One Way Slab


One way slab (Roof – 11.25’x5.25’)
𝐿𝑏 11.25
= 5.25 = 2.14 > 2
𝐿𝑎

One way slab design

One end continuous slab


𝐿 𝑓𝑦
Min slab thickness h = 24 x (0.4+100)

5.25𝑥12 40
= x (0.4+ )
24 100

=2.1 “ < 4”
10
Take h=4” , d=4”-0.75-( )=3.05"
25.4𝑥2

Min As = 0.002 bh = 0.002x12x4 = 0.096 in²/ft

As = 0.122 in²/ft (10mm dia bar 12” c/c spacing)

Smax = 2h =2x4 = 8”

10mm dia bar 8” c/c spacing (Control for Min As=0.183in²/ft)


4
Own weight of slab = 12 x 150 = 50 lb/ft2

Finish load = 20 lb/ft2

Live load = 20 lb/ft2

Rain load = 20 lb/ft2

Factored load w = 1.2D+1.6L+0.5R

=1.2(50+20)+1.6(20)+0.5(20)

=126 lb/ft2 126 lb/ft2


1’ width beam , w = 126 lb/ft2 x 1 = 126 lb/ft
wl² 126x5.25²
Max Mu = 10 = = 347.29 lb-ft
10

𝑤𝑙 126𝑥5.25 126𝑥3.05
Max Vu =1.15x 2 − 𝑤𝑑=1.15x − = 348.34 lb
2 12

1
KSI Engineering - Pathein – 09798432969/09422453947 Project Calculation
Fundamental of RC Structure Analysis and Design

Flexural Strength

Main steel

2𝑀𝑢
𝑎 = d − √𝑑² −
0.68𝑓𝑐′𝑏

2𝑥347.29𝑥12
= 3.05 − √3.05² − 0.68𝑥2500𝑥12

=0.068 in
𝑀𝑢
As= 𝑎
⏀𝑓𝑦(𝑑− )
2

347.29𝑥12
= 0.068
0.8𝑥40000𝑥(3.05− )
2

=0.043 in²/ft < Min As =0.183 in²/ft

10mm dia bar 8” c/c spacing

Distribution Steel

As = 0.183 in²/ft (10mm dia bar 8” c/c spacing)

Shear Strength

⏀𝑉𝑐 = ⏀2√𝑓𝑐 ′𝑏𝑑

=0.75x2x√2500 x 12x 3.05

=2745lb > Max Vu (OK)

Main bar – 10mm dia bar 6” c/c spacing

Distribution bar - 10mm dia bar 6” c/c spacing

Slab thickness h =4”

2
KSI Engineering - Pathein – 09798432969/09422453947 Project Calculation
Fundamental of RC Structure Analysis and Design

One way slab (Typical Floor– 11.25’x5.25’)


𝐿𝑏 11.25
= 5.25 = 2.14 > 2
𝐿𝑎

One way slab design

One end continuous slab


𝐿 𝑓𝑦
Min slab thickness h = 24 x (0.4+100)

5.25𝑥12 40
= x (0.4+100)
24

=2.1 “ < 4”
10
Take h=4” , d=4”-0.75-(25.4𝑥2)=3.05"

Min As = 0.002 bh = 0.002x12x4 = 0.096 in²/ft

As = 0.122 in²/ft (10mm dia bar 12” c/c spacing)

Smax = 2h =2x4 = 8”

10mm dia bar 8” c/c spacing (Control for Min As=0.183in²/ft)


4
Own weight of slab = 12 x 150 = 50 lb/ft2

Finish load = 20 lb/ft2

Live load = 40 lb/ft

Factored load w = 1.2D+1.6L

=1.2(50+20)+1.6(40)

=148 lb/ft2 148 lb/ft2


1’ width beam , w = 148 lb/ft2 x 1 = 148 lb/ft

wl² 148x5.25²
Max Mu = 10 = = 407.925 lb-ft
10

𝑤𝑙 148𝑥5.25 148𝑥3.05
Max Vu =1.15 2 − 𝑤𝑑=1.15x − = 409.16 lb
2 12

3
KSI Engineering - Pathein – 09798432969/09422453947 Project Calculation
Fundamental of RC Structure Analysis and Design

Flexural Strength

Main steel

2𝑀𝑢
𝑎 = d − √𝑑² −
0.68𝑓𝑐′𝑏

2𝑥407.925𝑥12
= 3.05 − √3.05² − 0.68𝑥2500𝑥12

=0.08 in
𝑀𝑢
As= 𝑎
⏀𝑓𝑦(𝑑− )
2

407.925𝑥12
= 0.08
0.8𝑥40000𝑥(3.05− )
2

=0.051 in²/ft < Min As =0.183 in²/ft

10mm dia bar 8” c/c spacing

Distribution Steel

As = 0.183 in²/ft (10mm dia bar 8” c/c spacing)

Shear Strength

⏀𝑉𝑐 = ⏀2√𝑓𝑐 ′𝑏𝑑

=0.75x2x√2500 x 12x 3.05

=2745lb > Max Vu (OK)

Main bar – 10mm dia bar 6” c/c spacing

Distribution bar - 10mm dia bar 6” c/c spacing

Slab thickness h =4”

4
KSI Engineering - Pathein – 09798432969/09422453947 Project Calculation
Fundamental of RC Structure Analysis and Design

One way slab (Typical Floor– 11.25’x3.25’)


𝐿𝑏 11.25
= 3.25 = 3.46 > 2
𝐿𝑎

One way slab design

One end continuous slab


𝐿 𝑓𝑦
Min slab thickness h = 24 x (0.4+100)

3.25𝑥12 40
= x (0.4+100)
24

=1.3 “ < 4”
10
Take h=4” , d=4”-0.75-(25.4𝑥2)=3.05"j

Min As = 0.002 bh = 0.002x12x4 = 0.096 in²/ft

As = 0.122 in²/ft (10mm dia bar 12” c/c spacing)

Smax = 2h =2x4 = 8”

10mm dia bar 8” c/c spacing (Control for Min As=0.183in²/ft)


4
Own weight of slab = 12 x 150 = 50 lb/ft2

Finish load = 20 lb/ft2

Live load = 40 lb/ft

Factored load w = 1.2D+1.6L

=1.2(50+20)+1.6(40)

=148 lb/ft2 148 lb/ft2


1’ width beam , w = 148 lb/ft2 x 1 = 148 lb/ft

wl² 148x3.25²
Max Mu = 10 = = 156.325 lb-ft
10

𝑤𝑙 148𝑥3.25 148𝑥3.05
Max Vu =1.15 2 − 𝑤𝑑=1.15x − = 238.96 lb
2 12

5
KSI Engineering - Pathein – 09798432969/09422453947 Project Calculation
Fundamental of RC Structure Analysis and Design

Flexural Strength

Main steel

2𝑀𝑢
𝑎 = d − √𝑑² −
0.68𝑓𝑐′𝑏

2𝑥156.325𝑥12
= 3.05 − √3.05² − 0.68𝑥2500𝑥12

=0.03 in
𝑀𝑢
As= 𝑎
⏀𝑓𝑦(𝑑− )
2

156.325𝑥12
= 0.03
0.8𝑥40000𝑥(3.05− )
2

=0.019 in²/ft < Min As =0.183 in²/ft

10mm dia bar 8” c/c spacing

Distribution Steel

As = 0.183 in²/ft (10mm dia bar 8” c/c spacing)

Shear Strength

⏀𝑉𝑐 = ⏀2√𝑓𝑐 ′𝑏𝑑

=0.75x2x√2500 x 12x 3.05

=2745lb > Max Vu (OK)

Main bar – 10mm dia bar 6” c/c spacing

Distribution bar - 10mm dia bar 6” c/c spacing

Slab thickness h =4”

6
KSI Engineering - Pathein – 09798432969/09422453947 Project Calculation
Fundamental of RC Structure Analysis and Design

Two Way Slab


Two way slab (Roof -11.25’x11.25’)
𝐿𝑏 11.25
= =1 < 2
𝐿𝑎 11.25

Two way slab design


2(𝐿𝑎+𝑙𝑏)
Min slab thickness h = 180

2(11.25+11.25)
= x 12 = 3” < 4”
180

10 10
Take h =4” , d=4”-0.75-(25.4) -(25.4𝑥2) = 2.66"

Min As = 0.002 bh = 0.002x12x4 = 0.096 in²/ft

As = 0.122 in²/ft (10mm dia bar 12” c/c spacing)

Smax = 2h =2x4 = 8”

10mm dia bar 8” c/c spacing (Control for Min As=0.183in²/ft)


4
Own weight of slab = 12 x 150 = 50 lb/ft2

Finish load = 20 lb/ft2

Live load = 20 lb/ft2

Rain load = 20 lb/ft2

Factored load w = 1.2D+1.6L+0.5R

=1.2(50+20)+1.6(20)+0.5(20)

=126 lb/ft2 126 lb/ft2


1’ width beam , w = 126 lb/ft2 x 1 = 126 lb/ft

𝐿𝑎 11.25
m=𝐿𝑏 = 11.25 = 1 (CASE 4)

