metres). 8"-3000m 8"-2000 m 8"- 1500 m (HDPE) 6" -1100 m 12700
12 "- 1000m 6"= 1100 m

commissioned (in nos. 6 6


Total nos. of pump pontoons NA 26
commissioned (in nos ) 7
Total nos. of new pump pontoons proposed to be
6 2 NA 24
3 12 6 7
Total itj (in nos.). NA 47
commissioned (in nos.).
Total nos. of new pump foundations proposed to be 0
sump cleaning in Mm 0.353 0.145
Proposed augmentation of Sump Capacity existing
0.91
m 1.408
sump preparation in Mm3 NIL 0.6
Proposed augmentation of Sump Capacity new 0.6
0.353 0.745 0.91
Total m+n in Mm 2.008
related electricals etc In process In process
Procurement action for pump spares & In process In process In process In process
p In process
POWER SUPPLY MANAGEMENT
Nos, of new Electrical gears (for
pumping) to be procured (in nos) 2 3
15

500 m 70
Nos of new Electrical cables (for 300 m 70 mm²
pumping) to be procured (in nos.) mm 200m 70 mm²
600mtr of 70 mm? 200 m 50 mm 2700
S00 m 50 200m 95 mm? 200m 50 mm
lotal length of OH ine to be repaired ex0sting before onset of sqmm
Monsoon(in metres) 2000 4000 1000 5000 500 12500
lotal length of OH line to be commissioned (new) before onset of
Monsoon(in metres) 13100 1000 600 500 15200
lotal cd (in metres)
15100 5000 1600 5000 1000 0 27700
lotal nos, of Earth Pits to be repaired (existing) (in
nos. 10 10 20 2 42
lotal nos. of Earth Pits to be
constructed new (in nos., 5 15 15 4 39
h lotal nos. of Earth Pits to be repaired (existing) & to be
constructed new (in nos.) f+ 10 15 39 17 8
S00 KVA DG
Spares for maintenance of alternate power supply
management (DG sets etc) NA NA NA NA NA set
Available
RETAINING WALLS/EMBANKMENTS
lot.al legth of Retaining walls to be constructed (new) before the onset of Monsoon (in
mettes).
lotal length of Embankments (existing) (in metres). 8270 4100 1650 2500 NA 16520
lotal length of Embankments to be constructed (new) (in metres). 0 NA
Total length Embankments (existing)&to be constructed (new) before the onset of Monsoon 8270 4100 1650
(in metres). c+d 2500 NA 16520
FLOAT ALARM

Total nos.of Float Alarm to be repaired (existing)&to be commissioned new (in nos.) 0

DUMP& SLOP STABILITY


Old
dump:1,2,3,4 Old dump: 1 No
Dump No. 5 &8 are unstable &| AllActive dump
Stability of old & active dumps all others are stable. Active dump: no:D-1,D-6,D-7
Old dump No:2,4 Active dump: 2 &4 NA As per note
5 (Quarry No
dump)
By Total
Station &
By TotalStationBy Total Station &By Total Station &
physical
inspections & physical physical physical
By Total Station & physical inspections at
System of monitoring of OB dump. inspections at inspections at
inspections at regular interval at regular regular interval regular interval regular interval
and as per Scientific study interval and NA As per note
and as per and as per and as per
Mock rehearsal will be done. as per
Scientific Mock rehearsal Scientific study
Scientific study Scientific study
study Mock Mock rehearsal Mock rehearsal
will be done. will be done. willbe done.
rehearsal
willbe done.
vii. HAUL ROAD MANAGEMENT
Total length of Haul Road to be repaired (existing) & constructed (new)
before the onset of
Monsoon (in metres). NIL NIL NIL NIL NIL NA NIL
vii. COAL TRANSPORT ROAD MANAGEMENT
Total length of Coal Transport Road to be repaired (existing) &constructed (new) before the NIL NIL
onset of Monsoon (in metres). NIL NIL 1000 NA 1000
ix. SUBSIDENCE MANAGEMENT
Filling up of all known cracks, potholes, subsided and low-lying areas NA NA NA NA NA NIL NIL
X RAILWAY SIDING/ STOCK YARD/ COAL DESPATCH POINTS

To be inspected Inspection of stock


Inspection of Railway siding / stock yard/coal despatch points Regularly done by the Regularly on weekly basis yard coal despatch
NA NIL As per note
competent person. inspected throughout the point regularly in
monsoon period monsoon

Excavation of
drain around RH
All around stock
Drainage system dump and
substation, coal yard / coal
b Drainage at Railway siding / stock yard/coal despatch points Provided. NA provided &
dispatch point NIL As per note
maintained stock yard & up to
coal drainage clean
before monsoon
transportation
road completed
xi. EMERGENCY ORGANISATION
Whether emergency organisation has been formulated Formulated. YES Yes YES YES YES As per note
xii. HEFL & RLS
Max. Rain fall in last 10years 130 mm on 283 mm on
137mm on dated:18/07/2023 217 mm on 165 mmn on
a
13.07.2022 172mmn on 17.09.22
on a single date 17.09.2015 17.09.2015
As per note
Wardha River Wardha river Wardha river
b Name of Nalla/River NA Vidarbha River Seasonal
nallah As per note
188 190
c Figure of HFL (m) 191.27 189 237.15 215.5 As per note
187 184 186
d Withdrawal level (m) 186
185 183 235.15 214.3 As per note
Warning level (m) 185 185
e 233.15 213.3 As per note
Incline no 1
RLS of all the opening entries both OC& UG. Access trench no. 1=193.94 218.52
Access Trench: Incline no 2
Access Trench No 2 =192.68 218.50
Bhandewad
185 195 195 244 As per note
Incline No: a incline
218.56
Incline No: Air Shaft
219.50
Air Shaft :

aibhau a2024
LA.Saha C.Joshi Vaibhav Sharma
Sr.Manager.(Min) S&C Asst.mgr.WCL M.T.Civil. WCL 2 G.M.(oprn), WNA,WCL

Note: Allthe above information should be kept in 5 copies along with the plans one with Manager, one with SAM, one with ASO, one in Pit Office and one set to be handed over to ISO Team.