b Additional Pumping Capacity to be installed (in GPM) 13000 5000 9000 2000 2000 31000
C Total a+b (in GPM) 20000 10200 15000 6000 7500 5500 64200
d Nos. of total existing pumps installed (in nos. 4 5 2 4 3 27
e Nos. of additional pumps to be installed (in nos.) 2 4 1 17
f Nos. of total pumps to be installed (in nos.) d+e 13 6 5 8
8"-2000 m 3"=100Om
h Total length of new pipe ranges to be procured & to be installed (in metres). 8"-3000m 8"-2000 m 8"- 1500 m (HDPE) 6" -1100 m 12700
12 "- 1000m 6"= 1100 m
500 m 70
Nos of new Electrical cables (for 300 m 70 mm²
pumping) to be procured (in nos.) mm 200m 70 mm²
600mtr of 70 mm? 200 m 50 mm 2700
S00 m 50 200m 95 mm? 200m 50 mm
lotal length of OH ine to be repaired ex0sting before onset of sqmm
Monsoon(in metres) 2000 4000 1000 5000 500 12500
lotal length of OH line to be commissioned (new) before onset of
Monsoon(in metres) 13100 1000 600 500 15200
lotal cd (in metres)
15100 5000 1600 5000 1000 0 27700
lotal nos, of Earth Pits to be repaired (existing) (in
nos. 10 10 20 2 42
lotal nos. of Earth Pits to be
constructed new (in nos., 5 15 15 4 39
h lotal nos. of Earth Pits to be repaired (existing) & to be
constructed new (in nos.) f+ 10 15 39 17 8
S00 KVA DG
Spares for maintenance of alternate power supply
management (DG sets etc) NA NA NA NA NA set
Available
RETAINING WALLS/EMBANKMENTS
lot.al legth of Retaining walls to be constructed (new) before the onset of Monsoon (in
mettes).
lotal length of Embankments (existing) (in metres). 8270 4100 1650 2500 NA 16520
lotal length of Embankments to be constructed (new) (in metres). 0 NA
Total length Embankments (existing)&to be constructed (new) before the onset of Monsoon 8270 4100 1650
(in metres). c+d 2500 NA 16520
FLOAT ALARM
Total nos.of Float Alarm to be repaired (existing)&to be commissioned new (in nos.) 0
Excavation of
drain around RH
All around stock
Drainage system dump and
substation, coal yard / coal
b Drainage at Railway siding / stock yard/coal despatch points Provided. NA provided &
dispatch point NIL As per note
maintained stock yard & up to
coal drainage clean
before monsoon
transportation
road completed
xi. EMERGENCY ORGANISATION
Whether emergency organisation has been formulated Formulated. YES Yes YES YES YES As per note
xii. HEFL & RLS
Max. Rain fall in last 10years 130 mm on 283 mm on
137mm on dated:18/07/2023 217 mm on 165 mmn on
a
13.07.2022 172mmn on 17.09.22
on a single date 17.09.2015 17.09.2015
As per note
Wardha River Wardha river Wardha river
b Name of Nalla/River NA Vidarbha River Seasonal
nallah As per note
188 190
c Figure of HFL (m) 191.27 189 237.15 215.5 As per note
187 184 186
d Withdrawal level (m) 186
185 183 235.15 214.3 As per note
Warning level (m) 185 185
e 233.15 213.3 As per note
Incline no 1
RLS of all the opening entries both OC& UG. Access trench no. 1=193.94 218.52
Access Trench: Incline no 2
Access Trench No 2 =192.68 218.50
Bhandewad
185 195 195 244 As per note
Incline No: a incline
218.56
Incline No: Air Shaft
219.50
Air Shaft :
aibhau a2024
LA.Saha C.Joshi Vaibhav Sharma
Sr.Manager.(Min) S&C Asst.mgr.WCL M.T.Civil. WCL 2 G.M.(oprn), WNA,WCL
Note: Allthe above information should be kept in 5 copies along with the plans one with Manager, one with SAM, one with ASO, one in Pit Office and one set to be handed over to ISO Team.