Max Mu = Ca,negwl² = 0.05 x 126 x 11.25² = 797.34 lb-ft


𝑤𝑙 126𝑥11.25 126𝑥2.66
Max Vu =Wa 𝑥 − 𝑤𝑑=0.5𝑥 - =326.45 lb
2 2 12

7
KSI Engineering - Pathein – 09798432969/09422453947 Project Calculation
Fundamental of RC Structure Analysis and Design

Flexural Strength

Main steel

2𝑀𝑢
𝑎 = d − √𝑑² −
0.68𝑓𝑐′𝑏

2𝑥797.34𝑥12
= 2.66 − √2.66² − 0.68𝑥2500𝑥12

=0.18 in
𝑀𝑢
As= 𝑎
⏀𝑓𝑦(𝑑− )
2

797.34𝑥12
= 0.18
0.8𝑥40000𝑥(2.66− )
2

=0.116 in²/ft < Min As = 0.183 in²/ft

10mm dia bar 8” c/c spacing

Shear Strength

⏀𝑉𝑐 = ⏀2√𝑓𝑐 ′𝑏𝑑

=0.75x2x√2500 x 12x 2.66

=2394 lb > Max Vu (OK)

Main bar – 10mm dia bar 6” c/c spacing

Slab thickness h = 4”

8
KSI Engineering - Pathein – 09798432969/09422453947 Project Calculation
Fundamental of RC Structure Analysis and Design

Two way slab (Typical floor -11.25’x11.25’)


𝐿𝑏 11.25
= =1 <2
𝐿𝑎 11.25

Two way slab design


2(𝐿𝑎+𝑙𝑏)
Min slab thickness h = 180

2(11.25+11.25)
= x 12 =3” < 4”
180

10 10
Take h =4” , d=4”-0.75-(25.4) -(25.4𝑥2) = 2.66"

Min As = 0.002 bh = 0.002x12x4 = 0.096 in²/ft

As = 0.122 in²/ft (10mm dia bar 12” c/c spacing)

Smax = 2h =2x4 = 8”

10mm dia bar 8” c/c spacing (Control for Min As=0.183in²/ft)


4
Own weight of slab = 12 x 150 = 50 lb/ft2

Finish load = 20 lb/ft2

Live load = 40 lb/ft2

Factored load w = 1.2D+1.6L

=1.2(50+20)+1.6(40)

=148 lb/ft2 148 lb/ft2


1’ width beam , w = 148 lb/ft2 x 1 = 148 lb/ft

𝐿𝑎 11.25
m=𝐿𝑏 = 11.25 = 1 (CASE 9)

Max Mu = Ca,negwl² = 0.061x 148 x 11.25² = 1142.61 lb-ft


𝑤𝑙 148𝑥11.25 148𝑥2.66
Max Vu =Wa 𝑥 − 𝑤𝑑=0.67𝑥 - =524.97 lb
2 2 12

9
KSI Engineering - Pathein – 09798432969/09422453947 Project Calculation
Fundamental of RC Structure Analysis and Design

Flexural Strength

Main steel

2𝑀𝑢
𝑎 = d − √𝑑² −
0.68𝑓𝑐′𝑏

2𝑥1142.61𝑥12
= 2.66 − √2.66² − 0.68𝑥2500𝑥12

=0.27 in
𝑀𝑢
As= 𝑎
⏀𝑓𝑦(𝑑− )
2

1142.61𝑥12
= 0.27
0.8𝑥40000𝑥(2.66− )
2

=0.17 in²/ft < Min As = 0.183 in²/ft

10mm dia bar 8” c/c spacing

Shear Strength

⏀𝑉𝑐 = ⏀2√𝑓𝑐 ′𝑏𝑑

=0.75x2x√2500 x 12x 2.66

=2394 lb > Max Vu (OK)

Main bar – 10mm dia bar 6” c/c spacing

Slab thickness h =4”

10
KSI Engineering - Pathein – 09798432969/09422453947 Project Calculation
Fundamental of RC Structure Analysis and Design

Two way slab (Typical floor -11.25’x9.25’)


𝐿𝑏 11.25
= 9.25 =1.22 < 2
𝐿𝑎

Two way slab design.


2(𝐿𝑎+𝑙𝑏)
Min slab thickness h = 180

2(11.25+9.25)
= x 12 =2.73” < 4”
180

10 10
Take h =4” , d=4”-0.75 -(25.4) -(25.4𝑥2)= 2.66"

Min As = 0.002 bh = 0.002x12x4 = 0.096 in²/ft

As = 0.122 in²/ft (10mm dia bar 12” c/c spacing)

Smax = 2h =2x4 = 8”

10mm dia bar 8” c/c spacing (Control for Min As=0.183in²/ft)


4
Own weight of slab = 12 x 150 = 50 lb/ft2

Finish load = 20 lb/ft2

Live load = 40 lb/ft2

Factored load w = 1.2D+1.6L

=1.2(50+20)+1.6(40)

=148 lb/ft2 148 lb/ft2


1’ width beam , w = 148 lb/ft2 x 1 = 148 lb/ft

𝐿𝑎 9.25
m=𝐿𝑏 = 11.25 = 0.8 (CASE 9)

Max Mu = Ca,negwl² = 0.075 x 148 x 9.25² = 949.74 lb-ft


𝑤𝑙 148𝑥9.25 148𝑥2.66
Max Vu =Wa 𝑥 − 𝑤𝑑=𝟎. 𝟖𝟑𝒙 - =535.33 lb
2 2 12

11
KSI Engineering - Pathein – 09798432969/09422453947 Project Calculation
Fundamental of RC Structure Analysis and Design

Flexural Strength

Main steel

2𝑀𝑢
𝑎 = d − √𝑑² −
0.68𝑓𝑐′𝑏

2𝑥949.74𝑥12
= 2.66 − √2.66² − 0.68𝑥2500𝑥12

=0.22 in
𝑀𝑢
As= 𝑎
⏀𝑓𝑦(𝑑− )
2

949.74𝑥12
= 0.22
0.8𝑥40000𝑥(2.66− )
2

=0.14 in²/ft < Min As = 0.183 in²/ft

10mm dia bar 8” c/c spacing

Shear Strength

⏀𝑉𝑐 = ⏀2√𝑓𝑐 ′𝑏𝑑

=0.75x2x√2500 x 12x 2.66

=2394 lb > Max Vu (OK)

Main bar – 10mm dia bar 6” c/c spacing

Slab thickness h =4”

12
KSI Engineering - Pathein – 09798432969/09422453947 Project Calculation
Fundamental of RC Structure Analysis and Design

Two way slab (Landing - 5.25’x3.25’)


𝐿𝑏 5.25
= =1.62 < 2
𝐿𝑎 3.25

Two way slab design.


2(𝐿𝑎+𝑙𝑏)
Min slab thickness h = 180

2(5.25+3.25)
= x 12 =1.13” < 4”
180

10 10
Take h =4” , d=4”-0.75 -(25.4) -(25.4𝑥2)= 2.66"

Min As = 0.002 bh = 0.002x12x4 = 0.096 in²/ft

As = 0.122 in²/ft (10mm dia bar 12” c/c spacing)

Smax = 2h =2x4 = 8”

10mm dia bar 8” c/c spacing (Control for Min As=0.183in²/ft)


4
Own weight of slab = 12 x 150 = 50 lb/ft2

Finish load = 20 lb/ft2

Live load = 100 lb/ft2

Factored load w = 1.2D+1.6L

=1.2(50+20)+1.6(100)

=244 lb/ft2 244 lb/ft2


1’ width beam , w = 244 lb/ft2 x 1 = 244 lb/ft

𝐿𝑎 3.25
m=𝐿𝑏 = 5.25 = 0.6 (CASE 7)

Max Mu = Cb,negwl² = 0.024x 244 x 5.25² =161.41 lb-ft


𝑤𝑙 244𝑥3.25 244𝑥2.66
Max Vu =Wa 𝑥 − 𝑤𝑑=0.76𝑥 - =247.25 lb
2 2 12

13
KSI Engineering - Pathein – 09798432969/09422453947 Project Calculation
Fundamental of RC Structure Analysis and Design

Flexural Strength

Main steel

2𝑀𝑢
𝑎 = d − √𝑑² −
0.68𝑓𝑐′𝑏

2𝑥161.41𝑥12
= 2.66 − √2.66² − 0.68𝑥2500𝑥12

=0.04 in
𝑀𝑢
As= 𝑎
⏀𝑓𝑦(𝑑− )
2

161.41𝑥12
= 0.04
0.8𝑥40000𝑥(2.66− )
2

=0.023 in²/ft < Min As = 0.183 in²/ft

10mm dia bar 8” c/c spacing

Shear Strength

⏀𝑉𝑐 = ⏀2√𝑓𝑐 ′𝑏𝑑

=0.75x2x√2500 x 12x 2.66

=2394 lb > Max Vu (OK)

Main bar – 10mm dia bar 6” c/c spacing

Slab thickness h =4”

