You are on page 1of 7

Project info:

Mathura Shrestha
Data: Status of designe:
Exterior column load [KN].unfactored = 110 c TRUE
Interior column load [KN].unfactored = 295 c
Load factor = 1
Distance between column center lines[m] = 3.2 c
Depth of foundation Df [m] = 0.35
Allowable bearing capacity of soil [KN/sq.m] = 150 c
Width of ext. col. In strap beam direction [m] = 0.3
Width of ext. col. In direct perpendicular strap beam [m] = 0.3
Width of int. col. In strap beam direction [m] = 0.3
Width of int. col. In direct perpendicular strap beam [m] = 0.3
Breadth of strap beam [m] = 0.355 c
Eccentricity of exterior load from footing [m] = 0.6
R.C designation : Fcu [N/sq.mm] = 20
reinf. Strength : Fy [N/sq.mm] = 500
density of soil [KN/cu.m] 19
Calculation:
reaction of ext.footing R1 135.38 [KN]
geo. reaction of ext.footing R1T 141.67 [KN]
Req. ext. footing 0.94 [sq.m] Dim. sq 0.97182 reqd

reaction of int.footing R2 269.62 [KN]


geo. reaction of int.footing R2T 282.12 [KN]
Req. int. footing 1.88 [sq.m] Dim. sq 1.37143 reqd

Use dimensions for ext.footing L= 1.5 [m] Area prov.d 2.25 238%
B= 1.5 [m] in strap direction

Use dimensions for int.footing L= 1.5 [m] Area prov.d 2.25 120%
B= 1.5 [m] in strap direction
check dim TRUE
Designe of strap beam:
Breadth of strap beam [m] 0.355
depth of strap beam from shear d 209.80 [mm]
Use depth d 525 [mm] TRUE
total depth H 575 [mm]
fcu = 20 N/smm fy = 500 N/smm

Width = 355 mm Max. B.M. Mu¯ = 51 kNm


Depth = 525 mm Max. S.F. Vu = 133 kN
Mu = 51 kNm
K = M/bd2fcu = 0.03 N/mm2 A's required 0.00 mm2
Z = 441.75 mm2 As required 262.96 Top mm2 As prvd. 272%
As bottom = 515.00 mm2 As provided 716 Top mm2 TRUE
Design shear v= 0.81 N/mm2 Diameter of stirrups 8 mm No. legs 2
Design concrete shear vc = 0.48 N/mm2 Spacing of stirrups reqd. 750 mm
check shear at col face TRUE

Designe of exterior footing:


Net presure under ext. footing 72.42 [KN/sq.m] TRUE

fcu 20 N/smm fy 500 N/smm

Ult. column load 135.38 [KN] Safe bearing capacity 150 [KN/sq.m]
Self weight 41.03 [KN] Overburden height -0.2 m A prvd.
Overburden -13.47 [KN] Area of footing reqd. 0.75 m 2 TRUE
Total load 162.95 [KN] Area of footing provided 2.25 m 2
L reqd.
Net upward pressure ult. 72.42 [KN/sq.m] Footing thickness 521 [mm] 0.50
Short span Long span B/W
Width B= 1.50 m Length L= 1.50 m 1.00
Column width 300.00 mm Column breadth 300 mm
Max. cantilever proj. 1.20 m Max. cantilever proj. 0.60 m As min
Max. B.M. /m width 52.14 kNm Max. B.M. /m width 13 kNm 602

K = M/bd2fcu 0.013 N/mm2 K = M/bd2fcu 0.003 N/mm2 No. of bars


Z 424.65 mm Z 440 mm 9
As required /m width 282.28 [mm] As required /m width 68 [sq.mm] 9
Diameter of bars 16 [mm] Diameter of bars 16 [mm]
Spacing of bars 150 [mm] Number of bars/side 150 [mm] As prvd. TRUE
As provided/m width 1340 [sq.mm] As provided/m width 1340 [sq.mm] 475%
1967%
Punch shear 0.00 [KN] Dist. to critical section 600 [mm]
Punch shear stress 0.00 [N/sq.mm] Shear force 43 [KN]
Allow.shear stress 0.42 [N/sq.mm] Shear stress 0.10 [N/sq.mm] TRUE
Designe of interior footing:
Net presure under int. footing 132.08 [KN/sq.m] TRUE

fcu 20 N/smm fy 500 N/smm

Ult. column load 269.615385 [KN] Safe bearing capacity 150 [KN/sq.m]
Self weight 35 [KN] Overburden height -0.1 m A prvd.
Overburden -8 [KN] Area of footing reqd. 1.37 m2 TRUE
Total load 297 [KN] Area of footing provided 2.25 m2 L reqd.
Net upward pressure ult. 132 [KN/sq.m] Footing thickness 450 [mm] 0.91
Short span Long span B/W
Width B= 1.50 m Length L= 1.50 m 1.00
Column width 300 mm Column breadth 300 mm
Max. cantilever proj. 0.60 m Max. cantilever proj. 0.60 m As min
Max. B.M. /m width 24 kNm Max. B.M. /m width 24 kNm 512

K = M/bd2fcu 0.008 N/mm2 K = M/bd2fcu 0.008 N/mm2 No. of bars


Z 363 mm Z 374 mm 9
As required /m width 151 [mm] As required /m width 146 [sq.mm] 9
Diameter of bars 12 [mm] Diameter of bars 12 [mm]
Spacing of bars 150 [mm] Number of bars/side 150 [mm] As prvd. TRUE
As provided/m width 754 [sq.mm] As provided/m width 754 [sq.mm] 501%
516%
Punch shear 0 [KN] Dist. to critical section 300 [mm]
Punch shear stress 0.000 [N/sq.mm] Shear force 40 [KN]
Allow.shear stress 0.37 [N/sq.mm] Shear stress 0.10 [N/sq.mm] TRUE
TOT 1

CHECK SHEAR IN STRAP


1 INCRESE FOOTING DIM
1 CHECK SHEAR IN STRAP
1 INCRESE EXT. FOOTING DIM
1 CHECK SHEAR EXT. FOOTING
1 INCRESE INT. FOOTING DIM
1 CHECK SHEAR INT. FOOTING
1 INCRESE TOP REIN'T IN STRAP
1 INCRESE REIN'T IN EXT.FOOTING
1 INCRESE REIN'T IN INT.FOOTING
1 "CHANG DEPTH"
1 CHECK NET PRUSSUR EXT.FOOTING
1 CHECK NET PRUSSUR INT.FOOTING

0.8(Fcu)^0.5 3.577709 [N/sq.mm]

q1= 90.25641 [KN/m']


q2= 179.7436 [KN/m']
1-- 13.53846 [KN]
2-- -96.46154 [KN]
at ext. Col. face 3-- -82.92308 [KN]
4-- 25.38462 [KN]
dis. at max.moment x1 1.06875 [m]
Mmax -50.53125 [KN.m]

5-- -134.8077 [KN]


6-- 160.1923 [KN]
at int. Col. face 7-- 133.2308 [KN]
Mmin 50.55288 [KN.m]
6
1 4 7

3 5

2 S.F.D

You might also like