PROPOSED 2 STOREYED R.C.

C BUILDING
NO.133(B), SHWE HLAE STREET, 9 - WARD,
EAST DAGON TOWNSHIP, YANGON

STRUCTURAL DRAWINGS

DECEMBER, 2021
LIST OF DRAWINGS

No. Drawing No. Item Issued Date Drawn By Remarks

1. A&A-ED / S / GN / 001 GENERAL NOTES - 1 28/10/2021 H.S.A

2. A&A-ED / S / GN / 002 GENERAL NOTES - 2 28/10/2021 H.S.A

3. A&A-ED / S / FO / -0F / 003 FOOTING LAYOUT PLAN & DETAILS 28/10/2021 H.S.A

4. A&A-ED / S / CL / -0F - 1F / 004 COLUMN LAYOUT PLAN & DETAILS (FOOTING - 1FL) 28/10/2021 H.S.A

5. A&A-ED / S / CL / 1F - RF / 005 COLUMN LAYOUT PLAN & DETAILS (1FL - RFL) 28/10/2021 H.S.A

6. A&A-ED / S / CL / RF - RT / 006 COLUMN LAYOUT PLAN & DETAILS (RFL - RTL) 28/10/2021 H.S.A

7. A&A-ED / S / RW / -0F / 007 RETAINING WALL LAYOUT PLAN & DETAILS 28/10/2021 H.S.A

8. A&A-ED / S / BM / 0F / 008 PLINTH BEAM LAYOUT PLAN & DETAILS 28/10/2021 H.S.A

9. A&A-ED / S / BM / 1F / 009 FIRST FLOOR BEAM LAYOUT PLAN & DETAILS 28/10/2021 H.S.A

10. A&A-ED / S / BM / RF / 010 ROOF BEAM LAYOUT PLAN & DETAILS 28/10/2021 H.S.A

11. A&A-ED / S / BM / RT / 011 ROOF TOP BEAM LAYOUT PLAN & DETAILS 28/10/2021 H.S.A

12. A&A-ED / S / SC / 0F - RF / 012 STAIRCASE SECTION DETAILS 28/10/2021 H.S.A

ANNOTATIONS :
GN - General Notes
FO - Footing
CL - Column
RW - Retaining Wall REV Description DATE
BM - Beam
SB - Slab
SC - Staircase

Project Address

NO.133(B), SHWE HLAE STREET,


9 - WARD, EAST DAGON TOWNSHIP,
YANGON

Project Owner

DAW THANDAR KYAW


Contractor

A&A
ENGINEERING
DESIGN & CONSTRUCTION
Build your dreams. Build right.
Ph; 09-780-704-100

Drawing Title :

LIST OF DRAWINGS

Check by : KK 16/12/2021
Drawn by : HSA 16/12/2021
Issue Date : 16/12/2021
Scale :
Drawing No. :
Sheet No. STATUS
REV 0
GENERAL NOTES

1. ANY PART OF THE DOCUMENT AND INFORMATION SHALL NOT BE CHANGED OR MODIFIED 11. STANDARD HOOK DETAILS

WITHOUT PERMISSION. CRITICAL SECTION

D
db db

12db
2. ALL STRUCTURAL DRAWINGS SHALL BE READ IN CONJUNCTION WITH THE ARCHITECTURAL, PLUMBING, Ldh = 6" MIN;

D
4db ≥ 65 MIN. 90°HOOK db
ELECTRICAL AND MECHANICAL DRAWINGS.

12db
STANDARD 90°HOOK STANDARD 180°HOOK D
3. ALL CHASES, CHAMFERS, POCKETS, OPENINGS, FIXINGS AND INSERTS PROVIDE IN THE DRAWINGS
MAIN BAR
SHALL BE CHECKED AND VERIFIED BY THE CONTRACTOR AND PRESENTED TO THE CONSULTANT