14
KSI Engineering - Pathein – 09798432969/09422453947 Project Calculation
Fundamental of RC Structure Analysis and Design

Stair
Stair ( GF to 1st Landing)

Stair horizontal length =7.25 ft

One end continuous slab


𝐿 𝑓𝑦
Min waist thickness h = 24 x (0.4+100)

7.25𝑥12 40
= x (0.4+ )
24 100

=2.9 “ < 5”
12
Take Waist thickness h =5”, d=5-0.75-(25.4𝑥2) = 4”

Min As = 0.002 bh = 0.002x12x5= 0.12 in²/ft

As = 0.175 in²/ft (12mm dia bar 12” c/c spacing)

Smax = 2h =2x5 =10”

12mm dia bar 10” c/c spacing (Control for Min As=0.21 in²/ft)

(1’width)
12+6 1
Own weight of stair= x 9x150 x 144= 84.375 lb/step
2

12
= 84.375 x ( 9 ) =112.5lb/ft

Finish load = 20x 1 = 20 lb/ft

Live load = 100x 1 = 100 lb/ft

Factored load w = 1.2D+1.6L

=1.2(112.5+20)+1.6(100)

=319 lb/ft (319/1’) = 319 lb/ft2


wl² 319x7.25²
Max Mu = = = 1676.74 lb-ft
10 10

𝑤𝑙 319𝑥7.25 319𝑥4
Max Vu =1.15 2 − 𝑤𝑑=1.15x − = 1223.5 lb
2 12

15
KSI Engineering - Pathein – 09798432969/09422453947 Project Calculation
Fundamental of RC Structure Analysis and Design

Flexural Strength

Main steel

2𝑀𝑢
𝑎 = d − √𝑑² −
0.68𝑓𝑐′𝑏

2𝑥1676.74𝑥12
= 4 − √4² − 0.68𝑥2500𝑥12

=0.25 in
𝑀𝑢
As= 𝑎
⏀𝑓𝑦(𝑑− )
2

1676.24𝑥12
= 0.25
0.8𝑥40000𝑥(4− )
2

=0.16 in²/ft < Min As = 0.21 in²/ft

12mm dia bar 10” c/c spacing

Distribution Steel

Min As = 0.21 in²/ft

10mm dia bar 6.5” c/c spacing (As = 0.225 in²/ft)

Shear Strength

⏀𝑉𝑐 = ⏀2√𝑓𝑐 ′𝑏𝑑=0.75x2x√2500 x 12x 4 =3600lb > Max Vu (OK)

Main bar – 12mm dia bar 8” c/c spacing

Distribution bar - 10mm dia bar 6” c/c spacing

Waist thickness h =5”

16
KSI Engineering - Pathein – 09798432969/09422453947 Project Calculation
Fundamental of RC Structure Analysis and Design

Stair ( Typical)
Stair horizontal length =3.25 ft

Both end continuous slab


𝐿 𝑓𝑦
Min waist thickness h = 28 x (0.4+100)

3.25𝑥12 40
= x (0.4+100)
28

=1.11 “ < 5”
12
Take Waist thickness h =5”, d=5-0.75-( ) = 4”
25.4𝑥2

Min As = 0.002 bh = 0.002x12x5= 0.12 in²/ft

As = 0.175 in²/ft (12mm dia bar 12” c/c spacing)

Smax = 2h =2x5 =10”

12mm dia bar 10” c/c spacing (Control for Min As=0.21 in²/ft)

(1’width)
12+6 1
Own weight of stair= x 9x150 x 144= 84.375 lb/step
2

12
= 84.375 x ( 9 ) =112.5lb/ft

Finish load = 20x 1 = 20 lb/ft

Live load = 100x 1 = 100 lb/ft

Factored load w = 1.2D+1.6L

=1.2(112.5+20)+1.6(100)

=319 lb/ft (319/1’) = 319 lb/ft2


wl² 319x3.25²
Max Mu = 10 = = 336.94 lb-ft
10

𝑤𝑙 319𝑥3.25 319𝑥4
Max Vu =1.15 2 − 𝑤𝑑=1.15x − = 489.8 lb
2 12

17
KSI Engineering - Pathein – 09798432969/09422453947 Project Calculation
Fundamental of RC Structure Analysis and Design

Flexural Strength

Main steel

2𝑀𝑢
𝑎 = d − √𝑑² −
0.68𝑓𝑐′𝑏

2𝑥336.94𝑥12
= 4 − √4² − 0.68𝑥2500𝑥12

=0.05 in
𝑀𝑢
As= 𝑎
⏀𝑓𝑦(𝑑− )
2

336.94𝑥12
= 0.05
0.8𝑥40000𝑥(4− )
2

=0.032 in²/ft < Min As = 0.21 in²/ft

12mm dia bar 10” c/c spacing

Distribution Steel

Min As = 0.21 in²/ft

10mm dia bar 6.5” c/c spacing (As = 0.225 in²/ft)

Shear Strength

⏀𝑉𝑐 = ⏀2√𝑓𝑐 ′𝑏𝑑=0.75x2x√2500 x 12x 4 =3600lb > Max Vu (OK)

Main bar – 12mm dia bar 8” c/c spacing

Distribution bar - 10mm dia bar 6” c/c spacing

Waist thickness h =5”

18
KSI Engineering - Pathein – 09798432969/09422453947 Project Calculation
Fundamental of RC Structure Analysis and Design

Singly Reinforced Beam


Roof Beam and Typical Floor Beam
Beam size=9”x9”

d=9-2.5=6.5” From Experiments


𝑓𝑐′ 𝜖𝑢
Max As =0.85β1 𝑓𝑦 (𝜖𝑢+𝜖𝑡)bd

2500 0.003
=0.85x0.85x40000x(0.003+0.0038)x9x6.5

=1.17 in²

3√𝑓𝑐′ 3√2500
Min As = xbxd= x 9 x 6.5 =0.219 in²
𝑓𝑦 40000

200 200
Min As = xbxd= x 9 x 6.5 =0.293 in²(Control)
𝑓𝑦 40000

Beam size =9”x12”

d=12-2.5=9.5”
𝑓𝑐′ 𝜖𝑢
Max As =0.85β1 𝑓𝑦 (𝜖𝑢+𝜖𝑡)bd

2500 0.003
=0.85x0.85x40000x(0.003+0.0038)x9x9.5

=1.703 in²

3√𝑓𝑐′ 3√2500
Min As = xbxd= x 9 x 9.5 =0.321 in²
𝑓𝑦 40000

200 200
Min As = 𝑓𝑦
x b x d = 40000 x 9 x 9.5 =0.428 in²(Control)

19
KSI Engineering - Pathein – 09798432969/09422453947 Project Calculation
Fundamental of RC Structure Analysis and Design

Roof Beam
Line1 Span A-B (Assume B9”x9” )

One end continuous


𝐿 6𝑥12 40
= x (0.4+100) = 3.11”< 9” (OK)
18.5 18.5

9 9
Own weight of beam = 12 x 12x 150 = 84.375 lb/ft

Wall load = 50𝑥3 = 150 lb/ft

Factored load w =1.4(84.375+150)= 328.125 lb/ft


wl² 328.125x6²
Max Mu = 1.2x =1.2x = 1181.25 lb-ft
12 12

𝑤𝑙 328.125𝑥6
Max Vu =1.15x 2 = 1.15 x = 1132.03 lb
2

Line1-Span B-C (Assume B9”x9” )

Both end continuous


𝐿 10𝑥12 40
= x (0.4+100) = 4.57”<9” (OK)
21 21

A = ½ x 10x5 =25 ft2


9 9
Own weight of beam = 12 x 12x 150 = 84.375 lb/ft

Wall load = 50𝑥3 = 150 lb/ft

Slab load = 126x25x1/10 = 315 lb/ft

Factored load w =1.2(84.375+150)+315 =596.25 lb/ft


wl² 596.25x10²
Max Mu =1.2x 12
=1.2𝑥 12
= 5962.5 lb-ft

𝑤𝑙 596.25𝑥10
Max Vu =1.15x 2 = 1.15 x = 3428.44 lb
2

20
KSI Engineering - Pathein – 09798432969/09422453947 Project Calculation
Fundamental of RC Structure Analysis and Design

Line1-Span C-D (Assume B9”x9”)

One end continuous


𝐿 12𝑥12 40
= x (0.4+100) = 6.22”<9” (OK)
18.5 18.5

A = ½ x 12x6 =36 ft2


9 9
Own weight of beam = 12 x 12x 150 = 84.375 lb/ft

Wall load = 50𝑥3 = 150 lb/ft

Slab load =126x36x1/12 = 378 lb/ft

Factored load w=1.2(84.375+150)+ 378=659.25 lb/ft


wl² 659.25x12²
Max Mu =1.2x =1.2𝑥 = 9493.2 lb-ft
12 12

𝑤𝑙 659.25𝑥12
Max Vu =1.15x = 1.15 x = 4548.83 lb
2 2

Roof Beam Line1 Analysis Result

Roof
Beam Mu (lb-ft) Vu (lb)
1/AB 1181.25 1132.03
1/BC 5962.5 3428.44
1/CD 9493.2 4548.83

