Report No
N
A K H - Y M I - D D - DW 1 1 X - D - C E - R E P - 0 0 0 1 - 0
Projeect Organizzation Stage Locaation Cateegory Discipline Type of Number Vers.
Document

17.05.20
016
Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 1 / 139
ERC AKH R
Railway Project
P

Projject:

AW
WASH – KOMBO
K OLCHA A – HARA
A GEB
BAYA
RA
AILWAY
Y PROJECT, ETHIO
OPIA

Empployer:

ETH
HIOPIA
AN RAIL
LWAY
YS COR
RPORAT
TION (ERC)
(

Empployer’s Represen
R ntative:

Conntractor:

ww
ww.ym.c om.tr

Designer:

Repport Namee:

PER
RMAN
NENT WAY
W M
MAINTE
ENANC
CE BUIL
LDING
G
DE
ESIGN REPOR
R RT

Reeport No:
A K H - Y M I - D D - DW 1 1 X - D - C E - R E P - 0 0 0 1 - 0
Projectt Organizaation Stage Locat
ation Cateegory Discipline Type of Number Vers.
Document

Datee: 17.05.22016
Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 2 / 139
ERC AKH R
Railway Project
P
VERS
SION HISTO
ORY

Verssion Details
D Datte Amend
ded By

0 Firsst Issue 17.05.2


2016 YM Desig
gn Group

PREP
PARED BY

YM
Y Structurral Design
Edited
d by Ö. Yöney
Y
Engineer
E

YM
Y Structurral Design
Check
ked by C. Avcı
A
Engineer
E

YM
Y Structurral Design
Check
ked by C. Özaydın
Ö
Engineer
E

YM
Y General Structural
Approoved by Ö. Güzel
G
Design
D Manager

Approoved by Z. Uygun
U YM
Y Deputy GM
M, Design

Approoved by A. Kılıç
K YM
Y Project Maanager

ROVAL
APPR

A
APPROVED AP
PPROVED AS
A NOTED REJE
ECTED

APPR
ROVED BY

Nam
me Title Signnature & Stamp

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 3 / 139
ERC AKH R
Railway Project
P
CONTENTTS
CONTENTS ....................................................................................................................................................................................... 4
INTRODUCTIO
ON ............................................................................................................................................................................... 5

1 STRUCTTURAL DESIGN
N PARAMETERS ...................................................................................................................................... 9

1.1 Maaterial Propertties......................................................................................................................................................... 9


1.2 Reebar Splice ................................................................................................................................................................. 10
1.3 Soil Properties .............................................................................................................................................................. 11
1.4 Sitte Seismicity ............................................................................................................................................................. 11
1.5 Moodelling Princciples .................................................................................................................................................... 12
2 LOAD DEFINITIONS ............................................................................................................................................................... 13
2.1 Gravity Inducedd Loads................................................................................................................................................. 13
2.2 Temmperature Indduced Loads ........................................................................................................................................ 16
2.3 Wiind Induced Loads
L .................................................................................................................................................... 16
2.4 Craane Induced Loads
L – Cranee Beam Designn ............................................................................................................. 20
2.5 Seiismicity Inducced Loads ............................................................................................................................................ 21
2.6 Looad Case and Combination
C Definitions
D .................................................................................................................... 22
3 MEMBEER DESIGN .................................................................................................................................................................. 65
3.1 Fraame Member Design ................................................................................................................................................ 65
3.2 Purrlin and Girt Design
D ................................................................................................................................................. 71
3.3 Fouundation Desiign ....................................................................................................................................................... 80
3.3.1 Footing Deesign ..................................................................................................................................................... 80
3.3.2 Pedestal Deesign .................................................................................................................................................... 86
4 DRIFT CHECKS ..................................................................................................................................................................... 88
4.1 Chheck for Verticcal Loads ............................................................................................................................................. 88
4.2 Chheck for Horizzontal Loads ......................................................................................................................................... 88
5 SOIL STTRESS CHECKSS ........................................................................................................................................................... 90
6 REFEREENCES ......................................................................................................................................................................... 92
APPENDIX A STRUCTU
URAL LAYO
OUTS ............................................................................................................................. 93
APPENDIX B STEEL ST
TRUCTURE MODEL
M DET
TAILS ..................................................................................................... 97
APPENDIX C FRAME DESIGN
D DETAILS ......................................................................................................................... 110
NTS ........................................................................................................................... 112
APPENDIX D JOINT DIISPLACEMEN
APPENDIX E JOINT CA NS.............................................................................................................................. 127
ALCULATION

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 4 / 139
ERC AKH R
Railway Project
P

INTRO
ODUCTION
N

This re
eport contains the analysis and desig
gn details of the
t Permane
ent Way Mai ntenance Bu
uilding. Building
is a single sstorey steel structure.
s Pla
an dimension
ns of the stru
ucture are 64
4.0 m x 8.2 m
m. The struc
ctural heightss of
the frames are 5.000 m at lower ed
dge and 5.98
84 m at high
h edge. There are two pprimary axes
s parallel to the
t
longitudinal direction an
nd 10 axes parallel to trransverse direction. Typiical span lenngth is 8.2 m and distan
nce
between fra
ames is 8.0 m.
m Building can
c be thoug
ght as two part,
p one part is building typed closed
d structure and
a
the other on
ne is canopyy typed open
n structure. B
Building type
ed part’s dim
mensions aree 40 m x 8.2 m and cano
opy
type part’s 2
24 m x 8.2 m.
m
All the
e perimeter of
o the building typed pa
art is surrou 2 cm thick and 3.0 m in height self-
unded with 20
supporting iisolation wall. Upper leve
el of wall is lo
ower than ed
dge height off the roof, it m
means there are small pa
arts
need additio o frontal and side facess of building.. All perimeter of the cannopy typed part except the
onal panel on t
face adjace
ent to the building typed part
p is open b
between +/-0
0.00 m and +4.00
+ m. Rooof and facad
des are coverred
by sandwich
h panel, rooff slope is 12%
%.
Gravityy and lateral force resisting system o
of the buildin
ng consist off the invertedd pendulum columns alo
ong
the transverrse and long
gitudinal directions. All co
olumns are connected
c to
o each otherr by link beams with pinn
ned
connectionss in longitudinal direction and roof be
eams connec
cted with pinn
ned connectiions in transv
verse direction.
Typical colu
umn’s section
ns are HE30
00A – S235, typical beam
m’s sections are
a IPE400 – S235. Typical link beam
m’s
and bracing
g’s sections are
a RHS120x
x5 – S235 an
nd RHS80x4
4 – S235 resp
pectively.
Found
dation system
m consist of the rectangu
ular footings (1.8 m x 2.5
5 m) supportting the single columns. The
T
depth of th
he foundation bottom level is 1.6 m
m(Bottom off foundation is at -1.60 m) and typ
pical foundattion
thicknessess are 400 mm.
m Steel columns are ssupported by
y pedestals which has 8800 mm x 790
7 mm secttion
dimensions and 1200 mm
m height on the foundatiion. Concrete compressiv
ve strength oof the founda
ation is 30 MPa.
Also there is a perimete
er wall surrou
unds the bui lding typed part
p with 200
0 mm thick bbetween the levels -1.200
0m
and +/-0.00 m to supporrt the perime
eter self-supp
porting façad
de wall. 3D views
v of the m e seen from the
model can be
following fig
gures. Structtural layouts
s can be see
en in the Ap
ppendix A and
a model ddetails are presented in the
Appendix B.

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 5 / 139
ERC AKH R
Railway Project
P

IPE400
0

RHS
S120x5

IP
PE400
RHS120x
R x5

HE-A
A300

HE-A
A300

Figu
ure 1. 3D View_1 of
o the Analys
sis Model

RH
HS120x55 RHS120x
R x5 RHS
HS80x4

IPE
E400

Figu
ure 2. 3D View_2 of
o the Analys
sis Model

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 6 / 139
ERC AKH R
Railway Project
P

IPE4
400

RHS1200x5

HE--A300

Figu
ure 3. 3D View_3 of
o the Analys
sis Model

W t=
= 0.2

WF 0.6x0.4

F 1.8x
x2.5x0.44

F 1.8x2.5x0
1 0.4

Figure 4. Founda
ation Model_
_3D

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 7 / 139
ERC AKH R
Railway Project
P

P 0.80x0.779x1.20 P 0.80x
x0.79x1.2
20

Figure 5. Founda
ation Model_P
Plan

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 8 / 139
ERC AKH R
Railway Project
P

1 STRU
UCTURAL DESIGN PARAMETE
ERS

1.1 Mate
erial Prop
perties
Materia
al properties used for des
sign are pressented below
w.
• Con
ncrete Materrial Properties for Pedesta
tals
γm concrete : 1.5

fck : 30 N/mm2
fcd : 20 N/mm2
fctk : 2.0 N/mm2
fctd m2
: 1.33 N/mm
Ec : 33 GPa
• ncrete Materrial Properties for Founda
Con ation
γm concrete : 1.5

fck : 25 N/mm2
fcd m2
: 16.7 N/mm
fctk m2
: 1.8 N /mm
fctd : 1.2 N/mm2
Ec : 31 GPa

• bar Material Properties


Reb
γm steel : 1.15

fyk m2
: 500 N/mm
fyd m2
: 435 N/mm
• ofiles Materia
Pro al Properties
fy-S235 m2
: 235 N/mm
fu-S235 m2
: 360 N/mm
fy-S275 m2
: 275 N/mm
fu-S275 m2
: 430 N/mm
fy-S355 m2
: 355 N/mm
fu-S355 m2
: 510 N/mm
• Plate Material Properties
P
fy-S235 m2
: 235 N/mm
fu-S235 m2
: 360 N/mm
fy-S275 m2
: 275 N/mm
fu-S275 m2
: 430 N/mm
fy-S275 (t>40mm) m2
: 255 N/mm
fu-S275 (t>40mm) m2
: 410 N/mm

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 9 / 139
ERC AKH R
Railway Project
P
fy-S355 m2
: 355 N/mm
fu-S355 m2
: 510 N/mm
• mary Bolts Material
Prim M Prope
erties
fyb-G10.9 m2
: 900 N/mm
fub-G10.9 : 1000 N/mm2
fyb-G8.8 m2
: 640 N/mm
fub-G8.8 m2
: 800 N/mm

• Seccondary Boltss Material Prroperties


fyb-G5.6 m2
: 300 N/mm
fub-G5.6 m2
: 500 N/mm
• Ancchor Bolts Ma
aterial Prope
erties
fyb-G5.6 m2
: 300 N/mm
fub-G5.6 m2
: 500 N/mm
fyb-G6.8 m2
: 480 N/mm
fub-G6.8 m2
: 600 N/mm
• eld Material Properties
We P
fEEX-E70 m2
: 483 N/mm

1.2 Reb
bar Splice
Calcula
ated splice le
engths for va diameters arre presented below.
arious rebar d
Table 1 Lap gth Calculation
p Splice Leng

η1 η1 fbd fbd lb,rqd lb, rqd l0 l0


reba
ar σsd fctd η2 α 1-5 α 6 l0 min
CASE 1 CASE 2 C
CASE 1 CASE 2 SE 2
CASE 1 CAS CASE 1 CASE 2

m N/mm2 N//mm2
mm - - N/mm2 N/mm
- N m2 mm m
mm - - mm mm
m mm
10 500 1
1.33 1 0.7 1 2.99 2.09
9 418 59
97 1 1.5
5 627 89
95 200
12 500 1
1.33 1 0.7 1 2.99 2.09
9 501 71
16 1 1.5
5 752 107
74 200
14 500 1
1.33 1 0.7 1 2.99 2.09
9 585 83
35 1 1.5
5 877 125
53 210
16 500 1
1.33 1 0.7 1 2.99 2.09
9 668 95
55 1 1.5
5 1003 143
32 240
20 500 1
1.33 1 0.7 1 2.99 2.09
9 835 11
193 1 1.5
5 1253 179
90 300

η1 η1 fbd fbd lb,rqd lb, rqd l0 l0


reba
ar σsd fctd η2 α 1-5 α 6 l0 min
CASE 1 CASE 2 C
CASE 1 CASE 2 SE 2
CASE 1 CAS CASE 1 CASE 2

m N/mm2 N//mm2
mm - - N/mm2 N/mm
- N m2 mm m
mm - - mm mm
m mm
10 500 1.2 1 0.7 1 2.70 1.89
9 463 66
61 1 1.5
5 694 99
92 200
12 500 1.2 1 0.7 1 2.70 1.89
9 556 79
94 1 1.5
5 833 119
90 200
14 500 1.2 1 0.7 1 2.70 1.89
9 648 92
26 1 1.5
5 972 138
89 210
16 500 1.2 1 0.7 1 2.70 1.89
9 741 10
058 1 1.5
5 1111 158
87 240
20 500 1.2 1 0.7 1 2.70 1.89
9 926 13
323 1 1.5
5 1389 198
84 300

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 10 / 13
39
ERC AKH R
Railway Project
P
1.3 Soill Propertie
es
Soil pro
operties used
d for design are presente
ed below.
Allowable S
Soil Pressure
e : 250 kN/m2
Sub Grade Modulus : 15000 kN//m3

1.4 Site
e Seismicitty
Seismic properties of site and used
u spectru m without an
ny modification factor aree presented below.
b
pe
Ground Typ :C
Type of Elastic Responsse Spectra : Type 1
agR : 0.2
ag : 0.2
S (Soil Facttor) : 1.15
TB(s) : 0.2
TC(s) : 0.6

TYPE
E 1 ELASTIIC RESPON
NSE SPECTR
RA FOR GR
ROUND TYP
PE C
6.00
Spectral Acc.

5.50

5.00

4.50

4.00

3.50

3.00

2.50

2.00

1.50

1.00

0.50

0.00
0.00 0.50 1.00
0 1.50
0 2.00
0 2.5
50 3.0
00 3.5
50 4.00
Period ( s )

Figure 6 . Desiign Spectrum


m

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 11 / 13
39
ERC AKH R
Railway Project
P
1.5 Mod
delling Priinciples
Structu
ural models have
h been bu
uilt and run b
by considerin
ng the assum
mptions below
w;
• Und
der seismic excitation, la
ateral force resisting bra
aces of the steel
s upper structure mo
odel have be
een
trea
ated as tension only mem
mbers as in d
defined in the
e EN 1998-1..
• Bea
am-column connections
c have
h been se
elected as welded
w conne
ections with C
CJP welds at
a workshop and
a
splices have been located at
a non-dissipa
ative zones.
• Bassed on the single store
ey structure limitations, no strong column weaak beam ch
heck has be
een
con
nsidered.
• Columns of maiin frames have been fullyy fixed to the foundation.
• Com
mpression on
nly springs have
h been ussed for seism
mic included loads in the ffoundation model.
m
• K co
oefficient of the
t columns is presented
d below.
Forr all columnss for the both
h direction off their strong
g and weak axis K valuee is 2 becaus
se of rigid ba
ase
con
nnection and pinned beam
m connection
ns at top of columns.
c

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 12 / 13
39
ERC AKH R
Railway Project
P

2 LOAD
D DEFINITIIONS

2.1 Grav
vity Induc
ced Loads

Gravityy induced loa


ads are prese
ented below..
• D L
Load Case consists
c from
m the self-we
eight of the structural members andd taken in to account by the
ana
alysis program.
• oad Case co
F Lo onsists loads from the roo
of skin layers d equal to 0.44kN/m2.
s, purlins and
• ML
Load Case co
onsists from the lightning uipment, sprrinklers and eequal to 1kN/m2.
g, climate equ
• Lr L
Load Case co qual to 0.6kN/m2.
onsists from the roof live load and eq
• S Load Case co
onsists from the weights o
of the filling over
o foundattion and slabb on grade.
oundation (1.0*20kN/m3 (compacted filling) +0.2*25kN/m3 (slaab on grade))): 25 kN/m2
S Loads over Fo
S(D
Dwall) Loads over
o N/m2 (Perime
RC Walll (3.0*2.50kN eter Brick Wa
all, H=3.0m))) : 7.5 kN
N/m

-1.6 kN/m
-1.6
-0.8 kN/m
kN/m
-1.6
-0.9 kN/m
kN/m-0.8 kN/m
2*-1.6 kN/m
2*-1.6 kN//m -0.9
-0.8 kN/m
2*-1.6 kN/m
2*-1.6 kN/m - kN/m
-1.6
- kN/m
-0.8
2*-1.6 kN/m
2*-1.6 kN//m
2*-1.6 kN/m 2*-1.66 kN/m
2*-1.6 kN/m 2
2*-1.6 kN/m
2*-1.6 kN/m
2*-1.6 kN//m
2*-1.6 kN/m 2*-1.66 kN/m
2*-1.6 kN/m 2
2*-1.6 kN/m
2*-1.6 kN//m
2*-1.6 kN/m
-1.6 kN/m 2*-1.6 kN/m
-0.4
-11.2 kN/m
-1.6 -1.6 kN/m
kN/m
-0.9 kN/m
-00.4 kN/m
-0.4 kN/m
kN/m -1.6 kN/m
-0.4 kN/m
-0.8
m
-11.2 kN/m
-1.6
-00.4 kN/m kN/m
-1.2 -0.8 kN/m
-0.4
kN/mkN/m
-0.9 -0.4 -1.6m
kN/mmkN/m
-1.6 kN/m
kN/m kN/m -0.4 kN/m
-0.8 kN/m
kN/m 2*-1.6 kN/m
-1.2 -0.8
-1.6
-1.2
-1.6 kN/m kN/m
kN/m
kN/m-1.6 kN/m
-1.2 -1.2 kN/mm
m -0.9
-0.8 kN/mm
-1.6 -1.6 kN/m
-1.2 kN/m
kN/m -0.8 kN/m
k-0.4
-1.2 kN/m
kN/m
2*-1.6 kN/m k-1.6
-0.4 kN/m kN/m
-0.8 kN/m
2*-1.62*-1.6
kN/m kN/m
2*-1.6 kN/
N/m
2*-1. 6 kN/m -1.6 kN/m
-1.2 kN/m
-1.6 kN/m
-1.6 kN/m
-0.9 kN/m-1.6 kN/m
m 2*-1.6 kN/m
-0.9
-0.8 kN/m
m
-1.6 kN/m
-0.8 kN/m

Y
X
Z
Load 4

Figure 7.
7 F Lo
oad Case ov
ver Main Fram
me Memberss

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 13 / 13
39
ERC AKH R
Railway Project
P

-4.0 kN/m
-4.0 kN/m
m
2*-4.0 kN/m
2*-4.0 kN//m
2*-4.0 kN/m
2*-4.0 kN/m
2*-4.0 kN//m
2*-4. 0 kN/m
2*-4.0 kN/m
2*-4.0 kN/m
2*-4.0 kN/
N/m
2*-4. 0 kN/m
2*-4.0 kN/m
2*-4.0 kN/
N/m
-4.0 kN/m
-4.0 kN/m
-33.1 kN/m
-0.9 kN/m-4.0 kN/m m
kN/m-4.0 kN/m
-0.9 kN/m
-00.9 kN/m-3.1
-4.0 kN/m -0.9 kN/m
m
-3.1 kN/m
-4.0 kN/m -0.9 kN/m-0.9 kN/m
-3.1 kN/m
-4.0 kN/mm
-3.1 kN/mm
-4.0 kN/m
-3.1 kN/m
2*-4.0 kN/m
2*-4.0 kN/m
2*-4.0 kN
N/m
2*-4..0 kN/m
-4.0 kN/m
-4.0 kN/m
m

Y
X
Z
Load 5

Figure 8. ML
Load Case over
o Main Fra
ame Beams

-2.4 kN/m
-2.4 kN/m
m
2*-2.4 kN/m
2*-2.4 kN//m
2*-2.4 kN/m
2*-2.4 kN/m
2*-2.4 kN//m
2*-2. 4 kN/m
2*-2.4 kN/m
2*-2.4 kN/m
2*-2.4 kN/
N/m
2*-2. 4 kN/m
2*-2.4 kN/m
2*-2.4 kN/
N/m
-2.4 kN/m
-11.8 kN/m -2.4 kN/m
-0.6 kN/m -2.4 kN/m
-00.6 kN/m-0.6 kN/m m
-1.8 kN/m -2.4mkN/m
-0.6 kN/m
-2.4 kN/m
-1.8 kN/m -0.6 kN/m-0.6 kN/m
-2.4 kN/m
-1.8 kN/m
-2.4
-1.8 kN/m
m
kN/m
m
-2.4
-1.8 kN/m
kN/m
2*-2.4 kN/m
2*-2.4 kN/m
2*-2.4 kN
N/m
2*-2..4 kN/m
-2.4 kN/m
-2.4 kN/m
m

Y
X
Z
Load 6

Figure 9. LR
R Load Case over Main Frame Beam

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 14 / 13
39
ERC AKH R
Railway Project
P

Perrimeter W
Wall Loa
ad

Loads
ds from Steel
S Stru
ucture

S Loadss over Fo
oundatioon

Figure
e 10. D Load Case over Founda
ation(Includin
ng S and Dw
wall Loads)

Load
ds from S
Steel Str.

Perimeter Wall Loaad

SL
Loads ovver Foundation
Figure
e 11. D Load Case over Founda
ation(Includin
ng S and Dw
wall Loads)

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 15 / 13
39
ERC AKH R
Railway Project
P
2.2 Tem
mperature Induced Loads
L
Tempe
erature inducced loads are
e presented b
below.
• T Lo
oad Case co
onsists from temperature
t o +20o/-20o C
differences and equal to Celsius.

Y
X
Z
Load 14

Figure 12. TL
Load Case over
o all Frame Members

2.3 Wind Induced


d Loads
Wind lloads are named
n as WIND(+X),
W W
WIND(-X), WIND(+Z)
W an
nd WIND(-Z
Z) where X and Z refer to
transversal and longitudinal directio
ons of the b
building resp
pectively. Ca
alculation deetails of the wind loads are
presented b
below.

vb,0 (fundam
mental value of the basic wind velocityy) : 22m/s
cdir (directio
onal factor) :1
cseason (seasson factor) :1
K (shape pa
arameter) : 0.2
n (exponentt) : 0.5
ρ (density o
of air) : 0.0125kN//m3
cprob (EN 19
991-1-4 / 4.2) :1
vb (basic wind velocity) : 22m/s
co(z) (orogra
aphy factor) :1
Terrain cate
egory : II
z0,II : 0.05m

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 16 / 13
39
ERC AKH R
Railway Project
P
z0 : 0.05m
zmin : 2m
kr (EN 1991-1-4 / 4.5) : 0.19
cr(z) (roughness factor at
a z=6.09m) : 0.91
kl (turbulencce factor) :1
ence intensitty at z=6.09, EN 1991-1-4
lv(z) (turbule 4 / 4.5) : 0.21
ce(z) (z=6.0
09m) : 2.46
qb(z) (z=6.0
09m) m2
: 0.25 kN/m
qp(z) (z=6.0
09m) m2
: 0.62 kN/m
cs (size facttor) :1
cd (dynamicc factor) :1

d by building dimensions defined in th


Based on the direcctions related he EN 1991--1-4 clause 7.2.2,
7 calcula
ated
ure at top le
wind pressu evel will be applied as constant acttion to the overall
o façadde height wiithout reducttion.
Building is n
not an open structure and although ssmall number of roller doors are existt, based on the
t explanations
defined in tthe EN 1991-1-4 clause
e 7.2.9 (3); under the design wind actions, it iss accepted that;
t due to the
working time serviceability and safetty requireme
ents, roller do
oors will be closed
c so theere will not be opening att the
outer faces and building
g is classified
d as closed fo
or ultimate lim
mit state des
sign.

Externa
al pressure coefficients
c cpe for walls a om EN 1991-1-4 Table 7--1 and presented below;
are taken fro
cpe,10 (A) : -1.2
cpe,10 (B) : -0.8
cpe,10 (C) : -0.5
cpe,10 (D) : +0.8
cpe,10 (E) : -0.4
Externa
al pressure coefficients
c cpe for roof w nd acts parallel to the Z direction are
when the win e taken from EN
1991-1-4 Ta
able 7-4a and presented below;
cpe,10 (F) : -1.7
cpe,10 (G) : -1.2
cpe,10 (H) : -0.6
Externa
al pressure coefficients
c cpe for roof w nd acts parallel to the X direction are
when the win e taken from EN
1991-1-4 Ta
able 7-4b and presented below;
cpe,10 (F) : -2.1
cpe,10 (G) : -1.8
cpe,10 (H) : -0.6
cpe,10 (I) : -0.5
we(z) = qp(z)*cpe*cs*cd for z=6.0
09 m and app
plication deta ented in the ffollowing figu
ails are prese ures.