6db OR 12db
Ldh = 6" MIN;
FOR APPROVAL BEFORE CONCRETING. db db
180°HOOK db

D
D
4. THE CONTRACTOR SHALL CHECK ALL DRAWINGS AND VERIFY LEVELS AND DIMENSIONS IN ADVANCE OF D

6d
b
THE WORK.ANY DISCREPANCIES OR FAULTS SHALL BE REPORTED TO THE CONSULTANT IMMEDIATELY. - 6db FOR D16 BAR OR SMALLER
4db
-12db FOR D20 TO D25
5. ALL DIMENSIONS ARE IN FEET AND ALL LEVELS ARE REFER TO TOP OF STRUCTURAL MEMBER.
STANDARD 90°HOOK STANDARD 135° HOOK
6. THE CONTRACTOR SHALL OBTAIN THE ENGINEER'S APPROVAL BEFORE CONCRETING AND PLACING OF Ld = 12" MIN;
STIRRUPS AND TIES
ANY LEAN CONCRETE LAYER OR REINFORCEMENT. STRAIGHT db
Lsp = 1.3 Ld
7. CODES AND STANDARD 6 (MIN:)
1
ACI 318-08: BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE
TYPICAL LAP SPLICE CRANKING DEVELOPMENT LENGTH OF ANCHOR BARS
MYANMAR NATIONAL BUILDING CODE (MNBC)

8. MATERIAL PROPERTIES OF CONCRETE

CONCRETE STRENGTHS MARKED ON DRAWINGS ARE THE 28 DAYS CYLINDER STRENGTH. 11.1 MINIMUM BEND DIAMETER FOR STANDARD HOOKS (MAIN BARS)

fc' = 3000 psi


BAR SIZE ( db ) MINIMUM INSIDE DIAMETER
9. MATERIAL PROPERTIES OF STRUCTURAL STEEL MEMBERS

fy = 40,000psi NO. 3 (10 mm) THROUGH


6 db
10. CONCRETE COVER
NO. 8 (25mm) REV Description DATE

10.1 FOR CONCRETE CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH, FOR STIRRUP AND TIE HOOKS (BAR SIZES NO.5 (16 mm) AND SMALLER), THE INSIDE DIAMETER OF BEND SHOULD NOT BE LESS THAN 4 db (ACI).

THE MINIMUM CONCRETE COVER SHALL BE 3 in.

10.2 FOR CONCRETE EXPOSED TO EARTH OR WEATHER, 12. END ANCHORAGE LENGTH

THE MINIMUM CONCRETE COVER SHALL BE (A) USING STANDARD HOOKS (B) USING ALTERNATIVE METHOD Project Address

No. 6 THROUGH No. 18 BARS : 2 in (BASED ON TOTAL LENGTH-LESS DESIRABLE AND ONLY FOR USE WHEN NO.133(B), SHWE HLAE STREET,
9 - WARD, EAST DAGON TOWNSHIP,
No. 5 BARS AND SMALLER : 1 21 in SPACE IS NOT ADEQUATE FOR STANDARD HOOKS, Ldh.)
YANGON
(a) BEAM - COLUMN CONNECTIONS (b) BEAM - GIRDER CONNECTIONS (a) BEAM - COLUMN CONNECTIONS (b) BEAM - GIRDER CONNECTIONS
10.3 FOR CONCRETE NOT EXPOSED TO WEATHER OR IN CONTACT WITH GROUND,
Project Owner
(USING STANDARD HOOKS) (USING STANDARD HOOKS) (USING ALTERNATIVE METHOD) (USING ALTERNATIVE METHOD)
THE MINIMUM CONCRETE COVER SHALL BE DAW THANDAR KYAW
La2 ≥ Ldh + 14db
- SLABS AND WALLS La2 ≥ Ldh + 14db Contractor
La1 ≥ Ldh ≥ 8db or 6 in La1 ≥ Ldh ≥ 8db or 6 in

Lb2 ≥ Ldh + 11db


1 21

Lb2 ≥ Ldh + 14db


No. 14 AND No. 18 BARS ; in
A&A
3 CLEAR CLEAR
No. 11 BARS AND SMALLER : 4 in ENGINEERING
COVER COVER DESIGN & CONSTRUCTION
Build your dreams. Build right.