Flexural Strength

2𝑀𝑢
𝑎 = d − √𝑑² −
0.68𝑓𝑐′𝑏

2𝑥9493.2𝑥12
= 6.5 − √6.5² − 0.68𝑥2500𝑥9

=1.27 in
𝑀𝑢
As= 𝑎
⏀𝑓𝑦(𝑑− )
2

9493.2𝑥12
= 1.27
0.8𝑥40000𝑥(6.5− )
2

=0.607 in² > Min As=0.293 in²

21
KSI Engineering - Pathein – 09798432969/09422453947 Project Calculation
Fundamental of RC Structure Analysis and Design

Use As=0.624 in²(16mm-2Nos)

Max As > As > Min As


1.17in²>0.624in²> 0.293 in² (OK)

Main Top bar = 16mm-2Nos

Main Bottom bar = 16mm-2Nos

Shear Strength

⏀𝑉𝑐 = ⏀2√𝑓𝑐 ′𝑏𝑑

=0.75x2x√2500 x9x 6.5

=4387.5 lb < Max Vu = 4548.83 lb

Vu > ⏀𝑉𝑐 (Need Shear Force Resisting Stirrup)

Vu − ⏀𝑉𝑐 =4548.83 – 4387.5= 161.33 lb

⏀4√𝑓𝑐 ′𝑏𝑑 =0.75x4x√2500 x9x 6.5 = 8775 lb >Vu − ⏀𝑉𝑐

Try 8 mm dia stirrup


⏀𝐴𝑣𝑓𝑦𝑑 0.75𝑥0.078𝑥2𝑥40000𝑥6.5
S = 𝑉𝑢−⏀𝑉𝑐 = = 188.56”
161.33

S=d/2 = 6.5/2 = 3.25” (Control)

Stirrup

8mm dia bar 3”c/c spacing inside 2h.

8mm dia bar 6”c/c spacing outside 2h.

22
KSI Engineering - Pathein – 09798432969/09422453947 Project Calculation
Fundamental of RC Structure Analysis and Design

Line B Span 1-2 (Assume B9”x9”)

One end continuous


𝐿 12𝑥12 40
= x (0.4+100) = 6.22”<9” (OK)
18.5 18.5

12+(12−10)
A = (12𝑥3) + ( 𝑥5)=36+35=71 ft2
2

9 9
Own weight of beam = 12 x 12x 150 = 84.375 lb/ft

Slab load= 126x71x1/12 = 745.5 lb/ft

Factored load w = =1.2(84.375)+745.5 =846.75 lb/ft


wl² 846.75x12²
Max Mu =1.2x 12
=1.2𝑥 12
= 12193.2 lb-ft

𝑤𝑙 846.75𝑥12
Max Vu =1.15x 2 = 1.15 x 2
= 5842.56 lb

Try line B-Span-23

Try line B-Span-34

Try line B-Span-45

Roof Beam LineB Analysis Result

Beam Mu (lb-ft) Vu (lb)


B/12 12193.2 5842.56
B/23 try try
B/34 try try
B/45 try try

Flexural Strength

2𝑀𝑢
𝑎 = d − √𝑑² −
0.68𝑓𝑐′𝑏

2𝑥12193.2𝑥12
= 6.5 − √6.5² − 0.68𝑥2500𝑥9

=1.69 in

23
KSI Engineering - Pathein – 09798432969/09422453947 Project Calculation
Fundamental of RC Structure Analysis and Design
𝑀𝑢
As= 𝑎
⏀𝑓𝑦(𝑑− )
2

12193.2𝑥12
= 1.69
0.8𝑥40000𝑥(6.5− )
2

=0.809 in² > Min As=0.293 in²

Use As=0.935 in²(16mm-3Nos)

Max As > As > Min As


1.17in²>0.935in²> 0.293 in² (OK)

Main Top bar = 16mm-3Nos

Main Bottom bar = 16mm-3Nos

Shear Strength

⏀𝑉𝑐 = ⏀2√𝑓𝑐 ′𝑏𝑑

=0.75x2x√2500 x9x 6.5

=4387.5 lb < Max Vu = 5842.56 lb

Vu > ⏀𝑉𝑐 (Need Shear Force Resisting Stirrup)

Vu − ⏀𝑉𝑐 =5842.56 – 4387.5= 1455.06 lb

⏀4√𝑓𝑐 ′𝑏𝑑 =0.75x4x√2500 x9x 6.5 = 8775 lb >Vu − ⏀𝑉𝑐

Try 8 mm dia stirrup


⏀𝐴𝑣𝑓𝑦𝑑 0.75𝑥0.078𝑥2𝑥40000𝑥6.5
S = 𝑉𝑢−⏀𝑉𝑐 = = 20.91 ”
1455.06

S=d/2 = 6.5/2 = 3.25” (Control)

Stirrup

8mm dia bar 3”c/c spacing inside 2h.

8mm dia bar 6”c/c spacing outside 2h.

24
KSI Engineering - Pathein – 09798432969/09422453947 Project Calculation
Fundamental of RC Structure Analysis and Design

Typical Floor Beam


Line1-Span A-B (Assume B9”x12” )

One end continuous


𝐿 6𝑥12 40
= x (0.4+100) = 3.11”<12” (OK)
18.5 18.5

6+(6−4)
A=( 𝑥2)=8 ft2
2

9 12
Own weight of beam = 12 x 12x 150 = 112.5 lb/ft

Wall load = 50𝑥3 = 150 lb/ft

Landing slab load = 244 x8x1/6 =325.33 lb/ft

Factored load w =1.2(112.5+150)+325.33 =640.33 lb/ft


wl² 640.33x6²
Max Mu =1.2x 12
=1.2𝑥 12
= 2305.19 lb-ft

𝑤𝑙 640.33𝑥6
Max Vu =1.15x = 1.15 x = 2209.14 lb
2 2

Line1-Span B-C (Assume B9”x12” )

Both end continuous


𝐿 10𝑥12 40
= x (0.4+100) = 4.57”<12” (OK)
21 21

A = (½ x 10x5)+(2x10)=25+20= 45 ft2
9 12
Own weight of beam = 12 x 12x 150 = 112.5 lb/ft

Wall Area = (9𝑥10) – (3x7) –(2x4) = 61 ft2

Wall Load = 50x61/10 = 305 lb/ft

Slab Load = 148 x 45x1/10 = 666 lb/ft

Factored load w =1.2(112.5+305)+666 =1167 lb/ft


wl² 1167x10²
Max Mu =1.2x =1.2𝑥 = 9725 lb-ft
12 12

𝑤𝑙 1167𝑥10
Max Vu =1.15x 2 = 1.15 x = 5835 lb
2

25
KSI Engineering - Pathein – 09798432969/09422453947 Project Calculation
Fundamental of RC Structure Analysis and Design

Line1-Span C-D (Assume B9”x12” )

One end continuous


𝐿 12𝑥12 40
= x (0.4+100) = 6.22”<12” (OK)
18.5 18.5

A =( ½ x 12x6)+(2x12)=36+24=60 ft2
9 12
Own weight of beam = 12 x 12x 150 = 112.5 lb/ft

Wall Area = (9𝑥12) – (4x4) = 92 ft2

Wall Load = 50x92/12 = 383.33 lb/ft

Slab load = 148x60x1/12 =740 lb/ft

Factored load w =1.2(112.5+383.33)+740 =1335 lb/ft


wl² 1335x12²
Max Mu =1.2x 12
=1.2𝑥 12
= 19224 lb-ft

𝑤𝑙 1335𝑥12
Max Vu =1.15x 2 = 1.15 x = 9211.5 lb
2

Typical Floor Beam Line1 Analysis Result

Beam Mu (lb-ft) Vu (lb)


1/AB 2305.19 2209.14
1/BC 9725 5835
1/CD 19224 9211.5

Flexural Strength

2𝑀𝑢
𝑎 = d − √𝑑² −
0.68𝑓𝑐′𝑏

2𝑥19224𝑥12
= 9.5 − √9.5² −
0.68𝑥2500𝑥9

=1.75 in
𝑀𝑢
As= 𝑎
⏀𝑓𝑦(𝑑− )
2

19224𝑥12
= 1.75
0.8𝑥40000𝑥(9.5− )
2

=0.84 in² > Min As=0.428 in²

26
KSI Engineering - Pathein – 09798432969/09422453947 Project Calculation
Fundamental of RC Structure Analysis and Design

Use As=0.935 in²(16mm-3Nos)

Max As > As > Min As


1.703in²>0.935in²> 0.428in² (OK)

Main Top bar = 16mm-3Nos

Main Bottom bar = 16mm-3Nos

Shear Strength

⏀𝑉𝑐 = ⏀2√𝑓𝑐 ′𝑏𝑑

=0.75x2x√2500 x9x 9.5

=6412.5 lb < Max Vu =9211.5 lb

Vu > ⏀𝑉𝑐 (Need Shear Force Resisting Stirrup)

Vu − ⏀𝑉𝑐 =9211.5 – 6412.5= 2799 lb

⏀4√𝑓𝑐 ′𝑏𝑑 =0.75x4x√2500 x9x 9.5 = 12825 lb >Vu − ⏀𝑉𝑐

Try 8 mm dia stirrup


⏀𝐴𝑣𝑓𝑦𝑑 0.75𝑥0.078𝑥2𝑥40000𝑥9.5
S = 𝑉𝑢−⏀𝑉𝑐 = 2688.6
= 16.54”

S=d/2 = 9.5/2 = 4.75” (Control)

Stirrup

8mm dia bar 4”c/c spacing inside 2h.