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 17 / 13
39
ERC AKH R
Railway Project
P

1.4 kN/m
0.4
0.4 kN/m
kN/m
0.4-1.2
kN/m 1.4 kN/m
kN/m m
0.4 kN/m
2.8 kN/m
2*-1.2 kN/m 1..2
0 kN/m
0.4 kN/m
2.8 kN/m
m
2.8 kN/m
2*-1.2
2.8kN/m
kN/m 2
2*1.2 kN/m
2.8 kN/mm
2.88 kN/m
2.8 kN/m
2*-1.2
2.8kN/m
kN/m 2
2*1.2 kN/m
2.8 kN//m
2.88 kN/m
2.9 kN/m 2*1.2 kN/m
-1.2
-2.2kN/m
kN/m
2.9 kN//m
-1.0 -0.3
kN/m
0.8 0.9
kN/m kN/m
-0.3 2.3kN/m
kN/m kN/m
-2.2 0.9 kN/m
kN/m kN/mm
0.9 kN/m 2.30.9
0.8 kN/m m
kN/m
22.2
1.2kN/m
kN/m
-2.2 kN/m
2.3 kN
N/m 0.9 kN/m
-1.2 kN/m
-1.0 kN/m 2..30.9 kN/m
kN/m
1.6 kN/m 0.9 kN/mm2.2
2 kN/m
1.6 kN/m 2
2.2 0.3
0.9 kN/m
kN/m
kN/m
1.6 kN
N/m 0.3
2*-1.2 kN/m 1..6 kN/m 1.030 0.9
kN/m
kN/mkN/m

1.0
1.2 kN/m
kN/m
-1.2 kN/m
2.6 kN/m
8.9 kN/m 2*1.2 kN/m
2.1kN/m
2.5 kN/m
m 8.9 kN/m
m
8.9 kN/m
k
2.1 1.2
kN/m 8.9 kN/m
8.1 kN/m kN/m
8.1 kN/m
k

Y
X
Z
Load 7

Figure 13. WIND(+X


X) Loads over Roof

-0.9 kN//m
2.3 kN/m-0.9 kN//m
-0.9kN/m
-2.2 kN/m
2.3 kN/m
m
-0.9 kN//m
2.9 kN/m 2.22 kN/m
-1.2
-2.2kN/m
kN/m -0.9 kN/m
2.9 kN/m
m
2.8 kN/m 2.2
2*-1.2
2.8kN/m
kN/m 12 kN/m
1.2 kN/m
2.8 kN/mm
2.88 kN/m
2.8 kN/m
2*-1.2
2.8kN/m
kN/m 2
2*1.2 kN/m
2.8 kN//m
2.88 kN/m
2.8 kN/m
2*-1.2 kN/m 2*1.2 kN/m
2.8 kN//m
1.4
-0.4
-0.3 kN/m
kN/m
-0.3 -1.2kN/m
kN/m
1.4 -0.4 kN
-0.4
kN/m kN N/m
N/m
-1.0kN/m
-0.4
-1.2kN/m
kN/m kN/m1.4 kN/
N/m -0.4 kN/m 2*1.2 kN/m
-0.4 kN/m
1. 4 kN/m
-0.4 kN N/m
-1.0
-1.2 kN/m
kN/m 1.2 kN/m
-0.4
0.3 kN/m
kN/m
1.0
0.33kN/m
kN/m
1.2 kN/m
8.1 kN/m -0.4 kN/m
1.6 kN/mkN/m
2*-1.2 1.2 kN/m 8.1 kN/m
1.0 kN/m
1.6 kN/m
1.6 kN
N/m 8.9 kN/m
-2.6 kN/m 1
1.6 kN/m 8.9 kN/m
0.8 kN/m
-1.2 kN/m 2*1.2 kN/m 8.9 kN/m
k
0.8 kN 8.9 kN/m
-2 2N/mkN/m
-2.1
2.5 kN/m

-2.1 kN/m
1.2 kN/m

Y
X
Z
Load 8

Figure
F 14. WIND(-X) Loads overr Roof

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 18 / 13
39
ERC AKH R
Railway Project
P

1.9 kN/m
1.51.5
kN/m
1.5 kN/m
kN/m
1.6 kN/m 1.5 kN/m
m
3.7 kN/m
2*1.9 kN/m 1.1kN/m
1.5 kN/m
1..0 kN/m
3.0 kN/m 1. 0 kN/m
2*1.9 kN/m 3.0 kN/m
m
2
2*1.0 kN/m
6.1 kN/m
3.03.0kN/m
kN/m
2*1.9 kN/m 3.0 kN/mm
3.00 kN/m
6.0 kN/m 2
2*1.0 kN/m
3.03.0kN/m
kN/m
2*1.9 kN/m 3.0 kN//m
-4.4 kN/m -2.2 kN/m 3.00 kN/m
6.0 kN/m 2
2*1.0 kN/m
3.0 kN/m
k 1.90.8
2.7 kN/m kN/m
-0.7 -1.6
kN/mkN/m-1.5
kN/m -1.55 kN/m
0 1.9
0.8 kN/m
kN/m -0.7 kN/m 5 kN/m
-1.6 3.0 kN/
N/m
-4.4 kN/m 1.5 kN/m
1.5 kN/m
-1.5 kN/m N/m -1.0 2*1.0 kN/m
3 2.7kN/m
3.5 kN/m -1.5 kNN/m 1.5 kN 6.1kN/m
-1.0 kN/m
kN/m
-11.5 kN/m3.7 kN/m -1.1 -1.5
1.55kN/m
kN/m
kN/m
2.7 kN/mm1.00.8 kN/m
-1.0 kN/m
kN/m
0.8 kN/m
k1.0 kN/m
2*3.5 kN/m -1.5 kN/m
-1.5 kNN/m
-1.0 kN/m
-11.5 kN/m 3.5 kN/m
2.77 kN/m
-2.2 kN/m
.5 kN/m -0.7 kN/m
-1.7 kN/m
-0.7 kN/m
k 2*3..5 kN/m

-1.4
-1. kN/m
1 kN/m
3.55 kN/m
-1.0 kN/m

Y
X
Z
Load 9

Figure 15. WIND(+Z


Z) Loads overr Roof

2.0 kN/m
1.0
1.0 kN/m
kN/m
1.1-1.0
kN/mkN/m2.0 kN/m
m
1.0kN/m
1.6 kN/m
4.0 kN/m 4. 8 kN/m
2*-1.0 kN/m
1..5 kN/m
-1.9 kN/
4.0 kN/m
m
4.0 kN/m
2*-1.0 kN/m
4.0 kN/m 6 kN/m
6.8 2*-1.9 kN/m
4.0 kN/mm
4.00 kN/m
4.0 kN/m
2*-1.0 kN/m
4.0 kN/m 6 kN/m
6.4 2*-1.9 kN/m
4.0 kN//m
4.00 kN/m
4.0 kN/m
2*-1.0 kN/m
6.4 kN/m
2*-1.9 kN/m
-1.1kN/m
kN/m-1.0 kN/m 4.0 kN//m
2.0
-0.8
-1.0 kN/m k
-1.0 kN/m
k
1.8 kN/m
-0.8 -1.12.0
kN/m kN/m
kN/m
-2.7-1.0
kN/mkN/m2.0 kN/
N/m -1.5 -1.5 kN/m
kN/m
1.8 kN/m 2. 0 kN/m 6.8 kN/m
2*-1.9 kN/m
-1.6kN/m
-1.0 kkN/m
-1.5 kN/m
3.6-2.7
-3.5
kN/mkN/m
kN/m 4.8-0.8
kN/m kN/m
-1.9 kN/m
kN/m
3.6 kN/m 5.4 kN-0
0.8
N/m -1.5
kN/m
3.6 kN
N/m -2.7 kN/mkN/m
-1.9

3.6 2*-3.5
kN/m kN/m m
-2.7
3.6 kN/m -3.5kN/m
kN/m
3.6 kN
N/m
-1.1
1.8 kN/m
kN/m
-3.5 kN/m 10.8 kN/m
1.8 kN
kN/m
-1.7
-0.97kN/m
kN/m 2*-3.5 kN/m

-1.4 kN/m 10.8 kN/m


5.4 kN/m
-3.5 kN/m

Y
X
Z
Load 10

Figure
F 16. WIND(-Z) Loads overr Roof

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 19 / 13
39
ERC AKH R
Railway Project
P
2.4 Cran
ne Induce
ed Loads – Crane Be
eam Desig
gn

manent Wayy Maintenanc


In Perm ce Building tthere is no crane
c or any other hoist. Crane loads called CR,, CL
and CD are
e empty load
d cases so load combina C CL and CD load caases do not consist
ations with CR, c of crrane
loads actually.

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 20 / 13
39
ERC AKH R
Railway Project
P
2.5 Seis
smicity Ind
duced Loa
ads
Seismic induced lo
oad cases arre named ass; E(X) and E(Z).
E Calcula
ations param
meters of the
e load cases are
presented b
below;

H : 5.984 m
Tx : 0.914 s
Tz : 0.580 s
Ground Typ
pe :C
Type of Elastic Responsse Spectra :1
Importance Factor :1
Soil Factor : 1.15
Reference P
Peak Ground
d Acceleratio
on on Type G
Ground A : 0.2g
Basic Value
e of the Beha
aviour Factorr for X Directtion (DCM – frame with concentric braacing) :2
Basic Value aviour Factorr for Y Directtion (DCM – moment resiisting framess)
e of the Beha :2
X Direction Base Shear Coefficient : 0.185
Z Direction Base Shear Coefficient : 0.282

3,50
EC8
8 DESIGN SPECTRU
UM
Design Spectrum

3,00

2,50

2,00

1,50

1,00

0,50

0,00
0
0,00 0,50 1,0
00 1,50
0 2,00
0 2,50 3,00 3,50 4,00
Periiod ( s )

Figure 17. Ela


astic Design Spectrum Modified by q

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 21 / 13
39
ERC AKH R
Railway Project
P

ated base sh
Calcula hear coefficie
ents have be
een used for load cases E(X)
E and E(Z
Z). Base shear coefficient for
load cases E(X) and E(Z) have been
b amplifiied by an increment fa
actor for reinnforced concrete design
n of
ent factor has
foundation. The increme s been calcu
ulated accord
ding to the EN 1998-1 / 44.4.2.6(4).
Ωmax,z :2
Ωmax,x :2

γRd (q<3) : 1.0

γRd* Ωmax,z : 2.0

γRd* Ωmax,x : 2.0


X Direction Base Shear Coefficient : 0.370
Z Direction Base Shear Coefficient : 0.564

2.6 Load
d Case an
nd Combin
nation Deffinitions

Table
e 2 Basic Loa
ad Cases

Num
mber Name
N
1 E(X))
2 E(Z))
3 D
4 F
5 M
6 LR
7 WINND(+X)
8 WINND(-X)
9 WINND(+Z)
10 WINND(-Z)
11 CR
12 CL
13 CD
14 T(+220)
15 T(-2
20)
16 PERRIOD CALCULA
ATION

Tab
ble 3 Load C
Combinations
s for Steel Strructure
on
Combinatio
Combination Nam
me Primary Priimary Load Case Name
e Factor
Number
101 1.35G+1.5LR+0.9W(+X))+1.5CR+0.9T(+
+20) 3 D 1.35
4 F 1.35
5 M 1.35
6 LR 1.50
7 WINND(+X) 0.90
11 CR 1.50
14 T(+20) 0.90
102 1.35G+1.5LR+0.9W(+X))+1.5CR+0.9T(--20) 3 D 1.35
4 F 1.35
5 M 1.35
6 LR 1.50
7 WINND(+X) 0.90
11 CR 1.50
15 T(-2
20) 0.90
103 1.35G+1.5LR+0.9W(+X))+1.5CL+0.9T(+
+20) 3 D 1.35

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 22 / 13
39
ERC AKH R
Railway Project
P
4 F 1.35
5 M 1.35
6 LR 1.50
7 WINND(+X) 0.90
12 CL 1.50
14 T(+20) 0.90
104 1.35G+1.5LR+0.9W(+X))+1.5CL+0.9T(--20) 3 D 1.35
4 F 1.35
5 M 1.35
6 LR 1.50
7 WINND(+X) 0.90
12 CL 1.50
15 T(-2
20) 0.90
105 1.35G+1.5LR+0.9W(-X)+1.5CR+0.9T(+
+20) 3 D 1.35
4 F 1.35
5 M 1.35
6 LR 1.50
8 WINND(-X) 0.90
11 CR 1.50
14 T(+20) 0.90
106 1.35G+1.5LR+0.9W(-X)+1.5CR+0.9T(-2
20) 3 D 1.35
4 F 1.35
5 M 1.35
6 LR 1.50
8 WINND(-X) 0.90
11 CR 1.50
15 T(-2
20) 0.90
107 1.35G+1.5LR+0.9W(-X)+1.5CL+0.9T(+ 20) 3 D 1.35
4 F 1.35
5 M 1.35
6 LR 1.50
8 WINND(-X) 0.90
12 CL 1.50
14 T(+20) 0.90
108 1.35G+1.5LR+0.9W(-X)+1.5CL+0.9T(-2
20) 3 D 1.35
4 F 1.35
5 M 1.35
6 LR 1.50
8 WINND(-X) 0.90
12 CL 1.50
15 T(-2
20) 0.90
109 1.35G+1.5LR+0.9W(+Z))+1.5CR+0.9T(+
+20) 3 D 1.35
4 F 1.35
5 M 1.35
6 LR 1.50
9 WINND(+Z) 0.90
11 CR 1.50
14 T(+20) 0.90
110 1.35G+1.5LR+0.9W(+Z))+1.5CR+0.9T(--20) 3 D 1.35
4 F 1.35
5 M 1.35
6 LR 1.50
9 WINND(+Z) 0.90
11 CR 1.50
15 T(-2
20) 0.90
111 1.35G+1.5LR+0.9W(+Z))+1.5CL+0.9T(+
+20) 3 D 1.35
4 F 1.35
5 M 1.35
6 LR 1.50
9 WINND(+Z) 0.90
12 CL 1.50
14 T(+20) 0.90
112 1.35G+1.5LR+0.9W(+Z))+1.5CL+0.9T(-2
20) 3 D 1.35
4 F 1.35
5 M 1.35
6 LR 1.50
9 WINND(+Z) 0.90
12 CL 1.50
15 T(-2
20) 0.90

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 23 / 13
39
ERC AKH R
Railway Project
P
113 1.35G+1.5LR+0.9W(-Z)+
+1.5CR+0.9T(+
+20) 3 D 1.35
4 F 1.35
5 M 1.35
6 LR 1.50
10 WINND(-Z) 0.90
11 CR 1.50
14 T(+20) 0.90
114 1.35G+1.5LR+0.9W(-Z)+
+1.5CR+0.9T(-2
20) 3 D 1.35
4 F 1.35
5 M 1.35
6 LR 1.50
10 WINND(-Z) 0.90
11 CR 1.50
15 T(-2
20) 0.90
115 1.35G+1.5LR+0.9W(-Z)+
+1.5CL+0.9T(+2
20) 3 D 1.35
4 F 1.35
5 M 1.35
6 LR 1.50
10 WINND(-Z) 0.90
12 CL 1.50
14 T(+20) 0.90
116 1.35G+1.5LR+0.9W(-Z)+
+1.5CL+0.9T(-2
20) 3 D 1.35
4 F 1.35
5 M 1.35
6 LR 1.50
10 WINND(-Z) 0.90
12 CL 1.50
15 T(-2
20) 0.90
117 1.35G+1.5LR+0.9W(+X))+1.5CR 3 D 1.35
4 F 1.35
5 M 1.35
6 LR 1.50
7 WINND(+X) 0.90
11 CR 1.50
118 1.35G+1.5LR+0.9W(+X))+1.5CL 3 D 1.35
4 F 1.35
5 M 1.35
6 LR 1.50
7 WINND(+X) 0.90
12 CL 1.50
119 1.35G+1.5LR+0.9W(-X)+1.5CR 3 D 1.35
4 F 1.35
5 M 1.35
6 LR 1.50
8 WINND(-X) 0.90
11 CR 1.50
120 1.35G+1.5LR+0.9W(-X)+1.5CL) 3 D 1.35
4 F 1.35
5 M 1.35
6 LR 1.50
8 WINND(-X) 0.90
12 CL 1.50
121 1.35G+1.5LR+0.9W(+Z))+1.5CR 3 D 1.35
4 F 1.35
5 M 1.35
6 LR 1.50
9 WINND(+Z) 0.90
11 CR 1.50
122 1.35G+1.5LR+0.9W(+Z))+1.5CL 3 D 1.35
4 F 1.35
5 M 1.35
6 LR 1.50
9 WINND(+Z) 0.90
12 CL 1.50
123 1.35G+1.5LR+0.9W(-Z)+
+1.5CR 3 D 1.35
4 F 1.35
5 M 1.35
6 LR 1.50
10 WINND(-Z) 0.90

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 24 / 13
39
ERC AKH R
Railway Project
P
11 CR 1.50
124 1.35G+1.5LR+0.9W(-Z)+
+1.5CL 3 D 1.35
4 F 1.35
5 M 1.35
6 LR 1.50
10 WINND(-Z) 0.90
12 CL 1.50
125 1.35G+1.5LR+0.9W(+X))+0.9T(+20) 3 D 1.35
4 F 1.35
5 M 1.35
6 LR 1.50
7 WINND(+X) 0.90
14 T(+20) 0.90
126 1.35G+1.5LR+0.9W(+X))+0.9T(-20) 3 D 1.35
4 F 1.35
5 M 1.35
6 LR 1.50
7 WINND(+X) 0.90
15 T(-2
20) 0.90
127 1.35G+1.5LR+0.9W(-X)+0.9T(+20) 3 D 1.35
4 F 1.35
5 M 1.35
6 LR 1.50
8 WINND(-X) 0.90
14 T(+20) 0.90
128 1.35G+1.5LR+0.9W(-X)+0.9T(-20) 3 D 1.35
4 F 1.35
5 M 1.35
6 LR 1.50
8 WINND(-X) 0.90
15 T(-2
20) 0.90
129 1.35G+1.5LR+0.9W(+Z))+0.9T(+20) 3 D 1.35
4 F 1.35
5 M 1.35
6 LR 1.50
9 WINND(+Z) 0.90
14 T(+20) 0.90
130 1.35G+1.5LR+0.9W(+Z))+0.9T(-20) 3 D 1.35
4 F 1.35
5 M 1.35
6 LR 1.50
9 WINND(+Z) 0.90
15 T(-2
20) 0.90
131 1.35G+1.5LR+0.9W(-Z)+
+0.9T(+20) 3 D 1.35
4 F 1.35
5 M 1.35
6 LR 1.50
10 WINND(-Z) 0.90
14 T(+20) 0.90
132 1.35G+1.5LR+0.9W(-Z)+
+0.9T(-20) 3 D 1.35
4 F 1.35
5 M 1.35
6 LR 1.50
10 WINND(-Z) 0.90
15 T(-2
20) 0.90
133 1.35G+1.5LR+1.5CR+0.9T(+20) 3 D 1.35
4 F 1.35
5 M 1.35
6 LR 1.50
11 CR 1.50
14 T(+20) 0.90
134 1.35G+1.5LR+1.5CR+0.9T(-20) 3 D 1.35
4 F 1.35
5 M 1.35
6 LR 1.50
11 CR 1.50
15 T(-2
20) 0.90
135 1.35G+1.5LR+1.5CL+0.9T(+20) 3 D 1.35
4 F 1.35

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 25 / 13
39
ERC AKH R
Railway Project
P
5 M 1.35
6 LR 1.50
12 CL 1.50
14 T(+20) 0.90
136 1.35G+1.5LR+1.5CL+0.9T(-20) 3 D 1.35
4 F 1.35
5 M 1.35
6 LR 1.50
12 CL 1.50
15 T(-2
20) 0.90
137 1.35G+1.5LR+0.9W(+X)) 3 D 1.35
4 F 1.35
5 M 1.35
6 LR 1.50
7 WINND(+X) 0.90
138 1.35G+1.5LR+0.9W(-X) 3 D 1.35
4 F 1.35
5 M 1.35
6 LR 1.50
8 WINND(-X) 0.90
139 1.35G+1.5LR+0.9W(+Z)) 3 D 1.35
4 F 1.35
5 M 1.35
6 LR 1.50
9 WINND(+Z) 0.90
140 1.35G+1.5LR+0.9W(-Z) 3 D 1.35
4 F 1.35
5 M 1.35
6 LR 1.50
10 WINND(-Z) 0.90
141 1.35G+1.5LR+1.5CR 3 D 1.35
4 F 1.35
5 M 1.35
6 LR 1.50
11 CR 1.50
142 1.35G+1.5LR+1.5CL 3 D 1.35
4 F 1.35
5 M 1.35
6 LR 1.50
12 CL 1.50
143 1.35G+1.5LR+0.9T(+20) 3 D 1.35
4 F 1.35
5 M 1.35
6 LR 1.50
14 T(+20) 0.90
144 1.35G+1.5LR+0.9T(-20)) 3 D 1.35
4 F 1.35
5 M 1.35
6 LR 1.50
15 T(-2
20) 0.90
145 1.35G+1.5LR 3 D 1.35
4 F 1.35
5 M 1.35
6 LR 1.50
146 1.35G+1.5W(+X)+1.05L
LR+1.5CR+0.9T
T(+20) 3 D 1.35
4 F 1.35
5 M 1.35
7 WINND(+X) 1.50
6 LR 1.05
11 CR 1.50
14 T(+20) 0.90
147 1.35G+1.5W(+X)+1.05L
LR+1.5CR+0.9T
T(-20) 3 D 1.35
4 F 1.35
5 M 1.35
7 WINND(+X) 1.50
6 LR 1.05
11 CR 1.50
15 T(-2
20) 0.90
148 1.35G+1.5W(+X)+1.05L
LR+1.5CL+0.9T((+20) 3 D 1.35

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 26 / 13
39
ERC AKH R
Railway Project
P
4 F 1.35
5 M 1.35
7 WINND(+X) 1.50
6 LR 1.05
12 CL 1.50
14 T(+20) 0.90
149 1.35G+1.5W(+X)+1.05L
LR+1.5CL+0.9T((-20) 3 D 1.35
4 F 1.35
5 M 1.35
7 WINND(+X) 1.50
6 LR 1.05
12 CL 1.50
15 T(-2
20) 0.90
150 1.35G+1.5W(-X)+1.05LR
R+1.5CR+0.9T((+20) 3 D 1.35
4 F 1.35
5 M 1.35
8 WINND(-X) 1.50
6 LR 1.05
11 CR 1.50
14 T(+20) 0.90
151 1.35G+1.5W(-X)+1.05LR
R+1.5CR+0.9T((-20) 3 D 1.35
4 F 1.35
5 M 1.35
8 WINND(-X) 1.50
6 LR 1.05
11 CR 1.50
15 T(-2
20) 0.90
152 1.35G+1.5W(-X)+1.05LR
R+1.5CL+0.9T( +20) 3 D 1.35
4 F 1.35
5 M 1.35
8 WINND(-X) 1.50
6 LR 1.05
12 CL 1.50
14 T(+20) 0.90
153 1.35G+1.5W(-X)+1.05LR
R+1.5CL+0.9T(--20) 3 D 1.35
4 F 1.35
5 M 1.35
8 WINND(-X) 1.50
6 LR 1.05
12 CL 1.50
15 T(-2
20) 0.90
154 1.35G+1.5W(+Z)+1.05LR+1.5CR+0.9T
T(+20) 3 D 1.35
4 F 1.35
5 M 1.35
9 WINND(+Z) 1.50
6 LR 1.05
11 CR 1.50
14 T(+20) 0.90
155 1.35G+1.5W(+Z)+1.05LR+1.5CR+0.9T
T(-20) 3 D 1.35
4 F 1.35
5 M 1.35
9 WINND(+Z) 1.50
6 LR 1.05
11 CR 1.50
15 T(-2
20) 0.90
156 1.35G+1.5W(+Z)+1.05LR+1.5CL+0.9T((+20) 3 D 1.35
4 F 1.35
5 M 1.35
9 WINND(+Z) 1.50
6 LR 1.05
12 CL 1.50
14 T(+20) 0.90
157 1.35G+1.5W(+Z)+1.05LR+1.5CL+0.9T((-20) 3 D 1.35
4 F 1.35
5 M 1.35
9 WINND(+Z) 1.50
6 LR 1.05
12 CL 1.50
15 T(-2
20) 0.90

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 27 / 13
39
ERC AKH R
Railway Project
P
158 1.35G+1.5W(-Z)+1.05LR
R+1.5CR+0.9T((+20) 3 D 1.35
4 F 1.35
5 M 1.35
10 WINND(-Z) 1.50
6 LR 1.05
11 CR 1.50
14 T(+20) 0.90
159 1.35G+1.5W(-Z)+1.05LR
R+1.5CR+0.9T((-20) 3 D 1.35
4 F 1.35
5 M 1.35
10 WINND(-Z) 1.50
6 LR 1.05
11 CR 1.50
15 T(-2
20) 0.90
160 1.35G+1.5W(-Z)+1.05LR
R+1.5CL+0.9T(+
+20) 3 D 1.35
4 F 1.35
5 M 1.35
10 WINND(-Z) 1.50
6 LR 1.05
12 CL 1.50
14 T(+20) 0.90
161 1.35G+1.5W(-Z)+1.05LR
R+1.5CL+0.9T(--20) 3 D 1.35
4 F 1.35
5 M 1.35
10 WINND(-Z) 1.50
6 LR 1.05
12 CL 1.50
15 T(-2
20) 0.90
162 1.35G+1.5W(+X)+1.05L
LR+1.5CR 3 D 1.35
4 F 1.35
5 M 1.35
7 WINND(+X) 1.50
6 LR 1.05
11 CR 1.50
163 1.35G+1.5W(+X)+1.05L
LR+1.5CL 3 D 1.35
4 F 1.35
5 M 1.35
7 WINND(+X) 1.50
6 LR 1.05
12 CL 1.50
164 1.35G+1.5W(-X)+1.05LR
R+1.5CR 3 D 1.35
4 F 1.35
5 M 1.35
8 WINND(-X) 1.50
6 LR 1.05
11 CR 1.50
165 1.35G+1.5W(-X)+1.05LR
R+1.5CL 3 D 1.35
4 F 1.35
5 M 1.35
8 WINND(-X) 1.50
6 LR 1.05
12 CL 1.50
166 1.35G+1.5W(+Z)+1.05LR+1.5CR 3 D 1.35
4 F 1.35
5 M 1.35
9 WINND(+Z) 1.50
6 LR 1.05
11 CR 1.50
167 1.35G+1.5W(+Z)+1.05LR+1.5CL 3 D 1.35
4 F 1.35
5 M 1.35
9 WINND(+Z) 1.50
6 LR 1.05
12 CL 1.50
168 1.35G+1.5W(-Z)+1.05LR
R+1.5CR 3 D 1.35
4 F 1.35
5 M 1.35
10 WINND(-Z) 1.50
6 LR 1.05

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 28 / 13
39
ERC AKH R
Railway Project
P
11 CR 1.50
169 1.35G+1.5W(-Z)+1.05LR
R+1.5CL 3 D 1.35
4 F 1.35
5 M 1.35
10 WINND(-Z) 1.50
6 LR 1.05
12 CL 1.50
170 1.35G+1.5W(+X)+1.05L
LR+0.9T(+20) 3 D 1.35
4 F 1.35
5 M 1.35
7 WINND(+X) 1.50
6 LR 1.05
14 T(+20) 0.90
171 1.35G+1.5W(+X)+1.05L
LR+0.9T(-20) 3 D 1.35
4 F 1.35
5 M 1.35
7 WINND(+X) 1.50
6 LR 1.05
15 T(-2
20) 0.90
172 1.35G+1.5W(-X)+1.05LR
R+0.9T(+20) 3 D 1.35
4 F 1.35
5 M 1.35
8 WINND(-X) 1.50
6 LR 1.05
14 T(+20) 0.90
173 1.35G+1.5W(-X)+1.05LR
R+0.9T(-20) 3 D 1.35
4 F 1.35
5 M 1.35
8 WINND(-X) 1.50
6 LR 1.05
15 T(-2
20) 0.90
174 1.35G+1.5W(+Z)+1.05LR+0.9T(+20) 3 D 1.35
4 F 1.35
5 M 1.35
9 WINND(+Z) 1.50
6 LR 1.05
14 T(+20) 0.90
175 1.35G+1.5W(+Z)+1.05LR+0.9T(-20) 3 D 1.35
4 F 1.35
5 M 1.35
9 WINND(+Z) 1.50
6 LR 1.05
15 T(-2
20) 0.90
176 1.35G+1.5W(-Z)+1.05LR
R+0.9T(+20) 3 D 1.35
4 F 1.35
5 M 1.35
10 WINND(-Z) 1.50
6 LR 1.05
14 T(+20) 0.90
177 1.35G+1.5W(-Z)+1.05LR
R+0.9T(-20) 3 D 1.35
4 F 1.35
5 M 1.35
10 WINND(-Z) 1.50
6 LR 1.05
15 T(-2
20) 0.90
178 1.35G+1.5W(+X)+1.5CR
R+0.9T(+20) 3 D 1.35
4 F 1.35
5 M 1.35
7 WINND(+X) 1.50
11 CR 1.50
14 T(+20) 0.90
179 1.35G+1.5W(+X)+1.5CR
R+0.9T(-20) 3 D 1.35
4 F 1.35
5 M 1.35
7 WINND(+X) 1.50
11 CR 1.50
15 T(-2
20) 0.90
180 1.35G+1.5W(+X)+1.5CL
L+0.9T(+20) 3 D 1.35
4 F 1.35

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 29 / 13
39
ERC AKH R
Railway Project
P
5 M 1.35
7 WINND(+X) 1.50
12 CL 1.50
14 T(+20) 0.90
181 1.35G+1.5W(+X)+1.5CL
L+0.9T(-20) 3 D 1.35
4 F 1.35
5 M 1.35
7 WINND(+X) 1.50
12 CL 1.50
15 T(-2
20) 0.90
182 1.35G+1.5W(-X)+1.5CR
R+0.9T(+20) 3 D 1.35
4 F 1.35
5 M 1.35
8 WINND(-X) 1.50
11 CR 1.50
14 T(+20) 0.90
183 1.35G+1.5W(-X)+1.5CR
R+0.9T(-20) 3 D 1.35
4 F 1.35
5 M 1.35
8 WINND(-X) 1.50
11 CR 1.50
15 T(-2
20) 0.90
184 1.35G+1.5W(-X)+1.5CL+0.9T(+20) 3 D 1.35
4 F 1.35
5 M 1.35
8 WINND(-X) 1.50
12 CL 1.50
14 T(+20) 0.90
185 1.35G+1.5W(-X)+1.5CL+0.9T(-20) 3 D 1.35
4 F 1.35
5 M 1.35
8 WINND(-X) 1.50
12 CL 1.50
15 T(-2
20) 0.90
186 1.35G+1.5W(+Z)+1.5CR
R+0.9T(+20) 3 D 1.35
4 F 1.35
5 M 1.35
9 WINND(+Z) 1.50
11 CR 1.50
14 T(+20) 0.90
187 1.35G+1.5W(+Z)+1.5CR
R+0.9T(-20) 3 D 1.35
4 F 1.35
5 M 1.35
9 WINND(+Z) 1.50
11 CR 1.50
15 T(-2
20) 0.90
188 1.35G+1.5W(+Z)+1.5CL
L+0.9T(+20) 3 D 1.35
4 F 1.35
5 M 1.35
9 WINND(+Z) 1.50
12 CL 1.50
14 T(+20) 0.90
189 1.35G+1.5W(+Z)+1.5CL
L+0.9T(-20) 3 D 1.35
4 F 1.35
5 M 1.35
9 WINND(+Z) 1.50
12 CL 1.50
15 T(-2
20) 0.90
190 1.35G+1.5W(-Z)+1.5CR
R+0.9T(+20) 3 D 1.35
4 F 1.35
5 M 1.35
10 WINND(-Z) 1.50
11 CR 1.50
14 T(+20) 0.90
191 1.35G+1.5W(-Z)+1.5CR
R+0.9T(-20) 3 D 1.35
4 F 1.35
5 M 1.35
10 WINND(-Z) 1.50
11 CR 1.50