≥ 2 in ≥ 2 in Ph; 09-780-704-100

- BEAMS AND COLUMNS ; 1 21 in COLUMN PRIMARY BEAM


(GIRDER) CLEAR COLUMN CLEAR PRIMARY BEAM
IF CONCRETE IS POURED IN DIRECT CONTACT WITH THE GROUND WITHOUT THE USE OF FORMS, A COVER OF COVER ≥ 2 in COVER ≥ 2 in (GIRDER)

Lb1 ≥ Ldh ≥ 8db or 6 in Lb1 ≥ Ldh ≥ 8db or 6 in ≥ 8db or 6 in ≥ 8db or 6 in


Drawing Title :
AT LEAST 3 in SHALL BE PROVIDED. HOWEVER, IT MAY BE REDUCED, BUT NOT TO BE LESS THAN 2 in, IF AT LEAST

3 in THK; (1:3:6) LEAN CONCRETE IS PLACED UNDER THE FOOTING. GENERAL NOTES - 1

Check by : KK 16/12/2021
DEVELOPMENT LENGTH, LAP AND HOOK LENGTH
Drawn by : HSA 16/12/2021
Issue Date : 16/12/2021
BAR SIZE DEVELOPMENT LENGTH IN TENSION, Ld DEVELOPMENT LENGTH IN TENSION, Ld LAP SPLICE IN TENSION, L splice, ten LAP SPLICE IN TENSION, L splice, ten DEVELOPMENT LENGTH OF BEAM ANCHOR HOOK LENGTH BEAM ANCHOR HOOK LENGTH
( db ) FOR OTHER BARS FOR TOP BARS CLASS B FOR OTHER BARS CLASS B FOR TOP BARS STANDARD HOOK IN TENSION, Ldh La2 ≥ Ldh + 14db Lb2 ≥ Ldh + 11db Scale :
mm ( in ) ( in ) ( in) ( in) ( in ) ( in ) ( in )
Drawing No. : A&A-ED / S / GN / 001
10 mm 12 15 13 17 6 12 10
Sheet No. STATUS
16 mm 19 24 21 27 8 18 16 REV 0
001
12" 12"
FLOOR LEVEL MIN MIN
≥ 2H SPLICE ZONE FOR TOP BARS ≥ 2H

SPLICE

C2
≤ 2" s LENGTH

Lo
C1

H
A A SECTION A -A

SPLICE S ≤ D/2
LENGTH
- 8 x LONGITUDINAL BAR DIAMETER
SPLICE ZONE
≥ 2H FOR BOT; BARS
- 24 x TIE BAR DIAMETER
So ≤
SPLICE ZONE

- 0.5 x ( SMALLER OF C1 OR C2 ) Lc/3 Lc/3 Lc/3

Lsp
Ho

Lc
- 12"
TYPICAL BEAM DETAILS
- D/4
S≤2So

- LARGER OF C1 OR C2 - 8 x SMALLEST LONGITUDINAL BAR DIAMETER


s ≤
Lo ≥ - Ho/6 - 24 x TIE BAR DIAMETER

- 18" - 12"
So
Lo

FLOOR LEVEL
PROP COLUMN TENSION DEVELOPMENT LENGTH

R.C BEAM REV Description DATE

H
BEAM WIDTH

3"
Project Address
TENSION DEVELOPMENT LENGTH
SLOPE FOR DIFFERENT BEAM DEPTH DETAIL FOR DIFFERENT BEAM SIZE NO.133(B), SHWE HLAE STREET,
TOP OF FOUNDATION PROP COLUMN DETAILS 9 - WARD, EAST DAGON TOWNSHIP,
3" THK: LEAN CONCRETE YANGON
Ld

Project Owner
12" 12" DAW THANDAR KYAW
MIN MIN
TOP BARS TOP BARS Contractor
TYPICAL COLUMN DETAILS

SECONDARY BEAM SECONDARY BEAM A&A


ENGINEERING
DESIGN & CONSTRUCTION
Build your dreams. Build right.

MAIN BEAM BOTTOM BARS MAIN BEAM BOTTOM BARS Ph; 09-780-704-100

Drawing Title :

GENERAL NOTES - 2
TENSION REINF: AS SHOWN OR
ANCHORAGE SCHEDULES ON FLOOR PLANS
Lsp
Check by : KK 16/12/2021
Drawn by : HSA 16/12/2021
50 Lsp 50 Lsp Issue Date : 16/12/2021
MAIN REINF: SECONDARY BEAM
Scale :
MAIN BEAM Drawing No. : A&A-ED / S / GN / 002
TYPICAL SLAB DETAILS TYPICAL DETAILS SHOWING SECONDARY BEAM SUPPORT TO MAIN BEAM Sheet No. STATUS
REV 0
002
A B C D E F

49'-3"