8mm dia bar 6”c/c spacing outside 2h.

27
KSI Engineering - Pathein – 09798432969/09422453947 Project Calculation
Fundamental of RC Structure Analysis and Design

Line1’-Span B-C (Assume B9”x9” )

One end continuous


𝐿 10𝑥12 40
= x (0.4+100) = 5.2”< 9” (OK)
18.5 18.5

A =10𝑥2 =20 ft2


9 9
Own weight of beam = 12 x 12x 150 = 84.375 lb/ft

Slab load = 148x20x1/10 =296 lb/ft

Factored load w =1.2(84.375)+296 =397.25 lb/ft 397.25 lb/ft

wl² 397.25x10²
Max Mu = 1.2x =1.2𝑥 = 3972.5 lb-ft
12 12

𝑤𝑙 397.25𝑥10
Max Vu =1.15𝑥 = 1.15𝑥 = 2284.19 lb
2 2

Line1’-Span C-D(Assume B9”x9” )

One end continuous


𝐿 12𝑥12 40
= x (0.4+100) = 6.23”<9” (OK)
18.5 18.5

A =2x12=24 ft2
9 9
Own weight of beam = 12 x 12x 150 = 84.375 lb/ft

Slab load = 148x24x1/12 =296 lb/ft

Factored load w =1.2(84.375)+296 =397.25 lb/ft 397.25 lb/ft

wl² 397.25x12²
Max Mu =1.2x =1.2x = 5720.4 lb-ft
12 12

𝑤𝑙 397.25𝑥12
Max Vu =1.15𝑥 = 1.15𝑥 = 2741.025 lb
2 2

Typical Floor Beam Line1’ Analysis Result

Mu (lb-
Beam ft) Vu (lb)
1'/BC 3972.5 2284.19
1'/CD 5720.4 2741.025

28
KSI Engineering - Pathein – 09798432969/09422453947 Project Calculation
Fundamental of RC Structure Analysis and Design

Flexural Strength

2𝑀𝑢
𝑎 = d − √𝑑² −
0.765𝑓𝑐′𝑏

2𝑥5720.4𝑥12
= 6.5 − √6.5² − 0.68𝑥2500𝑥9 =0.73 in

𝑀𝑢
As= 𝑎
⏀𝑓𝑦(𝑑− )
2

5720.4𝑥12
= 0.73 =0.35 in² > Min As=0.293 in²
0.8𝑥40000𝑥(6.5− )
2

Use As=0.624 in²(16mm-2Nos)

Max As > As > Min As


1.17 in²> 0.624in²> 0.375 in² (OK)

Main Top bar = 16mm-2Nos

Main Bottom bar = 16mm-2Nos

Shear Strength

⏀𝑉𝑐 = ⏀2√𝑓𝑐 ′𝑏𝑑

=0.75x2x√2500 x9x 6.5

=4387.5 lb > Max Vu =2741.025 lb


⏀𝑉𝑐
= 2193.75 lb < Max Vu =2741.025 lb
2

⏀𝑉𝑐
⏀𝑉𝑐 > Vu > (Need Shear Force Resisting Stirrup)
2

Try 8 mm dia stirrup


𝐴𝑣𝑓𝑦 0.078𝑥2𝑥40000
S= = = 13.87”
50𝑏 50𝑥9

S=d/2 =6.5/2 = 3.25” (Control)

Stirrup

8mm dia bar 3”c/c spacing inside 2h.

8mm dia bar 6”c/c spacing outside 2h.

29
KSI Engineering - Pathein – 09798432969/09422453947 Project Calculation
Fundamental of RC Structure Analysis and Design

LineB-Span 1’-1(Assume B9”x12” )

Cantilever
𝐿 4𝑥12 40
= x (0.4+100) = 4.8”<12” (OK)
8 8

9 12
Own weight of beam = 12 x 12x 150 = 112.5 lb/ft

Factored load w =1.2(112.5)=135 lb/ft

P = (397.25x10)/2 = 1986.25 lb
wl² 135x42
Max Mu = 1.2( + 𝑃𝑙 )=1.2( + 1986.25𝑥4) = 10830 lb-ft
2 2

Max Vu =1.15(wl+P)= 1.15 x(135x4 +1986.25) = 2905.19 lb

Secondary Beam on LineB Span 1-2 (Assume B9”x9” )

Simply Supported
𝐿 6𝑥12 40
= x (0.4+100) = 3.6”< 9” (OK)
16 16

9 9
Own weight of beam = 12 x 12x 150 = 84.375 lb/ft

6+(6−4)
Landing Slab Area = ( 𝑥2)=8 ft2
2

Landing Slab Load =244 x8x 1/6= 325.33 lb/ft

Stair Area = (2x3)+(2x3) =6+6 = 12 ft2

Stair Load =319x12x 1/6= 638 lb/ft

Landing Slab +Stair Load w = 325.33+638 = 963.33 lb/ft

Factored load w =1.2(84.375)+ 963.33 =1064.58 lb/ft 1064.58 lb/ft


wl² 1064.58x6²
Max Mu = = = 4790.61 lb-ft
8 8

𝑤𝑙 1064.58𝑥6
Max Vu = 2 = = 3193.74 lb
2

30
KSI Engineering - Pathein – 09798432969/09422453947 Project Calculation
Fundamental of RC Structure Analysis and Design

Continue Design

LineB-Span 1-2 (Assume B9”x12” )

Both end continuous


𝐿 12𝑥12 40
= x (0.4+100) = 5.49”<12” (OK)
21 21

9 12
Own weight of beam = 12 x 12x 150 = 112.5 lb/ft

Wall Area = (9𝑥12) – (3x7) = 87 ft2

Wall Load = 50x87/12 = 362.5 lb/ft

12+(12−10)
Typical Slab Area = ( 𝑥5)=35 ft2
2

Typical Slab Load = 148x35x1/12 =431.67 lb/ft


1
Landing Slab Area = (2 𝑥4𝑥2)=4 ft2

Landing Slab Load =244 x 4 x 1/12= 81.33 lb/ft

Typical Slab + Landing Slab Load w = 431.67+81.33 = 513 lb/ft

Factored load w =1.2(112.5+362.5)+ 513 =961.8 lb/ft

Point load=1064.58 x6/2 = 3193.74 lb


wl² Pa2 𝑏 961.8x122 3193.74x82𝑥4
Max Mu =1.2x ( + ) =1.2x( + ) = 20663.23 lb-ft
12 l2 12 122

𝑤𝑙 𝑃𝑎 961.8𝑥12 3193.74𝑥8
Max Vu =1.15𝑥( 2 + 𝑙 )= 1.15 x( + ) = 9084.95 lb
2 12

Try line B-Span-23

Try line B-Span-34

31
KSI Engineering - Pathein – 09798432969/09422453947 Project Calculation
Fundamental of RC Structure Analysis and Design

Secondary Beam on LineB Span 4 -5 (Assume B9”x9” )

Simply Supported
𝐿 6𝑥12 40
= x (0.4+100) = 3.6”< 9” (OK)
16 16

6+(6−5) 6+(6−5)
A=( x 2. 5)+ ( x 2. 5) =8.75+8.75=17.5 ft²
2 2

9 9
Own weight of beam = 12 x 12x 150 = 84.375 lb/ft

Wall load = 50x9 = 450 lb/ft

Slab load =148x17.5x1/6 =431.67 lb/ft

Factored load w =1.2(84.375+450)+ 431.67=1072.92 lb/ft 1072.92 lb/ft


wl² 1072.92x6²
Max Mu = = = 4828.14 lb-ft
8 8

𝑤𝑙 1072.92𝑥6
Max Vu = = = 3218.76 lb
2 2

Continue Design

LineB-Span 4-5(Assume B9”x12” )

One end continuous


𝐿 10𝑥12 40
= x (0.4+100) = 5.2”<12” (OK)
18.5 18.5

A = 2(1/2𝑥5𝑥2.5)+ (1/2x10x5)=12.5+25=37.5 ft²


9 12
Own weight of beam = 12 x 12x 150 = 112.5 lb/ft

Wall Area = (9𝑥10) – (2.5x6.5) – (2.5x6.5) = 57.5 ft2

Wall Load = 50x57.5/10 = 287.5 lb/ft

Slab load =148x37.5x1/10 = 555 lb/ft

Factored load w =1.2(112.5+287.5)+555=1035 lb/ft

Point load=1072.92 x6/2 =3218.76 lb


wl² PL 1035x102 3218.76𝑥10
Max Mu =1.2x ( + 8 ) =1.2𝑥( + ) = 15178.14 lb-ft
12 12 8

