You are on page 1of 18

Location Service

Submission Inspection Length


S No. RFI NO Description of Activity From CH: To CH: Side Road/ Item Status
Date Date (M)
MCW
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11791 KHPL/TK/NH-66/STR/11665 1-Feb-2024 2-Feb-2024 395+623 395+660 37 LHS Drain
Drain Wall 1st with Final lift Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11792 KHPL/TK/NH-66/STR/11666 1-Feb-2024 2-Feb-2024 397+340 397+360 20 LHS Drain
Drain Raft Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
11793 KHPL/TK/NH-66/STR/11667 1-Feb-2024 2-Feb-2024 395+623 395+660 37 LHS Drain Repeated
Drain Wall 1st with Final lift
Work
11794 KHPL/TK/NH-66/STR/11668 1-Feb-2024 2-Feb-2024 Checking of excavation, level and pouring PCC M-15 grade Below Drain Raft. 370+945 370+980 35 LHS Drain
Done
Work
11795 KHPL/TK/NH-66/STR/11669 1-Feb-2024 2-Feb-2024 Checking of excavation, level and pouring PCC M-15 grade Below Drain Raft. 370+985 371+000 15 LHS Drain
Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11796 KHPL/TK/NH-66/STR/11670 1-Feb-2024 2-Feb-2024 372+250 372+300 50 LHS Drain
Drain Raft Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
11797 KHPL/TK/NH-66/STR/11671 1-Feb-2024 2-Feb-2024 397+320 397+340 20 LHS Drain Repeated
Drain Slab
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11798 KHPL/TK/NH-66/STR/11672 1-Feb-2024 2-Feb-2024 372+200 372+250 50 RHS Drain
Drain Wall 1st with Final lift Done
Work
11799 KHPL/TK/NH-66/STR/11673 1-Feb-2024 2-Feb-2024 Checking of excavation, level and pouring PCC M-15 grade Below Drain Raft. 394+028 394+047 19 RHS Drain
Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11800 KHPL/TK/NH-66/STR/11674 1-Feb-2024 2-Feb-2024 372+250 372+300 50 RHS Drain
Drain Raft Done
Work
11801 KHPL/TK/NH-66/STR/11675 1-Feb-2024 2-Feb-2024 Checking of excavation, level and pouring PCC M-15 grade Below Drain Raft. 372+320 372+380 60 LHS Drain
Done
Work
11802 KHPL/TK/NH-66/STR/11676 1-Feb-2024 2-Feb-2024 Checking of excavation, level and pouring PCC M-15 grade Below Drain Raft. 372+535 372+580 45 LHS Drain
Done
Work
11803 KHPL/TK/NH-66/STR/11677 1-Feb-2024 2-Feb-2024 Checking of excavation, level and pouring PCC M-15 grade Below Drain Raft. 371+800 371+860 60 LHS Drain
Done
Major PSC Girder Work
11804 KHPL/TK/NH-66/STR/11678 1-Feb-2024 2-Feb-2024 Checking of stressing for PSC girder Major Bridge (IG-1/RHS,A1-P1) 387+230 RHS
Bridge stressing Done
Major PSC Girder Work
11805 KHPL/TK/NH-66/STR/11679 1-Feb-2024 2-Feb-2024 Checking of stressing for PSC girder Major Bridge (IG-2/RHS,A1-P1) 387+230 RHS
Bridge stressing Done
Major PSC Girder Work
11806 KHPL/TK/NH-66/STR/11680 1-Feb-2024 2-Feb-2024 Checking of stressing for PSC girder Major Bridge (IG-3/RHS,A1-P1) 387+230 RHS
Bridge stressing Done
Elevated PSC Girder Work
11807 KHPL/TK/NH-66/STR/11681 1-Feb-2024 2-Feb-2024 Checking of stressing for PSC girder Elevated Bridge (OG-2/RHS,P12-P13)(388+500) 389+465 RHS
Bridge stressing Done
Elevated PSC Girder Work
11808 KHPL/TK/NH-66/STR/11682 1-Feb-2024 2-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (OG-1/LHS,P7-P8)(388+500) 389+465 LHS
Bridge Grouting Done
Elevated PSC Girder Work
11809 KHPL/TK/NH-66/STR/11683 1-Feb-2024 2-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (OG-2/LHS,P7-P8)(388+500) 389+465 LHS
Bridge Grouting Done
Elevated PSC Girder Work
11810 KHPL/TK/NH-66/STR/11684 1-Feb-2024 2-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (OG-2/LHS,P6-P7)(388+500) 389+465 LHS
Bridge Grouting Done
Checking of Level, reinforcement, shuttering, and pouring concrete M-50 grade for Elevated Elevated
11811 KHPL/TK/NH-66/STR/11685 1-Feb-2024 2-Feb-2024 389+305 RHS Not done
Pedestal 08 nos of Elevated Bridge ( P11/RHS) Bridge Bridge
Checking of Level, reinforcement, shuttering, and pouring concrete M-50 grade for Elevated Elevated Work
11812 KHPL/TK/NH-66/STR/11686 1-Feb-2024 2-Feb-2024 389+665 RHS
Pedestal 08 nos of Elevated Bridge ( P20/RHS) Bridge Bridge Done
Checking of Level, reinforcement, shuttering, and pouring concrete M-50 grade for Elevated Elevated
11813 KHPL/TK/NH-66/STR/11687 1-Feb-2024 2-Feb-2024 389+665 RHS Repeated
Pedestal 08 nos of Elevated Bridge ( P20/RHS) Bridge Bridge
Checking of excavation, level, layout and pouring PCC (M-15) grade for Box Culvert
11814 KHPL/TK/NH-66/STR/11688 1-Feb-2024 2-Feb-2024 388+064 Box Culvert LHS MCW Box Culvert Repeated
(MCW)
Checking of reinforcement, shuttering, centering and pouring concrete M -30 grade in Work
11815 KHPL/TK/NH-66/STR/11689 1-Feb-2024 2-Feb-2024 383+623 383+645 22 LHS Retaining Wall
Wall 1st lift for Retaining Wall. Done

11816 KHPL/TK/NH-66/STR/11690 1-Feb-2024 2-Feb-2024 Checking of excavation, level and pouring of PCC M-15 grade for Retaining Wall. 383+510 383+530 20 RHS Retaining Wall Not done
Checking of reinforcement, mould and pouring concrete M-35 grade for RE Panel Casting Work
11817 KHPL/TK/NH-66/STR/11691 1-Feb-2024 2-Feb-2024 386+600 RE Panel
S5 type-17 nos, P2 type-07 nos. Yard Done
Checking of reinforcement, mould and pouring concrete M-30 grade for Drain (Pre-Cast) Casting
11818 KHPL/TK/NH-66/STR/11692 1-Feb-2024 2-Feb-2024 397+300 Pre-Cast Drain Not done
(14 nos) Yard
Checking of reinforcement, mould and pouring concrete M-35 grade for RE Panel Casting
11819 KHPL/TK/NH-66/STR/11693 1-Feb-2024 2-Feb-2024 369+550 RE Panel Not done
S4 type-16 nos, P3 type-06 nos. Yard
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11820 KHPL/TK/NH-66/STR/11694 2-Feb-2024 3-Feb-2024 395+623 395+660 37 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11821 KHPL/TK/NH-66/STR/11695 2-Feb-2024 3-Feb-2024 370+945 370+980 35 LHS Drain
Drain Raft Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11822 KHPL/TK/NH-66/STR/11696 2-Feb-2024 3-Feb-2024 370+985 371+000 15 LHS Drain
Drain Raft Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11823 KHPL/TK/NH-66/STR/11697 2-Feb-2024 3-Feb-2024 372+250 372+280 30 LHS Drain
Drain Wall 1st with Final lift Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11824 KHPL/TK/NH-66/STR/11698 2-Feb-2024 3-Feb-2024 372+200 372+220 20 RHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11825 KHPL/TK/NH-66/STR/11699 2-Feb-2024 3-Feb-2024 394+028 394+047 19 RHS Drain
Drain Raft Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11826 KHPL/TK/NH-66/STR/11700 2-Feb-2024 3-Feb-2024 397+340 397+360 20 LHS Drain
Drain Wall 1st with Final lift Done
Work
11827 KHPL/TK/NH-66/STR/11701 2-Feb-2024 3-Feb-2024 Checking of excavation, level and pouring PCC M-15 grade Below Drain Raft. 393+935 393+997 62 RHS Drain
Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11828 KHPL/TK/NH-66/STR/11702 2-Feb-2024 3-Feb-2024 397+370 397+410 40 LHS Drain
Drain Raft Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11829 KHPL/TK/NH-66/STR/11703 2-Feb-2024 3-Feb-2024 373+755 373+800 45 LHS Drain
Drain Wall 1st with Final lift Done
Work
11830 KHPL/TK/NH-66/STR/11704 2-Feb-2024 3-Feb-2024 Checking of excavation, level and pouring PCC M-15 grade Below Drain Raft. 394+465 394+490 25 LHS Drain
Done
Work
11831 KHPL/TK/NH-66/STR/11705 2-Feb-2024 3-Feb-2024 Checking of excavation, level and pouring of PCC M-15 grade for Retaining Wall. 383+510 383+530 20 RHS Retaining Wall
Done
Elevated PSC Girder Work
11832 KHPL/TK/NH-66/STR/11706 2-Feb-2024 3-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (OG-2/RHS,P12-P13)(388+500) 389+465 RHS
Bridge Grouting Done
Elevated
11833 KHPL/TK/NH-66/STR/11707 2-Feb-2024 3-Feb-2024 Reinforcement & profile checking of PSC girder of Elevated Bridge (OG-1/RHS,P8-P9) 394+000 RHS PSC Girder Repeated
Bridge
Checking of shuttering, centering and pouring concrete M-55 grade for PSC Girder of Elevated
11834 KHPL/TK/NH-66/STR/11708 2-Feb-2024 3-Feb-2024 394+000 RHS PSC Girder Repeated
Elevated Bridge (OG-1/RHS,P8-P9) Bridge
Checking of Level, reinforcement, shuttering, and pouring concrete M-35 grade for Pier Elevated Elevated
11835 KHPL/TK/NH-66/STR/11709 2-Feb-2024 3-Feb-2024 390+025 LHS Not done
Cap of Elevated Bridges (Pier No. P29/LHS) Bridge Bridge
Elevated PSC Girder Work
11836 KHPL/TK/NH-66/STR/11710 2-Feb-2024 3-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (OG-1/LHS,P9-P10) (388+500) 389+465 LHS
Bridge Grouting Done
Elevated PSC Girder Work
11837 KHPL/TK/NH-66/STR/11711 2-Feb-2024 3-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (OG-1/RHS,P10-P11) (388+500) 389+465 RHS
Bridge Grouting Done
Elevated PSC Girder Work
11838 KHPL/TK/NH-66/STR/11712 2-Feb-2024 3-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (OG-2/LHS,P10-P11) (388+500) 389+465 LHS
Bridge Grouting Done
Elevated PSC Girder Work
11839 KHPL/TK/NH-66/STR/11713 2-Feb-2024 3-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (OG-1/LHS,P10-P11) (388+500) 389+465 LHS
Bridge Grouting Done
Elevated PSC Girder Work
11840 KHPL/TK/NH-66/STR/11714 2-Feb-2024 3-Feb-2024 Checking of stressing for PSC girder Elevated Bridge (OG-2/RHS,P11-P12)(388+500) 389+465 RHS
Bridge stressing Done
Elevated PSC Girder Work
11841 KHPL/TK/NH-66/STR/11715 2-Feb-2024 3-Feb-2024 Checking of stressing for PSC girder Elevated Bridge (OG-2/LHS,P11-P12)(388+500) 389+465 LHS
Bridge stressing Done
Elevated PSC Girder Work