11'-3" 10' 11' 13'-5" 3'-8"


2' 2' 2' 2' 2' 2' 2' 2' 2' 2'

6"

6"

6"

6"

6"
2
C1A C1A C1A C1 C1
3'-6"

3'-6"

3'-6"

3'-6"

3'-6"
6'-5"
F1 F2 F1 F1 F1

1'-11" 3'-8" 2'


16'-5"

4'
C3 C3

CF1

2' 2' 2' 2' 2' 2' 2' 2' 1'-11" 3'-8" 2'

6'
3'-6"

3'-6"

3'-6"

3'-6"

3'-6"
1
6"

6"

6"

6"

6"
C1A F1 C1A F2 C1A F1 C1 F1 C1 C2 CF1
REV Description DATE
0 FOOTING LAYOUT PLAN & DETAILS 16/12/2021

4' 4' 7'-6" Project Address


3" 3" 3" 3" 3" 3"
NO.133(B), SHWE HLAE STREET,
3"

3"

3"
9 - WARD, EAST DAGON TOWNSHIP,
YANGON
16 - D16 @ 6" C/C
8 - D16 @ 6" C/C 8 - D16 @ 6" C/C
4'

4'

4'
BOTH WAYS BOTH WAYS Project Owner
8 - D16 @ 6" C/C
DAW THANDAR KYAW
3"

3"

3"
Contractor

F1 F2 CF1
FOOTING PLAN DETAIL FOOTING PLAN DETAIL FOOTING PLAN DETAIL A&A
ENGINEERING
DESIGN & CONSTRUCTION
Build your dreams. Build right.
Ph; 09-780-704-100

N.G.L N.G.L N.G.L

12" x 12" 12" x 12" 9" x 9"


Drawing Title :
SQUARE COLUMN SQUARE COLUMN SQUARE COLUMN
4' - 6"

4' - 6"

4' - 6"
FOOTING LAYOUT PLAN & DETAILS
8 - D16 @ 6" C/C 16 - D16 @ 6" C/C
8 - D16 @ 6" C/C
BOTH WAYS BOTH WAYS 1'-8" 8 - D16 @ 6" C/C

3" 3" 3" Check by : KK 16/12/2021


3"

3"

3"
Drawn by : HSA 16/12/2021
8"

8"
10"

3" THK; 3" THK; 3" THK; Issue Date : 16/12/2021


4' LEAN CONCRETE LEAN CONCRETE 7'-6" LEAN CONCRETE
4' Scale : 6" = 1' - 0"
F1 CF1
F2 Drawing No. : A&A-ED / S / FO / -0F / 003
FOOTING SECTION DETAILS FOOTING SECTION DETAILS FOOTING SECTION DETAILS
Sheet No. STATUS
REV 0
003
A B C D E F

49'-3"

11'-3" 10' 11' 13'-5" 3'-8"


6" 6" 6" 6" 6" 6" 6" 6" 6" 6"

6" 6"

6" 6"

6" 6"

6" 6"

6" 6"
2
C1A C1A C1A C1 C1

8'-5"

8'-5"
3" 6" 421" 421"
16'-5"

C3 C3

8'

8'
6" 6" 6" 6" 6" 6" 6" 6" 6" 6" 421" 421"
6" 6"

6" 6"

6" 6"

6" 6"

6" 6"

6" 6"
1
C1A C1A C1A C1 C1 C2
REV Description DATE
COLUMN LEGEND : 0 COLUMN LAYOUT PLAN & DETAILS 16/12/2021

R.C COLUMN

Project Address

NO.133(B), SHWE HLAE STREET,


9 - WARD, EAST DAGON TOWNSHIP,
YANGON

Project Owner

DAW THANDAR KYAW


Contractor

A&A
ENGINEERING
DESIGN & CONSTRUCTION
Build your dreams. Build right.
Ph; 09-780-704-100

Drawing Title :

1' 1' 9" COLUMN LAYOUT PLAN


(FOUNDATION -1FL) & DETAILS
9"
LONG; BAR : 6 - D16 LONG; BAR : 8 - D16 LONG; BAR : 4 - D16

LONG; BAR : 4 - D16 Check by : KK 16/12/2021


D6.5 @ 6" C/C D6.5 @ 6" C/C D6.5 @ 6" C/C
1'

1'

1'