𝑤𝑙 1035𝑥10 3218.76
Max Vu =1.15( +P/2)= 1.15 ( + ) = 7802.04 lb
2 2 2

32
KSI Engineering - Pathein – 09798432969/09422453947 Project Calculation
Fundamental of RC Structure Analysis and Design

Typical Floor Beam LineB Analysis Result

Beam Mu (lb-ft) Vu (lb)


B/1'1 10830 2905.19
B/12 20663.23 9084.95
B/23 try try
B/34 try try
B/45 15178.14 7802.04

Flexural Strength

2𝑀𝑢
𝑎 = d − √𝑑² −
0.68𝑓𝑐′𝑏

2𝑥20663.23𝑥12
= 9.5 − √9.5² − 0.68𝑥2500𝑥9

=1.89 in

𝑀𝑢
As= 𝑎
⏀𝑓𝑦(𝑑− )
2

20663.23𝑥12
= 1.89
0.8𝑥40000𝑥(9.5− )
2

=0.9 in² > Min As=0.428 in²

Use As=1.184 in²(18mm-3Nos)

Max As > As > Min As


1.703in²>1.184in²> 0.428in² (OK)

Main Top bar = 18mm-3Nos

Main Bottom bar = 18mm-3Nos

or

As=1.247 in²(16mm-4Nos)

But 16mm-4Nos, one row is not OK.

Try Two Row

d=12-3.5=8.5” (tow row)

33
KSI Engineering - Pathein – 09798432969/09422453947 Project Calculation
Fundamental of RC Structure Analysis and Design

2𝑀𝑢
𝑎 = d − √𝑑² −
0.68𝑓𝑐′𝑏

2𝑥20663.23𝑥12
= 8.5 − √8.5² − 0.68𝑥2500𝑥9

=1.01 in
𝑀𝑢
As= 𝑎
⏀𝑓𝑦(𝑑− )
2

20663.23𝑥12
= 1.01
0.8𝑥40000𝑥(8.5− )
2

=0.97 in² < 1.247 in²

Use 1.247 in² (16mm 4Nos)


𝑓𝑐′ 𝜖𝑢
Max As =0.85β1 ( )bd
𝑓𝑦 𝜖𝑢+𝜖𝑡

2500 0.003
=0.85x0.85x40000x(0.003+0.0038)x9x8.5

=1.524 in²

3√𝑓𝑐′ 3√2500
Min As = xbxd= x 9 x 8.5 =0.287 in²
𝑓𝑦 40000

200 200
Min As = x b x d = 40000 x 9 x 8.5 =0.383 in²(Control)
𝑓𝑦

Max As > As > Min As


1.524in²>1.247in²> 0.383 in² (OK)

Main Top bar = 16mm-4Nos (two row)

Main Bottom bar = 16mm-4Nos (two row)

34
KSI Engineering - Pathein – 09798432969/09422453947 Project Calculation
Fundamental of RC Structure Analysis and Design

Shear Strength

⏀𝑉𝑐 = ⏀2√𝑓𝑐 ′𝑏𝑑

=0.75x2x√2500 x9x 8.5

=5737.5 lb < Max Vu =10231.73 lb

Vu > ⏀𝑉𝑐 (Need Shear Force Resisting Stirrup)

Vu − ⏀𝑉𝑐 =10231.73 -5737.5 = 4494.23 lb

⏀4√𝑓𝑐 ′𝑏𝑑 =0.75x4x√2500 x9x 8.5= 11475 lb >Vu − ⏀𝑉𝑐

Try 8 mm dia stirrup


⏀𝐴𝑣𝑓𝑦𝑑 0.75𝑥0.078𝑥2𝑥40000𝑥8.5
S = 𝑉𝑢−⏀𝑉𝑐 = =8.85”
4494.23

S=d/2 = 8.5/2 = 4.25” (Control)

Stirrup

8mm dia bar 4”c/c spacing inside 2h.

8mm dia bar 6”c/c spacing outside 2h.

Remark – You should design all beams in Line B to be economical.

35
KSI Engineering - Pathein – 09798432969/09422453947 Project Calculation
Fundamental of RC Structure Analysis and Design

Ground Floor Beam


From Experiments
Beam size=9”x9”

d=9-3=6”
𝑓𝑐′ 𝜖𝑢
Max As =0.85β1 𝑓𝑦 (𝜖𝑢+𝜖𝑡)bd

2500 0.003
=0.85x0.85x40000x(0.003+0.0038)x9x6

=1.08 in²

3√𝑓𝑐′ 3√2500
Min As = xbxd= x 9 x 6 =0.203 in²
𝑓𝑦 40000

200 200
Min As = xbxd= x 9 x 6 =0.27 in²(Control)
𝑓𝑦 40000

Beam size=9”x12”

d=12-3=9”
𝑓𝑐′ 𝜖𝑢
Max As =0.85β1 𝑓𝑦 (𝜖𝑢+𝜖𝑡)bd

2500 0.003
=0.85x0.85x40000x(0.003+0.0038)x9x9

=1.614 in²

3√𝑓𝑐′ 3√2500
Min As = xbxd= x 9 x 9 =0.304 in²
𝑓𝑦 40000

200 200
Min As = x b x d = 40000 x 9 x 9 =0.405 in²(Control)
𝑓𝑦

Line1-Span A-B (Assume B9”x9” )

One end continuous


𝐿 6𝑥12 40
= x (0.4+ ) = 3.11”<9” (OK)
18.5 18.5 100

9 9
Own weight of beam = 12 x 12x 150 = 84.375 lb/ft

Stair Area = 3x4 =12 ft2

Stair load =319x12 x1/6 =638 lb/ft

Factored load w = 1.2(84.375)+638 = 739.25 lb/ft


wl² 739.25x6²
Max Mu =1.2x =1.2x = 2661.3 lb-ft
12 12

36
KSI Engineering - Pathein – 09798432969/09422453947 Project Calculation
Fundamental of RC Structure Analysis and Design
𝑤𝑙 739.25𝑥6
Max Vu =1.15x 2 = 1.15 x = 2550.41 lb
2

Line1-Span B-C (Assume B9”x9” )

Both end continuous


𝐿 10𝑥12 40
= x (0.4+100) = 4.57”< 9” (OK)
21 21

9 9
Own weight of beam = 12 x 12x 150 = 84.375 lb/ft

Factored load w = 1.4D

=1.4(84.375)

=118.125 lb/ft
wl² 118.125x10²
Max Mu =1.2x =1.2x = 1181.25 lb-ft
12 12

𝑤𝑙 118.125𝑥10
Max Vu =1.15x 2 = 1.15 x 2
= 679.22 lb

Line1-Span C-D (Assume B9”x9” )

One end continuous


𝐿 12𝑥12 40
= x (0.4+100) = 6.23”<21” (OK)
21 18.5

9 9
Own weight of beam = 12 x 12x 150 = 84.375 lb/ft

Factored load w = 1.4D

=1.4(84.375)

=118.125 lb/ft
wl² 118.125x12²
Max Mu =1.2x =1.2x = 1701 lb-ft
12 12

𝑤𝑙 118.125𝑥12
Max Vu =1.15x 2 = 1.15 x = 815.06 lb
2

Ground Floor Beam Line1 Analysis Result

Beam Mu (lb-ft) Vu (lb)


1/AB 2661.3 2550.41
1/BC 1181.25 679.22
1/CD 1701 815.06

37
KSI Engineering - Pathein – 09798432969/09422453947 Project Calculation
Fundamental of RC Structure Analysis and Design

Flexural Strength

2𝑀𝑢
𝑎 = d − √𝑑² −
0.68𝑓𝑐′𝑏

2𝑥2661.3𝑥12
= 6 − √6² − 0.68𝑥2500𝑥9 =0.36 in

𝑀𝑢
As= 𝑎
⏀𝑓𝑦(𝑑− )
2

2661.3𝑥12
= 0.36
0.8𝑥40000𝑥(6− )
2

=0.17 in² < Min As=0.27 in²

Use As=0.624 in²(16mm-2Nos)

Max As > As > Min As


1.08in²>0.624in²> 0.27 in² (OK)

Main Top bar = 16mm-2Nos

Main Bottom bar = 16mm-2Nos

Shear Strength

⏀𝑉𝑐 = ⏀2√𝑓𝑐 ′𝑏𝑑

=0.75x2x√2500 x 9x 6

=4050 lb > Max Vu = 2550.41 lb


⏀𝑉𝑐
=2025 lb < Max Vu = 2550.41 lb
2

⏀𝑉𝑐
⏀𝑉𝑐 > Vu > (Need Shear Force Resisting Stirrup)
2

Try 8 mm dia stirrup


𝐴𝑣𝑓𝑦 0.078𝑥2𝑥40000
S= = = 13.87”
50𝑏 50𝑥9

S=d/2 =6/2 = 3” (Control)

Stirrup

8mm dia bar 3”c/c spacing inside 2h.

