Professional Documents
Culture Documents
From Primavera P6 To Excel
From Primavera P6 To Excel
Greetings, Planning Engineers! At times, we may need to transfer data from our Oracle
Primavera schedule to an Excel sheet for sharing with parties who are not familiar with
Primavera P6.
Unfortunately, copying data from P6 results in losing the WBS formatting. To address this
issue, I have developed an Excel sheet that allows you to copy data from Oracle Primavera
and paste it into the sheet.
The macro embedded in the sheet will automatically format the data to match Primavera’s
layout. Additionally, the sheet offers various color themes to apply to your data, and with a
single click, you can save your formatted data to a new Excel sheet
Click on “Create” to show the WBS to make the Excel sheet looks the same as the Primavera P6.
And the sheet will open a new Excel Sheet with your data.
Note: If you face a security issue with the downloaded file as per the below screenshot:
2- Check the “Unblock” in the security section in the general tab as shown below.
For those who are interested in planning and Scheduling, We provide Beginner,
Intermediate, and Advanced Courses
---------------
---------------
Useful links:
---------------
Keep in Touch:
WhatsApp: +201277767728
Email: Info@PlanningEngineer.Net
Twitter: https://twitter.com/PlanningEEst
Instagram: https://www.instagram.com/planningengineerest/
TikTok: https://www.tiktok.com/@planningengineerest
---------------