11842 KHPL/TK/NH-66/STR/11716 2-Feb-2024 3-Feb-2024 Checking of stressing for PSC girder Elevated Bridge (IG-1/LHS,A1-P1)(388+500) 389+465 LHS
Bridge stressing Done
Elevated PSC Girder Work
11843 KHPL/TK/NH-66/STR/11717 2-Feb-2024 3-Feb-2024 Checking of stressing for PSC girder Elevated Bridge (IG-1/RHS,A1-P1)(388+500) 389+465 RHS
Bridge stressing Done
Checking of reinforcement, mould and pouring concrete M-35 grade for RE Panel Casting Work
11844 KHPL/TK/NH-66/STR/11718 2-Feb-2024 3-Feb-2024 386+600 RE Panel
S5 type-17 nos, P2 type-07 nos. Yard Done
Checking of reinforcement, mould and pouring concrete M-30 grade for Drain (Pre-Cast) Casting
11845 KHPL/TK/NH-66/STR/11719 2-Feb-2024 3-Feb-2024 397+300 Pre-Cast Drain Not done
(14 nos) Yard
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11846 KHPL/TK/NH-66/STR/11720 3-Feb-2024 4-Feb-2024 370+945 370+980 35 LHS Drain
Drain Wall 1st with Final lift Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11847 KHPL/TK/NH-66/STR/11721 3-Feb-2024 4-Feb-2024 370+985 371+000 15 LHS Drain
Drain Wall 1st with Final lift Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11848 KHPL/TK/NH-66/STR/11722 3-Feb-2024 4-Feb-2024 372+250 372+280 30 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11849 KHPL/TK/NH-66/STR/11723 3-Feb-2024 4-Feb-2024 394+028 394+047 19 RHS Drain
Drain Wall 1st with Final lift Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11850 KHPL/TK/NH-66/STR/11724 3-Feb-2024 4-Feb-2024 393+950 393+997 47 RHS Drain
Drain Raft Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11851 KHPL/TK/NH-66/STR/11725 3-Feb-2024 4-Feb-2024 389+965 389+985 20 LHS Drain
Drain Wall 1st with Final lift Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11852 KHPL/TK/NH-66/STR/11726 3-Feb-2024 4-Feb-2024 397+370 397+390 20 LHS Drain
Drain Wall 1st with Final lift Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11853 KHPL/TK/NH-66/STR/11727 3-Feb-2024 4-Feb-2024 397+340 397+360 20 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11854 KHPL/TK/NH-66/STR/11728 3-Feb-2024 4-Feb-2024 397+410 397+430 20 LHS Drain
Drain Raft Done
Work
11855 KHPL/TK/NH-66/STR/11729 3-Feb-2024 4-Feb-2024 Checking of excavation, level and pouring PCC M-15 grade Below Drain Raft. 370+900 370+945 45 LHS Drain
Done
Work
11856 KHPL/TK/NH-66/STR/11730 3-Feb-2024 4-Feb-2024 Checking of excavation, level and pouring of PCC M-15 grade for Retaining Wall. 377+450 377+480 30 LHS Retaining Wall
Done
Work
11857 KHPL/TK/NH-66/STR/11731 3-Feb-2024 4-Feb-2024 Checking of Level & Erection of Box Culvert Pre- Cast (MCW) 388+064 Box Culvert LHS MCW Box Culvert
Done
Checking of excavation, level, layout and pouring PCC (M-15) grade for Box Culvert Work
11858 KHPL/TK/NH-66/STR/11732 3-Feb-2024 4-Feb-2024 388+027 Box Culvert RHS MCW Box Culvert
(MCW) Done
Checking of reinforcement, mould and pouring concrete M-40 grade for Plank Slab (Pre- Work
11859 KHPL/TK/NH-66/STR/11733 3-Feb-2024 4-Feb-2024 396+888 Flyover Plank Slab
Cast) (14 nos) Done
Checking of excavation, level, layout and pouring PCC (M-15) grade for Pile Cap of Elevated Elevated Work
11860 KHPL/TK/NH-66/STR/11734 3-Feb-2024 4-Feb-2024 394+000 LHS
Elevated Bridge (Ch.394+120) (Pier No. P09/LHS) Bridge Bridge Done
Elevated PSC Girder Work
11861 KHPL/TK/NH-66/STR/11735 3-Feb-2024 4-Feb-2024 Checking of stressing for PSC girder Elevated Bridge (OG-1/LHS,P11-P12)(388+500) 389+465 LHS
Bridge stressing Done
Elevated PSC Girder Work
11862 KHPL/TK/NH-66/STR/11736 3-Feb-2024 4-Feb-2024 Checking of stressing for PSC girder Elevated Bridge (OG-2/RHS,P8-P9)(388+500) 389+465 RHS
Bridge stressing Done
Elevated PSC Girder Work
11863 KHPL/TK/NH-66/STR/11737 3-Feb-2024 4-Feb-2024 Checking of stressing for PSC girder Elevated Bridge (OG-2/LHS,P8-P9)(388+500) 389+465 LHS
Bridge stressing Done
Elevated PSC Girder Work
11864 KHPL/TK/NH-66/STR/11738 3-Feb-2024 4-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (OG-1/RHS,P9-P10) (388+500) 389+465 RHS
Bridge Grouting Done
Elevated PSC Girder Work
11865 KHPL/TK/NH-66/STR/11739 3-Feb-2024 4-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (OG-2/RHS,P9-P10) (388+500) 389+465 RHS
Bridge Grouting Done
Checking of Level, reinforcement, shuttering, and pouring concrete M-50 grade for Elevated Elevated
11866 KHPL/TK/NH-66/STR/11740 3-Feb-2024 4-Feb-2024 389+585 RHS Not done
Pedestal 08 nos of Elevated Bridge ( P18/RHS)(Design ch: 389+465) Bridge Bridge
Checking of Level, reinforcement, shuttering, and pouring concrete M-50 grade for Elevated Elevated
11867 KHPL/TK/NH-66/STR/11741 3-Feb-2024 4-Feb-2024 389+305 RHS Not done
Pedestal 08 nos of Elevated Bridge ( P11/RHS) Bridge Bridge
Checking of reinforcement, shuttering, centering and pouring concrete M-35 grade for Elevated Elevated
11868 KHPL/TK/NH-66/STR/11742 3-Feb-2024 4-Feb-2024 394+000 RHS Repeated
Elevated Bridge inner-side pier Shaft (Pier No. P02/RHS) (Ch.393+910) Bridge Bridge
Checking of reinforcement, shuttering, centering and pouring concrete M-35 grade for Elevated Elevated Work
11869 KHPL/TK/NH-66/STR/11743 3-Feb-2024 4-Feb-2024 394+000 RHS
Elevated Bridge outer-side pier Shaft Starter (Pier No. P02/RHS) (Ch.393+910) Bridge Bridge Done
Checking of reinforcement, mould and pouring concrete M-35 grade for RE Panel Casting Work
11870 KHPL/TK/NH-66/STR/11744 3-Feb-2024 4-Feb-2024 386+600 RE Panel
S5 type-13 nos. Yard Done
Checking of reinforcement, mould and pouring concrete M-30 grade for Drain (Pre-Cast) Casting Work
11871 KHPL/TK/NH-66/STR/11745 3-Feb-2024 4-Feb-2024 397+300 Pre-Cast Drain
(14 nos) Yard Done
Checking of reinforcement, mould and pouring concrete M-35 grade for RE Panel Casting Work
11872 KHPL/TK/NH-66/STR/11746 3-Feb-2024 4-Feb-2024 369+550 RE Panel
S4 type-02 nos, S5 type-18 nos, P3 type-02 nos, MG4 type-02 nos. Yard Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11873 KHPL/TK/NH-66/STR/11747 4-Feb-2024 5-Feb-2024 370+945 370+980 35 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11874 KHPL/TK/NH-66/STR/11748 4-Feb-2024 5-Feb-2024 370+985 371+000 15 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11875 KHPL/TK/NH-66/STR/11749 4-Feb-2024 5-Feb-2024 394+028 394+047 19 RHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11876 KHPL/TK/NH-66/STR/11750 4-Feb-2024 5-Feb-2024 370+900 370+945 45 LHS Drain
Drain Raft Done
Work
11877 KHPL/TK/NH-66/STR/11751 4-Feb-2024 5-Feb-2024 Checking of excavation, level and pouring PCC M-15 grade Below Drain Pre- Cast. 395+860 395+870 10 RHS Drain Erection
Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11878 KHPL/TK/NH-66/STR/11752 4-Feb-2024 5-Feb-2024 378+840 378+850 10 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11879 KHPL/TK/NH-66/STR/11753 4-Feb-2024 5-Feb-2024 372+220 372+250 30 RHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11880 KHPL/TK/NH-66/STR/11754 4-Feb-2024 5-Feb-2024 372+250 372+300 50 RHS Drain
Drain Wall 1st with Final lift Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11881 KHPL/TK/NH-66/STR/11755 4-Feb-2024 5-Feb-2024 372+000 372+008 8 RHS Drain
Drain Wall 1st with Final lift Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11882 KHPL/TK/NH-66/STR/11756 4-Feb-2024 5-Feb-2024 372+050 372+078 28 RHS Drain
Drain Wall 1st with Final lift Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11883 KHPL/TK/NH-66/STR/11757 4-Feb-2024 5-Feb-2024 372+150 372+160 10 RHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11884 KHPL/TK/NH-66/STR/11758 4-Feb-2024 5-Feb-2024 393+950 393+997 47 RHS Drain
Drain Wall 1st with Final lift Done
Drain Work
11885 KHPL/TK/NH-66/STR/11759 4-Feb-2024 5-Feb-2024 Checking of excavation, level and pouring PCC M-15 grade Below Drain Pre- Cast. 395+860 395+920 60 RHS
Erection Done
Drain
11886 KHPL/TK/NH-66/STR/11760 4-Feb-2024 5-Feb-2024 Checking of Level & Erection of Drain Pre- Cast. 395+800 395+840 40 RHS Not done
Erection
Drain
11887 KHPL/TK/NH-66/STR/11761 4-Feb-2024 5-Feb-2024 Checking of Level & Erection of Drain Pre- Cast. 395+860 395+920 60 RHS Not done
Erection
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11888 KHPL/TK/NH-66/STR/11762 4-Feb-2024 5-Feb-2024 397+390 397+410 20 LHS Drain
Drain Wall 1st with Final lift Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
11889 KHPL/TK/NH-66/STR/11763 4-Feb-2024 5-Feb-2024 397+370 397+390 20 LHS Drain Not done
Drain Slab
11890 KHPL/TK/NH-66/STR/11764 4-Feb-2024 5-Feb-2024 Checking of excavation, level and pouring PCC M-15 grade Below Drain Raft. 397+430 397+530 100 LHS Drain Not done
Checking of Level, reinforcement, shuttering, and pouring concrete M-50 grade for Elevated Elevated Work
11891 KHPL/TK/NH-66/STR/11765 4-Feb-2024 5-Feb-2024 389+585 RHS
Pedestal 08 nos of Elevated Bridge ( P18/RHS)(Design ch: 389+465) Bridge Bridge Done
Checking of Level, reinforcement, shuttering, and pouring concrete M-50 grade for Elevated Elevated
11892 KHPL/TK/NH-66/STR/11766 4-Feb-2024 5-Feb-2024 389+305 RHS Not done
Pedestal 08 nos of Elevated Bridge ( P11/RHS) Bridge Bridge
Checking of reinforcement, shuttering, centering and pouring concrete M -30 grade in
11893 KHPL/TK/NH-66/STR/11767 4-Feb-2024 5-Feb-2024 383+510 383+530 20 RHS Retaining Wall Not done
Raft of Retaining Wall.