Drawn by : HSA 16/12/2021


D6.5 @ 6" C/C

9"
Issue Date : 16/12/2021
Scale : 6" = 1' - 0"
C1 C1A C2 C3 Drawing No. : A&A-ED / S / CL / -0F - 1F / 004
COLUMN DETAIL COLUMN DETAIL COLUMN DETAIL COLUMN DETAIL
Sheet No. STATUS
REV 0
004
A B C D E F

49'-3"

11'-3" 10' 11' 13'-5" 3'-8"


6" 6" 6" 6" 6" 6" 6" 6" 6" 6"

6" 6"

6" 6"

6" 6"

6" 6"

6" 6"
2
C1A C1A C1A C1 C1

8'-5"

8'-5"
3" 6" 421" 421"
16'-5"

C3 C3

8'

8'
6" 6" 6" 6" 6" 6" 6" 6" 6" 6" 421" 421"
6" 6"

6" 6"

6" 6"

6" 6"

6" 6"

6" 6"
1
C1A C1A C1A C1 C1 C2
REV Description DATE
COLUMN LEGEND : 0 COLUMN LAYOUT PLAN & DETAILS 16/12/2021

R.C COLUMN

R.C COLUMN (STOP AT + 3'-0" LEVEL FROM 1FL)

Project Address

NO.133(B), SHWE HLAE STREET,


9 - WARD, EAST DAGON TOWNSHIP,
YANGON

Project Owner

DAW THANDAR KYAW


Contractor

A&A
ENGINEERING
DESIGN & CONSTRUCTION
Build your dreams. Build right.
Ph; 09-780-704-100

Drawing Title :

1' 1' 9" COLUMN LAYOUT PLAN


(1FL -RFL) & DETAILS
9"
LONG; BAR : 6 - D16 LONG; BAR : 8 - D16 LONG; BAR : 4 - D16

LONG; BAR : 4 - D16 Check by : KK 16/12/2021


D6.5 @ 6" C/C D6.5 @ 6" C/C D6.5 @ 6" C/C
1'

1'

1'

Drawn by : HSA 16/12/2021


D6.5 @ 6" C/C

9"
Issue Date : 16/12/2021
Scale : 6" = 1' - 0"
C1 C1A C2 C3 Drawing No. : A&A-ED / S / CL / 1F - RF / 005
COLUMN DETAIL COLUMN DETAIL COLUMN DETAIL COLUMN DETAIL
Sheet No. STATUS
REV 0
005
A B C D E F

49'-3"

11'-3" 10' 11' 13'-5" 3'-8"


3" 3" 3" 3" 3" 3" 3" 3"

3"

3"

3"

3"

3"
2 C4 C4 C4 C4 C4

5'-4"
8'-221"

8'-5"

8'-5"
121" 421"

C4

3" 3" 6" 3" 6"


16'-5"

C4
C3 C3

11'-1"
8'-221"

8'

8'
6" 6" 6" 6"
3" 3" 3" 3" 3" 121" 421"

6" 6"

6" 6"
1
3"

3"

3"

3"
C4 C4 C4 C1 C1 C4
REV Description DATE
COLUMN LEGEND : 0 COLUMN LAYOUT PLAN & DETAILS 16/12/2021

R.C COLUMN

Project Address

NO.133(B), SHWE HLAE STREET,


9 - WARD, EAST DAGON TOWNSHIP,
YANGON

Project Owner

DAW THANDAR KYAW


Contractor

A&A
ENGINEERING
DESIGN & CONSTRUCTION
Build your dreams. Build right.
Ph; 09-780-704-100

Drawing Title :

1' COLUMN LAYOUT PLAN


(RFL -RTL) & DETAILS
9"
LONG; BAR : 6 - D16
6"
LONG; BAR : 4 - D16 Check by : KK 16/12/2021
D6.5 @ 6" C/C
1'

LONG; BAR : 4 - D16 Drawn by : HSA 16/12/2021


D6.5 @ 6" C/C
9"

D6.5 @ 6" C/C Issue Date : 16/12/2021


6"

Scale : 6" = 1' - 0"


C1 C3 C4 (UP TO RFL + 3'-6") Drawing No. : A&A-ED / S / CL / RF - RT / 006
COLUMN DETAIL COLUMN DETAIL COLUMN DETAIL
Sheet No. STATUS
REV 0
006
A B C D E F

