Four-Laning of Nagpur-Saoner-Betul Section of NH -69 from Km. 3.00 to Km. 59.300 in the state of Maharastra and from km 137.00 to km 257 .00 in the State of Madhya Pradesh under NHDP Phase IV and DBFOT (Annuity) basis
Extra for staging for cast in situ. Cum 3,500.0 ./ ./ ."7 } ,,.,- /
Extra for erection bv Crane Cum 4,500.0 ,478.726 < 452.060 ( 26.666 / 2,154,267 2,034,270 \.119997 /
Extra for Lounching of Girders Cum 10,000.0 ~
<..~
Supply & fixing of POT/ PTFE bearing complete as per drg. And IRC:
6.18
IR'.'l fPart-1111-200?
al Free bearing
i) Caoacitv 5000 KN No. 100,000.0
iil Caoacitv 3500 KN No. 70,000.0
iii) Caoacitv 2000 KN
ivl Caoacitv 1750 KN
vl Caoacitv 1250 KN
vil Caoacitv 1000 KN
No.
No.
No.
No.
40,000.0
35,000.0
25,000.0
20,000.0
~
(' 56.000 16.000
,....,
7 40.0
~
I
/
1.400,000.0 400,000.0 -
(' 1,000,000.0 ,
- ('
/
./7
bl Fixed bearim•
ivl Canacitv 1750 KN
vl Canacitv 1250 KN
vii Canacitv 1000 KN
No.
No.
No.
35,000.0
25,000.0
20,000.0
../
( 24.000 8.000 r 16.0
"
_,,, /
- (
/ 600,000.0 200,000.0 --
c 400,000.0~
-/
'."'
/
c) Guided bearin<'
iii1 Canacitv 2000 KN No. 40,000.0 / /7
ivl Capacitv 1750 KN No. 35,000.0 ../ I - /
v) Capacity 1250 KN No. 25,000.0 ( 71.000 24.000 {47.o I 1.775,000.0 600,000.0 ("1,175,000.0 /
v ,,,
vii Capacitv 1000 KN No. 20,000.0 1\ - l\ -
6.25
a)Providing cement concrete crash barrier in M-40 grade including
safety kerb and G.l pipe but excluding the cost of reinforcement
complete as per drawing & MORT&H specification sections 1500,
Cum 9,900.0 ~.218 22.369
~4~ I
v 1.091,158.0 221,450.0 ~708.0
" •no
b) Supplying
7()(\ ')')(\(\ (l
~ ~~
abutment, wing walls /return walls/ retaining wall etc. with lOOmm
6.34 dia AC. pipe, extending through the full width of structure with slope No. 175.0 4·2,000.0 I' 42,000.0
'
of 1V:20H toeards draining face complete as per drg. and MORT&H
•C - /
6.35
Pinting of bridge No. and spsn arrangement as per drg. lRC: 7-1971
l::inrl MnRTR,J..J cnp .... :f": ........... inn ........... +-inn onn
No. 500.0 u
6.36 Providing NP 150mm dia PVC service pipe of approved quality in foot m
I norh romnlete ,<no• ..lm R, ,.i;.ocHnno of the Rnrr;noo•
Providing & erecting thrie metal beam crash Barrier of diamention &
6.37 location complete as per drawing & MORT&H specification clause
IQ1n ".'.llnrl .. .,. '"i."'"ol -~
'""
--
al Metal beam crash barrier with sinllle face Thrie beam. m
b) Metal beam crash barrier with double face thrie beam. m
Carrying out initial test for board cast-in ·site piles complete as per (i.ooo
6.38 No. 250,000.0 1.000 250,000.0 250,000.0
MORTR,H enoe;flnnHAn <ertinn 11 nn
6.39
Carrying out routine test for board cast-in-site piles complete as per
No. 250,000.0 (2.ooo 2.000 500,000.0 500,000.0 ____..
MORT&H snecification section 1100.
Total Amount 112,521,178.0 99,372,795.0 "- 13,H0,303.0 .,/
Deduction@ 0.364% for in proper Safety arrangement (409,577.0) (361.717.0) ( (47,860.Q.l /
Sub Total Amount 112,111,601.0 99,011,078.0 (13,100,523.0 v
'