Checking of reinforcement, shuttering, centering and pouring concrete M -30 grade in Retaining Wall Work
11894 KHPL/TK/NH-66/STR/11768 4-Feb-2024 5-Feb-2024 375+430 375+538 108 RHS
Retaining Wall NJCB. NJCB Done
Checking of reinforcement, shuttering, centering and pouring concrete M -30 grade in Retaining Wall Work
11895 KHPL/TK/NH-66/STR/11769 4-Feb-2024 5-Feb-2024 369+995 370+062 67 LHS
Retaining Wall NJCB. NJCB Done
Checking of reinforcement, shuttering, centering and pouring concrete M -30 grade in Retaining Wall Work
11896 KHPL/TK/NH-66/STR/11770 4-Feb-2024 5-Feb-2024 370+067 370+147 80 LHS
Retaining Wall NJCB. NJCB Done
Checking of Level, reinforcement, shuttering, and pouring concrete M-50 grade for Elevated Elevated Work
11897 KHPL/TK/NH-66/STR/11771 4-Feb-2024 5-Feb-2024 389+305 LHS
Pedestal 08 nos of Elevated Bridge ( P11/LHS) Bridge Bridge Done
Checking of Level, reinforcement, shuttering, and pouring concrete M-35 grade for Pier Elevated Elevated
11898 KHPL/TK/NH-66/STR/11772 4-Feb-2024 5-Feb-2024 390+025 LHS Repeated
Cap of Elevated Bridges (Pier No. P29/LHS) Bridge Bridge
Elevated
11899 KHPL/TK/NH-66/STR/11773 4-Feb-2024 5-Feb-2024 Reinforcement & profile checking of PSC girder of Elevated Bridge (IG-1/RHS,P8-P9) 394+000 RHS PSC Girder Repeated
Bridge
Checking of shuttering, centering and pouring concrete M-55 grade for PSC Girder of Elevated
11900 KHPL/TK/NH-66/STR/11774 4-Feb-2024 5-Feb-2024 394+000 RHS PSC Girder Repeated
Elevated Bridge (IG-1/RHS,P8-P9) Bridge
PSC Girder Work
11901 KHPL/TK/NH-66/STR/11775 4-Feb-2024 5-Feb-2024 Checking of stressing for PSC girder Major Bridge (OG-1/LHS,P3-A2) 387+230 MJB LHS
stressing Done
PSC Girder Work
11902 KHPL/TK/NH-66/STR/11776 4-Feb-2024 5-Feb-2024 Checking of stressing for PSC girder Major Bridge (IG-1/LHS,P3-A2) 387+230 MJB LHS
stressing Done
Checking of reinforcement, mould and pouring concrete M-40 grade for Plank Slab (Pre- Work
11903 KHPL/TK/NH-66/STR/11777 4-Feb-2024 5-Feb-2024 396+888 Flyover Plank Slab
Cast) (15 nos) Done
Checking of reinforcement, mould and pouring concrete M-35 grade for RE Panel Casting Work
11904 KHPL/TK/NH-66/STR/11778 4-Feb-2024 5-Feb-2024 386+600 RE Panel
S5 type-03 nos, P2 type-07 nos. Yard Done
Checking of reinforcement, mould and pouring concrete M-30 grade for Drain (Pre-Cast) Casting Work
11905 KHPL/TK/NH-66/STR/11779 4-Feb-2024 5-Feb-2024 397+300 Pre-Cast Drain
(09 nos) Yard Done
Checking of reinforcement, mould and pouring concrete M-35 grade for RE Panel Casting Work
11906 KHPL/TK/NH-66/STR/11780 4-Feb-2024 5-Feb-2024 369+550 RE Panel
S5 type-11 nos, P3 type-04 nos. Yard Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
11907 KHPL/TK/NH-66/STR/11781 4-Feb-2024 5-Feb-2024 370+900 370+945 45 LHS Drain Repeated
Drain Raft

11908 KHPL/TK/NH-66/STR/11782 4-Feb-2024 5-Feb-2024 Checking of excavation, level and pouring PCC M-15 grade Below Drain Pre- Cast. 395+860 395+870 10 RHS Drain Erection Repeated

Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in


11909 KHPL/TK/NH-66/STR/11783 4-Feb-2024 5-Feb-2024 378+840 378+850 10 LHS Drain Repeated
Drain Slab
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
11910 KHPL/TK/NH-66/STR/11784 4-Feb-2024 5-Feb-2024 372+220 372+250 30 RHS Drain Repeated
Drain Slab
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
11911 KHPL/TK/NH-66/STR/11785 4-Feb-2024 5-Feb-2024 372+250 372+268 18 RHS Drain Repeated
Drain Wall 1st with Final lift
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
11912 KHPL/TK/NH-66/STR/11786 4-Feb-2024 5-Feb-2024 372+000 372+008 8 RHS Drain Repeated
Drain Wall 1st with Final lift
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
11913 KHPL/TK/NH-66/STR/11787 4-Feb-2024 5-Feb-2024 372+050 372+078 28 RHS Drain Repeated
Drain Wall 1st with Final lift
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
11914 KHPL/TK/NH-66/STR/11788 4-Feb-2024 5-Feb-2024 372+150 372+160 10 RHS Drain Repeated
Drain Slab

11915 KHPL/TK/NH-66/STR/11789 5-Feb-2024 6-Feb-2024 Checking of Level & Erection of Drain Pre- Cast. 395+860 395+888 28 RHS Drain Erection Not done

Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11916 KHPL/TK/NH-66/STR/11790 5-Feb-2024 6-Feb-2024 372+250 372+300 50 RHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11917 KHPL/TK/NH-66/STR/11791 5-Feb-2024 6-Feb-2024 372+000 372+008 8 RHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11918 KHPL/TK/NH-66/STR/11792 5-Feb-2024 6-Feb-2024 372+050 372+078 28 RHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
11919 KHPL/TK/NH-66/STR/11793 5-Feb-2024 6-Feb-2024 397+430 397+530 100 LHS Drain Not done
Drain Raft
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11920 KHPL/TK/NH-66/STR/11794 5-Feb-2024 6-Feb-2024 397+410 397+430 20 LHS Drain
Drain Wall 1st with Final lift Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
11921 KHPL/TK/NH-66/STR/11795 5-Feb-2024 6-Feb-2024 397+390 397+410 20 LHS Drain Not done
Drain Slab
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11922 KHPL/TK/NH-66/STR/11796 5-Feb-2024 6-Feb-2024 389+965 389+985 20 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
11923 KHPL/TK/NH-66/STR/11797 5-Feb-2024 6-Feb-2024 397+455 397+480 25 LHS Drain Not done
Drain Raft
Checking of Level, reinforcement, shuttering, and pouring concrete M-35 grade for Pier Elevated Elevated
11924 KHPL/TK/NH-66/STR/11798 5-Feb-2024 6-Feb-2024 388+905 LHS Repeated
Cap of Elevated Bridge (P01/LHS) Bridge Bridge
Elevated PSC Girder Work
11925 KHPL/TK/NH-66/STR/11799 5-Feb-2024 6-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (OG-1/RHS,P2-P3) (388+500) 389+465 RHS
Bridge Grouting Done
Elevated PSC Girder Work
11926 KHPL/TK/NH-66/STR/11800 5-Feb-2024 6-Feb-2024 Checking of stressing for PSC girder Elevated Bridge (OG-2/LHS,P2-P3)(388+500) 389+465 LHS
Bridge stressing Done
Elevated PSC Girder Work
11927 KHPL/TK/NH-66/STR/11801 5-Feb-2024 6-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (OG-1/LHS,P12-P13)(388+500) 389+465 LHS
Bridge Grouting Done
PSC Girder Work
11928 KHPL/TK/NH-66/STR/11802 5-Feb-2024 6-Feb-2024 Checking of stressing for PSC girder Major Bridge (OG-2/LHS,P3-A2) 387+230 MJB LHS
stressing Done
PSC Girder Work
11929 KHPL/TK/NH-66/STR/11803 5-Feb-2024 6-Feb-2024 Checking of stressing for PSC girder Major Bridge (IG-2/LHS,P3-A2) 387+230 MJB LHS
stressing Done
PSC Girder Work
11930 KHPL/TK/NH-66/STR/11804 5-Feb-2024 6-Feb-2024 Checking of stressing for PSC girder Major Bridge (IG-3/LHS,P3-A2) 387+230 MJB LHS
stressing Done
PSC Girder Work
11931 KHPL/TK/NH-66/STR/11805 5-Feb-2024 6-Feb-2024 Checking of stressing for PSC girder Major Bridge (OG-1/RHS,P3-A2) 387+230 MJB RHS
stressing Done
PSC Girder Work
11932 KHPL/TK/NH-66/STR/11806 5-Feb-2024 6-Feb-2024 Checking of stressing for PSC girder Major Bridge (IG-1/RHS,P3-A2) 387+230 MJB RHS
stressing Done
PSC Girder Work
11933 KHPL/TK/NH-66/STR/11807 5-Feb-2024 6-Feb-2024 Checking of stressing for PSC girder Major Bridge (IG-2/RHS,P3-A2) 387+230 MJB RHS
stressing Done
Checking of Level, reinforcement, shuttering, and pouring concrete M-50 grade for Elevated Elevated
11934 KHPL/TK/NH-66/STR/11808 5-Feb-2024 6-Feb-2024 389+585 LHS Not done
Pedestal 08 nos of Elevated Bridge ( P18/LHS)(Design ch: 389+465) Bridge Bridge
Checking of Level, reinforcement, shuttering, and pouring concrete M-50 grade for Elevated Elevated
11935 KHPL/TK/NH-66/STR/11809 5-Feb-2024 6-Feb-2024 389+305 RHS Not done
Pedestal 08 nos of Elevated Bridge ( P11/RHS) Bridge Bridge
Elevated Work
11936 KHPL/TK/NH-66/STR/11810 5-Feb-2024 6-Feb-2024 Reinforcement & profile checking of PSC girder of Elevated Bridge (IG-2/RHS,P8-P9) 394+000 RHS PSC Girder
Bridge Done
Checking of shuttering, centering and pouring concrete M-55 grade for PSC Girder of Elevated Work
11937 KHPL/TK/NH-66/STR/11811 5-Feb-2024 6-Feb-2024 394+000 RHS PSC Girder
Elevated Bridge (IG-2/RHS,P8-P9) Bridge Done
Checking of Level, reinforcement, shuttering, and pouring concrete M-50 grade for
11938 KHPL/TK/NH-66/STR/11812 5-Feb-2024 6-Feb-2024 396+888 Flyover LHS Flyover Not done
Pedestal 8 nos of Flyover (P02/LHS)
Checking of shuttering, centering and pouring concrete M-40 grade for RCC Girder of
11939 KHPL/TK/NH-66/STR/11813 5-Feb-2024 6-Feb-2024 396+888 Flyover LHS RCC Girder Not done
Flyover (IG-1/LHS, A1-P1)
Checking of reinforcement, mould and pouring concrete M-40 grade for Plank Slab (Pre- Work
11940 KHPL/TK/NH-66/STR/11814 5-Feb-2024 6-Feb-2024 396+888 Flyover Plank Slab
Cast) (13 nos) Done
Checking of reinforcement, mould and pouring concrete M-35 grade for RE Panel Casting Work
11941 KHPL/TK/NH-66/STR/11815 5-Feb-2024 6-Feb-2024 386+600 RE Panel
S5 type-17 nos, P2 type-07 nos. Yard Done
Checking of reinforcement, mould and pouring concrete M-30 grade for Drain (Pre-Cast) Casting
11942 KHPL/TK/NH-66/STR/11816 5-Feb-2024 6-Feb-2024 397+300 Pre-Cast Drain Not done
(14 nos) Yard
Checking of reinforcement, mould and pouring concrete M-35 grade for RE Panel Casting
11943 KHPL/TK/NH-66/STR/11817 5-Feb-2024 6-Feb-2024 369+550 RE Panel Not done
S4 type-02 nos, S5 type-18 nos, P3 type-02 nos, MG4 type-02 nos. Yard
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
11944 KHPL/TK/NH-66/STR/11818 5-Feb-2024 6-Feb-2024 372+250 372+268 18 RHS Drain Repeated
Drain Wall 1st with Final lift
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
11945 KHPL/TK/NH-66/STR/11819 5-Feb-2024 6-Feb-2024 372+000 372+008 8 RHS Drain Repeated
Drain Wall 1st with Final lift
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
11946 KHPL/TK/NH-66/STR/11820 5-Feb-2024 6-Feb-2024 372+050 372+078 28 RHS Drain Repeated
Drain Wall 1st with Final lift
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
11947 KHPL/TK/NH-66/STR/11821 5-Feb-2024 6-Feb-2024 372+150 372+160 10 RHS Drain Repeated
Drain Slab
Work
11948 KHPL/TK/NH-66/STR/11822 6-Feb-2024 7-Feb-2024 Checking of Level & Erection of Drain Pre- Cast. 395+800 395+840 40 RHS Drain Erection
Done

11949 KHPL/TK/NH-66/STR/11823 6-Feb-2024 7-Feb-2024 Checking of Level & Erection of Drain Pre- Cast. 395+860 395+920 60 RHS Drain Erection Not done

Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11950 KHPL/TK/NH-66/STR/11824 6-Feb-2024 7-Feb-2024 373+330 373+340 10 LHS Drain
Drain Raft Done
Work
11951 KHPL/TK/NH-66/STR/11825 6-Feb-2024 7-Feb-2024 Checking of excavation, level and pouring PCC M-15 grade Below Drain Pre- Cast. 395+920 395+940 20 RHS Drain Erection
Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11952 KHPL/TK/NH-66/STR/11826 6-Feb-2024 7-Feb-2024 389+940 389+968 28 LHS Drain
Drain Wall 1st with Final lift Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
11953 KHPL/TK/NH-66/STR/11827 6-Feb-2024 7-Feb-2024 397+410 397+430 20 LHS Drain Not done
Drain Slab
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11954 KHPL/TK/NH-66/STR/11828 6-Feb-2024 7-Feb-2024 372+535 372+580 45 LHS Drain
Drain Raft Done
Work
11955 KHPL/TK/NH-66/STR/11829 6-Feb-2024 7-Feb-2024 Checking of excavation, level and pouring PCC M-15 grade Below Drain Raft. 371+760 371+800 40 LHS Drain
Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11956 KHPL/TK/NH-66/STR/11830 6-Feb-2024 7-Feb-2024 372+320 372+380 60 LHS Drain
Drain Raft Done