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 30 / 13
39
ERC AKH R
Railway Project
P
15 T(-2
20) 0.90
192 1.35G+1.5W(-Z)+1.5CL+
+0.9T(+20) 3 D 1.35
4 F 1.35
5 M 1.35
10 WINND(-Z) 1.50
12 CL 1.50
14 T(+20) 0.90
193 1.35G+1.5W(-Z)+1.5CL+
+0.9T(-20) 3 D 1.35
4 F 1.35
5 M 1.35
10 WINND(-Z) 1.50
12 CL 1.50
15 T(-2
20) 0.90
194 1.35G+1.5W(+X)+1.05L
LR 3 D 1.35
4 F 1.35
5 M 1.35
7 WINND(+X) 1.50
6 LR 1.05
195 1.35G+1.5W(-X)+1.05LR
R 3 D 1.35
4 F 1.35
5 M 1.35
8 WINND(-X) 1.50
6 LR 1.05
196 1.35G+1.5W(+Z)+1.05LR 3 D 1.35
4 F 1.35
5 M 1.35
9 WINND(+Z) 1.50
6 LR 1.05
197 1.35G+1.5W(-Z)+1.05LR
R 3 D 1.35
4 F 1.35
5 M 1.35
10 WINND(-Z) 1.50
6 LR 1.05
198 1.35G+1.5W(+X)+1.5CR
R 3 D 1.35
4 F 1.35
5 M 1.35
7 WINND(+X) 1.50
11 CR 1.50
199 1.35G+1.5W(+X)+1.5CL
L 3 D 1.35
4 F 1.35
5 M 1.35
7 WINND(+X) 1.50
12 CL 1.50
200 1.35G+1.5W(-X)+1.5CR
R 3 D 1.35
4 F 1.35
5 M 1.35
8 WINND(-X) 1.50
11 CR 1.50
201 1.35G+1.5W(-X)+1.5CL 3 D 1.35
4 F 1.35
5 M 1.35
8 WINND(-X) 1.50
12 CL 1.50
202 1.35G+1.5W(+Z)+1.5CR
R 3 D 1.35
4 F 1.35
5 M 1.35
9 WINND(+Z) 1.50
11 CR 1.50
203 1.35G+1.5W(+Z)+1.5CL
L 3 D 1.35
4 F 1.35
5 M 1.35
9 WINND(+Z) 1.50
12 CL 1.50
204 1.35G+1.5W(-Z)+1.5CR
R 3 D 1.35
4 F 1.35
5 M 1.35
10 WINND(-Z) 1.50
11 CR 1.50
205 1.35G+1.5W(-Z)+1.5CL 3 D 1.35

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 31 / 13
39
ERC AKH R
Railway Project
P
4 F 1.35
5 M 1.35
10 WINND(-Z) 1.50
12 CL 1.50
206 1.35G+1.5W(+X)+0.9T(+
+20) 3 D 1.35
4 F 1.35
5 M 1.35
7 WINND(+X) 1.50
14 T(+20) 0.90
207 1.35G+1.5W(+X)+0.9T(--20) 3 D 1.35
4 F 1.35
5 M 1.35
7 WINND(+X) 1.50
15 T(-2
20) 0.90
208 1.35G+1.5W(-X)+0.9T(+
+20) 3 D 1.35
4 F 1.35
5 M 1.35
8 WINND(-X) 1.50
14 T(+20) 0.90
209 1.35G+1.5W(-X)+0.9T(-20) 3 D 1.35
4 F 1.35
5 M 1.35
8 WINND(-X) 1.50
15 T(-2
20) 0.90
210 1.35G+1.5W(+Z)+0.9T(+
+20) 3 D 1.35
4 F 1.35
5 M 1.35
9 WINND(+Z) 1.50
14 T(+20) 0.90
211 1.35G+1.5W(+Z)+0.9T(--20) 3 D 1.35
4 F 1.35
5 M 1.35
9 WINND(+Z) 1.50
15 T(-2
20) 0.90
212 1.35G+1.5W(-Z)+0.9T(+
+20) 3 D 1.35
4 F 1.35
5 M 1.35
10 WINND(-Z) 1.50
14 T(+20) 0.90
213 1.35G+1.5W(-Z)+0.9T(-2
20) 3 D 1.35
4 F 1.35
5 M 1.35
10 WINND(-Z) 1.50
15 T(-2
20) 0.90
214 1.35G+1.5W(+X) 3 D 1.35
4 F 1.35
5 M 1.35
7 WINND(+X) 1.50
215 1.35G+1.5W(-X) 3 D 1.35
4 F 1.35
5 M 1.35
8 WINND(-X) 1.50
216 1.35G+1.5W(+Z) 3 D 1.35
4 F 1.35
5 M 1.35
9 WINND(+Z) 1.50
217 1.35G+1.5W(-Z) 3 D 1.35
4 F 1.35
5 M 1.35
10 WINND(-Z) 1.50
218 1.35G+1.5CR+1.05LR+0
0.9W(+X)+0.9T
T(+20) 3 D 1.35
4 F 1.35
5 M 1.35
11 CR 1.50
6 LR 1.05
7 WINND(+X) 0.90
14 T(+20) 0.90
219 1.35G+1.5CR+1.05LR+0
0.9W(+X)+0.9T
T(-20) 3 D 1.35
4 F 1.35

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 32 / 13
39
ERC AKH R
Railway Project
P
5 M 1.35
11 CR 1.50
6 LR 1.05
7 WINND(+X) 0.90
15 T(-2
20) 0.90
220 1.35G+1.5CL+1.05LR+0
0.9W(+X)+0.9T((+20) 3 D 1.35
4 F 1.35
5 M 1.35
12 CL 1.50
6 LR 1.05
7 WINND(+X) 0.90
14 T(+20) 0.90
221 1.35G+1.5CL+1.05LR+0
0.9W(+X)+0.9T((-20) 3 D 1.35
4 F 1.35
5 M 1.35
12 CL 1.50
6 LR 1.05
7 WINND(+X) 0.90
15 T(-2
20) 0.90
222 1.35G+1.5CR+1.05LR+0
0.9W(-X)+0.9T((+20) 3 D 1.35
4 F 1.35
5 M 1.35
11 CR 1.50
6 LR 1.05
8 WINND(-X) 0.90
14 T(+20) 0.90
223 1.35G+1.5CR+1.05LR+0
0.9W(-X)+0.9T((-20) 3 D 1.35
4 F 1.35
5 M 1.35
11 CR 1.50
6 LR 1.05
8 WINND(-X) 0.90
15 T(-2
20) 0.90
224 1.35G+1.5CL+1.05LR+0
0.9W(-X)+0.9T( +20) 3 D 1.35
4 F 1.35
5 M 1.35
12 CL 1.50
6 LR 1.05
8 WINND(-X) 0.90
14 T(+20) 0.90
225 1.35G+1.5CL+1.05LR+0
0.9W(-X)+0.9T(--20) 3 D 1.35
4 F 1.35
5 M 1.35
12 CL 1.50
6 LR 1.05
8 WINND(-X) 0.90
15 T(-2
20) 0.90
226 1.35G+1.5CR+1.05LR+0
0.9W(+Z)+0.9T
T(+20) 3 D 1.35
4 F 1.35
5 M 1.35
11 CR 1.50
6 LR 1.05
9 WINND(+Z) 0.90
14 T(+20) 0.90
227 1.35G+1.5CR+1.05LR+0
0.9W(+Z)+0.9T
T(-20) 3 D 1.35
4 F 1.35
5 M 1.35
11 CR 1.50
6 LR 1.05
9 WINND(+Z) 0.90
15 T(-2
20) 0.90
228 1.35G+1.5CL+1.05LR+0
0.9W(+Z)+0.9T((+20) 3 D 1.35
4 F 1.35
5 M 1.35
12 CL 1.50
6 LR 1.05
9 WINND(+Z) 0.90
14 T(+20) 0.90
229 1.35G+1.5CL+1.05LR+0
0.9W(+Z)+0.9T((-20) 3 D 1.35

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 33 / 13
39
ERC AKH R
Railway Project
P
4 F 1.35
5 M 1.35
12 CL 1.50
6 LR 1.05
9 WINND(+Z) 0.90
15 T(-2
20) 0.90
230 1.35G+1.5CR+1.05LR+0
0.9W(-Z)+0.9T((+20) 3 D 1.35
4 F 1.35
5 M 1.35
11 CR 1.50
6 LR 1.05
10 WINND(-Z) 0.90
14 T(+20) 0.90
231 1.35G+1.5CR+1.05LR+0
0.9W(-Z)+0.9T((-20) 3 D 1.35
4 F 1.35
5 M 1.35
11 CR 1.50
6 LR 1.05
10 WINND(-Z) 0.90
15 T(-2
20) 0.90
232 1.35G+1.5CL+1.05LR+0
0.9W(-Z)+0.9T(+
+20) 3 D 1.35
4 F 1.35
5 M 1.35
12 CL 1.50
6 LR 1.05
10 WINND(-Z) 0.90
14 T(+20) 0.90
233 1.35G+1.5CL+1.05LR+0
0.9W(-Z)+0.9T(--20) 3 D 1.35
4 F 1.35
5 M 1.35
12 CL 1.50
6 LR 1.05
10 WINND(-Z) 0.90
15 T(-2
20) 0.90
234 1.35G+1.5CR+1.05LR+0
0.9W(+X) 3 D 1.35
4 F 1.35
5 M 1.35
11 CR 1.50
6 LR 1.05
7 WINND(+X) 0.90
235 1.35G+1.5CL+1.05LR+0
0.9W(+X) 3 D 1.35
4 F 1.35
5 M 1.35
12 CL 1.50
6 LR 1.05
7 WINND(+X) 0.90
236 1.35G+1.5CR+1.05LR+0
0.9W(-X) 3 D 1.35
4 F 1.35
5 M 1.35
11 CR 1.50
6 LR 1.05
8 WINND(-X) 0.90
237 1.35G+1.5CL+1.05LR+0
0.9W(-X) 3 D 1.35
4 F 1.35
5 M 1.35
12 CL 1.50
6 LR 1.05
8 WINND(-X) 0.90
238 1.35G+1.5CR+1.05LR+0
0.9W(+Z) 3 D 1.35
4 F 1.35
5 M 1.35
11 CR 1.50
6 LR 1.05
9 WINND(+Z) 0.90
239 1.35G+1.5CL+1.05LR+0
0.9W(+Z) 3 D 1.35
4 F 1.35
5 M 1.35
12 CL 1.50
6 LR 1.05

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 34 / 13
39
ERC AKH R
Railway Project
P
9 WINND(+Z) 0.90
240 1.35G+1.5CR+1.05LR+0
0.9W(-Z) 3 D 1.35
4 F 1.35
5 M 1.35
11 CR 1.50
6 LR 1.05
10 WINND(-Z) 0.90
241 1.35G+1.5CL+1.05LR+0
0.9W(-Z) 3 D 1.35
4 F 1.35
5 M 1.35
12 CL 1.50
6 LR 1.05
10 WINND(-Z) 0.90
242 1.35G+1.5CR+1.05LR+0
0.9T(+20) 3 D 1.35
4 F 1.35
5 M 1.35
11 CR 1.50
6 LR 1.05
14 T(+20) 0.90
243 1.35G+1.5CR+1.05LR+0
0.9T(-20) 3 D 1.35
4 F 1.35
5 M 1.35
11 CR 1.50
6 LR 1.05
15 T(-2
20) 0.90
244 1.35G+1.5CL+1.05LR+0
0.9T(+20) 3 D 1.35
4 F 1.35
5 M 1.35
12 CL 1.50
6 LR 1.05
14 T(+20) 0.90
245 1.35G+1.5CL+1.05LR+0
0.9T(-20) 3 D 1.35
4 F 1.35
5 M 1.35
12 CL 1.50
6 LR 1.05
15 T(-2
20) 0.90
246 1.35G+1.5CR+0.9W(+X
X)+0.9T(+20) 3 D 1.35
4 F 1.35
5 M 1.35
11 CR 1.50
7 WINND(+X) 0.90
14 T(+20) 0.90
247 1.35G+1.5CR+0.9W(+X
X)+0.9T(-20) 3 D 1.35
4 F 1.35
5 M 1.35
11 CR 1.50
7 WINND(+X) 0.90
15 T(-2
20) 0.90
248 1.35G+1.5CL+0.9W(+X))+0.9T(+20) 3 D 1.35
4 F 1.35
5 M 1.35
12 CL 1.50
7 WINND(+X) 0.90
14 T(+20) 0.90
249 1.35G+1.5CL+0.9W(+X))+0.9T(-20) 3 D 1.35
4 F 1.35
5 M 1.35
12 CL 1.50
7 WINND(+X) 0.90
15 T(-2
20) 0.90
250 1.35G+1.5CR+0.9W(-X))+0.9T(+20) 3 D 1.35
4 F 1.35
5 M 1.35
11 CR 1.50
8 WINND(-X) 0.90
14 T(+20) 0.90
251 1.35G+1.5CR+0.9W(-X))+0.9T(-20) 3 D 1.35
4 F 1.35

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 35 / 13
39
ERC AKH R
Railway Project
P
5 M 1.35
11 CR 1.50
8 WINND(-X) 0.90
15 T(-2
20) 0.90
252 1.35G+1.5CL+0.9W(-X)+0.9T(+20) 3 D 1.35
4 F 1.35
5 M 1.35
12 CL 1.50
8 WINND(-X) 0.90
14 T(+20) 0.90
253 1.35G+1.5CL+0.9W(-X)+0.9T(-20) 3 D 1.35
4 F 1.35
5 M 1.35
12 CL 1.50
8 WINND(-X) 0.90
15 T(-2
20) 0.90
254 1.35G+1.5CR+0.9W(+Z)+0.9T(+20) 3 D 1.35
4 F 1.35
5 M 1.35
11 CR 1.50
9 WINND(+Z) 0.90
14 T(+20) 0.90
255 1.35G+1.5CR+0.9W(+Z)+0.9T(-20) 3 D 1.35
4 F 1.35
5 M 1.35
11 CR 1.50
9 WINND(+Z) 0.90
15 T(-2
20) 0.90
256 1.35G+1.5CL+0.9W(+Z))+0.9T(+20) 3 D 1.35
4 F 1.35
5 M 1.35
12 CL 1.50
9 WINND(+Z) 0.90
14 T(+20) 0.90
257 1.35G+1.5CL+0.9W(+Z))+0.9T(-20) 3 D 1.35
4 F 1.35
5 M 1.35
12 CL 1.50
9 WINND(+Z) 0.90
15 T(-2
20) 0.90
258 1.35G+1.5CR+0.9W(-Z))+0.9T(+20) 3 D 1.35
4 F 1.35
5 M 1.35
11 CR 1.50
10 WINND(-Z) 0.90
14 T(+20) 0.90
259 1.35G+1.5CR+0.9W(-Z))+0.9T(-20) 3 D 1.35
4 F 1.35
5 M 1.35
11 CR 1.50
10 WINND(-Z) 0.90
15 T(-2
20) 0.90
260 1.35G+1.5CL+0.9W(-Z)+
+0.9T(+20) 3 D 1.35
4 F 1.35
5 M 1.35
12 CL 1.50
10 WINND(-Z) 0.90
14 T(+20) 0.90
261 1.35G+1.5CL+0.9W(-Z)+
+0.9T(-20) 3 D 1.35
4 F 1.35
5 M 1.35
12 CL 1.50
10 WINND(-Z) 0.90
15 T(-2
20) 0.90
262 1.35G+1.5CR+1.05LR 3 D 1.35
4 F 1.35
5 M 1.35
11 CR 1.50
6 LR 1.05

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 36 / 13
39
ERC AKH R
Railway Project
P
263 1.35G+1.5CL+1.05LR 3 D 1.35
4 F 1.35
5 M 1.35
12 CL 1.50
6 LR 1.05
264 1.35G+1.5CR+0.9W(+X
X) 3 D 1.35
4 F 1.35
5 M 1.35
11 CR 1.50
7 WINND(+X) 0.90
265 1.35G+1.5CL+0.9W(+X)) 3 D 1.35
4 F 1.35
5 M 1.35
12 CL 1.50
7 WINND(+X) 0.90
266 1.35G+1.5CR+0.9W(-X)) 3 D 1.35
4 F 1.35
5 M 1.35
11 CR 1.50
8 WINND(-X) 0.90
267 1.35G+1.5CL+0.9W(-X) 3 D 1.35
4 F 1.35
5 M 1.35
12 CL 1.50
8 WINND(-X) 0.90
268 1.35G+1.5CR+0.9W(+Z) 3 D 1.35
4 F 1.35
5 M 1.35
11 CR 1.50
9 WINND(+Z) 0.90
269 1.35G+1.5CL+0.9W(+Z)) 3 D 1.35
4 F 1.35
5 M 1.35
12 CL 1.50
9 WINND(+Z) 0.90
270 1.35G+1.5CR+0.9W(-Z)) 3 D 1.35
4 F 1.35
5 M 1.35
11 CR 1.50
10 WINND(-Z) 0.90
271 1.35G+1.5CL+0.9W(-Z) 3 D 1.35
4 F 1.35
5 M 1.35
12 CL 1.50
10 WINND(-Z) 0.90
272 1.35G+1.5CR+0.9T(+20
0) 3 D 1.35
4 F 1.35
5 M 1.35
11 CR 1.50
14 T(+20) 0.90
273 1.35G+1.5CR+0.9T(-20)) 3 D 1.35
4 F 1.35
5 M 1.35
11 CR 1.50
15 T(-2
20) 0.90
274 1.35G+1.5CL+0.9T(+20) 3 D 1.35
4 F 1.35
5 M 1.35
12 CL 1.50
14 T(+20) 0.90
275 1.35G+1.5CL+0.9T(-20)) 3 D 1.35
4 F 1.35
5 M 1.35
12 CL 1.50
15 T(-2
20) 0.90
276 1.35G+1.5CR 3 D 1.35
4 F 1.35
5 M 1.35
11 CR 1.50

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 37 / 13
39
ERC AKH R
Railway Project
P
277 1.35G+1.5CL 3 D 1.35
4 F 1.35
5 M 1.35
12 CL 1.50
278 1.35G+1.5T(+20)+1.05L
LR+0.9W(+X)+1 .5CR 3 D 1.35
4 F 1.35
5 M 1.35
14 T(+20) 1.50
6 LR 1.05
7 WINND(+X) 0.90
11 CR 1.50
279 1.35G+1.5T(-20)+1.05LR+0.9W(+X)+1..5CR 3 D 1.35
4 F 1.35
5 M 1.35
15 T(-2
20) 1.50
6 LR 1.05
7 WINND(+X) 0.90
11 CR 1.50
280 1.35G+1.5T(+20)+1.05L
LR+0.9W(+X)+1 .5CL 3 D 1.35
4 F 1.35
5 M 1.35
14 T(+20) 1.50
6 LR 1.05
7 WINND(+X) 0.90
12 CL 1.50
281 1.35G+1.5T(-20)+1.05LR+0.9W(+X)+1..5CL 3 D 1.35
4 F 1.35
5 M 1.35
15 T(-2
20) 1.50
6 LR 1.05
7 WINND(+X) 0.90
12 CL 1.50
282 1.35G+1.5T(+20)+1.05L
LR+0.9W(-X)+1..5CR 3 D 1.35
4 F 1.35
5 M 1.35
14 T(+20) 1.50
6 LR 1.05
8 WINND(-X) 0.90
11 CR 1.50
283 1.35G+1.5T(-20)+1.05LR+0.9W(-X)+1.5
5CR 3 D 1.35
4 F 1.35
5 M 1.35
15 T(-2
20) 1.50
6 LR 1.05
8 WINND(-X) 0.90
11 CR 1.50
284 1.35G+1.5T(+20)+1.05L
LR+0.9W(-X)+1..5CL 3 D 1.35
4 F 1.35
5 M 1.35
14 T(+20) 1.50
6 LR 1.05
8 WINND(-X) 0.90
12 CL 1.50
285 1.35G+1.5T(-20)+1.05LR+0.9W(-X)+1.5
5CL 3 D 1.35
4 F 1.35
5 M 1.35
15 T(-2
20) 1.50
6 LR 1.05
8 WINND(-X) 0.90
12 CL 1.50
286 1.35G+1.5T(+20)+1.05L
LR+0.9W(+Z)+1 .5CR 3 D 1.35
4 F 1.35
5 M 1.35
14 T(+20) 1.50
6 LR 1.05
9 WINND(+Z) 0.90
11 CR 1.50
287 1.35G+1.5T(-20)+1.05LR+0.9W(+Z)+1..5CR 3 D 1.35
4 F 1.35

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 38 / 13
39
ERC AKH R
Railway Project
P
5 M 1.35
15 T(-2
20) 1.50
6 LR 1.05
9 WINND(+Z) 0.90
11 CR 1.50
288 1.35G+1.5T(+20)+1.05L
LR+0.9W(+Z)+1 .5CL 3 D 1.35
4 F 1.35
5 M 1.35
14 T(+20) 1.50
6 LR 1.05
9 WINND(+Z) 0.90
12 CL 1.50
289 1.35G+1.5T(-20)+1.05LR+0.9W(+Z)+1..5CL 3 D 1.35
4 F 1.35
5 M 1.35
15 T(-2
20) 1.50
6 LR 1.05
9 WINND(+Z) 0.90
12 CL 1.50
290 1.35G+1.5T(+20)+1.05L
LR+0.9W(-Z)+1..5CR 3 D 1.35
4 F 1.35
5 M 1.35
14 T(+20) 1.50
6 LR 1.05
10 WINND(-Z) 0.90
11 CR 1.50
291 1.35G+1.5T(-20)+1.05LR+0.9W(-Z)+1.5
5CR 3 D 1.35
4 F 1.35
5 M 1.35
15 T(-2
20) 1.50
6 LR 1.05
10 WINND(-Z) 0.90
11 CR 1.50
292 1.35G+1.5T(+20)+1.05L
LR+0.9W(-Z)+1..5CL 3 D 1.35
4 F 1.35
5 M 1.35
14 T(+20) 1.50
6 LR 1.05
10 WINND(-Z) 0.90
12 CL 1.50
293 1.35G+1.5T(-20)+1.05LR+0.9W(-Z)+1.5
5CL 3 D 1.35
4 F 1.35
5 M 1.35
15 T(-2
20) 1.50
6 LR 1.05
10 WINND(-Z) 0.90
12 CL 1.50
294 1.35G+1.5T(+20)+1.05L
LR+0.9W(+X) 3 D 1.35
4 F 1.35
5 M 1.35
14 T(+20) 1.50
6 LR 1.05
7 WINND(+X) 0.90
295 1.35G+1.5T(-20)+1.05LR+0.9W(+X) 3 D 1.35
4 F 1.35
5 M 1.35
15 T(-2
20) 1.50
6 LR 1.05
7 WINND(+X) 0.90
296 1.35G+1.5T(+20)+1.05L
LR+0.9W(-X) 3 D 1.35
4 F 1.35
5 M 1.35
14 T(+20) 1.50
6 LR 1.05
8 WINND(-X) 0.90
297 1.35G+1.5T(-20)+1.05LR+0.9W(-X) 3 D 1.35
4 F 1.35
5 M 1.35
15 T(-2
20) 1.50

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 39 / 13
39
ERC AKH R
Railway Project
P
6 LR 1.05
8 WINND(-X) 0.90
298 1.35G+1.5T(+20)+1.05L
LR+0.9W(+Z) 3 D 1.35
4 F 1.35
5 M 1.35
14 T(+20) 1.50
6 LR 1.05
9 WINND(+Z) 0.90
299 1.35G+1.5T(-20)+1.05LR+0.9W(+Z) 3 D 1.35
4 F 1.35
5 M 1.35
15 T(-2
20) 1.50
6 LR 1.05
9 WINND(+Z) 0.90
300 1.35G+1.5T(+20)+1.05L
LR+0.9W(-Z) 3 D 1.35
4 F 1.35
5 M 1.35
14 T(+20) 1.50
6 LR 1.05
10 WINND(-Z) 0.90
301 1.35G+1.5T(-20)+1.05LR+0.9W(-Z) 3 D 1.35
4 F 1.35
5 M 1.35
15 T(-2
20) 1.50
6 LR 1.05
10 WINND(-Z) 0.90
302 1.35G+1.5T(+20)+1.05L
LR+1.5CR 3 D 1.35
4 F 1.35
5 M 1.35
14 T(+20) 1.50
6 LR 1.05
11 CR 1.50
303 1.35G+1.5T(-20)+1.05LR+1.5CR 3 D 1.35
4 F 1.35
5 M 1.35
15 T(-2
20) 1.50
6 LR 1.05
11 CR 1.50
304 1.35G+1.5T(+20)+1.05L
LR+1.5CL 3 D 1.35
4 F 1.35
5 M 1.35
14 T(+20) 1.50
6 LR 1.05
12 CL 1.50
305 1.35G+1.5T(-20)+1.05LR+1.5CL 3 D 1.35
4 F 1.35
5 M 1.35
15 T(-2
20) 1.50
6 LR 1.05
12 CL 1.50
306 1.35G+1.5T(+20)+0.9W(+X)+1.5CR 3 D 1.35
4 F 1.35
5 M 1.35
14 T(+20) 1.50
7 WINND(+X) 0.90
11 CR 1.50
307 1.35G+1.5T(-20)+0.9W((+X)+1.5CR 3 D 1.35
4 F 1.35
5 M 1.35
15 T(-2
20) 1.50
7 WINND(+X) 0.90
11 CR 1.50
308 1.35G+1.5T(+20)+0.9W(+X)+1.5CL 3 D 1.35
4 F 1.35
5 M 1.35
14 T(+20) 1.50
7 WINND(+X) 0.90
12 CL 1.50
309 1.35G+1.5T(-20)+0.9W((+X)+1.5CL 3 D 1.35

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 40 / 13
39
ERC AKH R
Railway Project
P
4 F 1.35
5 M 1.35
15 T(-2
20) 1.50
7 WINND(+X) 0.90
12 CL 1.50
310 1.35G+1.5T(+20)+0.9W(-X)+1.5CR 3 D 1.35
4 F 1.35
5 M 1.35
14 T(+20) 1.50
8 WINND(-X) 0.90
11 CR 1.50
311 1.35G+1.5T(-20)+0.9W((-X)+1.5CR 3 D 1.35
4 F 1.35
5 M 1.35
15 T(-2
20) 1.50
8 WINND(-X) 0.90
11 CR 1.50
312 1.35G+1.5T(+20)+0.9W(-X)+1.5CL 3 D 1.35
4 F 1.35
5 M 1.35
14 T(+20) 1.50
8 WINND(-X) 0.90
12 CL 1.50
313 1.35G+1.5T(-20)+0.9W((-X)+1.5CL 3 D 1.35
4 F 1.35
5 M 1.35
15 T(-2
20) 1.50
8 WINND(-X) 0.90
12 CL 1.50
314 1.35G+1.5T(+20)+0.9W(+Z)+1.5CR 3 D 1.35
4 F 1.35
5 M 1.35
14 T(+20) 1.50
9 WINND(+Z) 0.90
11 CR 1.50
315 1.35G+1.5T(-20)+0.9W((+Z)+1.5CR 3 D 1.35
4 F 1.35
5 M 1.35
15 T(-2
20) 1.50
9 WINND(+Z) 0.90
11 CR 1.50
316 1.35G+1.5T(+20)+0.9W(+Z)+1.5CL 3 D 1.35
4 F 1.35
5 M 1.35
14 T(+20) 1.50
9 WINND(+Z) 0.90
12 CL 1.50
317 1.35G+1.5T(-20)+0.9W((+Z)+1.5CL 3 D 1.35
4 F 1.35
5 M 1.35
15 T(-2
20) 1.50
9 WINND(+Z) 0.90
12 CL 1.50
318 1.35G+1.5T(+20)+0.9W(-Z)+1.5CR 3 D 1.35
4 F 1.35
5 M 1.35
14 T(+20) 1.50
10 WINND(-Z) 0.90
11 CR 1.50
319 1.35G+1.5T(-20)+0.9W((-Z)+1.5CR 3 D 1.35
4 F 1.35
5 M 1.35
15 T(-2
20) 1.50
10 WINND(-Z) 0.90
11 CR 1.50
320 1.35G+1.5T(+20)+0.9W(-Z)+1.5CL 3 D 1.35
4 F 1.35
5 M 1.35
14 T(+20) 1.50