49'-3"

11'-3" 10' 11' 13'-5" 3'-8"

2
RW RW RW RW
C1A C1A C1A C1 C1

RW
16'-5"

RW

RW

RW

RW
C3 RW C3

RW

RW
1
C1A RW C1A RW C1A RW C1 RW C1 RW C2
REV Description DATE
RETAINING WALL LAYOUT PLAN &
0 16/12/2021
DETAILS

Project Address

NO.133(B), SHWE HLAE STREET,


9 - WARD, EAST DAGON TOWNSHIP,
YANGON

Project Owner
PLINTH LEVEL
DAW THANDAR KYAW
Contractor
PLINTH BEAM

A&A
N.G.L ENGINEERING
DESIGN & CONSTRUCTION
Build your dreams. Build right.
Ph; 09-780-704-100

9" THK; BRICK WALL

Drawing Title :
3'

13.5" THK; BRICK STEPS, RETAINING WALL LAYOUT PLAN & DETAILS
TWO LAYERS

Check by : KK 16/12/2021
3" THK; Drawn by : HSA 16/12/2021
LEAN CONCRETE
Issue Date : 16/12/2021
Scale : 6" = 1' - 0"
RW Drawing No. : A&A-ED / S / RW / -0F / 007
RETAINING WALL SECTION DETAILS
Sheet No. STATUS
REV 0
007
A B C D E F

49'-3"

11'-3" 10' 11' 13'-5" 3'-8"

2
PB PB PB PB
C1 C1 C1 C1 C1
4'-5" 6'-1"

5'-3"
PB1

PB
11'-1"
PB1
16'-5"

PB

PB

PB

PB
C3 PB C3

10'-5" 1 2 3

PB
PB1

PB
4
19 18 17 16 15 14 13 12 11 10 9 8 7 6 5

4'-7"
1
C1 PB C1 PB C1 PB C1 PB C1 PB C2
REV Description DATE
BEAM LEGEND : SLAB LEGEND : 0 PLINTH BEAM LAYOUT PLAN & DETAILS 16/12/2021

N.G.L + 1' - 6" NON-SUSPENDED SLAB @ N.G.L + 1'-6"

N.G.L + 1' - 3" NON-SUSPENDED SLAB @ N.G.L + 1'-3"

N.G.L + 1' - 0" NON-SUSPENDED SLAB @ N.G.L + 1'-0"

Project Address

NO.133(B), SHWE HLAE STREET,


0' - 9" 0' - 9" 0' - 9"
9 - WARD, EAST DAGON TOWNSHIP,
YANGON
0' - 9" 0' - 9" 0' - 9"
2 - D16 2 - D16 2 - D16 Project Owner

DAW THANDAR KYAW


1'-2"

1'-2"

1'-2"

D6.5 @ 4" C/C D6.5 @ 6" C/C D6.5 @ 4" C/C 2 - D16 2 - D16 2 - D16 Contractor
D6.5 @ 4" C/C D6.5 @ 6" C/C D6.5 @ 4" C/C

9"

9"

9"
2 - D16 2 - D16 2 - D16 2 - D16 2 - D16 2 - D16
A&A
ENGINEERING
LEFT MIDDLE RIGHT LEFT MIDDLE RIGHT DESIGN & CONSTRUCTION
Build your dreams. Build right.

PB PB1 Ph; 09-780-704-100

PLINTH BEAM DETAIL PLINTH BEAM DETAIL

Drawing Title :

PLINTH BEAM LAYOUT PLAN & DETAILS


D10 @ 8" C/C
BOTH WAYS, ONE LAYER
WITH D10 @ 3' C/C FOR CONNECTION Check by : KK 16/12/2021
Drawn by : HSA 16/12/2021
4"

Issue Date : 16/12/2021


Scale : 6" = 1' - 0"

NON-SUSPENDED SLAB DETAIL Drawing No. : A&A-ED / S / BM / GF / 008


Sheet No. STATUS
REV 0
008
A B C D E F

49'-3"

11'-3" 10' 11' 13'-5" 3'-8"

2
FB FB FB FB
C1 C1 C1 C1 C1

4'-1"

4'-1"
S1 S1

CS

FB
10'-11"
FB2 FB2
S1 S1

12'
FB1
6'-1"

6'-1"
S1 S1
16'-5"