Work
11957 KHPL/TK/NH-66/STR/11831 6-Feb-2024 7-Feb-2024 Checking of excavation, level and pouring PCC M-15 grade Below Drain Raft. 372+395 372+440 45 LHS Drain
Done
Work
11958 KHPL/TK/NH-66/STR/11832 6-Feb-2024 7-Feb-2024 Checking of excavation, level and pouring PCC M-15 grade Below Drain Raft. 397+430 397+500 70 LHS Drain
Done
Checking of reinforcement, shuttering, centering and pouring concrete M-35 grade for Elevated Elevated
11959 KHPL/TK/NH-66/STR/11833 6-Feb-2024 7-Feb-2024 394+000 RHS Not done
Elevated Bridge outer-side pier Shaft (Pier No. P02/RHS) (Ch.393+910) Bridge Bridge
Checking of Level, reinforcement, shuttering, and pouring concrete M-50 grade for Work
11960 KHPL/TK/NH-66/STR/11834 6-Feb-2024 7-Feb-2024 396+888 Flyover LHS Flyover
Pedestal 8 nos of Flyover (P02/LHS) Done
Elevated PSC Girder Work
11961 KHPL/TK/NH-66/STR/11835 6-Feb-2024 7-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (OG-2/LHS,P2-P3)(388+500) 389+465 LHS
Bridge Grouting Done
Checking of Level, reinforcement, shuttering, and pouring concrete M-35 grade for Pier Elevated Elevated Work
11962 KHPL/TK/NH-66/STR/11836 6-Feb-2024 7-Feb-2024 394+560 LHS
Cap of Elevated Bridge (Abutment No.A2/LHS) Bridge Bridge Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade for Work
11963 KHPL/TK/NH-66/STR/11837 6-Feb-2024 7-Feb-2024 393+833 Box Culvert LHS SR Box Culvert
Box Culvert Wall Final lift, Top Haunch with Slab (SR) Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade for Work
11964 KHPL/TK/NH-66/STR/11838 6-Feb-2024 7-Feb-2024 393+833 Box Culvert LHS MCW Box Culvert
Box Culvert Wall Final lift, Top Haunch with Slab (MCW) Done
Checking of reinforcement, mould and pouring concrete M-35 grade for RE Panel Casting Work
11965 KHPL/TK/NH-66/STR/11839 6-Feb-2024 7-Feb-2024 386+600 RE Panel
S5 type-17 nos, P2 type-07 nos Yard Done
Checking of reinforcement, mould and pouring concrete M-30 grade for Drain (Pre-Cast) Casting
11966 KHPL/TK/NH-66/STR/11840 6-Feb-2024 7-Feb-2024 397+300 Pre-Cast Drain Not done
(14 nos) Yard
Checking of reinforcement, mould and pouring concrete M-35 grade for RE Panel Casting Work
11967 KHPL/TK/NH-66/STR/11841 6-Feb-2024 7-Feb-2024 369+550 RE Panel
S5 type-26 nos, P2 type-02 nos. Yard Done
Checking of shuttering, centering and pouring concrete M-40 grade for RCC Girder of Work
11968 KHPL/TK/NH-66/STR/11842 6-Feb-2024 7-Feb-2024 396+888 Flyover LHS RCC Girder
Flyover (IG-1/LHS, A1-P1) Done
11969 KHPL/TK/NH-66/STR/11843 6-Feb-2024 7-Feb-2024 Reinforcement & profile checking of PSC girder of Flyover (OG-2/RHS,P1-P2) 389+465 Flyover RHS PSC Girder Not done
Checking of shuttering, centering and pouring concrete M-50 grade for PSC Girder of
11970 KHPL/TK/NH-66/STR/11844 6-Feb-2024 7-Feb-2024 396+888 Flyover RHS PSC Girder Repeated
Flyover (OG-2/RHS,P1-P2)
Elevated PSC Girder Work
11971 KHPL/TK/NH-66/STR/11845 6-Feb-2024 7-Feb-2024 Checking of stressing for PSC girder Elevated Bridge (OG-2/LHS,A1-P1)(388+500) 389+465 LHS
Bridge stressing Done
Elevated PSC Girder Work
11972 KHPL/TK/NH-66/STR/11846 6-Feb-2024 7-Feb-2024 Checking of stressing for PSC girder Elevated Bridge (OG-2/RHS,A1-P1)(388+500) 389+465 RHS
Bridge stressing Done
Elevated PSC Girder Work
11973 KHPL/TK/NH-66/STR/11847 6-Feb-2024 7-Feb-2024 Checking of stressing for PSC girder Elevated Bridge (OG-1/RHS,A1-P1)(388+500) 389+465 RHS
Bridge stressing Done
Checking of excavation, level, layout and pouring PCC (M-15) grade for Pile Cap of Elevated Elevated Work
11974 KHPL/TK/NH-66/STR/11848 6-Feb-2024 7-Feb-2024 394+000 LHS
Elevated Bridge (Ch.394+120) (Abutment No. A2/LHS) Bridge Bridge Done
Checking of Level, reinforcement, shuttering, and pouring concrete M-50 grade for Elevated Elevated Work
11975 KHPL/TK/NH-66/STR/11849 6-Feb-2024 7-Feb-2024 389+585 LHS
Pedestal 08 nos of Elevated Bridge ( P18/LHS)(Design ch: 389+465) Bridge Bridge Done
Checking of Level, reinforcement, shuttering, and pouring concrete M-50 grade for Elevated Elevated
11976 KHPL/TK/NH-66/STR/11850 6-Feb-2024 7-Feb-2024 389+305 RHS Not done
Pedestal 08 nos of Elevated Bridge ( P11/RHS) Bridge Bridge
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11977 KHPL/TK/NH-66/STR/11851 7-Feb-2024 8-Feb-2024 373+330 373+340 10 LHS Drain
Drain Wall 1st with Final lift Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11978 KHPL/TK/NH-66/STR/11852 7-Feb-2024 8-Feb-2024 372+535 372+580 45 LHS Drain
Drain Wall 1st with Final lift Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11979 KHPL/TK/NH-66/STR/11853 7-Feb-2024 8-Feb-2024 372+395 372+440 45 LHS Drain
Drain Raft Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11980 KHPL/TK/NH-66/STR/11854 7-Feb-2024 8-Feb-2024 397+430 397+500 70 LHS Drain
Drain Raft Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11981 KHPL/TK/NH-66/STR/11855 7-Feb-2024 8-Feb-2024 372+280 372+300 20 LHS Drain
Drain Wall 1st with Final lift Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11982 KHPL/TK/NH-66/STR/11856 7-Feb-2024 8-Feb-2024 372+320 372+345 25 LHS Drain
Drain Wall 1st with Final lift Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11983 KHPL/TK/NH-66/STR/11857 7-Feb-2024 8-Feb-2024 373+948 373+963 15 LHS Drain
Drain Slab Done
Work
11984 KHPL/TK/NH-66/STR/11858 7-Feb-2024 8-Feb-2024 Pouring PCC M-15 grade Below Drain Raft 378+645 378+650 5 LHS Drain
Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11985 KHPL/TK/NH-66/STR/11859 7-Feb-2024 8-Feb-2024 381+015 381+030 15 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11986 KHPL/TK/NH-66/STR/11860 7-Feb-2024 8-Feb-2024 384+055 384+065 10 LHS Drain
Drain Slab Done
Work
11987 KHPL/TK/NH-66/STR/11861 7-Feb-2024 8-Feb-2024 Checking of excavation, level and pouring PCC M-15 grade Below Drain Raft. 385+115 385+120 5 LHS Drain
Done
Work
11988 KHPL/TK/NH-66/STR/11862 7-Feb-2024 8-Feb-2024 Checking of excavation, level and pouring PCC M-15 grade Below Drain Raft. 387+000 387+029 29 LHS Drain
Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11989 KHPL/TK/NH-66/STR/11863 7-Feb-2024 8-Feb-2024 387+054 387+080 26 LHS Drain
Drain Raft Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11990 KHPL/TK/NH-66/STR/11864 7-Feb-2024 8-Feb-2024 393+960 393+997 37 RHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
11991 KHPL/TK/NH-66/STR/11865 7-Feb-2024 8-Feb-2024 389+940 389+965 25 LHS Drain
Drain Slab Done
Work
11992 KHPL/TK/NH-66/STR/11866 7-Feb-2024 8-Feb-2024 Checking of excavation, level and pouring PCC M-15 grade Below Drain Raft. 390+170 390+190 20 LHS Drain
Done
Checking of Level, reinforcement, shuttering, and pouring concrete M-50 grade for Elevated Elevated
11993 KHPL/TK/NH-66/STR/11867 7-Feb-2024 8-Feb-2024 389+305 RHS Not done
Pedestal 08 nos of Elevated Bridge ( P11/RHS) Bridge Bridge
Elevated PSC Girder Work
11994 KHPL/TK/NH-66/STR/11868 7-Feb-2024 8-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (OG-1/LHS,P5-P6)(388+500) 389+465 LHS
Bridge Grouting Done
Elevated PSC Girder Work
11995 KHPL/TK/NH-66/STR/11869 7-Feb-2024 8-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (OG-1/RHS,P5-P6)(388+500) 389+465 RHS
Bridge Grouting Done
Elevated PSC Girder Work
11996 KHPL/TK/NH-66/STR/11870 7-Feb-2024 8-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (OG-1/LHS,P8-P9)(388+500) 389+465 LHS
Bridge Grouting Done
Elevated PSC Girder Work
11997 KHPL/TK/NH-66/STR/11871 7-Feb-2024 8-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (OG-1/RHS,P13-P14)(388+500) 389+465 RHS
Bridge Grouting Done
Checking of reinforcement, mould and pouring concrete M-35 grade for RE Panel Casting Work
11998 KHPL/TK/NH-66/STR/11872 7-Feb-2024 8-Feb-2024 386+600 RE Panel
S5 type-17 nos, P2 type-07 nos. Yard Done
Checking of reinforcement, mould and pouring concrete M-30 grade for Drain (Pre-Cast) Casting
11999 KHPL/TK/NH-66/STR/11873 7-Feb-2024 8-Feb-2024 397+300 Pre-Cast Drain Not done
(14 nos) Yard
Checking of reinforcement, mould and pouring concrete M-35 grade for RE Panel Casting Work
12000 KHPL/TK/NH-66/STR/11874 7-Feb-2024 8-Feb-2024 369+550 RE Panel
S5 type-11 nos, P2 type-04 nos, MG4 type-02 nos. Yard Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12001 KHPL/TK/NH-66/STR/11875 8-Feb-2024 9-Feb-2024 373+330 373+340 10 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12002 KHPL/TK/NH-66/STR/11876 8-Feb-2024 9-Feb-2024 372+280 372+300 20 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12003 KHPL/TK/NH-66/STR/11877 8-Feb-2024 9-Feb-2024 372+320 372+345 25 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12004 KHPL/TK/NH-66/STR/11878 8-Feb-2024 9-Feb-2024 372+560 372+580 20 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12005 KHPL/TK/NH-66/STR/11879 8-Feb-2024 9-Feb-2024 378+645 378+650 5 LHS Drain
Drain Raft Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12006 KHPL/TK/NH-66/STR/11880 8-Feb-2024 9-Feb-2024 385+115 385+120 5 LHS Drain
Drain Raft Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12007 KHPL/TK/NH-66/STR/11881 8-Feb-2024 9-Feb-2024 386+992 387+029 37 LHS Drain
Drain Raft Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12008 KHPL/TK/NH-66/STR/11882 8-Feb-2024 9-Feb-2024 387+054 387+080 26 LHS Drain
Drain Wall 1st with Final lift Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12009 KHPL/TK/NH-66/STR/11883 8-Feb-2024 9-Feb-2024 390+170 390+190 20 LHS Drain
Drain Raft Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12010 KHPL/TK/NH-66/STR/11884 8-Feb-2024 9-Feb-2024 397+430 397+450 20 LHS Drain
Drain Wall 1st with Final lift Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12011 KHPL/TK/NH-66/STR/11885 8-Feb-2024 9-Feb-2024 372+560 372+580 20 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12012 KHPL/TK/NH-66/STR/11886 8-Feb-2024 9-Feb-2024 373+755 373+775 20 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12013 KHPL/TK/NH-66/STR/11887 8-Feb-2024 9-Feb-2024 397+370 397+430 60 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12014 KHPL/TK/NH-66/STR/11888 8-Feb-2024 9-Feb-2024 391+737 391+749 12 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12015 KHPL/TK/NH-66/STR/11889 8-Feb-2024 9-Feb-2024 391+910 391+920 10 LHS Drain
Drain Raft Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12016 KHPL/TK/NH-66/STR/11890 8-Feb-2024 9-Feb-2024 396+543 396+550 7 LHS Drain
Drain Raft Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12017 KHPL/TK/NH-66/STR/11891 8-Feb-2024 9-Feb-2024 396+815 396+830 15 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
12018 KHPL/TK/NH-66/STR/11892 8-Feb-2024 9-Feb-2024 397+470 397+500 30 LHS Drain Not done
Drain Wall 1st with Final lift
Work
12019 KHPL/TK/NH-66/STR/11893 8-Feb-2024 9-Feb-2024 Checking of excavation, level and pouring of PCC M-15 grade for Retaining Wall. 372+170 372+220 50 LHS Retaining Wall
Done
Checking of reinforcement, shuttering, centering and pouring concrete M -30 grade in Work
12020 KHPL/TK/NH-66/STR/11894 8-Feb-2024 9-Feb-2024 377+545 377+580 35 RHS Retaining Wall
Wall 1st lift with Final for Retaining Wall. Done
Checking of reinforcement, mould and pouring concrete M-40 grade for Plank Slab (Pre- Work
12021 KHPL/TK/NH-66/STR/11895 8-Feb-2024 9-Feb-2024 396+888 Flyover Plank Slab
Cast) (13 nos) Done