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 41 / 13
39
ERC AKH R
Railway Project
P
10 WINND(-Z) 0.90
12 CL 1.50
321 1.35G+1.5T(-20)+0.9W((-Z)+1.5CL 3 D 1.35
4 F 1.35
5 M 1.35
15 T(-2
20) 1.50
10 WINND(-Z) 0.90
12 CL 1.50
322 1.35G+1.5T(+20)+1.05L
LR 3 D 1.35
4 F 1.35
5 M 1.35
14 T(+20) 1.50
6 LR 1.05
323 1.35G+1.5T(-20)+1.05LR 3 D 1.35
4 F 1.35
5 M 1.35
15 T(-2
20) 1.50
6 LR 1.05
324 1.35G+1.5T(+20)+0.9W(+X) 3 D 1.35
4 F 1.35
5 M 1.35
14 T(+20) 1.50
7 WINND(+X) 0.90
325 1.35G+1.5T(-20)+0.9W((+X) 3 D 1.35
4 F 1.35
5 M 1.35
15 T(-2
20) 1.50
7 WINND(+X) 0.90
326 1.35G+1.5T(+20)+0.9W(-X) 3 D 1.35
4 F 1.35
5 M 1.35
14 T(+20) 1.50
8 WINND(-X) 0.90
327 1.35G+1.5T(-20)+0.9W((-X) 3 D 1.35
4 F 1.35
5 M 1.35
15 T(-2
20) 1.50
8 WINND(-X) 0.90
328 1.35G+1.5T(+20)+0.9W(+Z) 3 D 1.35
4 F 1.35
5 M 1.35
14 T(+20) 1.50
9 WINND(+Z) 0.90
329 1.35G+1.5T(-20)+0.9W((+Z) 3 D 1.35
4 F 1.35
5 M 1.35
15 T(-2
20) 1.50
9 WINND(+Z) 0.90
330 1.35G+1.5T(+20)+0.9W(-Z) 3 D 1.35
4 F 1.35
5 M 1.35
14 T(+20) 1.50
10 WINND(-Z) 0.90
331 1.35G+1.5T(-20)+0.9W((-Z) 3 D 1.35
4 F 1.35
5 M 1.35
15 T(-2
20) 1.50
10 WINND(-Z) 0.90
332 1.35G+1.5T(+20)+1.5CR
R 3 D 1.35
4 F 1.35
5 M 1.35
14 T(+20) 1.50
11 CR 1.50
333 1.35G+1.5T(-20)+1.5CR
R 3 D 1.35
4 F 1.35
5 M 1.35
15 T(-2
20) 1.50
11 CR 1.50
334 1.35G+1.5T(+20)+1.5CL
L 3 D 1.35

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 42 / 13
39
ERC AKH R
Railway Project
P
4 F 1.35
5 M 1.35
14 T(+20) 1.50
12 CL 1.50
335 1.35G+1.5T(-20)+1.5CL
L 3 D 1.35
4 F 1.35
5 M 1.35
15 T(-2
20) 1.50
12 CL 1.50
336 1.35G+1.5T(+20) 3 D 1.35
4 F 1.35
5 M 1.35
14 T(+20) 1.50
337 1.35G+1.5T(-20) 3 D 1.35
4 F 1.35
5 M 1.35
15 T(-2
20) 1.50
338 G+E(X)+
+0.3E(Z)+CD 3 D 1.00
4 F 1.00
5 M 1.00
1 E(X
X) 1.00
2 E(Z
Z) 0.30
13 CD 1.00
339 G+E(X)-0
0.3E(Z)+CD 3 D 1.00
4 F 1.00
5 M 1.00
1 E(X
X) 1.00
2 E(Z
Z) -0.30
13 CD 1.00
340 G-E(X)+0
0.3E(Z)+CD 3 D 1.00
4 F 1.00
5 M 1.00
1 E(X
X) -1.00
2 E(Z
Z) 0.30
13 CD 1.00
341 G-E(X)-0
0.3E(Z)+CD 3 D 1.00
4 F 1.00
5 M 1.00
1 E(X
X) -1.00
2 E(Z
Z) -0.30
13 CD 1.00
342 G+0.3E(X
X)+E(Z)+CD 3 D 1.00
4 F 1.00
5 M 1.00
1 E(X
X) 0.30
2 E(Z
Z) 1.00
13 CD 1.00
343 G+0.3E(X
X)-E(Z)+CD 3 D 1.00
4 F 1.00
5 M 1.00
1 E(X
X) 0.30
2 E(Z
Z) -1.00
13 CD 1.00
344 G-0.3E(X
X)+E(Z)+CD 3 D 1.00
4 F 1.00
5 M 1.00
1 E(X
X) -0.30
2 E(Z
Z) 1.00
13 CD 1.00
345 G+0.3E(X
X)-E(Z)+CD 3 D 1.00
4 F 1.00
5 M 1.00
1 E(X
X) -0.30
2 E(Z
Z) -1.00
13 CD 1.00
401 G+LR+0.5W(+X)+CR+0.6T(+20) 3 D 1.00
4 F 1.00
5 M 1.00
6 LR 1.00

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 43 / 13
39
ERC AKH R
Railway Project
P
7 WINND(+X) 0.50
11 CR 1.00
14 T(+20) 0.60
402 G+LR+0.5W(+X)+CR+0.6T(-20) 3 D 1.00
4 F 1.00
5 M 1.00
6 LR 1.00
7 WINND(+X) 0.50
11 CR 1.00
15 T(-2
20) 0.60
403 G+LR+0.5W(+X)+CL+0..6T(+20) 3 D 1.00
4 F 1.00
5 M 1.00
6 LR 1.00
7 WINND(+X) 0.50
12 CL 1.00
14 T(+20) 0.60
404 G+LR+0.5W(+X)+CL+0..6T(-20) 3 D 1.00
4 F 1.00
5 M 1.00
6 LR 1.00
7 WINND(+X) 0.50
12 CL 1.00
15 T(-2
20) 0.60
405 G+LR+0.5W(-X)+CR+0.6T(+20) 3 D 1.00
4 F 1.00
5 M 1.00
6 LR 1.00
8 WINND(-X) 0.50
11 CR 1.00
14 T(+20) 0.60
406 G+LR+0.5W(-X)+CR+0.6T(-20) 3 D 1.00
4 F 1.00
5 M 1.00
6 LR 1.00
8 WINND(-X) 0.50
11 CR 1.00
15 T(-2
20) 0.60
407 G+LR+0.5W(-X)+CL+0.6
6T(+20) 3 D 1.00
4 F 1.00
5 M 1.00
6 LR 1.00
8 WINND(-X) 0.50
12 CL 1.00
14 T(+20) 0.60
408 G+LR+0.5W(-X)+CL+0.6
6T(-20) 3 D 1.00
4 F 1.00
5 M 1.00
6 LR 1.00
8 WINND(-X) 0.50
12 CL 1.00
15 T(-2
20) 0.60
409 G+LR+0.5W(+Z)+CR+0.6T(+20) 3 D 1.00
4 F 1.00
5 M 1.00
6 LR 1.00
9 WINND(+Z) 0.50
11 CR 1.00
14 T(+20) 0.60
410 G+LR+0.5W(+Z)+CR+0.6T(-20) 3 D 1.00
4 F 1.00
5 M 1.00
6 LR 1.00
9 WINND(+Z) 0.50
11 CR 1.00
15 T(-2
20) 0.60
411 G+LR+0.5W(+Z)+CL+0..6T(+20) 3 D 1.00
4 F 1.00
5 M 1.00

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 44 / 13
39
ERC AKH R
Railway Project
P
6 LR 1.00
9 WINND(+Z) 0.50
12 CL 1.00
14 T(+20) 0.60
412 G+LR+0.5W(+Z)+CL+0..6T(-20) 3 D 1.00
4 F 1.00
5 M 1.00
6 LR 1.00
9 WINND(+Z) 0.50
12 CL 1.00
15 T(-2
20) 0.60
413 G+LR+0.5W(-Z)+CR+0.6T(+20) 3 D 1.00
4 F 1.00
5 M 1.00
6 LR 1.00
10 WINND(-Z) 0.50
11 CR 1.00
14 T(+20) 0.60
414 G+LR+0.5W(-Z)+CR+0.6T(-20) 3 D 1.00
4 F 1.00
5 M 1.00
6 LR 1.00
10 WINND(-Z) 0.50
11 CR 1.00
15 T(-2
20) 0.60
415 G+LR+0.5W(-Z)+CL+0.6
6T(+20) 3 D 1.00
4 F 1.00
5 M 1.00
6 LR 1.00
10 WINND(-Z) 0.50
12 CL 1.00
14 T(+20) 0.60
416 G+LR+0.5W(-Z)+CL+0.6
6T(-20) 3 D 1.00
4 F 1.00
5 M 1.00
6 LR 1.00
10 WINND(-Z) 0.50
12 CL 1.00
15 T(-2
20) 0.60
417 G+LR+0.5W(+X)+CR 3 D 1.00
4 F 1.00
5 M 1.00
6 LR 1.00
7 WINND(+X) 0.50
11 CR 1.00
418 G+LR+0.5W(+X)+CL 3 D 1.00
4 F 1.00
5 M 1.00
6 LR 1.00
7 WINND(+X) 0.50
12 CL 1.00
419 G+LR+0.5W(-X)+CR 3 D 1.00
4 F 1.00
5 M 1.00
6 LR 1.00
8 WINND(-X) 0.50
11 CR 1.00
420 G+LR+0.5W(-X)+CL) 3 D 1.00
4 F 1.00
5 M 1.00
6 LR 1.00
8 WINND(-X) 0.50
12 CL 1.00
421 G+LR+0.5W(+Z)+CR 3 D 1.00
4 F 1.00
5 M 1.00
6 LR 1.00
9 WINND(+Z) 0.50
11 CR 1.00

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 45 / 13
39
ERC AKH R
Railway Project
P
422 G+LR+0.5W(+Z)+CL 3 D 1.00
4 F 1.00
5 M 1.00
6 LR 1.00
9 WINND(+Z) 0.50
12 CL 1.00
423 G+LR+0.5W(-Z)+CR 3 D 1.00
4 F 1.00
5 M 1.00
6 LR 1.00
10 WINND(-Z) 0.50
11 CR 1.00
424 G+LR+0.5W(-Z)+CL 3 D 1.00
4 F 1.00
5 M 1.00
6 LR 1.00
10 WINND(-Z) 0.50
12 CL 1.00
425 G+LR+0.5W(+X)+0.6T(+
+20) 3 D 1.00
4 F 1.00
5 M 1.00
6 LR 1.00
7 WINND(+X) 0.50
14 T(+20) 0.60
426 G+LR+0.5W(+X)+0.6T(--20) 3 D 1.00
4 F 1.00
5 M 1.00
6 LR 1.00
7 WINND(+X) 0.50
15 T(-2
20) 0.60
427 G+LR+0.5W(-X)+0.6T(+
+20) 3 D 1.00
4 F 1.00
5 M 1.00
6 LR 1.00
8 WINND(-X) 0.50
14 T(+20) 0.60
428 G+LR+0.5W(-X)+0.6T(-2
20) 3 D 1.00
4 F 1.00
5 M 1.00
6 LR 1.00
8 WINND(-X) 0.50
15 T(-2
20) 0.60
429 G+LR+0.5W(+Z)+0.6T(+
+20) 3 D 1.00
4 F 1.00
5 M 1.00
6 LR 1.00
9 WINND(+Z) 0.50
14 T(+20) 0.60
430 G+LR+0.5W(+Z)+0.6T(--20) 3 D 1.00
4 F 1.00
5 M 1.00
6 LR 1.00
9 WINND(+Z) 0.50
15 T(-2
20) 0.60
431 G+LR+0.5W(-Z)+0.6T(+
+20) 3 D 1.00
4 F 1.00
5 M 1.00
6 LR 1.00
10 WINND(-Z) 0.50
14 T(+20) 0.60
432 G+LR+0.5W(-Z)+0.6T(-2
20) 3 D 1.00
4 F 1.00
5 M 1.00
6 LR 1.00
10 WINND(-Z) 0.50
15 T(-2
20) 0.60
433 G+LR+C
CR+0.6T(+20) 3 D 1.00
4 F 1.00
5 M 1.00

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 46 / 13
39
ERC AKH R
Railway Project
P
6 LR 1.00
11 CR 1.00
14 T(+20) 0.60
434 G+LR+C
CR+0.6T(-20) 3 D 1.00
4 F 1.00
5 M 1.00
6 LR 1.00
11 CR 1.00
15 T(-2
20) 0.60
435 G+LR+C
CL+0.6T(+20) 3 D 1.00
4 F 1.00
5 M 1.00
6 LR 1.00
12 CL 1.00
14 T(+20) 0.60
436 G+LR+C
CL+0.6T(-20) 3 D 1.00
4 F 1.00
5 M 1.00
6 LR 1.00
12 CL 1.00
15 T(-2
20) 0.60
437 G+LR+0.5W(+X) 3 D 1.00
4 F 1.00
5 M 1.00
6 LR 1.00
7 WINND(+X) 0.50
438 G+LR+0.5W(-X) 3 D 1.00
4 F 1.00
5 M 1.00
6 LR 1.00
8 WINND(-X) 0.50
439 G+LR+0.5W(+Z) 3 D 1.00
4 F 1.00
5 M 1.00
6 LR 1.00
9 WINND(+Z) 0.50
440 G+LR+0.5W(-Z) 3 D 1.00
4 F 1.00
5 M 1.00
6 LR 1.00
10 WINND(-Z) 0.50
441 G+LR+C
CR 3 D 1.00
4 F 1.00
5 M 1.00
6 LR 1.00
11 CR 1.00
442 G+LR+C
CL 3 D 1.00
4 F 1.00
5 M 1.00
6 LR 1.00
12 CL 1.00
443 G+LR+0.6T(+20) 3 D 1.00
4 F 1.00
5 M 1.00
6 LR 1.00
14 T(+20) 0.60
444 G+LR+0.6T(-20) 3 D 1.00
4 F 1.00
5 M 1.00
6 LR 1.00
15 T(-2
20) 0.60
445 G+LR 3 D 1.00
4 F 1.00
5 M 1.00
6 LR 1.00
446 G+W(+X
X)+0.7LR+CR+0.6T(+20) 3 D 1.00
4 F 1.00
5 M 1.00
7 WINND(+X) 1.00

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 47 / 13
39
ERC AKH R
Railway Project
P
6 LR 0.70
11 CR 1.00
14 T(+20) 0.60
447 G+W(+X
X)+0.7LR+CR+0.6T(-20) 3 D 1.00
4 F 1.00
5 M 1.00
7 WINND(+X) 1.00
6 LR 0.70
11 CR 1.00
15 T(-2
20) 0.60
448 G+W(+X
X)+0.7LR+CL+0..6T(+20) 3 D 1.00
4 F 1.00
5 M 1.00
7 WINND(+X) 1.00
6 LR 0.70
12 CL 1.00
14 T(+20) 0.60
449 G+W(+X
X)+0.7LR+CL+0..6T(-20) 3 D 1.00
4 F 1.00
5 M 1.00
7 WINND(+X) 1.00
6 LR 0.70
12 CL 1.00
15 T(-2
20) 0.60
450 G+W(-X))+0.7LR+CR+0.6T(+20) 3 D 1.00
4 F 1.00
5 M 1.00
8 WINND(-X) 1.00
6 LR 0.70
11 CR 1.00
14 T(+20) 0.60
451 G+W(-X))+0.7LR+CR+0.6T(-20) 3 D 1.00
4 F 1.00
5 M 1.00
8 WINND(-X) 1.00
6 LR 0.70
11 CR 1.00
15 T(-2
20) 0.60
452 G+W(-X))+0.7LR+CL+0.6
6T(+20) 3 D 1.00
4 F 1.00
5 M 1.00
8 WINND(-X) 1.00
6 LR 0.70
12 CL 1.00
14 T(+20) 0.60
453 G+W(-X))+0.7LR+CL+0.6
6T(-20) 3 D 1.00
4 F 1.00
5 M 1.00
8 WINND(-X) 1.00
6 LR 0.70
12 CL 1.00
15 T(-2
20) 0.60
454 G+W(+Z)+0.7LR+CR+0.6T(+20) 3 D 1.00
4 F 1.00
5 M 1.00
9 WINND(+Z) 1.00
6 LR 0.70
11 CR 1.00
14 T(+20) 0.60
455 G+W(+Z)+0.7LR+CR+0.6T(-20) 3 D 1.00
4 F 1.00
5 M 1.00
9 WINND(+Z) 1.00
6 LR 0.70
11 CR 1.00
15 T(-2
20) 0.60
456 G+W(+Z)+0.7LR+CL+0..6T(+20) 3 D 1.00
4 F 1.00
5 M 1.00

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 48 / 13
39
ERC AKH R
Railway Project
P
9 WINND(+Z) 1.00
6 LR 0.70
12 CL 1.00
14 T(+20) 0.60
457 G+W(+Z)+0.7LR+CL+0..6T(-20) 3 D 1.00
4 F 1.00
5 M 1.00
9 WINND(+Z) 1.00
6 LR 0.70
12 CL 1.00
15 T(-2
20) 0.60
458 G+W(-Z))+0.7LR+CR+0.6T(+20) 3 D 1.00
4 F 1.00
5 M 1.00
10 WINND(-Z) 1.00
6 LR 0.70
11 CR 1.00
14 T(+20) 0.60
459 G+W(-Z))+0.7LR+CR+0.6T(-20) 3 D 1.00
4 F 1.00
5 M 1.00
10 WINND(-Z) 1.00
6 LR 0.70
11 CR 1.00
15 T(-2
20) 0.60
460 G+W(-Z))+0.7LR+CL+0.6
6T(+20) 3 D 1.00
4 F 1.00
5 M 1.00
10 WINND(-Z) 1.00
6 LR 0.70
12 CL 1.00
14 T(+20) 0.60
461 G+W(-Z))+0.7LR+CL+0.6
6T(-20) 3 D 1.00
4 F 1.00
5 M 1.00
10 WINND(-Z) 1.00
6 LR 0.70
12 CL 1.00
15 T(-2
20) 0.60
462 G+W(+X
X)+0.7LR+CR 3 D 1.00
4 F 1.00
5 M 1.00
7 WINND(+X) 1.00
6 LR 0.70
11 CR 1.00
463 G+W(+X
X)+0.7LR+CL 3 D 1.00
4 F 1.00
5 M 1.00
7 WINND(+X) 1.00
6 LR 0.70
12 CL 1.00
464 G+W(-X))+0.7LR+CR 3 D 1.00
4 F 1.00
5 M 1.00
8 WINND(-X) 1.00
6 LR 0.70
11 CR 1.00
465 G+W(-X))+0.7LR+CL 3 D 1.00
4 F 1.00
5 M 1.00
8 WINND(-X) 1.00
6 LR 0.70
12 CL 1.00
466 G+W(+Z)+0.7LR+CR 3 D 1.00
4 F 1.00
5 M 1.00
9 WINND(+Z) 1.00
6 LR 0.70
11 CR 1.00

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 49 / 13
39
ERC AKH R
Railway Project
P
467 G+W(+Z)+0.7LR+CL 3 D 1.00
4 F 1.00
5 M 1.00
9 WINND(+Z) 1.00
6 LR 0.70
12 CL 1.00
468 G+W(-Z))+0.7LR+CR 3 D 1.00
4 F 1.00
5 M 1.00
10 WINND(-Z) 1.00
6 LR 0.70
11 CR 1.00
469 G+W(-Z))+0.7LR+CL 3 D 1.00
4 F 1.00
5 M 1.00
10 WINND(-Z) 1.00
6 LR 0.70
12 CL 1.00
470 G+W(+X
X)+0.7LR+0.6T(+
+20) 3 D 1.00
4 F 1.00
5 M 1.00
7 WINND(+X) 1.00
6 LR 0.70
14 T(+20) 0.60
471 G+W(+X
X)+0.7LR+0.6T(--20) 3 D 1.00
4 F 1.00
5 M 1.00
7 WINND(+X) 1.00
6 LR 0.70
15 T(-2
20) 0.60
472 G+W(-X))+0.7LR+0.6T(+
+20) 3 D 1.00
4 F 1.00
5 M 1.00
8 WINND(-X) 1.00
6 LR 0.70
14 T(+20) 0.60
473 G+W(-X))+0.7LR+0.6T(-2
20) 3 D 1.00
4 F 1.00
5 M 1.00
8 WINND(-X) 1.00
6 LR 0.70
15 T(-2
20) 0.60
474 G+W(+Z)+0.7LR+0.6T(+
+20) 3 D 1.00
4 F 1.00
5 M 1.00
9 WINND(+Z) 1.00
6 LR 0.70
14 T(+20) 0.60
475 G+W(+Z)+0.7LR+0.6T(--20) 3 D 1.00
4 F 1.00
5 M 1.00
9 WINND(+Z) 1.00
6 LR 0.70
15 T(-2
20) 0.60
476 G+W(-Z))+0.7LR+0.6T(+
+20) 3 D 1.00
4 F 1.00
5 M 1.00
10 WINND(-Z) 1.00
6 LR 0.70
14 T(+20) 0.60
477 G+W(-Z))+0.7LR+0.6T(-2
20) 3 D 1.00
4 F 1.00
5 M 1.00
10 WINND(-Z) 1.00
6 LR 0.70
15 T(-2
20) 0.60
478 G+W(+X
X)+CR+0.6T(+20
0) 3 D 1.00
4 F 1.00
5 M 1.00

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 50 / 13
39
ERC AKH R
Railway Project
P
7 WINND(+X) 1.00
11 CR 1.00
14 T(+20) 0.60
479 G+W(+X
X)+CR+0.6T(-20) 3 D 1.00
4 F 1.00
5 M 1.00
7 WINND(+X) 1.00
11 CR 1.00
15 T(-2
20) 0.60
480 G+W(+X
X)+CL+0.6T(+20
0) 3 D 1.00
4 F 1.00
5 M 1.00
7 WINND(+X) 1.00
12 CL 1.00
14 T(+20) 0.60
481 G+W(+X
X)+CL+0.6T(-20)) 3 D 1.00
4 F 1.00
5 M 1.00
7 WINND(+X) 1.00
12 CL 1.00
15 T(-2
20) 0.60
482 G+W(-X))+CR+0.6T(+20) 3 D 1.00
4 F 1.00
5 M 1.00
8 WINND(-X) 1.00
11 CR 1.00
14 T(+20) 0.60
483 G+W(-X))+CR+0.6T(-20)) 3 D 1.00
4 F 1.00
5 M 1.00
8 WINND(-X) 1.00
11 CR 1.00
15 T(-2
20) 0.60
484 G+W(-X))+CL+0.6T(+20)) 3 D 1.00
4 F 1.00
5 M 1.00
8 WINND(-X) 1.00
12 CL 1.00
14 T(+20) 0.60
485 G+W(-X))+CL+0.6T(-20) 3 D 1.00
4 F 1.00
5 M 1.00
8 WINND(-X) 1.00
12 CL 1.00
15 T(-2
20) 0.60
486 G+W(+Z)+CR+0.6T(+20
0) 3 D 1.00
4 F 1.00
5 M 1.00
9 WINND(+Z) 1.00
11 CR 1.00
14 T(+20) 0.60
487 G+W(+Z)+CR+0.6T(-20) 3 D 1.00
4 F 1.00
5 M 1.00
9 WINND(+Z) 1.00
11 CR 1.00
15 T(-2
20) 0.60
488 G+W(+Z)+CL+0.6T(+20) 3 D 1.00
4 F 1.00
5 M 1.00
9 WINND(+Z) 1.00
12 CL 1.00
14 T(+20) 0.60
489 G+W(+Z)+CL+0.6T(-20)) 3 D 1.00
4 F 1.00
5 M 1.00
9 WINND(+Z) 1.00
12 CL 1.00
15 T(-2
20) 0.60

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 51 / 13
39
ERC AKH R
Railway Project
P
490 G+W(-Z))+CR+0.6T(+20) 3 D 1.00
4 F 1.00
5 M 1.00
10 WINND(-Z) 1.00
11 CR 1.00
14 T(+20) 0.60
491 G+W(-Z))+CR+0.6T(-20) 3 D 1.00
4 F 1.00
5 M 1.00
10 WINND(-Z) 1.00
11 CR 1.00
15 T(-2
20) 0.60
492 G+W(-Z))+CL+0.6T(+20)) 3 D 1.00
4 F 1.00
5 M 1.00
10 WINND(-Z) 1.00
12 CL 1.00
14 T(+20) 0.60
493 G+W(-Z))+CL+0.6T(-20) 3 D 1.00
4 F 1.00
5 M 1.00
10 WINND(-Z) 1.00
12 CL 1.00
15 T(-2
20) 0.60
494 G+W(+X
X)+0.7LR 3 D 1.00
4 F 1.00
5 M 1.00
7 WINND(+X) 1.00
6 LR 0.70
495 G+W(-X))+0.7LR 3 D 1.00
4 F 1.00
5 M 1.00
8 WINND(-X) 1.00
6 LR 0.70
496 G+W(+Z)+0.7LR 3 D 1.00
4 F 1.00
5 M 1.00
9 WINND(+Z) 1.00
6 LR 0.70
497 G+W(-Z))+0.7LR 3 D 1.00
4 F 1.00
5 M 1.00
10 WINND(-Z) 1.00
6 LR 0.70
498 G+W(+X
X)+CR 3 D 1.00
4 F 1.00
5 M 1.00
7 WINND(+X) 1.00
11 CR 1.00
499 G+W(+X
X)+CL 3 D 1.00
4 F 1.00
5 M 1.00
7 WINND(+X) 1.00
12 CL 1.00
500 G+W(-X))+CR 3 D 1.00
4 F 1.00
5 M 1.00
8 WINND(-X) 1.00
11 CR 1.00
501 G+W(-X))+CL 3 D 1.00
4 F 1.00
5 M 1.00
8 WINND(-X) 1.00
12 CL 1.00
502 G+W(+Z)+CR 3 D 1.00
4 F 1.00
5 M 1.00
9 WINND(+Z) 1.00
11 CR 1.00

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 52 / 13
39
ERC AKH R
Railway Project
P
503 G+W(+Z)+CL 3 D 1.00
4 F 1.00
5 M 1.00
9 WINND(+Z) 1.00
12 CL 1.00
504 G+W(-Z))+CR 3 D 1.00
4 F 1.00
5 M 1.00
10 WINND(-Z) 1.00
11 CR 1.00
505 G+W(-Z))+CL 3 D 1.00
4 F 1.00
5 M 1.00
10 WINND(-Z) 1.00
12 CL 1.00
506 G+W(+X
X)+0.6T(+20) 3 D 1.00
4 F 1.00
5 M 1.00
7 WINND(+X) 1.00
14 T(+20) 0.60
507 G+W(+X
X)+0.6T(-20) 3 D 1.00
4 F 1.00
5 M 1.00
7 WINND(+X) 1.00
15 T(-2
20) 0.60
508 G+W(-X))+0.6T(+20) 3 D 1.00
4 F 1.00
5 M 1.00
8 WINND(-X) 1.00
14 T(+20) 0.60
509 G+W(-X))+0.6T(-20) 3 D 1.00
4 F 1.00
5 M 1.00
8 WINND(-X) 1.00
15 T(-2
20) 0.60
510 G+W(+Z)+0.6T(+20) 3 D 1.00
4 F 1.00
5 M 1.00
9 WINND(+Z) 1.00
14 T(+20) 0.60
511 G+W(+Z)+0.6T(-20) 3 D 1.00
4 F 1.00
5 M 1.00
9 WINND(+Z) 1.00
15 T(-2
20) 0.60
512 G+W(-Z))+0.6T(+20) 3 D 1.00
4 F 1.00
5 M 1.00
10 WINND(-Z) 1.00
14 T(+20) 0.60
513 G+W(-Z))+0.6T(-20) 3 D 1.00
4 F 1.00
5 M 1.00
10 WINND(-Z) 1.00
15 T(-2
20) 0.60
514 G+W(+X
X) 3 D 1.00
4 F 1.00
5 M 1.00
7 WINND(+X) 1.00
515 G+W(-X)) 3 D 1.00
4 F 1.00
5 M 1.00
8 WINND(-X) 1.00
516 G+W(+Z) 3 D 1.00
4 F 1.00
5 M 1.00
9 WINND(+Z) 1.00
517 G+W(-Z)) 3 D 1.00
4 F 1.00