FB1

FB1

FB1
C3 FB C3

FB2 1 2
FB2 FB2 FB2

FB

FB
3
18 17 16 15 14 13 12 11 10 9 8 7 6 5 4
FB2

FB2

FB2
4'-9"

4'-9"

4'-9"
S1 S1 S1 S1

3'-8"
S1
8'-3" 2'-3" 4' 5'-3" 1'-11" 8'-4"

1
C1 FB C1 FB C1 FB C1 FB C1 FB C2
REV Description DATE
BEAM LEGEND : SLAB LEGEND : FIRST FLOOR BEAM LAYOUT PLAN &
0 16/12/2021
DETAILS
N.G.L + 12' - 6" SUSPENDED SLAB @ N.G.L + 12'-6"

SUSPENDED SLAB @ N.G.L + 12'-3"

Project Address

NO.133(B), SHWE HLAE STREET,


0' - 9" 0' - 9" 0' - 9"
9 - WARD, EAST DAGON TOWNSHIP,
YANGON
0' - 9" 0' - 9" 0' - 9"
2 - D16 2 - D16 2 - D16 Project Owner

DAW THANDAR KYAW


1'-2"

1'-2"

1'-2"

D6.5 @ 4" C/C D6.5 @ 6" C/C D6.5 @ 4" C/C 2 - D16 2 - D16 2 - D16 Contractor
D6.5 @ 4" C/C D6.5 @ 6" C/C D6.5 @ 4" C/C

9"

9"

9"
2 - D16 2 - D16 2 - D16 2 - D16 2 - D16 2 - D16
A&A
ENGINEERING
LEFT MIDDLE RIGHT LEFT MIDDLE RIGHT DESIGN & CONSTRUCTION
Build your dreams. Build right.

FB FB2 Ph; 09-780-704-100

FLOOR BEAM DETAIL FLOOR BEAM DETAIL

0' - 9" 0' - 9" 0' - 9"


Drawing Title :

FIRST FLOOR BEAM LAYOUT PLAN & DETAILS


4 - D16 2 - D16 4 - D16 D10 @ 8" C/C D10 @ 6" C/C
BOTH WAYS, TWO LAYERS BOTH WAYS, TWO LAYERS
1'-2"

1'-2"

1'-2"

D6.5 @ 4" C/C D6.5 @ 6" C/C D6.5 @ 4" C/C Check by : KK 16/12/2021
4"

4"
Drawn by : HSA 16/12/2021
2 - D16 4 - D16 2 - D16
Issue Date : 16/12/2021

LEFT MIDDLE RIGHT Scale : 6" = 1' - 0"


FB1 S1 CS Drawing No. : A&A-ED / S / BM / 1F / 009
FLOOR BEAM DETAIL SLAB DETAIL SLAB DETAIL
Sheet No. STATUS
REV 0
009
A B C D E F

49'-3"

11'-3" 10' 11' 13'-5" 3'-8"

2
RB RB RB RB
C1 C1 C1 C1 C1

S1 S1 S1 S1

RB
RB1

RB1

RB1

RB1
16'-5"

CS
RB2 RB2 RB2 RB2 C3

S1
S1

RB
S1 S1
RB2 RB2

S1

1
C1 RB C1 RB C1 RB C1 RB C1 RB C2
REV Description DATE
BEAM LEGEND : SLAB LEGEND : ROOF FLOOR BEAM LAYOUT PLAN &
0 16/12/2021
DETAILS
N.G.L + 22' - 6" SUSPENDED SLAB @ N.G.L + 22'-6"

Project Address

NO.133(B), SHWE HLAE STREET,


0' - 9" 0' - 9" 0' - 9"
9 - WARD, EAST DAGON TOWNSHIP,
YANGON
0' - 9" 0' - 9" 0' - 9"
2 - D16 2 - D16 2 - D16 Project Owner

DAW THANDAR KYAW


1'-2"

1'-2"

1'-2"

D6.5 @ 4" C/C D6.5 @ 6" C/C D6.5 @ 4" C/C 2 - D16 2 - D16 2 - D16 Contractor
D6.5 @ 4" C/C D6.5 @ 6" C/C D6.5 @ 4" C/C

9"

9"

9"
2 - D16 2 - D16 2 - D16 2 - D16 2 - D16 2 - D16
A&A
ENGINEERING
LEFT MIDDLE RIGHT LEFT MIDDLE RIGHT DESIGN & CONSTRUCTION
Build your dreams. Build right.