Checking of Level, reinforcement, shuttering, and pouring concrete M-50 grade for Elevated Elevated Work
12022 KHPL/TK/NH-66/STR/11896 8-Feb-2024 9-Feb-2024 389+305 RHS
Pedestal 08 nos of Elevated Bridge ( P11/RHS) Bridge Bridge Done
Elevated PSC Girder Work
12023 KHPL/TK/NH-66/STR/11897 8-Feb-2024 9-Feb-2024 Checking of stressing for PSC girder Elevated Bridge (OG-2/RHS,P5-P6)(388+500) 389+465 RHS
Bridge stressing Done
Elevated PSC Girder Work
12024 KHPL/TK/NH-66/STR/11898 8-Feb-2024 9-Feb-2024 Checking of stressing for PSC girder Elevated Bridge (OG-2/RHS,P2-P3)(388+500) 389+465 RHS
Bridge stressing Done
Elevated PSC Girder Work
12025 KHPL/TK/NH-66/STR/11899 8-Feb-2024 9-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (OG-1/RHS,P11-P12)(388+500) 389+465 RHS
Bridge Grouting Done
Elevated PSC Girder Work
12026 KHPL/TK/NH-66/STR/11900 8-Feb-2024 9-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (IG-1/LHS,A1-P1)(388+500) 389+465 LHS
Bridge Grouting Done
Elevated PSC Girder Work
12027 KHPL/TK/NH-66/STR/11901 8-Feb-2024 9-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (OG-1/RHS,P8-P9)(388+500) 389+465 RHS
Bridge Grouting Done
Elevated PSC Girder Work
12028 KHPL/TK/NH-66/STR/11902 8-Feb-2024 9-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (OG-2/LHS,P5-P6)(388+500) 389+465 LHS
Bridge Grouting Done
Elevated PSC Girder Work
12029 KHPL/TK/NH-66/STR/11903 8-Feb-2024 9-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (OG-1/LHS,P2-P3)(388+500) 389+465 LHS
Bridge Grouting Done
Checking of Level, reinforcement, shuttering, and pouring concrete M-35 grade for Pier Elevated Elevated Work
12030 KHPL/TK/NH-66/STR/11904 8-Feb-2024 9-Feb-2024 389+745 RHS
Cap of Elevated Bridge (P22/RHS) (Design ch: 389+465) Bridge Bridge Done
Checking of reinforcement, mould and pouring concrete M-35 grade for RE Panel Casting
12031 KHPL/TK/NH-66/STR/11905 8-Feb-2024 9-Feb-2024 386+600 RE Panel Not done
S5 type-17 nos, P2 type-07 nos. Yard
Checking of reinforcement, mould and pouring concrete M-30 grade for Drain (Pre-Cast) Casting
12032 KHPL/TK/NH-66/STR/11906 8-Feb-2024 9-Feb-2024 397+300 Pre-Cast Drain Not done
(14 nos) Yard
Checking of reinforcement, mould and pouring concrete M-35 grade for RE Panel Casting Work
12033 KHPL/TK/NH-66/STR/11907 8-Feb-2024 9-Feb-2024 369+550 RE Panel
S5 type-10 nos, P2 type-02 nos, MG4 type-02 nos. Yard Done
Checking of Level, reinforcement, shuttering, and pouring concrete M-50 grade for Elevated Elevated
12034 KHPL/TK/NH-66/STR/11908 8-Feb-2024 9-Feb-2024 389+105 RHS Not done
Pedestal 08 nos of Elevated Bridge ( P6/RHS)(Design ch: 389+465) Bridge Bridge
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12035 KHPL/TK/NH-66/STR/11909 9-Feb-2024 10-Feb-2024 385+115 385+120 5 LHS Drain
Drain Wall 1st with Final lift Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12036 KHPL/TK/NH-66/STR/11910 9-Feb-2024 10-Feb-2024 386+992 387+029 37 LHS Drain
Drain Wall 1st with Final lift Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12037 KHPL/TK/NH-66/STR/11911 9-Feb-2024 10-Feb-2024 387+054 387+080 26 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12038 KHPL/TK/NH-66/STR/11912 9-Feb-2024 10-Feb-2024 372+345 372+380 35 LHS Drain
Drain Wall 1st with Final lift Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12039 KHPL/TK/NH-66/STR/11913 9-Feb-2024 10-Feb-2024 391+910 391+920 10 LHS Drain
Drain Wall 1st with Final lift Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12040 KHPL/TK/NH-66/STR/11914 9-Feb-2024 10-Feb-2024 393+938 393+950 12 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12041 KHPL/TK/NH-66/STR/11915 9-Feb-2024 10-Feb-2024 396+543 396+550 7 LHS Drain
Drain Wall 1st with Final lift Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12042 KHPL/TK/NH-66/STR/11916 9-Feb-2024 10-Feb-2024 397+430 397+450 20 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12043 KHPL/TK/NH-66/STR/11917 9-Feb-2024 10-Feb-2024 371+810 371+860 50 LHS Drain
Drain Raft Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
12044 KHPL/TK/NH-66/STR/11918 9-Feb-2024 10-Feb-2024 372+345 372+380 35 LHS Drain Repeated
Drain Wall 1st with Final lift
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12045 KHPL/TK/NH-66/STR/11919 9-Feb-2024 10-Feb-2024 393+935 393+950 15 RHS Drain
Drain Raft Done
Work
12046 KHPL/TK/NH-66/STR/11920 9-Feb-2024 10-Feb-2024 Checking of excavation, level and pouring PCC M-15 grade Below Drain Raft. 397+500 397+520 20 LHS Drain
Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12047 KHPL/TK/NH-66/STR/11921 9-Feb-2024 10-Feb-2024 397+450 397+500 50 LHS Drain
Drain Wall 1st with Final lift Done
Elevated Work
12048 KHPL/TK/NH-66/STR/11922 9-Feb-2024 10-Feb-2024 Reinforcement & profile checking of PSC girder of Elevated Bridge (OG-2/RHS,P8-P9) 394+000 RHS PSC Girder
Bridge Done
Checking of shuttering, centering and pouring concrete M-55 grade for PSC Girder of Elevated Work
12049 KHPL/TK/NH-66/STR/11923 9-Feb-2024 10-Feb-2024 394+000 RHS PSC Girder
Elevated Bridge (OG-2/RHS,P8-P9) Bridge Done
Elevated Elevated
12050 KHPL/TK/NH-66/STR/11924 9-Feb-2024 10-Feb-2024 Pile Integrity test of Routine Pile at Elevated Bridge (P09/LHS). 394+000 LHS Not done
Bridge Bridge
Checking of reinforcement, shuttering, centering and pouring concrete M -30 grade in Work
12051 KHPL/TK/NH-66/STR/11925 9-Feb-2024 10-Feb-2024 372+170 372+220 50 LHS Retaining Wall
Raft of Retaining Wall. Done
Work
12052 KHPL/TK/NH-66/STR/11926 9-Feb-2024 10-Feb-2024 Reinforcement & profile checking of PSC girder of Flyover (IG-1/RHS,P1-P2) 396+888 Flyover RHS PSC Girder
Done
Checking of shuttering, centering and pouring concrete M-50 grade for PSC Girder of Work
12053 KHPL/TK/NH-66/STR/11927 9-Feb-2024 10-Feb-2024 396+888 Flyover RHS PSC Girder
Flyover (IG-1/RHS,P1-P2) Done
Work
12054 KHPL/TK/NH-66/STR/11928 9-Feb-2024 10-Feb-2024 Reinforcement & profile checking of PSC girder of Flyover (IG-2/RHS,P1-P2) 396+888 Flyover RHS PSC Girder
Done
Checking of shuttering, centering and pouring concrete M-50 grade for PSC Girder of Work
12055 KHPL/TK/NH-66/STR/11929 9-Feb-2024 10-Feb-2024 396+888 Flyover RHS PSC Girder
Flyover (IG-2/RHS,P1-P2) Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade for Work
12056 KHPL/TK/NH-66/STR/11930 9-Feb-2024 10-Feb-2024 393+397 Box Culvert LHS S/R Box Culvert
Box Culvert Raft with Bottom Haunch (SR) Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade for Work
12057 KHPL/TK/NH-66/STR/11931 9-Feb-2024 10-Feb-2024 393+397 Box Culvert LHS MCW Box Culvert
Box Culvert Raft with Bottom Haunch (MCW) Done
Checking of Level, reinforcement, shuttering, and pouring concrete M-35 grade for Pier Elevated Elevated
12058 KHPL/TK/NH-66/STR/11932 9-Feb-2024 10-Feb-2024 394+560 RHS Not done
Cap of Elevated Bridge (P04/RHS) Bridge Bridge
Elevated PSC Girder Work
12059 KHPL/TK/NH-66/STR/11933 9-Feb-2024 10-Feb-2024 Checking of stressing for PSC girder Elevated Bridge (IG-2/LHS,P3-P4)(388+500) 389+465 LHS
Bridge stressing Done
Elevated PSC Girder Work
12060 KHPL/TK/NH-66/STR/11934 9-Feb-2024 10-Feb-2024 Checking of stressing for PSC girder Elevated Bridge (IG-2/RHS,P3-P4)(388+500) 389+465 RHS
Bridge stressing Done
Checking of reinforcement, mould and pouring concrete M-35 grade for RE Panel Casting Work
12061 KHPL/TK/NH-66/STR/11935 9-Feb-2024 10-Feb-2024 386+600 RE Panel
S5 type-17 nos, P2 type-07 nos. Yard Done
Checking of reinforcement, mould and pouring concrete M-30 grade for Drain (Pre-Cast) Casting
12062 KHPL/TK/NH-66/STR/11936 9-Feb-2024 10-Feb-2024 397+300 Pre-Cast Drain Not done
(14 nos) Yard

Checking of reinforcement, mould and pouring concrete M-35 grade for RE Panel Casting Work
12063 KHPL/TK/NH-66/STR/11937 9-Feb-2024 10-Feb-2024 369+550 RE Panel
SR4 type-01 nos, S5 type-20 nos, P2 type-06 nos, MG4 type-02 nos, TB6 type-01 nos Yard Done

Checking of Level, reinforcement, shuttering, and pouring concrete M-50 grade for Elevated Elevated Work
12064 KHPL/TK/NH-66/STR/11938 9-Feb-2024 10-Feb-2024 389+105 RHS
Pedestal 08 nos of Elevated Bridge ( P6/RHS)(Design ch: 389+465) Bridge Bridge Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12065 KHPL/TK/NH-66/STR/11939 10-Feb-2024 11-Feb-2024 385+115 385+125 10 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12066 KHPL/TK/NH-66/STR/11940 10-Feb-2024 11-Feb-2024 386+992 387+029 37 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M -30 grade in Work
12067 KHPL/TK/NH-66/STR/11941 10-Feb-2024 11-Feb-2024 372+170 372+220 50 LHS Retaining Wall
Wall 1st lift with Final for Retaining Wall. Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12068 KHPL/TK/NH-66/STR/11942 10-Feb-2024 11-Feb-2024 372+345 372+380 35 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12069 KHPL/TK/NH-66/STR/11943 10-Feb-2024 11-Feb-2024 372+535 372+560 25 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12070 KHPL/TK/NH-66/STR/11944 10-Feb-2024 11-Feb-2024 391+910 391+920 10 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12071 KHPL/TK/NH-66/STR/11945 10-Feb-2024 11-Feb-2024 396+543 396+550 7 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12072 KHPL/TK/NH-66/STR/11946 10-Feb-2024 11-Feb-2024 371+810 371+860 50 LHS Drain
Drain Wall 1st with Final lift Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12073 KHPL/TK/NH-66/STR/11947 10-Feb-2024 11-Feb-2024 397+500 397+520 20 LHS Drain
Drain Raft Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12074 KHPL/TK/NH-66/STR/11948 10-Feb-2024 11-Feb-2024 397+445 397+475 30 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12075 KHPL/TK/NH-66/STR/11949 10-Feb-2024 11-Feb-2024 393+935 393+950 15 RHS Drain
Drain Wall 1st with Final lift Done
Work
12076 KHPL/TK/NH-66/STR/11950 10-Feb-2024 11-Feb-2024 Checking of Level & Erection of Drain Pre- Cast. 395+860 395+940 80 RHS Drain Erection
Done
Work
12077 KHPL/TK/NH-66/STR/11951 10-Feb-2024 11-Feb-2024 Checking of excavation, level and pouring PCC M-15 grade Below Drain Raft. 396+250 396+280 30 LHS Drain
Done
Work
12078 KHPL/TK/NH-66/STR/11952 10-Feb-2024 11-Feb-2024 Checking of excavation, level and pouring of PCC M-15 grade for Retaining Wall. 392+086 392+160 74 LHS Retaining Wall
Done
Checking of reinforcement, shuttering, centering and pouring concrete M-35 grade for Elevated Elevated
12079 KHPL/TK/NH-66/STR/11953 10-Feb-2024 11-Feb-2024 394+000 RHS Not done
Elevated Bridge outer-side pier Shaft (Pier No. P02/RHS) (Ch.393+910) Bridge Bridge
Reinforcement, Shuttering checking & pouring concrete M-40 grade of Cross Girder Work
12080 KHPL/TK/NH-66/STR/11954 10-Feb-2024 11-Feb-2024 371+295 Flyover LHS Cross Girder
(Span P1-P2 towards P2/LHS, nos of 03 at Flyover Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade for Work
12081 KHPL/TK/NH-66/STR/11955 10-Feb-2024 11-Feb-2024 388+027 Box Culvert RHS MCW Box Culvert
Box Culvert Raft with Bottom Haunch (MCW) Done
Checking of excavation, level, layout and pouring PCC (M-15) grade for Box Culvert Work
12082 KHPL/TK/NH-66/STR/11956 10-Feb-2024 11-Feb-2024 388+064 Box Culvert RHS MCW Box Culvert
(MCW) Done
Checking of reinforcement, shuttering, centering and pouring concrete M-35 grade for Elevated Elevated
12083 KHPL/TK/NH-66/STR/11957 10-Feb-2024 11-Feb-2024 394+000 RHS Not done
Pile Cap of Elevated Bridge (Pier No. P01/LHS) (Ch.393+880) Bridge Bridge