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 53 / 13
39
ERC AKH R
Railway Project
P
5 M 1.00
10 WINND(-Z) 1.00
518 G+CR+0
0.7LR+0.5W(+X)+0.6T(+20) 3 D 1.00
4 F 1.00
5 M 1.00
11 CR 1.00
6 LR 0.70
7 WINND(+X) 0.50
14 T(+20) 0.60
519 G+CR+0
0.7LR+0.5W(+X)+0.6T(-20) 3 D 1.00
4 F 1.00
5 M 1.00
11 CR 1.00
6 LR 0.70
7 WINND(+X) 0.50
15 T(-2
20) 0.60
520 G+CL+0.7LR+0.5W(+X))+0.6T(+20) 3 D 1.00
4 F 1.00
5 M 1.00
12 CL 1.00
6 LR 0.70
7 WINND(+X) 0.50
14 T(+20) 0.60
521 G+CL+0.7LR+0.5W(+X))+0.6T(-20) 3 D 1.00
4 F 1.00
5 M 1.00
12 CL 1.00
6 LR 0.70
7 WINND(+X) 0.50
15 T(-2
20) 0.60
522 G+CR+0
0.7LR+0.5W(-X)+0.6T(+20) 3 D 1.00
4 F 1.00
5 M 1.00
11 CR 1.00
6 LR 0.70
8 WINND(-X) 0.50
14 T(+20) 0.60
523 G+CR+0
0.7LR+0.5W(-X)+0.6T(-20) 3 D 1.00
4 F 1.00
5 M 1.00
11 CR 1.00
6 LR 0.70
8 WINND(-X) 0.50
15 T(-2
20) 0.60
524 G+CL+0.7LR+0.5W(-X)+
+0.6T(+20) 3 D 1.00
4 F 1.00
5 M 1.00
12 CL 1.00
6 LR 0.70
8 WINND(-X) 0.50
14 T(+20) 0.60
525 G+CL+0.7LR+0.5W(-X)+
+0.6T(-20) 3 D 1.00
4 F 1.00
5 M 1.00
12 CL 1.00
6 LR 0.70
8 WINND(-X) 0.50
15 T(-2
20) 0.60
526 G+CR+0
0.7LR+0.5W(+Z))+0.6T(+20) 3 D 1.00
4 F 1.00
5 M 1.00
11 CR 1.00
6 LR 0.70
9 WINND(+Z) 0.50
14 T(+20) 0.60
527 G+CR+0
0.7LR+0.5W(+Z))+0.6T(-20) 3 D 1.00
4 F 1.00
5 M 1.00
11 CR 1.00

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 54 / 13
39
ERC AKH R
Railway Project
P
6 LR 0.70
9 WINND(+Z) 0.50
15 T(-2
20) 0.60
528 G+CL+0.7LR+0.5W(+Z))+0.6T(+20) 3 D 1.00
4 F 1.00
5 M 1.00
12 CL 1.00
6 LR 0.70
9 WINND(+Z) 0.50
14 T(+20) 0.60
529 G+CL+0.7LR+0.5W(+Z))+0.6T(-20) 3 D 1.00
4 F 1.00
5 M 1.00
12 CL 1.00
6 LR 0.70
9 WINND(+Z) 0.50
15 T(-2
20) 0.60
530 G+CR+0
0.7LR+0.5W(-Z)+0.6T(+20) 3 D 1.00
4 F 1.00
5 M 1.00
11 CR 1.00
6 LR 0.70
10 WINND(-Z) 0.50
14 T(+20) 0.60
531 G+CR+0
0.7LR+0.5W(-Z)+0.6T(-20) 3 D 1.00
4 F 1.00
5 M 1.00
11 CR 1.00
6 LR 0.70
10 WINND(-Z) 0.50
15 T(-2
20) 0.60
532 G+CL+0.7LR+0.5W(-Z)+
+0.6T(+20) 3 D 1.00
4 F 1.00
5 M 1.00
12 CL 1.00
6 LR 0.70
10 WINND(-Z) 0.50
14 T(+20) 0.60
533 G+CL+0.7LR+0.5W(-Z)+
+0.6T(-20) 3 D 1.00
4 F 1.00
5 M 1.00
12 CL 1.00
6 LR 0.70
10 WINND(-Z) 0.50
15 T(-2
20) 0.60
534 G+CR+0
0.7LR+0.5W(+X) 3 D 1.00
4 F 1.00
5 M 1.00
11 CR 1.00
6 LR 0.70
7 WINND(+X) 0.50
535 G+CL+0.7LR+0.5W(+X)) 3 D 1.00
4 F 1.00
5 M 1.00
12 CL 1.00
6 LR 0.70
7 WINND(+X) 0.50
536 G+CR+0
0.7LR+0.5W(-X) 3 D 1.00
4 F 1.00
5 M 1.00
11 CR 1.00
6 LR 0.70
8 WINND(-X) 0.50
537 G+CL+0.7LR+0.5W(-X) 3 D 1.00
4 F 1.00
5 M 1.00
12 CL 1.00
6 LR 0.70
8 WINND(-X) 0.50

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 55 / 13
39
ERC AKH R
Railway Project
P
538 G+CR+0
0.7LR+0.5W(+Z)) 3 D 1.00
4 F 1.00
5 M 1.00
11 CR 1.00
6 LR 0.70
9 WINND(+Z) 0.50
539 G+CL+0.7LR+0.5W(+Z)) 3 D 1.00
4 F 1.00
5 M 1.00
12 CL 1.00
6 LR 0.70
9 WINND(+Z) 0.50
540 G+CR+0
0.7LR+0.5W(-Z) 3 D 1.00
4 F 1.00
5 M 1.00
11 CR 1.00
6 LR 0.70
10 WINND(-Z) 0.50
541 G+CL+0.7LR+0.5W(-Z) 3 D 1.00
4 F 1.00
5 M 1.00
12 CL 1.00
6 LR 0.70
10 WINND(-Z) 0.50
542 G+CR+0
0.7LR+0.6T(+20
0) 3 D 1.00
4 F 1.00
5 M 1.00
11 CR 1.00
6 LR 0.70
14 T(+20) 0.60
543 G+CR+0
0.7LR+0.6T(-20)) 3 D 1.00
4 F 1.00
5 M 1.00
11 CR 1.00
6 LR 0.70
15 T(-2
20) 0.60
544 G+CL+0.7LR+0.6T(+20)) 3 D 1.00
4 F 1.00
5 M 1.00
12 CL 1.00
6 LR 0.70
14 T(+20) 0.60
545 G+CL+0.7LR+0.6T(-20) 3 D 1.00
4 F 1.00
5 M 1.00
12 CL 1.00
6 LR 0.70
15 T(-2
20) 0.60
546 G+CR+0
0.5W(+X)+0.6T(+20) 3 D 1.00
4 F 1.00
5 M 1.00
11 CR 1.00
7 WINND(+X) 0.50
14 T(+20) 0.60
547 G+CR+0
0.5W(+X)+0.6T(-20) 3 D 1.00
4 F 1.00
5 M 1.00
11 CR 1.00
7 WINND(+X) 0.50
15 T(-2
20) 0.60
548 G+CL+0.5W(+X)+0.6T(+
+20) 3 D 1.00
4 F 1.00
5 M 1.00
12 CL 1.00
7 WINND(+X) 0.50
14 T(+20) 0.60
549 G+CL+0.5W(+X)+0.6T(--20) 3 D 1.00
4 F 1.00
5 M 1.00

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 56 / 13
39
ERC AKH R
Railway Project
P
12 CL 1.00
7 WINND(+X) 0.50
15 T(-2
20) 0.60
550 G+CR+0
0.5W(-X)+0.6T(+
+20) 3 D 1.00
4 F 1.00
5 M 1.00
11 CR 1.00
8 WINND(-X) 0.50
14 T(+20) 0.60
551 G+CR+0
0.5W(-X)+0.6T(-20) 3 D 1.00
4 F 1.00
5 M 1.00
11 CR 1.00
8 WINND(-X) 0.50
15 T(-2
20) 0.60
552 G+CL+0.5W(-X)+0.6T(+
+20) 3 D 1.00
4 F 1.00
5 M 1.00
12 CL 1.00
8 WINND(-X) 0.50
14 T(+20) 0.60
553 G+CL+0.5W(-X)+0.6T(-2
20) 3 D 1.00
4 F 1.00
5 M 1.00
12 CL 1.00
8 WINND(-X) 0.50
15 T(-2
20) 0.60
554 G+CR+0
0.5W(+Z)+0.6T(+
+20) 3 D 1.00
4 F 1.00
5 M 1.00
11 CR 1.00
9 WINND(+Z) 0.50
14 T(+20) 0.60
555 G+CR+0
0.5W(+Z)+0.6T(--20) 3 D 1.00
4 F 1.00
5 M 1.00
11 CR 1.00
9 WINND(+Z) 0.50
15 T(-2
20) 0.60
556 G+CL+0.5W(+Z)+0.6T(+
+20) 3 D 1.00
4 F 1.00
5 M 1.00
12 CL 1.00
9 WINND(+Z) 0.50
14 T(+20) 0.60
557 G+CL+0.5W(+Z)+0.6T(--20) 3 D 1.00
4 F 1.00
5 M 1.00
12 CL 1.00
9 WINND(+Z) 0.50
15 T(-2
20) 0.60
558 G+CR+0
0.5W(-Z)+0.6T(+
+20) 3 D 1.00
4 F 1.00
5 M 1.00
11 CR 1.00
10 WINND(-Z) 0.50
14 T(+20) 0.60
559 G+CR+0
0.5W(-Z)+0.6T(-20) 3 D 1.00
4 F 1.00
5 M 1.00
11 CR 1.00
10 WINND(-Z) 0.50
15 T(-2
20) 0.60
560 G+CL+0.5W(-Z)+0.6T(+
+20) 3 D 1.00
4 F 1.00
5 M 1.00
12 CL 1.00
10 WINND(-Z) 0.50
14 T(+20) 0.60

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 57 / 13
39
ERC AKH R
Railway Project
P
561 G+CL+0.5W(-Z)+0.6T(-2
20) 3 D 1.00
4 F 1.00
5 M 1.00
12 CL 1.00
10 WINND(-Z) 0.50
15 T(-2
20) 0.60
562 G+CR+0
0.7LR 3 D 1.00
4 F 1.00
5 M 1.00
11 CR 1.00
6 LR 0.70
563 G+CL+0.7LR 3 D 1.00
4 F 1.00
5 M 1.00
12 CL 1.00
6 LR 0.70
564 G+CR+0
0.5W(+X) 3 D 1.00
4 F 1.00
5 M 1.00
11 CR 1.00
7 WINND(+X) 0.50
565 G+CL+0.5W(+X) 3 D 1.00
4 F 1.00
5 M 1.00
12 CL 1.00
7 WINND(+X) 0.50
566 G+CR+0
0.5W(-X) 3 D 1.00
4 F 1.00
5 M 1.00
11 CR 1.00
8 WINND(-X) 0.50
567 G+CL+0.5W(-X) 3 D 1.00
4 F 1.00
5 M 1.00
12 CL 1.00
8 WINND(-X) 0.50
568 G+CR+0
0.5W(+Z) 3 D 1.00
4 F 1.00
5 M 1.00
11 CR 1.00
9 WINND(+Z) 0.50
569 G+CL+0.5W(+Z) 3 D 1.00
4 F 1.00
5 M 1.00
12 CL 1.00
9 WINND(+Z) 0.50
570 G+CR+0
0.5W(-Z) 3 D 1.00
4 F 1.00
5 M 1.00
11 CR 1.00
10 WINND(-Z) 0.50
571 G+CL+0.5W(-Z) 3 D 1.00
4 F 1.00
5 M 1.00
12 CL 1.00
10 WINND(-Z) 0.50
572 G+CR+0
0.6T(+20) 3 D 1.00
4 F 1.00
5 M 1.00
11 CR 1.00
14 T(+20) 0.60
573 G+CR+0
0.6T(-20) 3 D 1.00
4 F 1.00
5 M 1.00
11 CR 1.00
15 T(-2
20) 0.60
574 G+CL+0.6T(+20) 3 D 1.00
4 F 1.00
5 M 1.00

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 58 / 13
39
ERC AKH R
Railway Project
P
12 CL 1.00
14 T(+20) 0.60
575 G+CL+0.6T(-20) 3 D 1.00
4 F 1.00
5 M 1.00
12 CL 1.00
15 T(-2
20) 0.60
576 G+CR 3 D 1.00
4 F 1.00
5 M 1.00
11 CR 1.00
577 G+CL 3 D 1.00
4 F 1.00
5 M 1.00
12 CL 1.00
578 G+T(+20
0)+0.7LR+0.5W((+X)+CR 3 D 1.00
4 F 1.00
5 M 1.00
14 T(+20) 1.00
6 LR 0.70
7 WINND(+X) 0.50
11 CR 1.00
579 G+T(-20))+0.7LR+0.5W(+X)+CR 3 D 1.00
4 F 1.00
5 M 1.00
15 T(-2
20) 1.00
6 LR 0.70
7 WINND(+X) 0.50
11 CR 1.00
580 G+T(+20
0)+0.7LR+0.5W((+X)+CL 3 D 1.00
4 F 1.00
5 M 1.00
14 T(+20) 1.00
6 LR 0.70
7 WINND(+X) 0.50
12 CL 1.00
581 G+T(-20))+0.7LR+0.5W(+X)+CL 3 D 1.00
4 F 1.00
5 M 1.00
15 T(-2
20) 1.00
6 LR 0.70
7 WINND(+X) 0.50
12 CL 1.00
582 G+T(+20
0)+0.7LR+0.5W((-X)+CR 3 D 1.00
4 F 1.00
5 M 1.00
14 T(+20) 1.00
6 LR 0.70
8 WINND(-X) 0.50
11 CR 1.00
583 G+T(-20))+0.7LR+0.5W(-X)+CR 3 D 1.00
4 F 1.00
5 M 1.00
15 T(-2
20) 1.00
6 LR 0.70
8 WINND(-X) 0.50
11 CR 1.00
584 G+T(+20
0)+0.7LR+0.5W((-X)+CL 3 D 1.00
4 F 1.00
5 M 1.00
14 T(+20) 1.00
6 LR 0.70
8 WINND(-X) 0.50
12 CL 1.00
585 G+T(-20))+0.7LR+0.5W(-X)+CL 3 D 1.00
4 F 1.00
5 M 1.00
15 T(-2
20) 1.00
6 LR 0.70

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 59 / 13
39
ERC AKH R
Railway Project
P
8 WINND(-X) 0.50
12 CL 1.00
586 G+T(+20
0)+0.7LR+0.5W((+Z)+CR 3 D 1.00
4 F 1.00
5 M 1.00
14 T(+20) 1.00
6 LR 0.70
9 WINND(+Z) 0.50
11 CR 1.00
587 G+T(-20))+0.7LR+0.5W(+Z)+CR 3 D 1.00
4 F 1.00
5 M 1.00
15 T(-2
20) 1.00
6 LR 0.70
9 WINND(+Z) 0.50
11 CR 1.00
588 G+T(+20
0)+0.7LR+0.5W((+Z)+CL 3 D 1.00
4 F 1.00
5 M 1.00
14 T(+20) 1.00
6 LR 0.70
9 WINND(+Z) 0.50
12 CL 1.00
589 G+T(-20))+0.7LR+0.5W(+Z)+CL 3 D 1.00
4 F 1.00
5 M 1.00
15 T(-2
20) 1.00
6 LR 0.70
9 WINND(+Z) 0.50
12 CL 1.00
590 G+T(+20
0)+0.7LR+0.5W((-Z)+CR 3 D 1.00
4 F 1.00
5 M 1.00
14 T(+20) 1.00
6 LR 0.70
10 WINND(-Z) 0.50
11 CR 1.00
591 G+T(-20))+0.7LR+0.5W(-Z)+CR 3 D 1.00
4 F 1.00
5 M 1.00
15 T(-2
20) 1.00
6 LR 0.70
10 WINND(-Z) 0.50
11 CR 1.00
592 G+T(+20
0)+0.7LR+0.5W((-Z)+CL 3 D 1.00
4 F 1.00
5 M 1.00
14 T(+20) 1.00
6 LR 0.70
10 WINND(-Z) 0.50
12 CL 1.00
593 G+T(-20))+0.7LR+0.5W(-Z)+CL 3 D 1.00
4 F 1.00
5 M 1.00
15 T(-2
20) 1.00
6 LR 0.70
10 WINND(-Z) 0.50
12 CL 1.00
594 G+T(+20
0)+0.7LR+0.5W((+X) 3 D 1.00
4 F 1.00
5 M 1.00
14 T(+20) 1.00
6 LR 0.70
7 WINND(+X) 0.50
595 G+T(-20))+0.7LR+0.5W(+X) 3 D 1.00
4 F 1.00
5 M 1.00
15 T(-2
20) 1.00
6 LR 0.70

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 60 / 13
39
ERC AKH R
Railway Project
P
7 WINND(+X) 0.50
596 G+T(+20
0)+0.7LR+0.5W((-X) 3 D 1.00
4 F 1.00
5 M 1.00
14 T(+20) 1.00
6 LR 0.70
8 WINND(-X) 0.50
597 G+T(-20))+0.7LR+0.5W(-X) 3 D 1.00
4 F 1.00
5 M 1.00
15 T(-2
20) 1.00
6 LR 0.70
8 WINND(-X) 0.50
598 G+T(+20
0)+0.7LR+0.5W((+Z) 3 D 1.00
4 F 1.00
5 M 1.00
14 T(+20) 1.00
6 LR 0.70
9 WINND(+Z) 0.50
599 G+T(-20))+0.7LR+0.5W(+Z) 3 D 1.00
4 F 1.00
5 M 1.00
15 T(-2
20) 1.00
6 LR 0.70
9 WINND(+Z) 0.50
600 G+T(+20
0)+0.7LR+0.5W((-Z) 3 D 1.00
4 F 1.00
5 M 1.00
14 T(+20) 1.00
6 LR 0.70
10 WINND(-Z) 0.50
601 G+T(-20))+0.7LR+0.5W(-Z) 3 D 1.00
4 F 1.00
5 M 1.00
15 T(-2
20) 1.00
6 LR 0.70
10 WINND(-Z) 0.50
602 G+T(+20
0)+0.7LR+CR 3 D 1.00
4 F 1.00
5 M 1.00
14 T(+20) 1.00
6 LR 0.70
11 CR 1.00
603 G+T(-20))+0.7LR+CR 3 D 1.00
4 F 1.00
5 M 1.00
15 T(-2
20) 1.00
6 LR 0.70
11 CR 1.00
604 G+T(+20
0)+0.7LR+CL 3 D 1.00
4 F 1.00
5 M 1.00
14 T(+20) 1.00
6 LR 0.70
12 CL 1.00
605 G+T(-20))+0.7LR+CL 3 D 1.00
4 F 1.00
5 M 1.00
15 T(-2
20) 1.00
6 LR 0.70
12 CL 1.00
606 G+T(+20
0)+0.5W(+X)+CR
R 3 D 1.00
4 F 1.00
5 M 1.00
14 T(+20) 1.00
7 WINND(+X) 0.50
11 CR 1.00
607 G+T(-20))+0.5W(+X)+CR
R 3 D 1.00
4 F 1.00

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 61 / 13
39
ERC AKH R
Railway Project
P
5 M 1.00
15 T(-2
20) 1.00
7 WINND(+X) 0.50
11 CR 1.00
608 G+T(+20
0)+0.5W(+X)+CL
L 3 D 1.00
4 F 1.00
5 M 1.00
14 T(+20) 1.00
7 WINND(+X) 0.50
12 CL 1.00
609 G+T(-20))+0.5W(+X)+CL
L 3 D 1.00
4 F 1.00
5 M 1.00
15 T(-2
20) 1.00
7 WINND(+X) 0.50
12 CL 1.00
610 G+T(+20
0)+0.5W(-X)+CR
R 3 D 1.00
4 F 1.00
5 M 1.00
14 T(+20) 1.00
8 WINND(-X) 0.50
11 CR 1.00
611 G+T(-20))+0.5W(-X)+CR
R 3 D 1.00
4 F 1.00
5 M 1.00
15 T(-2
20) 1.00
8 WINND(-X) 0.50
11 CR 1.00
612 G+T(+20
0)+0.5W(-X)+CL
L 3 D 1.00
4 F 1.00
5 M 1.00
14 T(+20) 1.00
8 WINND(-X) 0.50
12 CL 1.00
613 G+T(-20))+0.5W(-X)+CL 3 D 1.00
4 F 1.00
5 M 1.00
15 T(-2
20) 1.00
8 WINND(-X) 0.50
12 CL 1.00
614 G+T(+20
0)+0.5W(+Z)+CR
R 3 D 1.00
4 F 1.00
5 M 1.00
14 T(+20) 1.00
9 WINND(+Z) 0.50
11 CR 1.00
615 G+T(-20))+0.5W(+Z)+CR
R 3 D 1.00
4 F 1.00
5 M 1.00
15 T(-2
20) 1.00
9 WINND(+Z) 0.50
11 CR 1.00
616 G+T(+20
0)+0.5W(+Z)+CL
L 3 D 1.00
4 F 1.00
5 M 1.00
14 T(+20) 1.00
9 WINND(+Z) 0.50
12 CL 1.00
617 G+T(-20))+0.5W(+Z)+CL
L 3 D 1.00
4 F 1.00
5 M 1.00
15 T(-2
20) 1.00
9 WINND(+Z) 0.50
12 CL 1.00
618 G+T(+20
0)+0.5W(-Z)+CR
R 3 D 1.00
4 F 1.00
5 M 1.00
14 T(+20) 1.00
10 WINND(-Z) 0.50

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 62 / 13
39
ERC AKH R
Railway Project
P
11 CR 1.00
619 G+T(-20))+0.5W(-Z)+CR
R 3 D 1.00
4 F 1.00
5 M 1.00
15 T(-2
20) 1.00
10 WINND(-Z) 0.50
11 CR 1.00
620 G+T(+20
0)+0.5W(-Z)+CL
L 3 D 1.00
4 F 1.00
5 M 1.00
14 T(+20) 1.00
10 WINND(-Z) 0.50
12 CL 1.00
621 G+T(-20))+0.5W(-Z)+CL 3 D 1.00
4 F 1.00
5 M 1.00
15 T(-2
20) 1.00
10 WINND(-Z) 0.50
12 CL 1.00
622 G+T(+20
0)+0.7LR 3 D 1.00
4 F 1.00
5 M 1.00
14 T(+20) 1.00
6 LR 0.70
623 G+T(-20))+0.7LR 3 D 1.00
4 F 1.00
5 M 1.00
15 T(-2
20) 1.00
6 LR 0.70
624 G+T(+20
0)+0.5W(+X) 3 D 1.00
4 F 1.00
5 M 1.00
14 T(+20) 1.00
7 WINND(+X) 0.50
625 G+T(-20))+0.5W(+X) 3 D 1.00
4 F 1.00
5 M 1.00
15 T(-2
20) 1.00
7 WINND(+X) 0.50
626 G+T(+20
0)+0.5W(-X) 3 D 1.00
4 F 1.00
5 M 1.00
14 T(+20) 1.00
8 WINND(-X) 0.50
627 G+T(-20))+0.5W(-X) 3 D 1.00
4 F 1.00
5 M 1.00
15 T(-2
20) 1.00
8 WINND(-X) 0.50
628 G+T(+20
0)+0.5W(+Z) 3 D 1.00
4 F 1.00
5 M 1.00
14 T(+20) 1.00
9 WINND(+Z) 0.50
629 G+T(-20))+0.5W(+Z) 3 D 1.00
4 F 1.00
5 M 1.00
15 T(-2
20) 1.00
9 WINND(+Z) 0.50
630 G+T(+20
0)+0.5W(-Z) 3 D 1.00
4 F 1.00
5 M 1.00
14 T(+20) 1.00
10 WINND(-Z) 0.50
631 G+T(-20))+0.5W(-Z) 3 D 1.00
4 F 1.00
5 M 1.00
15 T(-2
20) 1.00
10 WINND(-Z) 0.50

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 63 / 13
39
ERC AKH R
Railway Project
P
632 G+T(+20
0)+CR 3 D 1.00
4 F 1.00
5 M 1.00
14 T(+20) 1.00
11 CR 1.00
633 G+T(-20))+CR 3 D 1.00
4 F 1.00
5 M 1.00
15 T(-2
20) 1.00
11 CR 1.00
634 G+T(+20
0)+CL 3 D 1.00
4 F 1.00
5 M 1.00
14 T(+20) 1.00
12 CL 1.00
635 G+T(-20))+CL 3 D 1.00
4 F 1.00
5 M 1.00
15 T(-2
20) 1.00
12 CL 1.00
636 G+T(+20
0) 3 D 1.00
4 F 1.00
5 M 1.00
14 T(+20) 1.00
637 G+T(-20)) 3 D 1.00
4 F 1.00
5 M 1.00
15 T(-2
20) 1.00

Joint re
eactions of the combinattions of the u
upper steel structure
s hav
ve been loadded to the foundation mo
odel
directly and
d summed byy D and S lo
oads. D load represents the self-weig
ght of the fo undations ellements; S lo
oad
represents tthe filling ove
er foundation
n which has d
defined in the Gravity Ind
duced Load D
Definitions.

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 64 / 13
39
ERC AKH R
Railway Project
P

3 MEMB
BER DESIG
GN

3.1 Fram
me Membe
er Design
Design
n results are presented by
y the followin
ng figures. Detailed
D results can be seeen in the Ap
ppendix C.

0.13 0.1446 0.1009 0.19 0.179 0.155 0.161 0.122


0.654 0.209 0.213 0.588 0.371 0.6044 0.286 0.286 0.604
0.438 0.196 0.196 0.622 0.792 0.196 0.197 0.792 0.411
0.863 0.151 0.151 0.774 0.497 0.8077 0.22 0.22 0.807
0.131 0.1 0.06638 0.126 0.206 0.103 0.188 0.114
0.863 0.0519 0.06750.774 0.497 0.8077 0.111 0.116 0.807
0.438 0.196 0.196 0.622 0.792 0.196 0.197 0.792 0.411
0.643 0.108 0.103 0.577 0.371 0.6044 0.183 0.176 0.604
0.139 0.1225 0.07758 0.144 0.153 0.127 0.13 0.113

Figure 18
8. Code
e Checking(S
Stress Ratio) – Roof Plann

0.438

0.438
0.134

0
0.0984

0.376 0
0.39

Figure 19. Co
ode Checking
g(Stress Ratio) – Axis 1

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 65 / 13
39
ERC AKH R
Railway Project
P

0.643
0
0.863
0.863
0.654
0.209

0.162

0.48 0.449

Figure 20. Co
ode Checking
g(Stress Ratio) – Axis 2

0.577
0.7774
0.774
0.588
0.185

0.147

0.463 0.439

Figure 21. Co g(Stress Ratio) – Axis 3


ode Checking

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 66 / 13
39
ERC AKH R
Railway Project
P

0.622

0.622
0.117

0.0748

0.373 0.389

Figure 22.
2 Cod
de Checking
g(Stress Ratio) – Axis 4a

0.371
0.4497
0.497
0.371
0.145

0.0956

0.25 0.189

0.433 0.405

Figure 23. Co
ode Checking
g(Stress Ratio) – Axis 4

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 67 / 13
39
ERC AKH R
Railway Project
P

0.792

0.792

0.239

0.188

0.488 0.453

Figure 24. Co
ode Checking
g(Stress Ratio) – Axis 5

0.604
0..807
0.807
0.604

0.253

0.204

0.525 0.502

Figure 25. Co
ode Checking
g(Stress Ratio) – Axis 6

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 68 / 13
39
ERC AKH R
Railway Project
P

0.604
0.8807
0.807
0.604

0.252

0.204

0.523 0.503

Figure 26. Co
ode Checking
g(Stress Ratio) – Axis 7

0.792

0.792

0.239

0.188

0.488 0.454

Figure 27. Co
ode Checking
g(Stress Ratio) – Axis 8

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 69 / 13
39
ERC AKH R
Railway Project
P

0.411

0.411

0.184

0.151

0.415 0.393

Figure 28. Co
ode Checking
g(Stress Ratio) – Axis 9

0.13 0.1446 0.1009 0.19 0.179 0.155 0.161 0.122


0.0984 0.162 0.147 0.07480.0956
0.188 0.2044 0.204 0.188 0.151
0.189
0.39 0.449 0.439 0.389
0.405 0.453 0.5022 0.503 0.454 0.393

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 70 / 13
39
ERC AKH R
Railway Project
P
Figure 29. Co
ode Checking
g(Stress Ratio) – Axis A

0.139 0.1225 0.07758 0.144 0.153 0.127 0.13 0.113


0.134 0.209 0.185 0.117 0.145
0.239 0.2533 0.2252 0.239 0.184
0.25
0.376 0.48 0.463 0.373
0.433 0.488 0.5255 0.5523 0.488 0.415

Figure 30. Co
ode Checking
g(Stress Ratio) – Axis B

3.2 Purllin and Girrt Design

Roof p
purlins and façade girts have been a a single span simplee supported members with
n provided as w
suspensions for weak axis at two loc
cations over the span and design results are pressented below
w.