RB RB2 Ph; 09-780-704-100

ROOF BEAM DETAIL ROOF BEAM DETAIL

0' - 9" 0' - 9" 0' - 9"


Drawing Title :

ROOF FLOOR BEAM LAYOUT PLAN & DETAILS


4 - D16 2 - D16 4 - D16 D10 @ 8" C/C D10 @ 6" C/C
BOTH WAYS, TWO LAYERS BOTH WAYS, TWO LAYERS
1'-2"

1'-2"

1'-2"

D6.5 @ 4" C/C D6.5 @ 6" C/C D6.5 @ 4" C/C Check by : KK 16/12/2021
4"

4"
Drawn by : HSA 16/12/2021
2 - D16 4 - D16 2 - D16
Issue Date : 16/12/2021

LEFT MIDDLE RIGHT Scale : 6" = 1' - 0"


RB1 S1 CS Drawing No. : A&A-ED / S / BM / RF / 010
ROOF BEAM DETAIL SLAB DETAIL SLAB DETAIL
Sheet No. STATUS
REV 0
010
A B C D E F

49'-3"

11'-3" 10' 11' 13'-5" 3'-8"

2
16'-5"

C3 RTB C3

RTB

RTB
S1

1
C1 RTB C1
REV Description DATE
BEAM LEGEND : SLAB LEGEND : ROOF TOP FLOOR BEAM LAYOUT PLAN &
0 16/12/2021
DETAILS
N.G.L + 32' - 6" SUSPENDED SLAB @ N.G.L + 32'-6"

Project Address

NO.133(B), SHWE HLAE STREET,


9 - WARD, EAST DAGON TOWNSHIP,
YANGON

Project Owner

DAW THANDAR KYAW


Contractor

A&A
ENGINEERING
DESIGN & CONSTRUCTION
Build your dreams. Build right.
Ph; 09-780-704-100

Drawing Title :

ROOF TOP FLOOR BEAM LAYOUT PLAN &


0' - 9" 0' - 9" 0' - 9" DETAILS
D10 @ 8" C/C BOTH WAYS

2 - D16 2 - D16 2 - D16 KK 16/12/2021


Check by :
4"

D6.5 @ 4" C/C D6.5 @ 6" C/C D6.5 @ 4" C/C


9"

9"

9"

Drawn by : HSA 16/12/2021


2 - D16 2 - D16 2 - D16
Issue Date : 16/12/2021

LEFT MIDDLE RIGHT Scale : 6" = 1' - 0"


RTB S1 Drawing No. : A&A-ED / S / BM / RT / 011
ROOF TOP BEAM DETAIL SLAB DETAIL
Sheet No. STATUS
REV 0
011
D E
13'-5"

2'-11"
RFL 18

17

16

RB1 RB
15

14
7 - D10
TOP & BOT;
13

12

7 - D10
11
D10 @ 6" C/C
TOP & BOT;
10

10' 9

5
7 - D10 3'-1"
4

1'-8"
BRICK STEPS
2'-11" REV Description DATE
1FL 19
0 STAIR REINFORCEMENT DETAILS 16/12/2021
18

17

FB1 FB FB
16

7 - D10 Project Address


15
TOP & BOT;
NO.133(B), SHWE HLAE STREET,
14
9 - WARD, EAST DAGON TOWNSHIP,
13 YANGON
7 - D10
12 D10 @ 6" C/C Project Owner
TOP & BOT;
11 DAW THANDAR KYAW
Contractor
10
11'

A&A
8
ENGINEERING
DESIGN & CONSTRUCTION
Build your dreams. Build right.
Ph; 09-780-704-100
7

9"
6
4"

7"

7 - D10 3'-1"
5
Drawing Title :
3
4"

STAIR REINFORCEMENT DETAILS


3
4"

TYPICAL BLOWUP DETAILS

2'-4"
BRICK STEPS Check by : KK 16/12/2021
Drawn by : HSA 16/12/2021

G.F.L Issue Date : 16/12/2021


Scale : 10" = 1' - 0"
Drawing No. : A&A-ED / S / SC / 0F - RF / 012

PB PB Sheet No. STATUS


REV 0
012