8mm dia bar 6”c/c spacing outside 2h.

38
KSI Engineering - Pathein – 09798432969/09422453947 Project Calculation
Fundamental of RC Structure Analysis and Design

LineB-Span 1-2 (Assume B9”x9” )

One end continuous


𝐿 12𝑥12 40
= x (0.4+100) = 6.22”<9” (OK)
18.5 18.5

9 9
Own weight of beam = 12 x 12x 150 = 84.375 lb/ft

Wall load = 50x 9 = 450 lb/ft

Factored load w = 1.4D

=1.4(84.375+450)

=748.125 lb/ft
wl² 748.125x12²
Max Mu =1.2x =1.2x = 10773 lb-ft
12 12

𝑤𝑙 748.125𝑥12
Max Vu =1.15x = 1.15 x = 5162.06 lb
2 2

Try LineB -Span 2-3

Try LineB -Span 3-4

Secondary Beam on Line B Span 4 -5 (Assume B9”x9” )

Simply Supported
𝐿 6𝑥12 40
= x (0.4+100) = 3.6”<9” (OK)
16 16

9 9
Own weight of beam = 12 x 12x 150 = 84.375 lb/ft

Wall load = 50x9 = 450lb/ft

Factored load w = 1.4D

=1.4(84.375+462.5)
748.125 lb/ft
=748.125 lb/ft
wl² 748.125x6² 𝑤𝑙 748.125𝑥6
Max Mu = = = 3366.56 lb-ftMax Vu = 2 = = 2244.375 lb
8 8 2

Continue Design

39
KSI Engineering - Pathein – 09798432969/09422453947 Project Calculation
Fundamental of RC Structure Analysis and Design

LineB Span 4-5(Assume B9”x9” )

One end continuous


𝐿 10𝑥12 40
= x (0.4+100) = 5.2”<9” (OK)
18.5 18.5

9 9
Own weight of beam = 12 x 12x 150 = 84.375 lb/ft

Wall Area = (9𝑥10) – (2.5x6.5) – (2.5x6.5) = 57.5 ft2

Wall Load = 50x57.5/10 = 287.5 lb/ft

Factored load w = 1.4D

=1.4(84.325+287.5)

=520.55 lb/ft

Point load=748.125x6/2 =2244.375 lb


wl² PL 520.55 x102 2244.375𝑥10
Max Mu =1.2x ( + 8 ) =1.2𝑥( + ) = 8572.06 lb-ft
12 12 8

𝑤𝑙 520.55 𝑥10 2244.375


Max Vu =1.15( 2 +P/2)= 1.15 ( + ) =4283.68 lb
2 2

Ground Floor Beam LineB Analysis Result

Beam Mu (lb-ft) Vu (lb)


B/12 10773 5162.06
B/23 try try
B/34 try try
B/45 8572.06 4283.68

Flexural Strength

2𝑀𝑢
𝑎 = d − √𝑑² −
0.68𝑓𝑐′𝑏

2𝑥10773𝑥12
= 6 − √6² − 0.68𝑥2500𝑥9

=1.63 in

40
KSI Engineering - Pathein – 09798432969/09422453947 Project Calculation
Fundamental of RC Structure Analysis and Design
𝑀𝑢
As= 𝑎
⏀𝑓𝑦(𝑑− )
2

10773𝑥12
= 1.63
0.8𝑥40000𝑥(6− )
2

=0.78 in² > Min As=0.27 in²

Use As=0.935 in²(16mm-3Nos)

Max As > As > Min As


1.08in²>0.935in²> 0.27 in² (OK)

Main Top bar = 16mm-3Nos

Main Bottom bar = 16mm-3Nos

Shear Strength

⏀𝑉𝑐 = ⏀2√𝑓𝑐 ′𝑏𝑑

=0.75x2x√2500 x 9x6

=4050 lb < Max Vu =5162.06 lb

Vu > ⏀𝑉𝑐 (Need Shear Force Resisting Stirrup)

Vu − ⏀𝑉𝑐 =5162.06 – 4050 = 1112.06 lb

⏀4√𝑓𝑐 ′𝑏𝑑 =0.75x4x√2500 x9x 6 = 8100 lb >Vu − ⏀𝑉𝑐

Try 8 mm dia stirrup


⏀𝐴𝑣𝑓𝑦𝑑 0.75𝑥0.078𝑥2𝑥40000𝑥6
S = 𝑉𝑢−⏀𝑉𝑐 = = 25.25”
1112.06

S=d/2 = 6/2 = 3” (Control)

Stirrup

8mm dia bar 3”c/c spacing inside 2h.

8mm dia bar 6”c/c spacing outside 2h.

41
KSI Engineering - Pathein – 09798432969/09422453947 Project Calculation
Fundamental of RC Structure Analysis and Design

Column
Roof Column 1B
9 9
Own weight of column = 12 x 12x10x150 =843.75lb = 0.84 kip

9 9
Upper column load = 12 x 12x3x150 =253.13lb = 0.25 kip

PAB=1132.03 lb = 1.13 kip/1.15 =0.98 kip

PBC=3428.44 lb = 3.43 kip/1.15 = 2.98 kip

P12= 5842.56 lb = 5.84 kip/1.15 = 5.08 kip

Factored load Pu= 1.2(0.84+0.25)+0.98 +2.98+5.08 = 10.35 kip

MAB=1181.25 lb-ft = 1.18 k-ft

MBC=5962.5 lb-ft = 5.96 k-ft

M12=12193.2 lb-ft =12.19 k-ft

Mux=5.96-1.18 =4.78 k-ft

Muy=12.19 k-ft

As=0.01Ag=0.01x9x9=0.81 in²

Try As=1.247 in² (16mm-4Nos)

⏀Pn=0.62x0.8x(0.85fc’(Ag-As)+Asfy)

=0.62x0.8x(0.85x2.5x(81-1.247)+1.247x40)

=108.8 kip> Pu=10.35 kip (OK)

42
KSI Engineering - Pathein – 09798432969/09422453947 Project Calculation
Fundamental of RC Structure Analysis and Design

Y Direction

e=Mu/Pu =(12.19 x12)/10.35=14.13 in > 0.1x9 =0.9 in

𝑏ℎ𝑓𝑐 ′ 𝐴𝑠 ′ 𝑓𝑦
⏀Pn = ⏀(3ℎ𝑒 + 𝑒 )
+1.18 +0.5
𝑑2 𝑑−𝑑′

9𝑥9𝑥2.5 0.624𝑥40
=0.62 (3𝑥9𝑥14.13 + 14.13 )
+1.18 +0.5
6.52 6.5−2.5

= 16.13 kip > Pu=10.35 kip (OK)

Tie spacing

Smax = 8xdb = 8x(16/25.4) =5.03 in

Smax = 24xdt = 24 x (8/25.4) =7.6 in

Smax = b/2 or h/2 = 9/2 =4.5 in

Use S = 4 in

Main bar = 16mm-4Nos

Tie =8mm- 4”c/c spacing

43
KSI Engineering - Pathein – 09798432969/09422453947 Project Calculation
Fundamental of RC Structure Analysis and Design

2nd Floor Column 1B


12 12
Own weight of column = 12 x 12x10x150 =1500lb = 1.5 kip

Upper Column load =10.35 kip

PAB=2209.14 lb =2.21 kip/1.15 = 1.92 kip

PBC=5835 lb =5.84 kip/1.15 = 5.08 kip

P1’1= 2905.19 lb =2.91 kip/1.15 = 2.53 kip

P12= 9084.95 lb =9.08 kip/1.15 = 7.89 kip

Factored load Pu= 1.2(1.5)+10.35+1.92+5.08+2.53+7.89 =29.57 kip

MAB=2305.19 lb-ft = 2.31 k-ft

MBC=9725 lb-ft = 9.73 k-ft

M1’1=10830 lb-ft =10.83 k-ft

M12=20663.23 lb-ft = 20.66 k-ft

Mux=9.73-2.31=7.42 k-ft

Muy=20.66-10.83=9.83 k-ft

As=0.01Ag=0.01x12x12=1.44 in²

Try As=1.871 in² (16mm-6Nos)

⏀Pn=0.62x0.8x(0.85fc’(Ag-As)+Asfy)

=0.62x0.8x(0.85x2.5x(144-1.871)+1.871x40)

=186.92 kip> Pu=29.57 kip (OK)

44
KSI Engineering - Pathein – 09798432969/09422453947 Project Calculation
Fundamental of RC Structure Analysis and Design

Y Direction

e=Mu/Pu =(9.83x12)/ 31.82 =3.71 in > 0.1x12 =1.2”


𝑏ℎ𝑓𝑐 ′ 𝐴𝑠 ′ 𝑓𝑦
⏀Pn = ⏀(3ℎ𝑒 + 𝑒 )
+1.18 +0.5
𝑑2 𝑑−𝑑′

12𝑥12𝑥2.5 0.624𝑥40
=0.62 (3𝑥12𝑥3.71 + 3.71 )
+1.18 +0.5
9.52 9.5−2.5

= 98.94 kip > Pu=29.57 kip (OK)