Major PSC Girder Work
12084 KHPL/TK/NH-66/STR/11958 10-Feb-2024 11-Feb-2024 Checking of Grouting for PSC girder Major Bridge (OG-1/RHS,P2-P3) 387+230 RHS
Bridge Grouting Done
Major PSC Girder Work
12085 KHPL/TK/NH-66/STR/11959 10-Feb-2024 11-Feb-2024 Checking of Grouting for PSC girder Major Bridge (IG-1/RHS,P2-P3) 387+230 RHS
Bridge Grouting Done
Major PSC Girder Work
12086 KHPL/TK/NH-66/STR/11960 10-Feb-2024 11-Feb-2024 Checking of Grouting for PSC girder Major Bridge (IG-2/RHS,P2-P3) 387+230 RHS
Bridge Grouting Done
Major PSC Girder Work
12087 KHPL/TK/NH-66/STR/11961 10-Feb-2024 11-Feb-2024 Checking of Grouting for PSC girder Major Bridge (IG-3/RHS,P2-P3) 387+230 RHS
Bridge Grouting Done
Major PSC Girder Work
12088 KHPL/TK/NH-66/STR/11962 10-Feb-2024 11-Feb-2024 Checking of Grouting for PSC girder Major Bridge (OG-2/RHS,P2-P3) 387+230 RHS
Bridge Grouting Done
Major PSC Girder Work
12089 KHPL/TK/NH-66/STR/11963 10-Feb-2024 11-Feb-2024 Checking of Grouting for PSC girder Major Bridge (OG-1/LHS,P2-P3) 387+230 LHS
Bridge Grouting Done
Major PSC Girder Work
12090 KHPL/TK/NH-66/STR/11964 10-Feb-2024 11-Feb-2024 Checking of Grouting for PSC girder Major Bridge (IG-1/LHS,P2-P3) 387+230 LHS
Bridge Grouting Done
Major PSC Girder Work
12091 KHPL/TK/NH-66/STR/11965 10-Feb-2024 11-Feb-2024 Checking of Grouting for PSC girder Major Bridge (IG-2/LHS,P2-P3) 387+230 LHS
Bridge Grouting Done
Major PSC Girder Work
12092 KHPL/TK/NH-66/STR/11966 10-Feb-2024 11-Feb-2024 Checking of Grouting for PSC girder Major Bridge (IG-3/LHS,P2-P3) 387+230 LHS
Bridge Grouting Done
Major PSC Girder Work
12093 KHPL/TK/NH-66/STR/11967 10-Feb-2024 11-Feb-2024 Checking of Grouting for PSC girder Major Bridge (OG-2/LHS,P2-P3) 387+230 LHS
Bridge Grouting Done
Reinforcement & profile checking of PSC girder (IG-1/LHS,P11-P12) (Casting Ch: Elevated Work
12094 KHPL/TK/NH-66/STR/11968 10-Feb-2024 11-Feb-2024 389+465 LHS PSC Girder
388+550). Bridge Done
Checking of shuttering, centering and pouring concrete M-55 grade for PSC Girder of Elevated Work
12095 KHPL/TK/NH-66/STR/11969 10-Feb-2024 11-Feb-2024 389+465 LHS PSC Girder
Elevated Bridge (IG-1/LHS,P11-P12) (Casting Ch: 388+550) Bridge Done
Reinforcement & profile checking of PSC girder (IG-2/LHS,P11-P12) (Casting Ch: Elevated
12096 KHPL/TK/NH-66/STR/11970 10-Feb-2024 11-Feb-2024 389+465 LHS PSC Girder Not done
388+550). Bridge
Checking of shuttering, centering and pouring concrete M-55 grade for PSC Girder of Elevated
12097 KHPL/TK/NH-66/STR/11971 10-Feb-2024 11-Feb-2024 389+465 LHS PSC Girder Not done
Elevated Bridge (IG-2/LHS,P11-P12) (Casting Ch: 388+550) Bridge
Elevated PSC Girder Work
12098 KHPL/TK/NH-66/STR/11972 10-Feb-2024 11-Feb-2024 Checking of stressing for PSC girder Elevated Bridge (IG-2/LHS,P1-P2)(388+500) 389+465 LHS
Bridge stressing Done
Elevated PSC Girder Work
12099 KHPL/TK/NH-66/STR/11973 10-Feb-2024 11-Feb-2024 Checking of stressing for PSC girder Elevated Bridge (IG-2/RHS,P1-P2)(388+500) 389+465 RHS
Bridge stressing Done
Elevated PSC Girder Work
12100 KHPL/TK/NH-66/STR/11974 10-Feb-2024 11-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (OG-2/RHS,P8-P9)(388+500) 389+465 RHS
Bridge Grouting Done
Elevated PSC Girder Work
12101 KHPL/TK/NH-66/STR/11975 10-Feb-2024 11-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (OG-2/LHS,P8-P9)(388+500) 389+465 LHS
Bridge Grouting Done
Elevated PSC Girder Work
12102 KHPL/TK/NH-66/STR/11976 10-Feb-2024 11-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (OG-1/LHS,P11-P12)(388+500) 389+465 LHS
Bridge Grouting Done
Elevated PSC Girder Work
12103 KHPL/TK/NH-66/STR/11977 10-Feb-2024 11-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (OG-2/RHS,P11-P12)(388+500) 389+465 RHS
Bridge Grouting Done
Checking of Level, reinforcement, shuttering, and pouring concrete M-35 grade for Pier Elevated Elevated Work
12104 KHPL/TK/NH-66/STR/11978 10-Feb-2024 11-Feb-2024 388+905 RHS
Cap of Elevated Bridge (P01/RHS) Bridge Bridge Done
Checking of Level, reinforcement, shuttering, and pouring concrete M-35 grade for Pier Elevated Elevated
12105 KHPL/TK/NH-66/STR/11979 10-Feb-2024 11-Feb-2024 389+985 LHS Not done
Cap of Elevated Bridge (P28/LHS) Bridge Bridge
Elevated Work
12106 KHPL/TK/NH-66/STR/11980 10-Feb-2024 11-Feb-2024 Reinforcement & profile checking of PSC girder of Elevated Bridge (OG-2/LHS,P8-P9) 394+000 LHS PSC Girder
Bridge Done
Checking of shuttering, centering and pouring concrete M-55 grade for PSC Girder of Elevated Work
12107 KHPL/TK/NH-66/STR/11981 10-Feb-2024 11-Feb-2024 394+000 LHS PSC Girder
Elevated Bridge (OG-2/LHS,P8-P9) Bridge Done
Checking of reinforcement, mould and pouring concrete M-35 grade for RE Panel Casting Work
12108 KHPL/TK/NH-66/STR/11982 10-Feb-2024 11-Feb-2024 386+600 RE Panel
S5 type-17 nos, P2 type-07 nos. Yard Done
Checking of reinforcement, mould and pouring concrete M-30 grade for Drain (Pre-Cast) Casting
12109 KHPL/TK/NH-66/STR/11983 10-Feb-2024 11-Feb-2024 397+300 Pre-Cast Drain Not done
(14 nos) Yard
Checking of reinforcement, mould and pouring concrete M-35 grade for RE Panel Casting Work
12110 KHPL/TK/NH-66/STR/11984 10-Feb-2024 11-Feb-2024 369+550 RE Panel
S5 type-12 nos. Yard Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12111 KHPL/TK/NH-66/STR/11985 11-Feb-2024 12-Feb-2024 371+810 371+860 50 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12112 KHPL/TK/NH-66/STR/11986 11-Feb-2024 12-Feb-2024 393+932 393+960 28 RHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12113 KHPL/TK/NH-66/STR/11987 11-Feb-2024 12-Feb-2024 396+250 396+280 30 LHS Drain
Drain Raft Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12114 KHPL/TK/NH-66/STR/11988 11-Feb-2024 12-Feb-2024 371+780 371+810 30 LHS Drain
Drain Raft Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12115 KHPL/TK/NH-66/STR/11989 11-Feb-2024 12-Feb-2024 372+395 372+440 45 LHS Drain
Drain Wall 1st with Final lift Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12116 KHPL/TK/NH-66/STR/11990 11-Feb-2024 12-Feb-2024 394+465 394+490 25 LHS Drain
Drain Raft Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12117 KHPL/TK/NH-66/STR/11991 11-Feb-2024 12-Feb-2024 396+253 396+280 27 LHS Drain
Drain Raft Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12118 KHPL/TK/NH-66/STR/11992 11-Feb-2024 12-Feb-2024 373+775 373+800 25 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12119 KHPL/TK/NH-66/STR/11993 11-Feb-2024 12-Feb-2024 394+475 394+490 15 LHS Drain
Drain Raft Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12120 KHPL/TK/NH-66/STR/11994 11-Feb-2024 12-Feb-2024 372+160 372+173 13 RHS Drain
Drain Slab Done
Work
12121 KHPL/TK/NH-66/STR/11995 11-Feb-2024 12-Feb-2024 Checking of excavation, level and pouring PCC M-15 grade Below Drain Raft. 389+985 390+000 15 LHS Drain
Done
Work
12122 KHPL/TK/NH-66/STR/11996 11-Feb-2024 12-Feb-2024 Checking of excavation, level and pouring PCC M-15 grade Below Drain Raft. 397+185 397+230 45 LHS Drain
Done
Work
12123 KHPL/TK/NH-66/STR/11997 11-Feb-2024 12-Feb-2024 Checking of excavation, level and pouring PCC M-15 grade Below Drain Raft. 397+520 397+540 20 LHS Drain
Done
Work
12124 KHPL/TK/NH-66/STR/11998 11-Feb-2024 12-Feb-2024 Checking of excavation, level and pouring PCC M-15 grade Below Drain Raft. 375+250 375+285 35 LHS Drain
Done
Reinforcement, Shuttering checking & pouring concrete M-40 grade of Cross Girder Work
12125 KHPL/TK/NH-66/STR/11999 11-Feb-2024 12-Feb-2024 371+295 Flyover RHS Cross Girder
(Span P1-P2 towards P1/RHS, nos of 03 at Flyover Done
Checking of reinforcement, shuttering, centering and pouring concrete M-35 grade for Elevated Elevated
12126 KHPL/TK/NH-66/STR/12000 11-Feb-2024 12-Feb-2024 394+000 RHS Not done
Pile Cap of Elevated Bridge (Pier No. P01/RHS) (Ch.393+880) Bridge Bridge
Work
12127 KHPL/TK/NH-66/STR/12001 11-Feb-2024 12-Feb-2024 Checking of excavation, level and pouring of PCC M-15 grade for Retaining Wall. 391+999 392+086 87 LHS Retaining Wall
Done
Work
12128 KHPL/TK/NH-66/STR/12002 11-Feb-2024 12-Feb-2024 Checking of excavation, level and pouring of PCC M-15 grade for L-Type Retaining Wall. 391+108 391+128 20 LHS Retaining Wall
Done
Work
12129 KHPL/TK/NH-66/STR/12003 11-Feb-2024 12-Feb-2024 Reinforcement & profile checking of PSC girder of Flyover (OG-2/LHS,P1-P2) 396+888 Flyover LHS PSC Girder
Done
Checking of shuttering, centering and pouring concrete M-50 grade for PSC Girder of Work
12130 KHPL/TK/NH-66/STR/12004 11-Feb-2024 12-Feb-2024 396+888 Flyover LHS PSC Girder
Flyover (OG-2/LHS,P1-P2) Done
Major PSC Girder Work
12131 KHPL/TK/NH-66/STR/12005 11-Feb-2024 12-Feb-2024 Checking of Grouting for PSC girder Major Bridge (OG-1/RHS,P1-P2) 387+230 RHS
Bridge Grouting Done
Major PSC Girder Work
12132 KHPL/TK/NH-66/STR/12006 11-Feb-2024 12-Feb-2024 Checking of Grouting for PSC girder Major Bridge (IG-1/RHS,P1-P2) 387+230 RHS
Bridge Grouting Done
Major PSC Girder Work
12133 KHPL/TK/NH-66/STR/12007 11-Feb-2024 12-Feb-2024 Checking of Grouting for PSC girder Major Bridge (IG-2/RHS,P1-P2) 387+230 RHS
Bridge Grouting Done
Major PSC Girder Work
12134 KHPL/TK/NH-66/STR/12008 11-Feb-2024 12-Feb-2024 Checking of Grouting for PSC girder Major Bridge (OG-2/RHS,P1-P2) 387+230 RHS
Bridge Grouting Done
Major PSC Girder Work
12135 KHPL/TK/NH-66/STR/12009 11-Feb-2024 12-Feb-2024 Checking of Grouting for PSC girder Major Bridge (IG-3/RHS,P1-P2) 387+230 RHS
Bridge Grouting Done
Major PSC Girder Work
12136 KHPL/TK/NH-66/STR/12010 11-Feb-2024 12-Feb-2024 Checking of Grouting for PSC girder Major Bridge (OG-1/LHS,P1-P2) 387+230 LHS
Bridge Grouting Done
Major PSC Girder Work
12137 KHPL/TK/NH-66/STR/12011 11-Feb-2024 12-Feb-2024 Checking of Grouting for PSC girder Major Bridge (IG-1/LHS,P1-P2) 387+230 LHS
Bridge Grouting Done
Major PSC Girder Work
12138 KHPL/TK/NH-66/STR/12012 11-Feb-2024 12-Feb-2024 Checking of Grouting for PSC girder Major Bridge (IG-3/LHS,P1-P2) 387+230 LHS
Bridge Grouting Done
Major PSC Girder Work
12139 KHPL/TK/NH-66/STR/12013 11-Feb-2024 12-Feb-2024 Checking of Grouting for PSC girder Major Bridge (OG-2/LHS,P1-P2) 387+230 LHS
Bridge Grouting Done
Work
12140 KHPL/TK/NH-66/STR/12014 11-Feb-2024 12-Feb-2024 Reinforcement & profile checking of PSC girder of Flyover (IG-1/LHS,P1-P2) 396+888 Flyover LHS PSC Girder
Done
Checking of shuttering, centering and pouring concrete M-50 grade for PSC Girder of Work
12141 KHPL/TK/NH-66/STR/12015 11-Feb-2024 12-Feb-2024 396+888 Flyover LHS PSC Girder
Flyover (IG-1/LHS,P1-P2) Done
Checking of shuttering, centering and pouring concrete M-40 grade for RCC Girder of
12142 KHPL/TK/NH-66/STR/12016 11-Feb-2024 12-Feb-2024 396+888 Flyover LHS RCC Girder Not done
Flyover (IG-2/LHS, A1-P1)
Elevated PSC Girder Work
12143 KHPL/TK/NH-66/STR/12017 11-Feb-2024 12-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (IG-1/RHS,A1-P1)(388+500) 389+465 RHS
Bridge Grouting Done
Elevated PSC Girder Work
12144 KHPL/TK/NH-66/STR/12018 11-Feb-2024 12-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (OG-2/LHS,P11-P12)(388+500) 389+465 LHS
Bridge Grouting Done
Elevated PSC Girder Work
12145 KHPL/TK/NH-66/STR/12019 11-Feb-2024 12-Feb-2024 Checking of stressing for PSC girder Elevated Bridge (OG-2/LHS,P13-P14)(388+500) 389+465 LHS