Purlin
n Design:

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 71 / 13
39
ERC AKH R
Railway Project
P

IPE2
220

Y
X
Z
Load 1

Figure 31. Purlin – General Viiew

I
IPE220

m
8.00

Y
X
Z
Load 1

Figu
ure 32. Purlin – Sec
ction and Dim
mension

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 72 / 13
39
ERC AKH R
Railway Project
P

-1.460 kN/m
m

-0.175 kN/m
m
-1.460 kN//m

-0.175 kN
N/m
-1.460 kN
N/m

-0.175 kN
N/m

Y
X
Z
Load 3

Figure 33. Purlin – Loa


ading(M Load Case)

0.8355
IPE220
0

0.9551

0.8872

Y
X
Z

Figure 34. Purlin– S


Section and Checking Co
ode(Stress R
Ratio)

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 73 / 13
39
ERC AKH R
Railway Project
P

Beam Noo:2 LC:27 7


Dall = 80000/200=4
40 mm
Dall=40 > Dmax=3 35.170

Max: 35.170
3 mm

Y
Z X

Figure 35. P
Purlin – Verttical Deflectio
on Check

ail of purlin ta
Design deta aken from ST
TAAD.Pro arre repsented below :

ALL UNITS ARE - KN METE (UNL


LESS OTHER
RWISE NOT
TED)
MEMBER TABLE RESULT/ CRITICAL C
COND/ RA
ATIO/ LOA
ADING/
FX MY MZ LOC
CATION
=========
==========
====================
==========
==========
==========
========
2 ST
T IPE220 PASS EC-6.3.2
E LTB
B 0.9
951 17
0.00 0.07 -41.93 1
1.11
==========
========= ========== ====================
========== ==========
========
MATERIAL DATA
Grade of ste
eel = S 235
Modulus of elasticity = 205 kN/mm
m2
ength (py)
Design Stre = 235 N/mm
m2

SECTION P
PROPERTIE
ES (units - cm
m)
Member Length = 266
6.00
Gross Area = 33.40 a = 33.40
Net Area
z-axis y-axis
Moment of iinertia : 2772.000 00
205.00
Plastic mod
dulus : 285.000 58.000
0
Elastic mod
dulus : 252.000 37.273

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 74 / 13
39
ERC AKH R
Railway Project
P
Shear Area : 13.493 15.911
Radius of gyyration : 9.110 2.477
Effective Le
ength : 266.000 266.000
0

DESIGN DA
ATA (units - kN,m)
k EUR
ROCODE NO
O.3 /2005
Section Cla
ass : CLASS 1
Squash Loa
ad : 784.90
Axial force/S
/Squash load
d : 0.000
s
z-axis y-axiss
Slenderness ratio (KL/r)) : 29.2 107.4
Compressio
on Capacity : 695.7 363. 7
Tension Ca
apacity : 713.5 713.5
apacity
Moment Ca : 60.9 12.4
Reduced M
Moment Capa
acity : 60.9
6 12
2.4
Shear Capa
acity : 166.4 196.2

BUCKLING TIONS (units - kN,m)


G CALCULAT
Lateral Torssional Bucklin
ng Moment MB = 44
4.1
co-efficientss C1 & K : C1 =1.132 K =1.0,
= Effectivve Length= 2.660
2
CRITICAL L
LOADS FOR K (units- kN,m):
R EACH CLAUSE CHECK

CLAUSE RATIO LOA


AD FX VY VZ MZ MY
Y
EC-6.2.9.1 0.480 17 0.0 0.6
-0 0.0 -4
41.9 0.1
Z) 0.004
EC-6.2.6-(Z 1
11 0.0 5.4
5 0.6 -2
28.6 -0.3
EC-6.2.6-(Y
Y) 0.037 1
17 0.0 7.2
7 0.6 3
36.7 0.3
EC-6.3.2 LT
TB 0.951 17 0.0 0.5 0.1 --41.9 0.1

Girt D
Design:

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 75 / 13
39
ERC AKH R
Railway Project
P

NPU
U140

Figure 36. Girts – General Vie


ew

NPU14
40

0m
8.0

Fig
gure 37. Girts – Sec
ction and Dim
mension

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 76 / 13
39
ERC AKH R
Railway Project
P

FAAÇADE LOAD
(V
VERTICA
AL)
-0.180 kN/m

-0.781 kN/m

-0.180 kN/m
-0.7781 kN/m

-
-1.004 kN/m

-0.180 kN
N/m

-11.004 kN/m
WINDD LOAD
D
-1.172 kN
N/m
(VER
RTICAL))

Figure 38. Girts – Loading(G+


+W)

NPU
U140 0.646

0.7747

0.689

Figure 39. Girt – S


Section and Checking
C Code(Stress Raatio)

Beam No:2 LC
C:22
Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE –Dall
REP –=00001 –0
8000/200 17.05.201
0=40 mm 6
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p Page:
P
Dall=440 > Dma
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A 77 / 13
ax=37.805 539
ERC AKH R
Railway Project
P

Maxx: 37.805 mm

Figure 40. Girt – Horizontal Deflection


D Check(Plan Vieew)

ail of girt take


Design deta en from STAA
AD.Pro are rrepsented be
elow :

ALL UNITS ARE - KN METE (UNL


LESS OTHER
RWISE NOT
TED)

MEMBER TABLE RESULT/ CRITICAL C


COND/ RA
ATIO/ LOA
ADING/
FX MY MZ LO
OCATION
=========
==========
==========
==========
====================
==========
========
2 ST U140 PASS EC-6.3.2
E LTB
B 0.747 12
1
0.00 -0.07 -10.51 1.11
=========
==========
==========
==========
====================
==========
========
MATERIAL DATA
Grade of ste
eel = S 235
Modulus of elasticity = 205 kN/mm
m2
Design Stre
ength (py) = 235 N/mm
m2

SECTION P
PROPERTIE
ES (units - cm
m)
Member Length = 266
6.00
Gross Area = 20.40 Net Area
a = 20.40
z-axis y-axis
Moment of iinertia : 605.000 62.700
0
Plastic mod
dulus : 103.200 26.200
0
Elastic mod
dulus : 86.429 14.929

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 78 / 13
39
ERC AKH R
Railway Project
P
Shear Area : 8.000 9.800
Radius of gyyration : 5.446 1.753
Effective Le
ength : 266.000 266.000
0

DESIGN DA
ATA (units - kN,m)
k EUR
ROCODE NO
O.3 /2005
Section Cla
ass : CLASS 1
Squash Loa
ad : 479.40
Axial force/S
/Squash load
d : 0.000
z-axis y-axis
Slenderness ratio (KL/r)) : 48.8 151.7
Compressio
on Capacity : 362.4 121. 9
Tension Ca
apacity : 435.8 435.8
Moment Ca
apacity : 22.0 5.6
Reduced M
Moment Capa
acity : 22.0
2 5
5.6
Shear Capa
acity : 98.7 124.6

BUCKLING TIONS (units - kN,m)


G CALCULAT
Lateral Torssional Bucklin
ng Moment MB = 14
4.1
co-efficientss C1 & K : C1 =1.132 K =1.0,
= Effectivve Length= 2.660
2

CRITICAL L
LOADS FOR K (units- kN,m):
R EACH CLAUSE CHECK

CLAUSE RATIO LOAD FX VY VZ


Z MZ MY
M
EC-6.2.9.1 0.496 12
2 0.0 1.6 -0.6 -9
9.7 0.3
EC-6.2.5 0.318 3 0.0 0.0
0 0.0 -7. 0 0.0
EC-6.2.6-(Z
Z) 0.006 1
11 0.0 0.0
0 -0.6 0.0 0.3
EC-6.2.6-(Y
Y) 0.015 1
12 0.0 1.8
1 -0.6 9.1 -0.3
EC-6.3.2 LT
TB 0.747 12 0.0 0.0 -0.1 --10.5 -0.1

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 79 / 13
39
ERC AKH R
Railway Project
P
3.3 Fou
undation Design
D

3.3.1 Footing Des


sign
Capacity calculatio
ons and interrnal force dia
agrams are presented below. Designn has been conducted with
w
os without se
ULS combo eismic loads and
a with amp
plified seismic loads.

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 80 / 13
39
ERC AKH R
Railway Project
P

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 81 / 13
39
ERC AKH R
Railway Project
P

M X (lo c a l)
k N m / m
< = -2 0 4
- 1 8 0
- 1 5 6
- 1 3 2
Mx=1 121.305 kNm/m
- 1 0 8
- 8 4 .7
Platee No:667 LC: 3433
- 6 0 .9
- 3 7 .1
- 1 3 .3
1 0 .5
3 4 .3
5 8 .1
8 1 .9
1 0 6
1 3 0
1 5 3
> = 1 7 7

Y X
Z Looad 343

Figurre 41. Mx D iagram(Single Fnd, Max Top Momennt)

M X (lo c a l)
k N m / m
< = -2 0 4
- 1 8 0
- 1 5 6
- 1 3 3
Mx==-150.7966 kNm/mm
- 1 0 9
- 8 5
- 6 1 .2
Platee No:667
7 LC: 3444
- 3 7 .5
- 1 3 .7
1 0
3 3 .8
5 7 .5
8 1 .3
1 0 5
1 2 9
1 5 3
> = 1 7 6

Y X
Z Looad 344

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 82 / 13
39
ERC AKH R
Railway Project
P
Figure 42. Mx Dia
agram(Single
e Fnd, Max Bottom Momeent)

M Y (lo c a l)
k N m / m
< = -1 5 4
- 1 3 7
- 1 1 9
- 1 0 1
- 8 3 .8
- 6 6 .2
- 4 8 .6
- 3 1
- 1 3 .4
4 .2
2 1 .8
3 9 .4
5 7
7 4 .6
9 2 .2
1 1 0
> = 1 2 7

My=81.80 kNmm/m
Plate N
No:3852 LC: 345
5
Y X
Z Looad 345

Figurre 43. My D iagram(Single Fnd, Max Top Momennt)

M Y (lo c a l)
k N m / m
< = -1 5 1
- 1 3 4
- 1 1 7
- 9 9 .5
- 8 2 .3
- 6 5 .1
- 4 7 .8
- 3 0 .6
- 1 3 .4
3 .8 7
2 1 .1
3 8 .3
5 5 .6
7 2 .8
9 0
1 0 7
> = 1 2 5

My==-106.71
18 kNm/m
/m
Plate No:95
50 LC: 3343
Y X
Z Looad 343

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 83 / 13
39
ERC AKH R
Railway Project
P
Figure 44. My Dia
agram(Single
e Fnd, Max Bottom Momeent)

M X (lo c a l)
k N m / m
< = -2 1 1
- 1 8 7
Mx=17.82
M 20 kNm//m
- 1 6 2
- 1 3 8
- 1 1 3
Plate
P No::780 LC
C: 345
- 8 8 .5
- 6 4
- 3 9 .4
- 1 4 .9
9 .6 4
3 4 .2
5 8 .7
8 3 .3
1 0 8
1 3 2
1 5 7
> = 1 8 1

Y X
Looad 345

ure 45. Mx D
Figu Diagram(Wall Fnd, Max Top
T Moment))

M X (lo c a l)
k N m / m
< = -2 1 1
- 1 8 6
- 1 6 2
Mx=-26.18
M 81 kNm//m
- 1 3 7
- 1 1 3
Pllate No:7
780 LC:: 342
- 8 8 .1
- 6 3 .6
- 3 9 .1
- 1 4 .6
9 .8 5
3 4 .3
5 8 .8
8 3 .3
1 0 8
1 3 2
1 5 7
> = 1 8 1

Y X
Looad 342

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 84 / 13
39
ERC AKH R
Railway Project
P
Figure
e 46. Mx Dia
agram(Wall Fnd, Max Bo
ottom Momennt)

M Y (lo c a l)
k N m / m
< = -1 5 4
- 1 3 7
- 1 1 9
- 1 0 1
- 8 3 .8
- 6 6 .2
- 4 8 .6
- 3 1
- 1 3 .4
4 .2
2 1 .8
3 9 .4
5 7
7 4 .6
9 2 .2
1 1 0
> = 1 2 7

My=7.0089 kNm/
m/m
No:1001 LC: 345
Plate N 5

Y X
Z Looad 345

Figu
ure 47. My D T Moment))
Diagram(Wall Fnd, Max Top

M Y (lo c a l)
k N m / m
< = -1 5 4
- 1 3 6
- 1 1 9
- 1 0 1
- 8 4
- 6 6 .5
- 4 9
- 3 1 .5
- 1 4
3 .4 8
2 1
3 8 .5
5 6
7 3 .5
9 0 .9
1 0 8
> = 1 2 6

My=-8.71
M 12 kNm/m/m
Plate
P No::1001 LC: 342
Y X
Z Looad 342

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 85 / 13
39
ERC AKH R
Railway Project
P
Figure
e 48. My Dia
agram(Wall Fnd, Max Bo
ottom Momennt)

3.3.2 Pedestal Des


sign

Pedesttal design has been completed by staad.PRO according to


o EN 1992--1-1 2004 an
nd summaryy of
pedestal de
esign for on
ne type cro en in following figure. O
oss-section ccan be see um longitudinal
Only minimu
reinforceme
ent is sufficie
ent.

F
Figure 49. Pedestal
P Long
g. Rebar Design for the cross-section
c n 800x790

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 86 / 13
39
ERC AKH R
Railway Project
P

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 87 / 13
39
ERC AKH R
Railway Project
P

4 DRIFTT CHECKS
S

4.1 Che
eck for Verrtical Load
ds Nod
de No:54 LC:412
Dalll = 8200/2
/240=34.17 mm
Dalll=34.17 > Dmax=2 24.495

Y:-24.495 mm

Load 4112 : Displacem


ment
Diisplacement - mm

Figurre 50. Vertic


cal Displacem
ment Check of Frame Be
eams under S
Service Load
ds

4.2 Che
eck for Horrizontal Lo
oads

Z:-15.994 mm
m

Nodde No:8 LC:493


L
Dalll = 5984//300=19.94
47 mm
Dalll=19.947
7 > Dmax= =15.994

L oad 493 : Disp


placement
Displaceement - mm

F
Figure 51. Drift
D Check u
under All Loa
ads without EQ
E Loads(X D
Direction)

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 88 / 13
39
ERC AKH R
Railway Project
P
Node No::24 LC:6442
D = 0.0
Dall 01x5984=
=59.84 mm
m
D
Dall=59.8
84 > Dmax
ax=0.5x2x
x27.747=27.747

Z:27.747 mm

Load 642 : Displacemennt


Dispplacement - mm
m

Figure
e 52. Drift C
Check under X Direction Seismic
S Loa ds

Noode No:28 8 LC:641


Daall = 0.01x
x5984=599.84 mm
Daall=59.84 > Dmax= =0.5x2x46
6.932=46.9
932

X:-446.932 mm

Load 641 : Displacem


ment
Figure
e 53. Drift C
Check under Z Direction Seismic
S Loadds

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 89 / 13
39
ERC AKH R
Railway Project
P

5 SOIL STRESS CHECKS


ment value correspondin
Settlem c g to the allo
owable soil stress
s is 250kN/m2/150000kN/m3=16.7
7mm. Maxim
mum
ure and settlement (100.441 kN/m2 / 15000 kN/m
base pressu m3 = 6.70 < 16.7mm) at base of foun
ndation is low
wer
than the allo
owable limit.
B a s e P r e s s u r e
k N / m 2
< = 3 9 .9
4 1 .9
4 3 .8
4 5 .8
4 7 .7
4 9 .6
5 1 .6
Nod
de No:40441 LC:445
5 3 .5
5 5 .5
Dalll = 250 > Dmax= 71.035
7 kN/
N/m^2
5 7 .4
5 9 .4
6 1 .3
6 3 .3
6 5 .2
6 7 .1
6 9 .1
> = 7 1

Figu
ure 54. Bas
se Pressure V
Values unde
er Serviceability Combinaations(G+LR))

B a s e P r e s s u r e
k N / m 2
< = 2 6 .8
3 0 .7
3 4 .5
3 8 .3
4 2 .1
4 5 .9
4 9 .7
5 3 .5
5 7 .3
6 1 .1
6 4 .9
6 8 .7
7 2 .5
7 6 .3
8 0 .1
8 4
> = 8 7 .8

Node Noo:4157 LCC:475


Dall = 2550 > Dma
ax= 87.760
0 kN/m^22

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 90 / 13
39
ERC AKH R
Railway Project
P
Figure 55. Base Pres
ssure Valuess under Serv
viceability Combinations(((G+LR)+(W+
+C+T))

B a s e P r e s s u r e
k N / m 2
< = 7 .8
1 3 .6
1 9 .4
2 5 .2
3 1
3 6 .8
4 2 .5
4 8 .3
5 4 .1
5 9 .9
6 5 .7
7 1 .5
7 7 .3
8 3 .1
8 8 .9
9 4 .7
> = 1 0 0

No
ode No:40065 LC:6
642
all = 250 > Dmax= 100.441 kN/m^2
Da k

Figure 56.
5 Base Prressure Valu
ues under Se
erviceability Combinations
C s((G)+(CD)+
+(E))

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 91 / 13
39
ERC AKH R
Railway Project
P

6 REFE
ERENCES
1- EN 1990 Eurocode 0 - Basis o of structural design
d
2- EN 1991-1-1 Eurocode 1- Actionss on structurees
Part 1--1: General actions
a - Dennsities, self-w
weight, impos sed loads forr buildings
3- EN 1991-1-3 Eurocode 1- Actionss on structurees
Part 1-3: Sn
now Loads
4- EN 1991-1-4 Eurocode 1- Actionss on structurees
Part 1-4: Wind Loads
5- EN 1991-1-5 Eurocode 1- Actionss on structurees
Part 1-5: Geeneral Action ns- Thermal Actions
6- EN 1992-1-1 Eurocode 2-2 Design of concrete structures
Part 1-1: Geeneral Ruless and Rules forf Buildings
7- EN 1993-1-1 Eurocode 3-3 Design of steel structures
Part 1-1: Geeneral Ruless and Rules forf Buildings
8- EN 1993-1-8 Eurocode 3-3 Design of steel structures
Part 1-8: De
esign of Join nts
9- EN 1993-6 Eurocode 3-3 Design Of Steel Structures
Part 6 : Cra
ane Supportin ng Structures s
10-EN 1998-1 Eurocode 8-8 Design of structures s for earthquake resistannce
Part 1: General rules, se eismic actionns and rules for buildingss
11-ACII 350.3-06 Seismic Desing of Liqui d - Containin ng Concrete Structures aand Comenta ary
12-SAP P2000 Structural Analysis
A Proggram Compu uters and Struuctures, Inc. Berkley, CA
A
13-STA AAD.Pro Structural Annalysis and D Design Progrram, Bentley y
14- pcaColumn Design and Investigation of Re einforced Cooncrete Colu umn Sections –
Portland Ceement Associiation
15- LIMCON Steel CConnection Design and Detailing Proggram

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 92 / 13
39
ERC AKH Railway
R P
Project

APPE
ENDIX A STRUCTU
URAL LAY
YOUTS

Perm
manent Way
y Maintenanc
ce Building AKH – YMII – DD –DW111X – D – CE – REP – 0001 – 0 05.2016
17.0
This report must noot be either loanned, copied or otherwise repro
oduced in wholee or in part or used
u for any puurpos
out the prior wriitten permission
witho n of Yapı Merke
ezi. © Yapi Merrkezi Insaat ve S
Sanayi A.Ş.,2015 Page: 93 / 139
ERC AKH Railway Project
P

Perm
manent Way
y Maintenanc
ce Building AKH – YMII – DD –DW111X – D – CE – REP – 0001 – 0 05.2016
17.0
This report must noot be either loanned, copied or otherwise repro
oduced in wholee or in part or used
u for any puurpos
out the prior wriitten permission
witho n of Yapı Merke
ezi. © Yapi Merrkezi Insaat ve S
Sanayi A.Ş.,2015 Page: 94 / 139
ERC AKH Railway Project
P

Perm
manent Way
y Maintenanc
ce Building AKH – YMII – DD –DW111X – D – CE – REP – 0001 – 0 05.2016
17.0
This report must noot be either loanned, copied or otherwise repro
oduced in wholee or in part or used
u for any puurpos
out the prior wriitten permission
witho n of Yapı Merke
ezi. © Yapi Merrkezi Insaat ve S
Sanayi A.Ş.,2015 Page: 95 / 139
ERC AKH Railway Project
P

Perm
manent Way
y Maintenanc
ce Building AKH – YMII – DD –DW111X – D – CE – REP – 0001 – 0 05.2016
17.0
This report must noot be either loanned, copied or otherwise repro
oduced in wholee or in part or used
u for any puurpos
out the prior wriitten permission
witho n of Yapı Merke
ezi. © Yapi Merrkezi Insaat ve S
Sanayi A.Ş.,2015 Page: 96 / 139
ERC AKH R
Railway Project
P

APPE
ENDIX B STEEL STRUCTUR
RE MODEL DETAIL
LS

Beam an
nd Node
e Numberrs

1 2 3 4a 4 5 6 7 8 9

Figure 57.. General View


V – Axis System
S

2 8 6 13 10 18 88 14 23 18 28 22 33 26 38 30 43 34
6 147 148 11 16 26 72 73 331
3 84 143 866 145 37 164 40 21 45 68 51 70 48 36 41
141 149 150 44 47 62 74 75 65
53 82 54 83 38 855 94 41 86 55 87 46 88 49 91 57 92 56
81 151 153 45 48 63 76 78 66
80 85 144 877 146 39 165 42 84 47 69 52 71 50 90 89
142 152 154 46 49 64 77 79 67
4 7 8 12 12 177 91 16 22 20 27 24 32 28 37 32 42 36

gure 58. Be am and Nod


Fig de Numbers – Roof Plan

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 97 / 13
39
ERC AKH R
Railway Project
P

A
1 5 9 90 13 17 211 25 29 33

B
3 7 11 93 15 19 233 27 31 35

1 2 3 4a
4 4 5 6 7 8 9

Figure 59. Node Numbers – Suppo


ort Plan

4
80
533
3
94 2
93

59 58

2 1

3 1

Figure
F 60. B
Beam and No
ode Numbers
s – Axis 1

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 98 / 13
39
ERC AKH R
Railway Project
P

8 142
85 8
81
544 141
84 6
98 6

96

61 60

5 4

7 5

Figure
F 61. B
Beam and No
ode Numbers
s – Axis 2

12 46
39 455
388 44
37 11
101 10

100

63 62

10 9

11 9

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 99 / 13
39
ERC AKH R
Railway Project
P
Figure
F 62. B
Beam and No
ode Numbers
s – Axis 3

91
1665
94
164
163 88

161

92 89

162 160

93 90
Figure 63. B eam and No
ode Numbers
s – Axis 4a

16 49
4
42 48
41 47
40 16
105 14

104

65 64

135 134

80 79

15 14

15 13

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 100 / 13
39
ERC AKH R
Railway Project
P
Figure
F 64. B
Beam and No
ode Numbers
s – Axis 4

20
8
84
55
21
18

109

108

71 70

20 19

19 17
Figure
F 65. B
Beam and No
ode Numbers
s – Axis 5

24 64
47 6
63
466 62
45 26
22

113

112

69 68

25 24

23 21

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 101 / 13
39
ERC AKH R
Railway Project
P
Figure
F 66. B
Beam and No
ode Numbers
s – Axis 6

28 67
50 66
499 65
48 31
26

120

119

73 72

30 29

27 25
Figure
F 67. B
Beam and No
ode Numbers
s – Axis 7

32
90
577
36
30

124

123

75 74

35 34

31 29

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 102 / 13
39
ERC AKH R
Railway Project
P
Figure
F 68. B
Beam and No
ode Numbers
s – Axis 8

36
89
5
56
41
34

128

127

77 76

40 39

35 33

Figure
F 69. B
Beam and No
ode Numbers
s – Axis 9

2 6 10 88 14 18 22 2
26 30 34
58 60 62 89 64
79 70 68 7
72 74 76

1 5 9 90 13 17 21 2
25 29 33

Figure 7
70. Node Numbers – Ax
xis A

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 103 / 13
39
ERC AKH R
Railway Project
P

93 8 96 13 100 18 161 104 23 28 33 38 43


134 108 1122 119 123 127
1 4 9 160 14 19 24 29 34 39

Figure 7
71. Beam Numbers
N – Ax
xis A

4 8 12 91 16 20 24 2
28 32 36
59 61 63 92 65
80 71 69 7
73 75 77

3 7 11 93 15 19 23 2
27 31 35

Figure 7
72. Node Numbers – Ax
xis B

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 104 / 13
39
ERC AKH R
Railway Project
P

7 122 177 22 27 32 37 42
94 98 101 163 105 109 1133 120 124 128
135
2 5 10 162 15 20 25 3
30 35 40

Figure 7
73. Beam Numbers
N – Ax
xis B

Beams
Length
L β
Beam Node A N
Node B Prroperty
(m) (deg
grees)
1 1 58 4.000 1 90
2 3 59 4.000 1 90
3 2 53 4.129 2 0
4 5 60 4.000 1 90
5 7 61 4.000 1 90
6 6 84 2.065 2 0
7 4 8 8.000 3 0
8 2 6 8.000 3 0
9 9 62 4.000 1 90
10 11 63 4.000 1 90
11 10 37 2.065 2 0
12 8 12 8.000 3 0
13 6 10 8.000 3 0
14 13 79 3.000 1 90
15 15 80 3.000 1 90
16 14 40 2.065 2 0
17 12 91 6.150 3 0
18 10 88 6.150 3 0
19 17 70 3.000 1 90
20 19 71 3.000 1 90
21 18 55 4.129 2 0
22 16 20 8.000 3 0
23 14 18 8.000 3 0
24 21 68 3.000 1 90
25 23 69 3.000 1 90
26 22 45 2.065 2 0