Tie spacing

Smax = 8xdb = 8x(16/25.4) =5.04 in

Smax = 24xdt = 24 x (8/25.4) =7.6 in

Smax = b/2 or h/2 = 12/2 =6 in

Use S = 5 in

Main bar = 16mm-6Nos

Tie =8mm- 5”c/c spacing

45
KSI Engineering - Pathein – 09798432969/09422453947 Project Calculation
Fundamental of RC Structure Analysis and Design

1st Floor Column 1B


12 12
Own weight of column = 12 x 12x10x150 =1500lb = 1.5 kip

Upper Column load =29.57 kip

PAB=2209.14 lb =2.21 kip/1.15 = 1.92 kip

PBC=5835 lb =5.84 kip/1.15 = 5.08 kip

P1’1= 2905.19 lb =2.91 kip/1.15 = 2.53 kip

P12= 9084.95 lb =9.08 kip/1.15 = 7.89 kip

Factored load Pu= 1.2(1.5)+29.57+1.92+5.08+2.53+7.89 =48.79 kip

MAB=2305.19 lb-ft = 2.31 k-ft

MBC=9725 lb-ft = 9.73 k-ft

M1’1=10830 lb-ft =10.83 k-ft

M12=20663.23 lb-ft = 20.66 k-ft

Mux=9.73-2.31=7.42 k-ft

Muy=20.66-10.83=9.83 k-ft

As=0.01Ag=0.01x12x12=1.44 in²

Try As=1.871 in² (16mm-6Nos)

⏀Pn=0.62x0.8x(0.85fc’(Ag-As)+Asfy)

=0.62x0.8x(0.85x2.5x(144-1.871)+1.871x40)

=186.92 kip> Pu=48.79 kip (OK)

46
KSI Engineering - Pathein – 09798432969/09422453947 Project Calculation
Fundamental of RC Structure Analysis and Design

Y Direction

e=Mu/Pu =(12.22x12)/ 48.79 =3 in > 0.1x12 =1.2”


𝑏ℎ𝑓𝑐 ′ 𝐴𝑠 ′ 𝑓𝑦
⏀Pn = ⏀(3ℎ𝑒 + 𝑒 )
+1.18 +0.5
𝑑2 𝑑−𝑑′

12𝑥12𝑥2.5 0.624𝑥40
=0.62 (3𝑥12𝑥3 + 3 )
+1.18 +0.5
9.52 9.5−2.5

= 110.58 kip > Pu=48.79 kip (OK)

Tie spacing

Smax = 8xdb = 8x(16/25.4) =5.04 in

Smax = 24xdt = 24 x (8/25.4) =7.6 in

Smax = b/2 or h/2 = 12/2 =6 in

Use S = 5 in

Main bar = 16mm-6Nos

Tie =8mm- 5”c/c spacing

47
KSI Engineering - Pathein – 09798432969/09422453947 Project Calculation
Fundamental of RC Structure Analysis and Design

Ground Floor Column 1B


12 12
Own weight of column = 12 x 12x7x150 =900 lb = 1.05 kip

Upper Column load =48.79 kip

PAB=2550.41 lb =2.55 kip/1.15 = 2.22 kip

PBC=679.22 lb =6.79 kip/1.15 = 5.9 kip

P12= 5162.06 lb =5.16 kip/1.15 = 4.49 kip

Factored load Pu= 1.2(1.05)+48.79+2.22+5.9+4.49 =62.66 kip

MAB=2661.3 lb-ft = 2.66 k-ft

MBC=1181.25 lb-ft = 1.18 k-ft

M12=10773 lb-ft = 10.77 k-ft

Mux=2.66-1.18=1.48 k-ft

Muy=10.77 k-ft

As=0.01Ag=0.01x12x12=1.44 in²

Try As=1.871 in² (16mm-6Nos)

⏀Pn=0.62x0.8x(0.85fc’(Ag-As)+Asfy)

=0.62x0.8x(0.85x2.5x(144-1.871)+1.871x40)

=186.92 kip> Pu=62.66 kip (OK)

48
KSI Engineering - Pathein – 09798432969/09422453947 Project Calculation
Fundamental of RC Structure Analysis and Design

Y Direction

e=Mu/Pu =(10.77x12)/ 62.66 =2.06 in > 0.1x12 =1.2”


𝑏ℎ𝑓𝑐 ′ 𝐴𝑠 ′ 𝑓𝑦
⏀Pn = ⏀(3ℎ𝑒 + 𝑒 )
+1.18 +0.5
𝑑2 𝑑−𝑑′

12𝑥12𝑥2.5 0.624𝑥40
=0.62 (3𝑥12𝑥2.06 + 2.06 )
+1.18 +0.5
9.52 9−3

= 124.86 kip > Pu=62.66 kip (OK)

Tie spacing

Smax = 8xdb = 8x(16/25.4) =5.04 in

Smax = 24xdt = 24 x (8/25.4) =7.6 in

Smax = b/2 or h/2 = 12/2 =6 in

Use S = 5 in

Main bar = 16mm-6Nos

Tie =8mm- 5”c/c spacing

49
KSI Engineering - Pathein – 09798432969/09422453947 Project Calculation
Fundamental of RC Structure Analysis and Design

Load Calculation for footing (1B)


Total factored load @ 1B = 62.66 kip

Service load Calculation

Total service load @ 1B = Total factored load/1.2

= 62.66 /1.2= 52.22 kip

Footing
Square Footing
Total service load =52.22 kip

Total factored load = 62.66 kip

Allowable soil bearing capacity qa= 1ton/ ft² = 1x2.24 =2.24 kip/ft²
100+150
Average Unit weight of earth & concrete = = 125 lb/ft³ = 0.125 kip/ft³
2

Effective soil bearing capacity qe= 2.24 – 0.125x5= 1.615 kip/ft²


𝑠𝑒𝑟𝑣𝑖𝑐𝑒 𝑙𝑜𝑎𝑑 52.22
Required area = = 1.615 = 32.33 ft²
qe

B=L=5.69 ft
𝑓𝑎𝑐𝑡𝑜𝑟𝑒𝑑 𝑙𝑜𝑎𝑑 62.66
Ultimate soil bearing capacity qu= = =1.74 kip/ft²< qa=2.24 kip/ft²
BxL 6x6

(OK)

Use 6’x6’ footing.

Assume footing thickness h = 10” , d=10-3.5 = 6.5”

Check punching shear

ab=cd=12+d/2+d/2=12+6.5/2+6.5/2 = 18.5”

ac=bd=12+d/2+d/2=12+6.5/2+6.5/2 = 18.5”

b0=(2x18.5)+(2x18.5) = 74”

50
KSI Engineering - Pathein – 09798432969/09422453947 Project Calculation
Fundamental of RC Structure Analysis and Design

⏀𝑉𝑐 = ⏀4√𝑓𝑐 ′b0𝑑

= 0.75𝑥4𝑥√2500𝑥 74 x 6.5 x 1/1000 =72.15 kip

Vu =qu x shaded area


18.5 18.5
=1.74 x (6x6-( 12 )x( 12 ))

=58.5 kip <⏀𝑉𝑐

OK for punching shear.

Check one way shear

⏀𝑉𝑐 = ⏀2√𝑓𝑐 ′b𝑑

= 0.75𝑥2𝑥√2500𝑥 (6x12) x6.5 x 1/1000

=35.1 kip

Vu =qu x shaded area


6.5
=1.74x (3-0.5- 12 ) x 6

=20.45 kip <⏀𝑉𝑐

OK for one way shear.

Determination of steel area

3√𝑓𝑐′ 3√2500
Min As = xbxd= x (6x12) x 6.5 =1.76 in²
𝑓𝑦 40000

200 200
Min As = 𝑓𝑦
x b x d = 40000 x (6x12) x 6.5 =2.34 in² (Control)

Mu = qu x shaded area x distance (C.G)

=1.74 x(6x2.5)x2.5/2

=32.63 k-ft

51
KSI Engineering - Pathein – 09798432969/09422453947 Project Calculation
Fundamental of RC Structure Analysis and Design

Main steel

2𝑀𝑢 2𝑥32.63𝑥12
a = d − √𝑑² − 0.68𝑓𝑐′𝑏= 6.5 − √6.5² − 0.68𝑥2.5𝑥6𝑥12 =0.51 in

𝑀𝑢 32.63𝑥12
As= 𝑎 = 0.51=1.96 in² < Min As= 2.34 in²
⏀𝑓𝑦(𝑑− ) 0.8𝑥40𝑥(6.5− )
2 2

Use As = 2.494 in²


Use 16mm dia bar 8 Nos for both direction.
16 1
Spacing = [(6x12)-(3x2)-(25.4x8)]x8−1 = 8.7 in (OK)

Length of footing = 6’

Width of footing = 6’

Footing thickness = 10”

Main bar (X dir) = 16mm dia bar 8 Nos

Main bar (Y dir) = 16mm dia bar 8 Nos