Bridge stressing Done
Reinforcement & profile checking of PSC girder (IG-2/LHS,P11-P12) (Casting Ch: Elevated Work
12146 KHPL/TK/NH-66/STR/12020 11-Feb-2024 12-Feb-2024 389+465 LHS PSC Girder
388+550). Bridge Done
Checking of shuttering, centering and pouring concrete M-55 grade for PSC Girder of Elevated Work
12147 KHPL/TK/NH-66/STR/12021 11-Feb-2024 12-Feb-2024 389+465 LHS PSC Girder
Elevated Bridge (IG-2/LHS,P11-P12) (Casting Ch: 388+550) Bridge Done
Checking of Level, reinforcement, shuttering, and pouring concrete M-35 grade for Pier Elevated Elevated Work
12148 KHPL/TK/NH-66/STR/12022 11-Feb-2024 12-Feb-2024 394+560 RHS
Cap of Elevated Bridge (P04/RHS) Bridge Bridge Done
Checking of reinforcement, mould and pouring concrete M-35 grade for RE Panel Casting Work
12149 KHPL/TK/NH-66/STR/12023 11-Feb-2024 12-Feb-2024 386+600 RE Panel
S5 type-17 nos, P2 type-07 nos. Yard Done
Checking of reinforcement, mould and pouring concrete M-30 grade for Drain (Pre-Cast) Casting
12150 KHPL/TK/NH-66/STR/12024 11-Feb-2024 12-Feb-2024 397+300 Pre-Cast Drain Not done
(14 nos) Yard
Checking of reinforcement, mould and pouring concrete M-35 grade for RE Panel Casting Work
12151 KHPL/TK/NH-66/STR/12025 11-Feb-2024 12-Feb-2024 369+550 RE Panel
S5 type-10 nos, P2 type-02 nos, MG4 type-02 nos. Yard Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
12152 KHPL/TK/NH-66/STR/12026 11-Feb-2024 12-Feb-2024 372+560 372+580 20 LHS Drain Repeated
Drain Slab
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
12153 KHPL/TK/NH-66/STR/12027 11-Feb-2024 12-Feb-2024 378+645 378+650 5 LHS Drain Repeated
Drain Raft
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
12154 KHPL/TK/NH-66/STR/12028 11-Feb-2024 12-Feb-2024 385+115 385+120 5 LHS Drain Repeated
Drain Raft
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
12155 KHPL/TK/NH-66/STR/12029 11-Feb-2024 12-Feb-2024 386+992 387+029 37 LHS Drain Repeated
Drain Raft
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
12156 KHPL/TK/NH-66/STR/12030 11-Feb-2024 12-Feb-2024 387+054 387+080 26 LHS Drain Repeated
Drain Wall 1st with Final lift
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
12157 KHPL/TK/NH-66/STR/12031 11-Feb-2024 12-Feb-2024 390+170 390+190 20 LHS Drain Repeated
Drain Raft
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
12158 KHPL/TK/NH-66/STR/12032 11-Feb-2024 12-Feb-2024 390+170 390+190 20 LHS Drain Repeated
Drain Raft
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
12159 KHPL/TK/NH-66/STR/12033 11-Feb-2024 12-Feb-2024 397+430 397+450 20 LHS Drain Repeated
Drain Wall 1st with Final lift
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
12160 KHPL/TK/NH-66/STR/12034 11-Feb-2024 12-Feb-2024 372+560 372+580 20 LHS Drain Repeated
Drain Slab
Checking of reinforcement, shuttering, centering and pouring concrete M -30 grade in Work
12161 KHPL/TK/NH-66/STR/12035 12-Feb-2024 13-Feb-2024 391+999 392+103 104 LHS Retaining Wall
Raft of Retaining Wall. Done
Checking of reinforcement, shuttering, centering and pouring concrete M -30 grade in Work
12162 KHPL/TK/NH-66/STR/12036 12-Feb-2024 13-Feb-2024 391+108 391+128 20 LHS Retaining Wall
Raft of L-Type Retaining Wall. Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12163 KHPL/TK/NH-66/STR/12037 12-Feb-2024 13-Feb-2024 396+250 396+280 30 LHS Drain
Drain Wall 1st with Final lift Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12164 KHPL/TK/NH-66/STR/12038 12-Feb-2024 13-Feb-2024 371+780 371+810 30 LHS Drain
Drain Wall 1st with Final lift Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12165 KHPL/TK/NH-66/STR/12039 12-Feb-2024 13-Feb-2024 394+475 394+490 15 LHS Drain
Drain Wall 1st with Final lift Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
12166 KHPL/TK/NH-66/STR/12040 12-Feb-2024 13-Feb-2024 396+253 396+280 27 LHS Drain Repeated
Drain Wall 1st with Final lift
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12167 KHPL/TK/NH-66/STR/12041 12-Feb-2024 13-Feb-2024 372+395 372+440 45 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
12168 KHPL/TK/NH-66/STR/12042 12-Feb-2024 13-Feb-2024 394+475 394+490 15 LHS Drain Repeated
Drain Wall 1st with Final lift
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12169 KHPL/TK/NH-66/STR/12043 12-Feb-2024 13-Feb-2024 389+985 390+000 15 LHS Drain
Drain Raft Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12170 KHPL/TK/NH-66/STR/12044 12-Feb-2024 13-Feb-2024 397+520 397+540 20 LHS Drain
Drain Raft Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12171 KHPL/TK/NH-66/STR/12045 12-Feb-2024 13-Feb-2024 370+920 370+945 25 LHS Drain
Drain Wall 1st with Final lift Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12172 KHPL/TK/NH-66/STR/12046 12-Feb-2024 13-Feb-2024 390+160 390+190 30 LHS Drain
Drain Wall 1st with Final lift Done
Work
12173 KHPL/TK/NH-66/STR/12047 12-Feb-2024 13-Feb-2024 Checking of excavation, level and pouring PCC M-15 grade Below Drain Raft. 395+580 395+623 43 LHS Drain
Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
12174 KHPL/TK/NH-66/STR/12048 12-Feb-2024 13-Feb-2024 397+500 397+510 10 LHS Drain Not done
Drain Wall 1st with Final lift
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
12175 KHPL/TK/NH-66/STR/12049 12-Feb-2024 13-Feb-2024 397+475 397+500 25 LHS Drain Not done
Drain Slab
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12176 KHPL/TK/NH-66/STR/12050 12-Feb-2024 13-Feb-2024 372+090 372+100 10 RHS Drain
Drain Wall 1st with Final lift Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12177 KHPL/TK/NH-66/STR/12051 12-Feb-2024 13-Feb-2024 384+372 384+385 13 RHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12178 KHPL/TK/NH-66/STR/12052 12-Feb-2024 13-Feb-2024 391+615 391+630 15 RHS Drain
Drain Raft Done
Reinforcement, Shuttering checking & pouring concrete M-35 grade of RCC Cross Girder RCC Cross Work
12179 KHPL/TK/NH-66/STR/12053 12-Feb-2024 13-Feb-2024 371+295 Flyover RHS
(Span A1-P1 towards P1/RHS, nos of 03 at Flyover Girder Done
Reinforcement, Shuttering checking & pouring concrete M-35 grade of RCC Cross Girder RCC Cross Work
12180 KHPL/TK/NH-66/STR/12054 12-Feb-2024 13-Feb-2024 371+295 Flyover LHS
(Span A1-P1 towards P1/LHS, nos of 03 at Flyover Girder Done
Elevated Work
12181 KHPL/TK/NH-66/STR/12055 12-Feb-2024 13-Feb-2024 Reinforcement & profile checking of PSC girder of Elevated Bridge (IG-1/LHS,P8-P9) 394+000 RHS PSC Girder
Bridge Done
Checking of shuttering, centering and pouring concrete M-55 grade for PSC Girder of Elevated Work
12182 KHPL/TK/NH-66/STR/12056 12-Feb-2024 13-Feb-2024 394+000 RHS PSC Girder
Elevated Bridge (IG-1/LHS,P8-P9) Bridge Done
Checking of Level, reinforcement, shuttering, and pouring concrete M-50 grade for Elevated Elevated Work
12183 KHPL/TK/NH-66/STR/12057 12-Feb-2024 13-Feb-2024 389+105 LHS
Pedestal 08 nos of Elevated Bridge ( P6/LHS)(Design ch: 389+465) Bridge Bridge Done
Checking of shuttering, centering and pouring concrete M-40 grade for RCC Girder of
12184 KHPL/TK/NH-66/STR/12058 12-Feb-2024 13-Feb-2024 396+888 Flyover LHS RCC Girder Not done
Flyover (IG-2/LHS, A1-P1)
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade for Work
12185 KHPL/TK/NH-66/STR/12059 12-Feb-2024 13-Feb-2024 388+027 Box Culvert RHS MCW Box Culvert
Box Culvert Wall 1st lift (MCW) Done
Elevated PSC Girder Work
12186 KHPL/TK/NH-66/STR/12060 12-Feb-2024 13-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (OG-2/LHS,A1-P1)(388+500) 389+465 LHS
Bridge Grouting Done
Elevated PSC Girder Work
12187 KHPL/TK/NH-66/STR/12061 12-Feb-2024 13-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (OG-2/RHS,A1-P1)(388+500) 389+465 RHS
Bridge Grouting Done
Elevated PSC Girder Work
12188 KHPL/TK/NH-66/STR/12062 12-Feb-2024 13-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (OG-1/RHS,A1-P1)(388+500) 389+465 RHS
Bridge Grouting Done
Elevated PSC Girder Work
12189 KHPL/TK/NH-66/STR/12063 12-Feb-2024 13-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (OG-2/RHS,P2-P3)(388+500) 389+465 RHS
Bridge Grouting Done
Elevated PSC Girder Work
12190 KHPL/TK/NH-66/STR/12064 12-Feb-2024 13-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (OG-2/LHS,P13-P14)(388+500) 389+465 LHS
Bridge Grouting Done
Checking of reinforcement, mould and pouring concrete M-35 grade for RE Panel Casting Work
12191 KHPL/TK/NH-66/STR/12065 12-Feb-2024 13-Feb-2024 386+600 RE Panel
S5 type-17 nos, P2 type-07 nos. Yard Done
Checking of reinforcement, mould and pouring concrete M-30 grade for Drain (Pre-Cast) Casting Work
12192 KHPL/TK/NH-66/STR/12066 12-Feb-2024 13-Feb-2024 397+300 Pre-Cast Drain
(14 nos) Yard Done
Checking of reinforcement, mould and pouring concrete M-35 grade for RE Panel Casting Work
12193 KHPL/TK/NH-66/STR/12067 12-Feb-2024 13-Feb-2024 369+550 RE Panel
S5 type-10 nos, P2 type-04 nos, MG4 type-02 nos. Yard Done
Checking of reinforcement, shuttering, centering and pouring concrete M -30 grade in Work
12194 KHPL/TK/NH-66/STR/12068 13-Feb-2024 14-Feb-2024 391+108 391+128 20 LHS Retaining Wall
Wall 1st lift for L-Type Retaining Wall. Done
Checking of reinforcement, shuttering, centering and pouring concrete M -30 grade in Work
12195 KHPL/TK/NH-66/STR/12069 13-Feb-2024 14-Feb-2024 377+500 377+545 45 RHS Retaining Wall
Wall 1st lift with Final for Retaining Wall. Done
Work
12196 KHPL/TK/NH-66/STR/12070 13-Feb-2024 14-Feb-2024 Checking of excavation, level and pouring of PCC M-15 grade for Retaining Wall. 377+600 377+680 80 LHS Retaining Wall
Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12197 KHPL/TK/NH-66/STR/12071 13-Feb-2024 14-Feb-2024 394+475 394+490 15 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12198 KHPL/TK/NH-66/STR/12072 13-Feb-2024 14-Feb-2024 370+920 370+945 25 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12199 KHPL/TK/NH-66/STR/12073 13-Feb-2024 14-Feb-2024 371+780 371+810 30 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12200 KHPL/TK/NH-66/STR/12074 13-Feb-2024 14-Feb-2024 389+985 390+000 15 LHS Drain
Drain Wall 1st with Final lift Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12201 KHPL/TK/NH-66/STR/12075 13-Feb-2024 14-Feb-2024 372+090 372+100 10 RHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12202 KHPL/TK/NH-66/STR/12076 13-Feb-2024 14-Feb-2024 391+615 391+630 15 RHS Drain
Drain Wall 1st with Final lift Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12203 KHPL/TK/NH-66/STR/12077 13-Feb-2024 14-Feb-2024 370+900 370+920 20 LHS Drain
Drain Wall 1st with Final lift Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12204 KHPL/TK/NH-66/STR/12078 13-Feb-2024 14-Feb-2024 390+160 390+190 30 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12205 KHPL/TK/NH-66/STR/12079 13-Feb-2024 14-Feb-2024 397+185 397+230 45 LHS Drain
Drain Raft Done
Work
12206 KHPL/TK/NH-66/STR/12080 13-Feb-2024 14-Feb-2024 Checking of excavation, level and pouring PCC M-15 grade Below Drain Raft. 394+760 394+800 40 LHS Drain
Done
Work
12207 KHPL/TK/NH-66/STR/12081 13-Feb-2024 14-Feb-2024 Reinforcement & profile checking of PSC girder of Flyover (IG-2/LHS,P1-P2) 396+888 Flyover LHS PSC Girder
Done
Checking of shuttering, centering and pouring concrete M-50 grade for PSC Girder of Work
12208 KHPL/TK/NH-66/STR/12082 13-Feb-2024 14-Feb-2024 396+888 Flyover LHS PSC Girder