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 105 / 13
39
ERC AKH R
Railway Project
P
27 20 24 8.000 3 0
28 18 22 8.000 3 0
29 25 72 3.000 1 90
30 27 73 3.000 1 90
31 26 48 2.065 2 0
32 24 28 8.000 3 0
33 22 26 8.000 3 0
34 29 74 3.000 1 90
35 31 75 3.000 1 90
36 30 57 4.129 2 0
37 28 32 8.000 3 0
38 26 30 8.000 3 0
39 33 76 3.000 1 90
40 35 77 3.000 1 90
41 34 56 4.129 2 0
42 32 36 8.000 3 0
43 30 34 8.000 3 0
44 37 38 2.065 2 0
45 38 39 2.065 2 0
46 39 12 2.065 2 0
47 40 41 2.065 2 0
48 41 42 2.065 2 0
49 42 16 2.065 2 0
62 45 46 2.065 2 0
63 46 47 2.065 2 0
64 47 24 2.065 2 0
65 48 49 2.065 2 0
66 49 50 2.065 2 0
67 50 28 2.065 2 0
68 45 51 4.000 3 0
69 47 52 4.000 3 0
70 51 48 4.000 3 0
71 52 50 4.000 3 0
72 22 51 4.501 4 0
73 26 51 4.501 4 0
74 46 51 4.501 4 0
75 49 51 4.501 4 0
76 46 52 4.501 4 0
77 24 52 4.501 4 0
78 49 52 4.501 4 0
79 28 52 4.501 4 0
80 53 4 4.129 2 0
81 54 85 2.065 2 0
82 53 54 8.000 3 0
83 54 38 8.000 3 0
84 55 20 4.129 2 0
85 38 94 6.150 3 0
86 41 55 8.000 3 0
87 55 46 8.000 3 0
88 46 49 8.000 3 0
89 56 36 4.129 2 0
90 57 32 4.129 2 0
91 49 57 8.000 3 0
92 57 56 8.000 3 0
93 58 2 1.000 1 90
94 59 4 1.984 1 90
96 60 6 1.000 1 90
98 61 8 1.984 1 90
100 62 10 1.000 1 90
101 63 12 1.984 1 90
104 64 14 1.000 1 90
105 65 16 1.984 1 90
108 70 18 2.000 1 90
109 71 20 2.984 1 90
112 68 22 2.000 1 90
113 69 24 2.984 1 90
119 72 26 2.000 1 90

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 106 / 13
39
ERC AKH R
Railway Project
P
120 73 28 2.984 1 90
123 74 30 2.000 1 90
124 75 32 2.984 1 90
127 76 34 2.000 1 90
128 77 36 2.984 1 90
134 79 64 1.000 1 90
135 80 65 1.000 1 90
141 84 54 2.065 2 0
142 85 8 2.065 2 0
143 84 86 4.000 3 0
144 85 87 4.000 3 0
145 86 37 4.000 3 0
146 87 39 4.000 3 0
147 6 86 4.501 4 0
148 10 86 4.501 4 0
149 54 86 4.501 4 0
150 38 86 4.501 4 0
151 54 87 4.501 4 0
152 8 87 4.501 4 0
153 38 87 4.501 4 0
154 12 87 4.501 4 0
160 90 89 4.000 1 90
161 89 88 1.000 1 90
162 93 92 4.000 1 90
163 92 91 1.984 1 90
164 88 94 4.129 2 0
165 94 91 4.129 2 0

Materialls
E Denssity α
Material Na
ame 2 ν 3
(kN/mm ) (kg/m
m) (1//°K)
1 STE
EEL 205.000 0.300 7.83E
E3 12EE -6
2 STAINLESSSTEEL 197.930 0.300 7.83E
E3 18EE -6
3 ALUM
MINUM 68.948 0.330 2.71E
E3 23EE -6
4 CONC CRETE 21.718 0.170 2.4E
E3 10EE -6

Section Propertties
Area Iyy Izz J
Prop Section 2 4 4 4 Ma
aterial
(cm ) (cm ) (cm ) (cm )
1 HEA3000 113.000 6.31E 3 18.3E 3 60.5300 ST
TEEL
2 IPE400 84.500 1.32E 3 23.1E 3 37.7199 ST
TEEL
3 TUB12012005.0 22.600 495.000 495.000 760.4377 ST
TEEL
4 TUB808044.0 12.000 115.000 115.000 175.5900 ST
TEEL

Release
es
Beam ends no
ot shown in this table are fixed in
i all directions.
Beam Nod
de x y z rx ry rz
3 2 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
6 6 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
7 4 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
7 8 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
8 2 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
8 6 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
11 100 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
12 8 Fixed
d Fixe
ed Fiixed Fixed Pin Pin

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 107 / 13
39
ERC AKH R
Railway Project
P
12 12
2 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
13 6 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
13 10
0 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
16 14
4 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
17 12
2 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
17 91
1 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
18 10
0 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
18 88
8 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
21 18
8 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
22 16
6 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
22 20
0 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
23 14
4 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
23 18
8 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
26 22
2 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
27 20
0 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
27 24
4 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
28 18
8 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
28 22
2 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
31 26
6 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
32 24
4 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
32 28
8 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
33 22
2 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
33 26
6 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
36 30
0 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
37 28
8 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
37 32
2 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
38 26
6 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
38 30
0 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
41 34
4 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
42 32
2 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
42 36
6 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
43 30
0 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
43 34
4 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
46 12
2 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
49 16
6 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
64 24
4 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
67 28
8 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
68 45
5 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
69 47
7 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
70 48
8 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
71 50
0 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
72 22
2 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
72 51
1 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
73 26
6 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
73 51
1 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
74 46
6 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
74 51
1 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
75 49
9 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
75 51
1 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
76 46
6 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
76 52
2 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
77 24
4 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
77 52
2 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
78 49
9 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
78 52
2 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
79 28
8 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
79 52
2 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
80 4 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
82 53
3 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
82 54
4 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
83 54
4 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
83 38
8 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
84 20
0 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
85 38
8 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
85 94
4 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
86 41
1 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
86 55
5 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
87 55
5 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
87 46
6 Fixed
d Fixe
ed Fiixed Fixed Pin Pin

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 108 / 13
39
ERC AKH R
Railway Project
P
88 46
6 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
88 49
9 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
89 36
6 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
90 32
2 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
91 49
9 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
91 57
7 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
92 57
7 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
92 56
6 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
142 8 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
143 84
4 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
144 85
5 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
145 37
7 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
146 39
9 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
147 6 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
147 86
6 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
148 10
0 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
148 86
6 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
149 54
4 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
149 86
6 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
150 38
8 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
150 86
6 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
151 54
4 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
151 87
7 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
152 8 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
152 87
7 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
153 38
8 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
153 87
7 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
154 12
2 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
154 87
7 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
164 88
8 Fixed
d Fixe
ed Fiixed Fixed Pin Pin
165 91
1 Fixed
d Fixe
ed Fiixed Fixed Pin Pin

Supportts

X Y Z rX rY rZ
Node - - -
(kkN/mm) (kN/mm) (kN/mm) (kN m/deg) (kN m/deg) (kN m/degg)
1 Fixed Fixed Fixed Fixed Fixed Fixed
3 Fixed Fixed Fixed Fixed Fixed Fixed
5 Fixed Fixed Fixed Fixed Fixed Fixed
7 Fixed Fixed Fixed Fixed Fixed Fixed
9 Fixed Fixed Fixed Fixed Fixed Fixed
11 Fixed Fixed Fixed Fixed Fixed Fixed
13 Fixed Fixed Fixed Fixed Fixed Fixed
15 Fixed Fixed Fixed Fixed Fixed Fixed
17 Fixed Fixed Fixed Fixed Fixed Fixed
19 Fixed Fixed Fixed Fixed Fixed Fixed
21 Fixed Fixed Fixed Fixed Fixed Fixed
23 Fixed Fixed Fixed Fixed Fixed Fixed
25 Fixed Fixed Fixed Fixed Fixed Fixed
27 Fixed Fixed Fixed Fixed Fixed Fixed
29 Fixed Fixed Fixed Fixed Fixed Fixed
31 Fixed Fixed Fixed Fixed Fixed Fixed
33 Fixed Fixed Fixed Fixed Fixed Fixed
35 Fixed Fixed Fixed Fixed Fixed Fixed
90 Fixed Fixed Fixed Fixed Fixed Fixed
93 Fixed Fixed Fixed Fixed Fixed Fixed

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 109 / 13
39
ERC AKH R
Railway Project
P

APPE
ENDIX C FRAME DESIGN D ETAILS

Checking
g Code (Sttress Ratio
o)

Design Actual Ax Iz Iy Ix
Beam Clause L/C 2 4 4 4
Property Ratio (cm ) (cm ) (cm ) (cm )
1 H
HEA300 0.390 EC-6.2.9.1 339 113.000 18.3E 3 6.31E 3 75.300
2 H
HEA300 0.376 EC-6.3.3.LTB 338 113.000 18.3E 3 6.31E 3 75.300
3 IP
PE400 0.438 EC-6.3.2 LTB 109 84.500 23.1E 3 1.32E 3 46.800
4 H
HEA300 0.449 EC-6.3.3.LTB 341 113.000 18.3E 3 6.31E 3 75.300
5 H
HEA300 0.480 EC-6.3.3.LTB 341 113.000 18.3E 3 6.31E 3 75.300
6 IP
PE400 0.654 EC-6.3.2 LTB 109 84.500 23.1E 3 1.32E 3 46.800
7 T
TUB1201205.0 0.139 EC-6.3.3 146 22.600 495.000 495.000 771.000
8 T
TUB1201205.0 0.130 EC-6.3.3 278 22.600 495.000 495.000 771.000
9 H
HEA300 0.439 EC-6.3.3.LTB 339 113.000 18.3E 3 6.31E 3 75.300
10 H
HEA300 0.463 EC-6.3.3.LTB 339 113.000 18.3E 3 6.31E 3 75.300
11 IP
PE400 0.588 EC-6.3.2 LTB 109 84.500 23.1E 3 1.32E 3 46.800
12 T
TUB1201205.0 0.125 EC-6.3.3 278 22.600 495.000 495.000 771.000
13 T
TUB1201205.0 0.146 EC-6.3.3 306 22.600 495.000 495.000 771.000
14 H
HEA300 0.405 EC-6.3.3.LTB 339 113.000 18.3E 3 6.31E 3 75.300
15 H
HEA300 0.433 EC-6.3.3.LTB 338 113.000 18.3E 3 6.31E 3 75.300
16 IP
PE400 0.371 EC-6.3.2 LTB 133 84.500 23.1E 3 1.32E 3 46.800
17 T
TUB1201205.0 0.076 EC-6.3.3 278 22.600 495.000 495.000 771.000
18 T
TUB1201205.0 0.109 EC-6.3.3 278 22.600 495.000 495.000 771.000
19 H
HEA300 0.453 EC-6.3.3.LTB 339 113.000 18.3E 3 6.31E 3 75.300
20 H
HEA300 0.488 EC-6.3.3.LTB 338 113.000 18.3E 3 6.31E 3 75.300
21 IP
PE400 0.792 EC-6.3.2 LTB 133 84.500 23.1E 3 1.32E 3 46.800
22 T
TUB1201205.0 0.144 EC-6.3.3 340 22.600 495.000 495.000 771.000
23 T
TUB1201205.0 0.190 EC-6.3.3 278 22.600 495.000 495.000 771.000
24 H
HEA300 0.502 EC-6.3.3.LTB 341 113.000 18.3E 3 6.31E 3 75.300
25 H
HEA300 0.525 EC-6.3.3.LTB 341 113.000 18.3E 3 6.31E 3 75.300
26 IP
PE400 0.604 EC-6.3.2 LTB 133 84.500 23.1E 3 1.32E 3 46.800
27 T
TUB1201205.0 0.153 EC-6.3.3 340 22.600 495.000 495.000 771.000
28 T
TUB1201205.0 0.179 EC-6.3.3 278 22.600 495.000 495.000 771.000
29 H
HEA300 0.503 EC-6.3.3.LTB 339 113.000 18.3E 3 6.31E 3 75.300
30 H
HEA300 0.523 EC-6.3.3.LTB 339 113.000 18.3E 3 6.31E 3 75.300
31 IP
PE400 0.604 EC-6.3.2 LTB 133 84.500 23.1E 3 1.32E 3 46.800
32 T
TUB1201205.0 0.127 EC-6.3.3 282 22.600 495.000 495.000 771.000
33 T
TUB1201205.0 0.155 EC-6.3.3 306 22.600 495.000 495.000 771.000
34 H
HEA300 0.454 EC-6.3.3.LTB 339 113.000 18.3E 3 6.31E 3 75.300
35 H
HEA300 0.488 EC-6.3.3.LTB 338 113.000 18.3E 3 6.31E 3 75.300
36 IP
PE400 0.792 EC-6.3.2 LTB 133 84.500 23.1E 3 1.32E 3 46.800
37 T
TUB1201205.0 0.130 EC-6.2.9.1 101 22.600 495.000 495.000 771.000
38 T
TUB1201205.0 0.161 EC-6.3.3 339 22.600 495.000 495.000 771.000
39 H
HEA300 0.393 EC-6.2.9.1 339 113.000 18.3E 3 6.31E 3 75.300
40 H
HEA300 0.415 EC-6.3.3.LTB 338 113.000 18.3E 3 6.31E 3 75.300
41 IP
PE400 0.411 EC-6.3.2 LTB 133 84.500 23.1E 3 1.32E 3 46.800
42 T
TUB1201205.0 0.113 EC-6.3.3 282 22.600 495.000 495.000 771.000
43 T
TUB1201205.0 0.122 EC-6.3.3 339 22.600 495.000 495.000 771.000
44 IP
PE400 0.774 EC-6.3.2 LTB 109 84.500 23.1E 3 1.32E 3 46.800
45 IP
PE400 0.774 EC-6.3.2 LTB 109 84.500 23.1E 3 1.32E 3 46.800
46 IP
PE400 0.577 EC-6.3.2 LTB 109 84.500 23.1E 3 1.32E 3 46.800
47 IP
PE400 0.497 EC-6.3.2 LTB 133 84.500 23.1E 3 1.32E 3 46.800
48 IP
PE400 0.497 EC-6.3.2 LTB 133 84.500 23.1E 3 1.32E 3 46.800
49 IP
PE400 0.371 EC-6.3.2 LTB 133 84.500 23.1E 3 1.32E 3 46.800
62 IP
PE400 0.807 EC-6.3.2 LTB 133 84.500 23.1E 3 1.32E 3 46.800
63 IP
PE400 0.807 EC-6.3.2 LTB 133 84.500 23.1E 3 1.32E 3 46.800
64 IP
PE400 0.604 EC-6.3.2 LTB 133 84.500 23.1E 3 1.32E 3 46.800
65 IP
PE400 0.807 EC-6.3.2 LTB 133 84.500 23.1E 3 1.32E 3 46.800
66 IP
PE400 0.807 EC-6.3.2 LTB 133 84.500 23.1E 3 1.32E 3 46.800
67 IP
PE400 0.604 EC-6.3.2 LTB 133 84.500 23.1E 3 1.32E 3 46.800
68 T
TUB1201205.0 0.196 EC-6.3.2 LTB 105 22.600 495.000 495.000 771.000
69 T
TUB1201205.0 0.196 EC-6.3.2 LTB 119 22.600 495.000 495.000 771.000
70 T
TUB1201205.0 0.197 EC-6.3.2 LTB 146 22.600 495.000 495.000 771.000
71 T
TUB1201205.0 0.197 EC-6.3.2 LTB 278 22.600 495.000 495.000 771.000
72 T
TUB80804.0 0.286 EC-6.3.3 341 12.000 115.000 115.000 177.000
73 T
TUB80804.0 0.286 EC-6.3.3 339 12.000 115.000 115.000 177.000

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 110 / 13
39
ERC AKH R
Railway Project
P
74 T
TUB80804.0 0.220 EC-6.3.3 338 12.000 115.000 115.000 177.000
75 T
TUB80804.0 0.220 EC-6.3.3 341 12.000 115.000 115.000 177.000
76 T
TUB80804.0 0.111 EC-6.3.3 339 12.000 115.000 115.000 177.000
77 T
TUB80804.0 0.183 EC-6.3.3 340 12.000 115.000 115.000 177.000
78 T
TUB80804.0 0.116 EC-6.3.3 340 12.000 115.000 115.000 177.000
79 T
TUB80804.0 0.176 EC-6.3.3 338 12.000 115.000 115.000 177.000
80 IP
PE400 0.438 EC-6.3.2 LTB 109 84.500 23.1E 3 1.32E 3 46.800
81 IP
PE400 0.863 EC-6.3.2 LTB 109 84.500 23.1E 3 1.32E 3 46.800
82 T
TUB1201205.0 0.131 EC-6.3.3 146 22.600 495.000 495.000 771.000
83 T
TUB1201205.0 0.100 EC-6.3.3 279 22.600 495.000 495.000 771.000
84 IP
PE400 0.792 EC-6.3.2 LTB 133 84.500 23.1E 3 1.32E 3 46.800
85 T
TUB1201205.0 0.064 EC-6.3.3 340 22.600 495.000 495.000 771.000
86 T
TUB1201205.0 0.126 EC-6.3.3 338 22.600 495.000 495.000 771.000
87 T
TUB1201205.0 0.206 EC-6.3.3 338 22.600 495.000 495.000 771.000
88 T
TUB1201205.0 0.103 EC-6.3.3 283 22.600 495.000 495.000 771.000
89 IP
PE400 0.411 EC-6.3.2 LTB 133 84.500 23.1E 3 1.32E 3 46.800
90 IP
PE400 0.792 EC-6.3.2 LTB 133 84.500 23.1E 3 1.32E 3 46.800
91 T
TUB1201205.0 0.188 EC-6.3.3 340 22.600 495.000 495.000 771.000
92 T
TUB1201205.0 0.114 EC-6.3.3 150 22.600 495.000 495.000 771.000
93 H
HEA300 0.098 EC-6.3.3.LTB 155 113.000 18.3E 3 6.31E 3 75.300
94 H
HEA300 0.134 EC-6.3.3.LTB 338 113.000 18.3E 3 6.31E 3 75.300
96 H
HEA300 0.162 EC-6.3.3.LTB 154 113.000 18.3E 3 6.31E 3 75.300
98 H
HEA300 0.209 EC-6.3.3.LTB 109 113.000 18.3E 3 6.31E 3 75.300
100 H
HEA300 0.147 EC-6.3.3.LTB 154 113.000 18.3E 3 6.31E 3 75.300
101 H
HEA300 0.185 EC-6.3.3.LTB 109 113.000 18.3E 3 6.31E 3 75.300
104 H
HEA300 0.096 EC-6.3.3.LTB 339 113.000 18.3E 3 6.31E 3 75.300
105 H
HEA300 0.145 EC-6.3.3.LTB 338 113.000 18.3E 3 6.31E 3 75.300
108 H
HEA300 0.188 EC-6.3.3.LTB 339 113.000 18.3E 3 6.31E 3 75.300
109 H
HEA300 0.239 EC-6.3.3.LTB 338 113.000 18.3E 3 6.31E 3 75.300
112 H
HEA300 0.204 EC-6.3.3.LTB 341 113.000 18.3E 3 6.31E 3 75.300
113 H
HEA300 0.253 EC-6.3.3.LTB 341 113.000 18.3E 3 6.31E 3 75.300
119 H
HEA300 0.204 EC-6.3.3.LTB 339 113.000 18.3E 3 6.31E 3 75.300
120 H
HEA300 0.252 EC-6.3.3.LTB 339 113.000 18.3E 3 6.31E 3 75.300
123 H
HEA300 0.188 EC-6.3.3.LTB 339 113.000 18.3E 3 6.31E 3 75.300
124 H
HEA300 0.239 EC-6.3.3.LTB 338 113.000 18.3E 3 6.31E 3 75.300
127 H
HEA300 0.151 EC-6.2.9.1 339 113.000 18.3E 3 6.31E 3 75.300
128 H
HEA300 0.184 EC-6.3.3.LTB 338 113.000 18.3E 3 6.31E 3 75.300
134 H
HEA300 0.189 EC-6.3.3.LTB 339 113.000 18.3E 3 6.31E 3 75.300
135 H
HEA300 0.250 EC-6.3.3.LTB 338 113.000 18.3E 3 6.31E 3 75.300
141 IP
PE400 0.863 EC-6.3.2 LTB 109 84.500 23.1E 3 1.32E 3 46.800
142 IP
PE400 0.643 EC-6.3.2 LTB 109 84.500 23.1E 3 1.32E 3 46.800
143 T
TUB1201205.0 0.196 EC-6.3.2 LTB 302 22.600 495.000 495.000 771.000
144 T
TUB1201205.0 0.196 EC-6.3.2 LTB 278 22.600 495.000 495.000 771.000
145 T
TUB1201205.0 0.196 EC-6.3.2 LTB 102 22.600 495.000 495.000 771.000
146 T
TUB1201205.0 0.196 EC-6.3.2 LTB 279 22.600 495.000 495.000 771.000
147 T
TUB80804.0 0.209 EC-6.3.3 340 12.000 115.000 115.000 177.000
148 T
TUB80804.0 0.213 EC-6.3.3 339 12.000 115.000 115.000 177.000
149 T
TUB80804.0 0.151 EC-6.3.3 339 12.000 115.000 115.000 177.000
150 T
TUB80804.0 0.151 EC-6.3.3 340 12.000 115.000 115.000 177.000
151 T
TUB80804.0 0.052 EC-6.3.3 182 12.000 115.000 115.000 177.000
152 T
TUB80804.0 0.108 EC-6.3.3 341 12.000 115.000 115.000 177.000
153 T
TUB80804.0 0.067 EC-6.3.3 178 12.000 115.000 115.000 177.000
154 T
TUB80804.0 0.103 EC-6.3.3 338 12.000 115.000 115.000 177.000
160 H
HEA300 0.389 EC-6.2.9.1 339 113.000 18.3E 3 6.31E 3 75.300
161 H
HEA300 0.075 EC-6.2.9.1 339 113.000 18.3E 3 6.31E 3 75.300
162 H
HEA300 0.373 EC-6.2.9.1 338 113.000 18.3E 3 6.31E 3 75.300
163 H
HEA300 0.117 EC-6.2.9.1 338 113.000 18.3E 3 6.31E 3 75.300
164 IP
PE400 0.622 EC-6.3.2 LTB 109 84.500 23.1E 3 1.32E 3 46.800
165 IP
PE400 0.622 EC-6.3.2 LTB 109 84.500 23.1E 3 1.32E 3 46.800

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 111 / 13
39
ERC AKH R
Railway Project
P

APPE
ENDIX D JOINT DISPLACEM
I MENTS

Node Dis
splacemen
nts

X Y Z Resultannt rX rY rZ
Node L/C
(mm) (m
mm) (mm)) (mm) (rad) (rad) (rad)
8 4
401:G+LR+0.5W
W(+X)+CR+0.6T T(+20) --1.207 0.7707 -1.2033 1.845 -0.000 0.000 0.000
4
402:G+LR+0.5W
W(+X)+CR+0.6T T(-20) 55.245 -1.0
017 -2.6455 5.961 -0.001 0.000 -0.001
4
403:G+LR+0.5W
W(+X)+CL+0.6T T(+20) --1.207 0.7707 -1.2033 1.845 -0.000 0.000 0.000
4
404:G+LR+0.5W
W(+X)+CL+0.6T T(-20) 55.245 -1.0
017 -2.6455 5.961 -0.001 0.000 -0.001
4
405:G+LR+0.5W
W(-X)+CR+0.6T(+20) --5.210 0.6662 -0.4688 5.273 -0.000 0.000 0.001
4
406:G+LR+0.5W
W(-X)+CR+0.6T(-20) 11.242 -1.0
061 -1.911 2.514 -0.001 0.000 -0.000
4
407:G+LR+0.5W
W(-X)+CL+0.6T((+20) --5.210 0.6662 -0.4688 5.273 -0.000 0.000 0.001
4
408:G+LR+0.5W
W(-X)+CL+0.6T((-20) 11.242 -1.0
061 -1.911 2.514 -0.001 0.000 -0.000
4
409:G+LR+0.5W
W(+Z)+CR+0.6T T(+20) --3.883 0.6645 7.033
3 8.059 0.002 0.000 0.001
4
410:G+LR+0.5W
W(+Z)+CR+0.6T T(-20) 22.569 -1.0
079 5.590
0 6.246 0.001 0.001 -0.001
4
411:G+LR+0.5W
W(+Z)+CL+0.6T(+20) --3.883 0.6645 7.033
3 8.059 0.002 0.000 0.001
4
412:G+LR+0.5W
W(+Z)+CL+0.6T(-20) 22.569 -1.0
079 5.590
0 6.246 0.001 0.001 -0.001
4
413:G+LR+0.5W
W(-Z)+CR+0.6T(+20) --4.254 0.6691 -6.9099 8.143 -0.002 -0.000 0.001
4
414:G+LR+0.5W
W(-Z)+CR+0.6T(-20) 22.198 -1.0
032 -8.3522 8.698 -0.002 0.000 -0.001
4
415:G+LR+0.5W
W(-Z)+CL+0.6T((+20) --4.254 0.6691 -6.9099 8.143 -0.002 -0.000 0.001
4
416:G+LR+0.5W
W(-Z)+CL+0.6T((-20) 22.198 -1.0
032 -8.3522 8.698 -0.002 0.000 -0.001
4
417:G+LR+0.5W
W(+X)+CR 22.019 -0.1
155 -1.9244 2.793 -0.000 0.000 -0.001
4
418:G+LR+0.5W
W(+X)+CL 22.019 -0.1
155 -1.9244 2.793 -0.000 0.000 -0.001
4
419:G+LR+0.5W
W(-X)+CR --1.984 -0.2
200 -1.1900 2.322 -0.000 0.000 0.000
4
420:G+LR+0.5W
W(-X)+CL) --1.984 -0.2
200 -1.1900 2.322 -0.000 0.000 0.000
4
421:G+LR+0.5W
W(+Z)+CR --0.657 -0.2
217 6.311
1 6.349 0.001 0.000 0.000
4
422:G+LR+0.5W
W(+Z)+CL --0.657 -0.2
217 6.311
1 6.349 0.001 0.000 0.000
4
423:G+LR+0.5W
W(-Z)+CR --1.028 -0.1
171 -7.631 7.702 -0.002 0.000 0.000
4
424:G+LR+0.5W
W(-Z)+CL --1.028 -0.1
171 -7.631 7.702 -0.002 0.000 0.000
4
425:G+LR+0.5W
W(+X)+0.6T(+200) --1.207 0.7707 -1.2033 1.845 -0.000 0.000 0.000
4
426:G+LR+0.5W
W(+X)+0.6T(-20) 55.245 -1.0
017 -2.6455 5.961 -0.001 0.000 -0.001
4
427:G+LR+0.5W
W(-X)+0.6T(+20) --5.210 0.6662 -0.4688 5.273 -0.000 0.000 0.001
4
428:G+LR+0.5W
W(-X)+0.6T(-20)) 11.242 -1.0
061 -1.911 2.514 -0.001 0.000 -0.000
4
429:G+LR+0.5W
W(+Z)+0.6T(+200) --3.883 0.6645 7.033
3 8.059 0.002 0.000 0.001
4
430:G+LR+0.5W
W(+Z)+0.6T(-20) 22.569 -1.0
079 5.590
0 6.246 0.001 0.001 -0.001
4
431:G+LR+0.5W
W(-Z)+0.6T(+20) --4.254 0.6691 -6.9099 8.143 -0.002 -0.000 0.001
4
432:G+LR+0.5W
W(-Z)+0.6T(-20) 22.198 -1.0
032 -8.3522 8.698 -0.002 0.000 -0.001
4
433:G+LR+CR++0.6T(+20) --3.224 0.6654 0.730
0 3.370 0.000 0.000 0.001
4
434:G+LR+CR++0.6T(-20) 33.228 -1.0
069 -0.7122 3.474 -0.000 0.000 -0.001
4
435:G+LR+CL+0.6T(+20) --3.224 0.6654 0.730
0 3.370 0.000 0.000 0.001
4
436:G+LR+CL+0.6T(-20) 33.228 -1.0
069 -0.7122 3.474 -0.000 0.000 -0.001
4
437:G+LR+0.5W
W(+X) 22.019 -0.1
155 -1.9244 2.793 -0.000 0.000 -0.001
4
438:G+LR+0.5W
W(-X) --1.984 -0.2
200 -1.1900 2.322 -0.000 0.000 0.000
4
439:G+LR+0.5W
W(+Z) --0.657 -0.2
217 6.311
1 6.349 0.001 0.000 0.000
4
440:G+LR+0.5W
W(-Z) --1.028 -0.1
171 -7.631 7.702 -0.002 0.000 0.000
4
441:G+LR+CR 00.002 -0.2
207 0.009
9 0.208 -0.000 0.000 0.000
4
442:G+LR+CL 00.002 -0.2
207 0.009
9 0.208 -0.000 0.000 0.000
4
443:G+LR+0.6T
T(+20) --3.224 0.6654 0.730
0 3.370 0.000 0.000 0.001
4
444:G+LR+0.6T
T(-20) 33.228 -1.0
069 -0.7122 3.474 -0.000 0.000 -0.001
4
445:G+LR 00.002 -0.2
207 0.009
9 0.208 -0.000 0.000 0.000
4
446:G+W(+X)+00.7LR+CR+0.6TT(+20) 00.810 0.7
775 -3.1366 3.330 -0.001 0.000 -0.000
4
447:G+W(+X)+00.7LR+CR+0.6TT(-20) 77.262 -0.9
949 -4.5799 8.637 -0.001 0.000 -0.002
4
448:G+W(+X)+00.7LR+CL+0.6TT(+20) 00.810 0.7
775 -3.1366 3.330 -0.001 0.000 -0.000
4
449:G+W(+X)+00.7LR+CL+0.6TT(-20) 77.262 -0.9
949 -4.5799 8.637 -0.001 0.000 -0.002
4
450:G+W(-X)+0.7LR+CR+0.6T(+20) --7.196 0.6686 -1.6688 7.419 -0.001 0.000 0.002
4
451:G+W(-X)+0.7LR+CR+0.6T(-20) --0.744 -1.0
038 -3.111 3.363 -0.001 0.000 0.000
4
452:G+W(-X)+0.7LR+CL+0.6T((+20) --7.196 0.6686 -1.6688 7.419 -0.001 0.000 0.002
4
453:G+W(-X)+0.7LR+CL+0.6T((-20) --0.744 -1.0
038 -3.111 3.363 -0.001 0.000 0.000
4
454:G+W(+Z)+0
0.7LR+CR+0.6T T(+20) --4.541 0.6651 13.335 14.102 0.003 0.001 0.001
4
455:G+W(+Z)+0
0.7LR+CR+0.6T T(-20) 11.911 -1.0
073 11.892 12.092 0.003 0.001 -0.000
4
456:G+W(+Z)+0
0.7LR+CL+0.6T(+20) --4.541 0.6651 13.335 14.102 0.003 0.001 0.001
4
457:G+W(+Z)+0
0.7LR+CL+0.6T(-20) 11.911 -1.0
073 11.892 12.092 0.003 0.001 -0.000
4
458:G+W(-Z)+0.7LR+CR+0.6T(+20) --5.284 0.7743 -14.5550 15.497 -0.003 -0.000 0.001
4
459:G+W(-Z)+0.7LR+CR+0.6T(-20) 11.168 -0.9
980 -15.9993 16.065 -0.004 -0.000 -0.000
4
460:G+W(-Z)+0.7LR+CL+0.6T((+20) --5.284 0.7743 -14.5550 15.497 -0.003 -0.000 0.001
4
461:G+W(-Z)+0.7LR+CL+0.6T((-20) 11.168 -0.9
980 -15.9993 16.065 -0.004 -0.000 -0.000