Flyover (IG-2/LHS,P1-P2) Done
Elevated PSC Girder Work
12209 KHPL/TK/NH-66/STR/12083 13-Feb-2024 14-Feb-2024 Checking of stressing for PSC girder Elevated Bridge (IG-2/RHS,A1-P1)(388+500) 389+465 RHS
Bridge stressing Done
Elevated PSC Girder Work
12210 KHPL/TK/NH-66/STR/12084 13-Feb-2024 14-Feb-2024 Checking of stressing for PSC girder Elevated Bridge (OG-2/RHS,P13-P14)(388+500) 389+465 RHS
Bridge stressing Done
Major PSC Girder Work
12211 KHPL/TK/NH-66/STR/12085 13-Feb-2024 14-Feb-2024 Checking of Grouting for PSC girder Major Bridge (OG-1/RHS,A1-P1) 387+230 RHS
Bridge Grouting Done
Major PSC Girder Work
12212 KHPL/TK/NH-66/STR/12086 13-Feb-2024 14-Feb-2024 Checking of Grouting for PSC girder Major Bridge (IG-1/RHS,A1-P1) 387+230 RHS
Bridge Grouting Done
Major PSC Girder Work
12213 KHPL/TK/NH-66/STR/12087 13-Feb-2024 14-Feb-2024 Checking of Grouting for PSC girder Major Bridge (IG-2/RHS,A1-P1) 387+230 RHS
Bridge Grouting Done
Major PSC Girder Work
12214 KHPL/TK/NH-66/STR/12088 13-Feb-2024 14-Feb-2024 Checking of Grouting for PSC girder Major Bridge (IG-3/RHS,A1-P1) 387+230 RHS
Bridge Grouting Done
Major PSC Girder Work
12215 KHPL/TK/NH-66/STR/12089 13-Feb-2024 14-Feb-2024 Checking of Grouting for PSC girder Major Bridge (OG-1/LHS,A1-P1) 387+230 LHS
Bridge Grouting Done
Major PSC Girder Work
12216 KHPL/TK/NH-66/STR/12090 13-Feb-2024 14-Feb-2024 Checking of Grouting for PSC girder Major Bridge (IG-1/LHS,A1-P1) 387+230 LHS
Bridge Grouting Done
Major PSC Girder Work
12217 KHPL/TK/NH-66/STR/12091 13-Feb-2024 14-Feb-2024 Checking of Grouting for PSC girder Major Bridge (IG-2/LHS,A1-P1) 387+230 LHS
Bridge Grouting Done
Major PSC Girder Work
12218 KHPL/TK/NH-66/STR/12092 13-Feb-2024 14-Feb-2024 Checking of Grouting for PSC girder Major Bridge (IG-3/LHS,A1-P1) 387+230 LHS
Bridge Grouting Done
Major PSC Girder Work
12219 KHPL/TK/NH-66/STR/12093 13-Feb-2024 14-Feb-2024 Checking of Grouting for PSC girder Major Bridge (OG-2/LHS,A1-P1) 387+230 LHS
Bridge Grouting Done
Checking of reinforcement, shuttering, centering and pouring concrete M-35 grade for Elevated Elevated Work
12220 KHPL/TK/NH-66/STR/12094 13-Feb-2024 14-Feb-2024 394+000 LHS
Pile Cap of Elevated Bridge (Pier No. P09/LHS) (Ch.394+120) Bridge Bridge Done
Status
Reinforcement & profile checking of PSC girder (IG-1/RHS,P11-P12) (Casting Ch: Elevated
12221 KHPL/TK/NH-66/STR/12095 13-Feb-2024 14-Feb-2024 389+465 RHS PSC Girder not
388+550). Bridge
Received
Status
Checking of shuttering, centering and pouring concrete M-55 grade for PSC Girder of Elevated
12222 KHPL/TK/NH-66/STR/12096 13-Feb-2024 14-Feb-2024 389+465 RHS PSC Girder not
Elevated Bridge (IG-1/RHS,P11-P12) (Casting Ch: 388+550) Bridge
Received
Status
Reinforcement, Shuttering checking & pouring concrete M-35 grade of RCC Cross Girder RCC Cross
12223 KHPL/TK/NH-66/STR/12097 13-Feb-2024 14-Feb-2024 371+295 Flyover LHS not
(Span P2-A2 towards P2/LHS, nos of 03 at Flyover Girder
Received
Status
Reinforcement, Shuttering checking & pouring concrete M-35 grade of RCC Cross Girder RCC Cross
12224 KHPL/TK/NH-66/STR/12098 13-Feb-2024 14-Feb-2024 371+295 Flyover LHS not
(Span A1-P1 towards A1/LHS, nos of 03 at Flyover Girder
Received
Status
Reinforcement, Shuttering checking & pouring concrete M-35 grade of RCC Cross Girder RCC Cross
12225 KHPL/TK/NH-66/STR/12099 13-Feb-2024 14-Feb-2024 371+295 Flyover RHS not
(Span A1-P1 towards A1/RHS, nos of 03 at Flyover Girder
Received
Checking of shuttering, centering and pouring concrete M-40 grade for RCC Girder of Work
12226 KHPL/TK/NH-66/STR/12100 13-Feb-2024 14-Feb-2024 396+888 Flyover LHS RCC Girder
Flyover (IG-2/LHS, A1-P1) Done
Major PSC Girder Work
12227 KHPL/TK/NH-66/STR/12101 13-Feb-2024 14-Feb-2024 Checking of stressing for PSC girder Major Bridge (OG-2/RHS,A1-P1) 387+230 RHS
Bridge stressing Done
Status
Checking of reinforcement, shuttering, centering and pouring concrete M-35 grade for Elevated Elevated
12228 KHPL/TK/NH-66/STR/12102 13-Feb-2024 14-Feb-2024 394+000 RHS not
Elevated Bridge outer-side pier Shaft (Pier No. P02/RHS) (Ch.393+910) Bridge Bridge
Received
Status
Checking of reinforcement, shuttering, centering and pouring concrete M-35 grade for Elevated Elevated
12229 KHPL/TK/NH-66/STR/12103 13-Feb-2024 14-Feb-2024 394+000 RHS not
Pile Cap of Elevated Bridge (Pier No. P01/LHS) (Ch.393+880) Bridge Bridge
Received
Checking of Level, reinforcement, shuttering, and pouring concrete M-35 grade for Pier Elevated Elevated Work
12230 KHPL/TK/NH-66/STR/12104 13-Feb-2024 14-Feb-2024 389+985 LHS
Cap of Elevated Bridge (P28/LHS) Bridge Bridge Done
Checking of reinforcement, shuttering, centering and pouring concrete M-35 grade for Elevated Elevated Work
12231 KHPL/TK/NH-66/STR/12105 13-Feb-2024 14-Feb-2024 394+000 RHS
Pile Cap of Elevated Bridge (Pier No. P01/RHS) (Ch.393+880) Bridge Bridge Done
Reinforcement, Shuttering checking & pouring concrete M-40 grade of Cross Girder Work
12232 KHPL/TK/NH-66/STR/12106 13-Feb-2024 14-Feb-2024 371+295 Flyover RHS Cross Girder
(Span P1-P2 towards P2/RHS, nos of 03 at Flyover Done
Checking of reinforcement, mould and pouring concrete M-35 grade for RE Panel Casting Work
12233 KHPL/TK/NH-66/STR/12107 13-Feb-2024 14-Feb-2024 386+600 RE Panel
S5 type-17 nos, P2 type-07 nos. Yard Done
Checking of reinforcement, mould and pouring concrete M-30 grade for Drain (Pre-Cast) Casting
12234 KHPL/TK/NH-66/STR/12108 13-Feb-2024 14-Feb-2024 397+300 Pre-Cast Drain Not done
(14 nos) Yard
Checking of reinforcement, mould and pouring concrete M-30 grade for Drain (Pre-Cast) Casting Work
12235 KHPL/TK/NH-66/STR/12109 13-Feb-2024 14-Feb-2024 386+400 Pre-Cast Drain
(06 nos) Yard Done
Checking of reinforcement, mould and pouring concrete M-35 grade for RE Panel Casting Work
12236 KHPL/TK/NH-66/STR/12110 13-Feb-2024 14-Feb-2024 369+550 RE Panel
S5 type-29 nos, P2 type-06 nos, MG4 type-02 nos. Yard Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12237 KHPL/TK/NH-66/STR/12111 14-Feb-2024 15-Feb-2024 391+615 391+630 15 RHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12238 KHPL/TK/NH-66/STR/12112 14-Feb-2024 15-Feb-2024 370+900 370+945 45 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12239 KHPL/TK/NH-66/STR/12113 14-Feb-2024 15-Feb-2024 371+760 371+780 20 LHS Drain
Drain Raft Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12240 KHPL/TK/NH-66/STR/12114 14-Feb-2024 15-Feb-2024 389+985 390+000 15 LHS Drain
Drain Slab Done
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in Work
12241 KHPL/TK/NH-66/STR/12115 14-Feb-2024 15-Feb-2024 396+250 396+272 22 LHS Drain
Drain Slab Done
Work
12242 KHPL/TK/NH-66/STR/12116 14-Feb-2024 15-Feb-2024 Checking of excavation, level and pouring PCC M-15 grade Below Drain Raft. 372+535 372+560 25 RHS Drain
Done
Status
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
12243 KHPL/TK/NH-66/STR/12117 14-Feb-2024 15-Feb-2024 397+500 397+530 30 LHS Drain not
Drain Wall 1st with Final lift
Received
Status
Elevated
12244 KHPL/TK/NH-66/STR/12118 14-Feb-2024 15-Feb-2024 Reinforcement & profile checking of PSC girder of Elevated Bridge (IG-2/LHS,P8-P9) 394+000 LHS PSC Girder not
Bridge
Received
Status
Checking of shuttering, centering and pouring concrete M-55 grade for PSC Girder of Elevated
12245 KHPL/TK/NH-66/STR/12119 14-Feb-2024 15-Feb-2024 394+000 LHS PSC Girder not
Elevated Bridge (IG-2/LHS,P8-P9) Bridge
Received
Checking of reinforcement, shuttering, centering and pouring concrete M -30 grade in Work
12246 KHPL/TK/NH-66/STR/12120 14-Feb-2024 15-Feb-2024 377+600 377+640 40 LHS Retaining Wall
Raft of Retaining Wall. Done
Elevated PSC Girder Work
12247 KHPL/TK/NH-66/STR/12121 14-Feb-2024 15-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (IG-2/LHS,P3-P4) (388+500) 389+465 LHS
Bridge Grouting Done
Elevated PSC Girder Work
12248 KHPL/TK/NH-66/STR/12122 14-Feb-2024 15-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (IG-2/RHS,P3-P4) (388+500) 389+465 RHS
Bridge Grouting Done
Elevated PSC Girder Work
12249 KHPL/TK/NH-66/STR/12123 14-Feb-2024 15-Feb-2024 Checking of Grouting for PSC girder Elevated Bridge (OG-2/RHS,P5-P6)(388+500) 389+465 RHS
Bridge Grouting Done
Major PSC Girder Work
12250 KHPL/TK/NH-66/STR/12124 14-Feb-2024 15-Feb-2024 Checking of Grouting for PSC girder Major Bridge (OG-2/RHS,A1-P1) 387+230 RHS
Bridge Grouting Done
Checking of Level, reinforcement, shuttering, and pouring concrete M-50 grade for Elevated Elevated Work
12251 KHPL/TK/NH-66/STR/12125 14-Feb-2024 15-Feb-2024 388+905 LHS
Pedestal 08 nos of Elevated Bridge ( P01/LHS)(Design ch: 389+465) Bridge Bridge Done
Status
Plank Slab
12252 KHPL/TK/NH-66/STR/12126 14-Feb-2024 15-Feb-2024 Checking of Plank Slab Erection of RCC Girder (Span A1-P1/RHS) at Flyover 371+295 Flyover RHS not
Erection
Received
Status
Checking of reinforcement, mould and pouring concrete M-35 grade for RE Panel S5 Casting
12253 KHPL/TK/NH-66/STR/12127 14-Feb-2024 15-Feb-2024 386+600 RE Panel not
type-17 nos, P2 type-07 nos. Yard
Received
Status
Checking of reinforcement, mould and pouring concrete M-30 grade for Drain (Pre-Cast) Casting
12254 KHPL/TK/NH-66/STR/12128 14-Feb-2024 15-Feb-2024 397+300 Pre-Cast Drain not
(14 nos) Yard
Received
Status
Checking of reinforcement, mould and pouring concrete M-30 grade for Drain (Pre-Cast) Casting
12255 KHPL/TK/NH-66/STR/12129 14-Feb-2024 15-Feb-2024 386+300 Pre-Cast Drain not
(06 nos) Yard
Received
Status
Checking of reinforcement, mould and pouring concrete M-35 grade for RE Panel S5 Casting
12256 KHPL/TK/NH-66/STR/12130 14-Feb-2024 15-Feb-2024 369+550 RE Panel not
type-10 nos, P2 type-02 nos, MG4 type-02 nos. Yard
Received
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
12257 KHPL/TK/NH-66/STR/12131 14-Feb-2024 15-Feb-2024 378+645 378+650 5 LHS Drain Repeated
Drain Raft
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
12258 KHPL/TK/NH-66/STR/12132 14-Feb-2024 15-Feb-2024 385+115 385+120 5 LHS Drain Repeated
Drain Raft
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
12259 KHPL/TK/NH-66/STR/12133 14-Feb-2024 15-Feb-2024 386+992 387+029 37 LHS Drain Repeated
Drain Raft
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
12260 KHPL/TK/NH-66/STR/12134 14-Feb-2024 15-Feb-2024 387+054 387+080 26 LHS Drain Repeated
Drain Wall 1st with Final lift
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
12261 KHPL/TK/NH-66/STR/12135 14-Feb-2024 15-Feb-2024 390+170 390+190 20 LHS Drain Repeated
Drain Raft
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
12262 KHPL/TK/NH-66/STR/12136 14-Feb-2024 15-Feb-2024 390+170 390+190 20 LHS Drain Repeated
Drain Raft
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
12263 KHPL/TK/NH-66/STR/12137 14-Feb-2024 15-Feb-2024 397+430 397+450 20 LHS Drain Repeated
Drain Wall 1st with Final lift
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade in
12264 KHPL/TK/NH-66/STR/12138 14-Feb-2024 15-Feb-2024 372+560 372+580 20 LHS Drain Repeated
Drain Slab
Status
Checking of reinforcement, shuttering, centering and pouring concrete M-30 grade for
12265 KHPL/TK/NH-66/STR/12139 14-Feb-2024 15-Feb-2024 393+833 Box Culvert RHS S/R Box Culvert not
Box Culvert Wall Final lift, Top Haunch with Slab (SR)
Received