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 112 / 13
39
ERC AKH R
Railway Project
P
4
462:G+W(+X)+00.7LR+CR 44.036 -0.0
087 -3.8577 5.583 -0.001 0.000 -0.001
4
463:G+W(+X)+00.7LR+CL 44.036 -0.0
087 -3.8577 5.583 -0.001 0.000 -0.001
4
464:G+W(-X)+0.7LR+CR --3.970 -0.1
176 -2.3899 4.637 -0.001 0.000 0.001
4
465:G+W(-X)+0.7LR+CL --3.970 -0.1
176 -2.3899 4.637 -0.001 0.000 0.001
4
466:G+W(+Z)+0
0.7LR+CR --1.315 -0.2
211 12.613 12.683 0.003 0.001 0.000
4
467:G+W(+Z)+0
0.7LR+CL --1.315 -0.2
211 12.613 12.683 0.003 0.001 0.000
4
468:G+W(-Z)+0.7LR+CR --2.058 -0.1
119 -15.2771 15.410 -0.003 -0.000 0.001
4
469:G+W(-Z)+0.7LR+CL --2.058 -0.1
119 -15.2771 15.410 -0.003 -0.000 0.001
4
470:G+W(+X)+00.7LR+0.6T(+20
0) 00.810 0.7
775 -3.1366 3.330 -0.001 0.000 -0.000
4
471:G+W(+X)+00.7LR+0.6T(-20) 77.262 -0.9
949 -4.5799 8.637 -0.001 0.000 -0.002
4
472:G+W(-X)+0.7LR+0.6T(+20) --7.196 0.6686 -1.6688 7.419 -0.001 0.000 0.002
4
473:G+W(-X)+0.7LR+0.6T(-20)) --0.744 -1.0
038 -3.111 3.363 -0.001 0.000 0.000
4
474:G+W(+Z)+0
0.7LR+0.6T(+200) --4.541 0.6651 13.335 14.102 0.003 0.001 0.001
4
475:G+W(+Z)+0
0.7LR+0.6T(-20) 11.911 -1.0
073 11.892 12.092 0.003 0.001 -0.000
4
476:G+W(-Z)+0.7LR+0.6T(+20) --5.284 0.7743 -14.5550 15.497 -0.003 -0.000 0.001
4
477:G+W(-Z)+0.7LR+0.6T(-20) 11.168 -0.9
980 -15.9993 16.065 -0.004 -0.000 -0.000
4
478:G+W(+X)+CCR+0.6T(+20) 00.810 0.8
811 -3.1377 3.340 -0.001 -0.000 -0.000
4
479:G+W(+X)+CCR+0.6T(-20) 77.262 -0.9
913 -4.5800 8.634 -0.001 0.000 -0.002
4
480:G+W(+X)+CCL+0.6T(+20) 00.810 0.8
811 -3.1377 3.340 -0.001 -0.000 -0.000
4
481:G+W(+X)+CCL+0.6T(-20) 77.262 -0.9
913 -4.5800 8.634 -0.001 0.000 -0.002
4
482:G+W(-X)+C
CR+0.6T(+20) --7.196 0.7721 -1.6699 7.422 -0.001 -0.000 0.002
4
483:G+W(-X)+C
CR+0.6T(-20) --0.744 -1.0
002 -3.1122 3.353 -0.001 0.000 0.000
4
484:G+W(-X)+C
CL+0.6T(+20) --7.196 0.7721 -1.6699 7.422 -0.001 -0.000 0.002
4
485:G+W(-X)+C
CL+0.6T(-20) --0.744 -1.0
002 -3.1122 3.353 -0.001 0.000 0.000
4
486:G+W(+Z)+C
CR+0.6T(+20) --4.541 0.6687 13.333 14.102 0.003 0.001 0.001
4
487:G+W(+Z)+C
CR+0.6T(-20) 11.911 -1.0
037 11.890 12.088 0.003 0.001 -0.000
4
488:G+W(+Z)+C
CL+0.6T(+20) --4.541 0.6687 13.333 14.102 0.003 0.001 0.001
4
489:G+W(+Z)+C
CL+0.6T(-20) 11.911 -1.0
037 11.890 12.088 0.003 0.001 -0.000
4
490:G+W(-Z)+C
CR+0.6T(+20) --5.284 0.7779 -14.5551 15.501 -0.003 -0.000 0.001
4
491:G+W(-Z)+C
CR+0.6T(-20) 11.168 -0.9
945 -15.9994 16.064 -0.004 -0.000 -0.000
4
492:G+W(-Z)+C
CL+0.6T(+20) --5.284 0.7779 -14.5551 15.501 -0.003 -0.000 0.001
4
493:G+W(-Z)+C
CL+0.6T(-20) 11.168 -0.9
945 -15.9994 16.064 -0.004 -0.000 -0.000
4
494:G+W(+X)+00.7LR 44.036 -0.0
087 -3.8577 5.583 -0.001 0.000 -0.001
4
495:G+W(-X)+0.7LR --3.970 -0.1
176 -2.3899 4.637 -0.001 0.000 0.001
4
496:G+W(+Z)+0
0.7LR --1.315 -0.2
211 12.613 12.683 0.003 0.001 0.000
4
497:G+W(-Z)+0.7LR --2.058 -0.1
119 -15.2771 15.410 -0.003 -0.000 0.001
4
498:G+W(+X)+CCR 44.036 -0.0
051 -3.8599 5.584 -0.001 0.000 -0.001
4
499:G+W(+X)+CCL 44.036 -0.0
051 -3.8599 5.584 -0.001 0.000 -0.001
5
500:G+W(-X)+C
CR --3.970 -0.1
140 -2.391 4.636 -0.001 0.000 0.001
5
501:G+W(-X)+C
CL --3.970 -0.1
140 -2.391 4.636 -0.001 0.000 0.001
5
502:G+W(+Z)+C
CR --1.315 -0.1
175 12.612 12.681 0.003 0.001 0.000
5
503:G+W(+Z)+C
CL --1.315 -0.1
175 12.612 12.681 0.003 0.001 0.000
5
504:G+W(-Z)+C
CR --2.058 -0.0
083 -15.2773 15.411 -0.003 -0.000 0.001
5
505:G+W(-Z)+C
CL --2.058 -0.0
083 -15.2773 15.411 -0.003 -0.000 0.001
5
506:G+W(+X)+00.6T(+20) 00.810 0.8
811 -3.1377 3.340 -0.001 -0.000 -0.000
5
507:G+W(+X)+00.6T(-20) 77.262 -0.9
913 -4.5800 8.634 -0.001 0.000 -0.002
5
508:G+W(-X)+0.6T(+20) --7.196 0.7721 -1.6699 7.422 -0.001 -0.000 0.002
5
509:G+W(-X)+0.6T(-20) --0.744 -1.0
002 -3.1122 3.353 -0.001 0.000 0.000
5
510:G+W(+Z)+0
0.6T(+20) --4.541 0.6687 13.333 14.102 0.003 0.001 0.001
5
511:G+W(+Z)+0
0.6T(-20) 11.911 -1.0
037 11.890 12.088 0.003 0.001 -0.000
5
512:G+W(-Z)+0.6T(+20) --5.284 0.7779 -14.5551 15.501 -0.003 -0.000 0.001
5
513:G+W(-Z)+0.6T(-20) 11.168 -0.9
945 -15.9994 16.064 -0.004 -0.000 -0.000
5
514:G+W(+X) 44.036 -0.0
051 -3.8599 5.584 -0.001 0.000 -0.001
5
515:G+W(-X) --3.970 -0.1
140 -2.391 4.636 -0.001 0.000 0.001
5
516:G+W(+Z) --1.315 -0.1
175 12.612 12.681 0.003 0.001 0.000
5
517:G+W(-Z) --2.058 -0.0
083 -15.2773 15.411 -0.003 -0.000 0.001
5
518:G+CR+0.7L
LR+0.5W(+X)+0 0.6T(+20) --1.207 0.7722 -1.2033 1.851 -0.000 0.000 0.000
5
519:G+CR+0.7L
LR+0.5W(+X)+0 0.6T(-20) 55.245 -1.0
001 -2.6466 5.959 -0.001 0.000 -0.001
5
520:G+CL+0.7L
LR+0.5W(+X)+0.6T(+20) --1.207 0.7722 -1.2033 1.851 -0.000 0.000 0.000
5
521:G+CL+0.7L
LR+0.5W(+X)+0.6T(-20) 55.245 -1.0
001 -2.6466 5.959 -0.001 0.000 -0.001
5
522:G+CR+0.7L
LR+0.5W(-X)+0.6T(+20) --5.210 0.6678 -0.4699 5.275 -0.000 0.000 0.001
5
523:G+CR+0.7L
LR+0.5W(-X)+0.6T(-20) 11.242 -1.0
046 -1.9122 2.508 -0.001 0.000 -0.000
5
524:G+CL+0.7L
LR+0.5W(-X)+0.6T(+20) --5.210 0.6678 -0.4699 5.275 -0.000 0.000 0.001
5
525:G+CL+0.7L
LR+0.5W(-X)+0.6T(-20) 11.242 -1.0
046 -1.9122 2.508 -0.001 0.000 -0.000
5
526:G+CR+0.7L
LR+0.5W(+Z)+0 0.6T(+20) --3.883 0.6660 7.032
2 8.060 0.002 0.000 0.001
5
527:G+CR+0.7L
LR+0.5W(+Z)+0 0.6T(-20) 22.569 -1.0
063 5.589
9 6.243 0.001 0.001 -0.001
5
528:G+CL+0.7L
LR+0.5W(+Z)+0.6T(+20) --3.883 0.6660 7.032
2 8.060 0.002 0.000 0.001
5
529:G+CL+0.7L
LR+0.5W(+Z)+0.6T(-20) 22.569 -1.0
063 5.589
9 6.243 0.001 0.001 -0.001
5
530:G+CR+0.7L
LR+0.5W(-Z)+0..6T(+20) --4.254 0.7706 -6.9100 8.145 -0.002 -0.000 0.001

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 113 / 13
39
ERC AKH R
Railway Project
P
5
531:G+CR+0.7LLR+0.5W(-Z)+0..6T(-20) 22.198 -1.0
017 -8.353
3 8.697 -0.002 0.000 -0.001
5
532:G+CL+0.7LLR+0.5W(-Z)+0.6T(+20) --4.254 0.7
706 -6.910
0 8.145 -0.002 -0.000 0.001
5
533:G+CL+0.7LLR+0.5W(-Z)+0.6T(-20) 22.198 -1.0
017 -8.353
3 8.697 -0.002 0.000 -0.001
5
534:G+CR+0.7LLR+0.5W(+X) 22.019 -0.1
139 -1.925
5 2.793 -0.000 0.000 -0.001
5
535:G+CL+0.7LLR+0.5W(+X) 22.019 -0.1
139 -1.925
5 2.793 -0.000 0.000 -0.001
5
536:G+CR+0.7LLR+0.5W(-X) --1.984 -0.1
184 -1.190
0 2.321 -0.000 0.000 0.000
5
537:G+CL+0.7LLR+0.5W(-X) --1.984 -0.1
184 -1.190
0 2.321 -0.000 0.000 0.000
5
538:G+CR+0.7LLR+0.5W(+Z) --0.657 -0.2
201 6.3111 6.348 0.001 0.000 0.000
5
539:G+CL+0.7LLR+0.5W(+Z) --0.657 -0.2
201 6.3111 6.348 0.001 0.000 0.000
5
540:G+CR+0.7LLR+0.5W(-Z) --1.028 -0.1
155 -7.631 7.702 -0.002 -0.000 0.000
5
541:G+CL+0.7LLR+0.5W(-Z) --1.028 -0.1
155 -7.631 7.702 -0.002 -0.000 0.000
5
542:G+CR+0.7LLR+0.6T(+20) --3.224 0.6
670 0.730
0 3.373 0.000 0.000 0.001
5
543:G+CR+0.7LLR+0.6T(-20) 33.228 -1.0
054 -0.713
3 3.470 -0.000 0.000 -0.001
5
544:G+CL+0.7LLR+0.6T(+20) --3.224 0.6
670 0.730
0 3.373 0.000 0.000 0.001
5
545:G+CL+0.7LLR+0.6T(-20) 33.228 -1.0
054 -0.713
3 3.470 -0.000 0.000 -0.001
5
546:G+CR+0.5WW(+X)+0.6T(+20 0) --1.207 0.7
758 -1.205
5 1.866 -0.000 0.000 0.000
5
547:G+CR+0.5WW(+X)+0.6T(-200) 55.245 -0.9
965 -2.647
7 5.954 -0.001 0.000 -0.001
5
548:G+CL+0.5WW(+X)+0.6T(+200) --1.207 0.7
758 -1.205
5 1.866 -0.000 0.000 0.000
5
549:G+CL+0.5WW(+X)+0.6T(-20) 55.245 -0.9
965 -2.647
7 5.954 -0.001 0.000 -0.001
5
550:G+CR+0.5WW(-X)+0.6T(+200) --5.210 0.7
713 -0.470
0 5.280 -0.000 0.000 0.001
5
551:G+CR+0.5WW(-X)+0.6T(-20)) 11.242 -1.0
010 -1.913
3 2.495 -0.001 0.000 -0.000
5
552:G+CL+0.5WW(-X)+0.6T(+20) --5.210 0.7
713 -0.470
0 5.280 -0.000 0.000 0.001
5
553:G+CL+0.5WW(-X)+0.6T(-20)) 11.242 -1.0
010 -1.913
3 2.495 -0.001 0.000 -0.000
5
554:G+CR+0.5WW(+Z)+0.6T(+20 0) --3.883 0.6
696 7.031
1 8.062 0.002 0.000 0.001
5
555:G+CR+0.5WW(+Z)+0.6T(-200) 22.569 -1.0
027 5.5888 6.236 0.001 0.000 -0.001
5
556:G+CL+0.5WW(+Z)+0.6T(+200) --3.883 0.6
696 7.031
1 8.062 0.002 0.000 0.001
5
557:G+CL+0.5WW(+Z)+0.6T(-20) 22.569 -1.0
027 5.5888 6.236 0.001 0.000 -0.001
5
558:G+CR+0.5WW(-Z)+0.6T(+200) --4.254 0.7
742 -6.912
2 8.150 -0.002 -0.000 0.001
5
559:G+CR+0.5WW(-Z)+0.6T(-20)) 22.198 -0.9
981 -8.354
4 8.694 -0.002 -0.000 -0.001
5
560:G+CL+0.5WW(-Z)+0.6T(+20) --4.254 0.7
742 -6.912
2 8.150 -0.002 -0.000 0.001
5
561:G+CL+0.5WW(-Z)+0.6T(-20) 22.198 -0.9
981 -8.354
4 8.694 -0.002 -0.000 -0.001
5
562:G+CR+0.7LLR 00.002 -0.1
192 0.0088 0.192 -0.000 0.000 0.000
5
563:G+CL+0.7LLR 00.002 -0.1
192 0.0088 0.192 -0.000 0.000 0.000
5
564:G+CR+0.5WW(+X) 22.019 -0.1
104 -1.926
6 2.792 -0.000 0.000 -0.001
5
565:G+CL+0.5WW(+X) 22.019 -0.1
104 -1.926
6 2.792 -0.000 0.000 -0.001
5
566:G+CR+0.5WW(-X) --1.984 -0.1
148 -1.192
2 2.319 -0.000 0.000 0.000
5
567:G+CL+0.5WW(-X) --1.984 -0.1
148 -1.192
2 2.319 -0.000 0.000 0.000
5
568:G+CR+0.5WW(+Z) --0.657 -0.1
166 6.3099 6.346 0.001 0.000 0.000
5
569:G+CL+0.5WW(+Z) --0.657 -0.1
166 6.3099 6.346 0.001 0.000 0.000
5
570:G+CR+0.5WW(-Z) --1.028 -0.1
119 -7.633
3 7.703 -0.002 -0.000 0.000
5
571:G+CL+0.5WW(-Z) --1.028 -0.1
119 -7.633
3 7.703 -0.002 -0.000 0.000
5
572:G+CR+0.6TT(+20) --3.224 0.7
706 0.728
8 3.380 0.000 0.000 0.001
5
573:G+CR+0.6TT(-20) 33.228 -1.0
018 -0.715
5 3.459 -0.000 0.000 -0.001
5
574:G+CL+0.6TT(+20) --3.224 0.7
706 0.728
8 3.380 0.000 0.000 0.001
5
575:G+CL+0.6TT(-20) 33.228 -1.0
018 -0.715
5 3.459 -0.000 0.000 -0.001
5
576:G+CR 00.002 -0.1
156 0.0077 0.156 -0.000 0.000 0.000
5
577:G+CL 00.002 -0.1
156 0.0077 0.156 -0.000 0.000 0.000
5
578:G+T(+20)+00.7LR+0.5W(+XX)+CR --3.358 1.2
297 -0.722
2 3.671 -0.000 0.000 0.001
5
579:G+T(-20)+0
0.7LR+0.5W(+X)+CR 77.395 -1.5
576 -3.127
7 8.182 -0.001 0.000 -0.002
5
580:G+T(+20)+00.7LR+0.5W(+XX)+CL --3.358 1.2
297 -0.722
2 3.671 -0.000 0.000 0.001
5
581:G+T(-20)+0
0.7LR+0.5W(+X)+CL 77.395 -1.5
576 -3.127
7 8.182 -0.001 0.000 -0.002
5
582:G+T(+20)+00.7LR+0.5W(-X)+CR --7.361 1.2
252 0.012
2 7.467 -0.000 0.000 0.002
5
583:G+T(-20)+0
0.7LR+0.5W(-X))+CR 33.393 -1.6
620 -2.393
3 4.457 -0.001 0.000 -0.001
5
584:G+T(+20)+00.7LR+0.5W(-X)+CL --7.361 1.2
252 0.012
2 7.467 -0.000 0.000 0.002
5
585:G+T(-20)+0
0.7LR+0.5W(-X))+CL 33.393 -1.6
620 -2.393
3 4.457 -0.001 0.000 -0.001
5
586:G+T(+20)+00.7LR+0.5W(+ZZ)+CR --6.033 1.2
235 7.513
3 9.715 0.002 0.000 0.002
5
587:G+T(-20)+0
0.7LR+0.5W(+Z)+CR 44.720 -1.6
638 5.1099 7.146 0.001 0.001 -0.001
5
588:G+T(+20)+00.7LR+0.5W(+ZZ)+CL --6.033 1.2
235 7.513
3 9.715 0.002 0.000 0.002
5
589:G+T(-20)+0
0.7LR+0.5W(+Z)+CL 44.720 -1.6
638 5.1099 7.146 0.001 0.001 -0.001
5
590:G+T(+20)+00.7LR+0.5W(-Z)+CR --6.405 1.2
281 -6.429
9 9.165 -0.001 -0.000 0.002
5
591:G+T(-20)+0
0.7LR+0.5W(-Z)+CR 44.349 -1.5
592 -8.834
4 9.974 -0.002 0.000 -0.001
5
592:G+T(+20)+00.7LR+0.5W(-Z)+CL --6.405 1.2
281 -6.429
9 9.165 -0.001 -0.000 0.002
5
593:G+T(-20)+0
0.7LR+0.5W(-Z)+CL 44.349 -1.5
592 -8.834
4 9.974 -0.002 0.000 -0.001
5
594:G+T(+20)+00.7LR+0.5W(+XX) --3.358 1.2
297 -0.722
2 3.671 -0.000 0.000 0.001
5
595:G+T(-20)+0
0.7LR+0.5W(+X) 77.395 -1.5
576 -3.127
7 8.182 -0.001 0.000 -0.002
5
596:G+T(+20)+00.7LR+0.5W(-X) --7.361 1.2
252 0.012
2 7.467 -0.000 0.000 0.002
5
597:G+T(-20)+0
0.7LR+0.5W(-X)) 33.393 -1.6
620 -2.393
3 4.457 -0.001 0.000 -0.001
5
598:G+T(+20)+00.7LR+0.5W(+ZZ) --6.033 1.2
235 7.513
3 9.715 0.002 0.000 0.002
5
599:G+T(-20)+0
0.7LR+0.5W(+Z) 44.720 -1.6
638 5.1099 7.146 0.001 0.001 -0.001

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 114 / 13
39
ERC AKH R
Railway Project
P
6
600:G+T(+20)+00.7LR+0.5W(-Z) --6.405 1.2281 -6.4299 9.165 -0.001 -0.000 0.002
6
601:G+T(-20)+00.7LR+0.5W(-Z) 44.349 -1.5
592 -8.8344 9.974 -0.002 0.000 -0.001
6
602:G+T(+20)+00.7LR+CR --5.375 1.2244 1.211
1 5.648 0.000 0.000 0.001
6
603:G+T(-20)+00.7LR+CR 55.378 -1.6
628 -1.1944 5.745 -0.000 0.000 -0.001
6
604:G+T(+20)+00.7LR+CL --5.375 1.2244 1.211
1 5.648 0.000 0.000 0.001
6
605:G+T(-20)+00.7LR+CL 55.378 -1.6
628 -1.1944 5.745 -0.000 0.000 -0.001
6
606:G+T(+20)+00.5W(+X)+CR --3.358 1.3333 -0.7244 3.685 -0.000 0.000 0.001
6
607:G+T(-20)+00.5W(+X)+CR 77.395 -1.5
540 -3.1288 8.176 -0.001 0.000 -0.002
6
608:G+T(+20)+00.5W(+X)+CL --3.358 1.3333 -0.7244 3.685 -0.000 0.000 0.001
6
609:G+T(-20)+00.5W(+X)+CL 77.395 -1.5
540 -3.1288 8.176 -0.001 0.000 -0.002
6
610:G+T(+20)+00.5W(-X)+CR --7.361 1.2288 0.010
0 7.473 -0.000 0.000 0.002
6
611:G+T(-20)+00.5W(-X)+CR 33.392 -1.5
585 -2.3944 4.444 -0.001 0.000 -0.001
6
612:G+T(+20)+00.5W(-X)+CL --7.361 1.2288 0.010
0 7.473 -0.000 0.000 0.002
6
613:G+T(-20)+00.5W(-X)+CL 33.392 -1.5
585 -2.3944 4.444 -0.001 0.000 -0.001
6
614:G+T(+20)+00.5W(+Z)+CR --6.033 1.2271 7.512
2 9.718 0.002 0.000 0.002
6
615:G+T(-20)+00.5W(+Z)+CR 44.720 -1.6
602 5.107
7 7.136 0.001 0.001 -0.001
6
616:G+T(+20)+00.5W(+Z)+CL --6.033 1.2271 7.512
2 9.718 0.002 0.000 0.002
6
617:G+T(-20)+00.5W(+Z)+CL 44.720 -1.6
602 5.107
7 7.136 0.001 0.001 -0.001
6
618:G+T(+20)+00.5W(-Z)+CR --6.405 1.3317 -6.431 9.171 -0.001 -0.000 0.002
6
619:G+T(-20)+00.5W(-Z)+CR 44.349 -1.5
556 -8.8355 9.970 -0.002 0.000 -0.001
6
620:G+T(+20)+00.5W(-Z)+CL --6.405 1.3317 -6.431 9.171 -0.001 -0.000 0.002
6
621:G+T(-20)+00.5W(-Z)+CL 44.349 -1.5
556 -8.8355 9.970 -0.002 0.000 -0.001
6
622:G+T(+20)+00.7LR --5.375 1.2244 1.211
1 5.648 0.000 0.000 0.001
6
623:G+T(-20)+00.7LR 55.378 -1.6
628 -1.1944 5.745 -0.000 0.000 -0.001
6
624:G+T(+20)+00.5W(+X) --3.358 1.3333 -0.7244 3.685 -0.000 0.000 0.001
6
625:G+T(-20)+00.5W(+X) 77.395 -1.5
540 -3.1288 8.176 -0.001 0.000 -0.002
6
626:G+T(+20)+00.5W(-X) --7.361 1.2288 0.010
0 7.473 -0.000 0.000 0.002
6
627:G+T(-20)+00.5W(-X) 33.392 -1.5
585 -2.3944 4.444 -0.001 0.000 -0.001
6
628:G+T(+20)+00.5W(+Z) --6.033 1.2271 7.512
2 9.718 0.002 0.000 0.002
6
629:G+T(-20)+00.5W(+Z) 44.720 -1.6
602 5.107
7 7.136 0.001 0.001 -0.001
6
630:G+T(+20)+00.5W(-Z) --6.405 1.3317 -6.431 9.171 -0.001 -0.000 0.002
6
631:G+T(-20)+00.5W(-Z) 44.349 -1.5
556 -8.8355 9.970 -0.002 0.000 -0.001
6
632:G+T(+20)+CCR --5.375 1.2280 1.209
9 5.656 0.000 0.000 0.001
6
633:G+T(-20)+CCR 55.378 -1.5
593 -1.1955 5.735 -0.000 0.000 -0.001
6
634:G+T(+20)+CCL --5.375 1.2280 1.209
9 5.656 0.000 0.000 0.001
6
635:G+T(-20)+CCL 55.378 -1.5
593 -1.1955 5.735 -0.000 0.000 -0.001
6
636:G+T(+20) --5.375 1.2280 1.209
9 5.656 0.000 0.000 0.001
6
637:G+T(-20) 55.378 -1.5
593 -1.1955 5.735 -0.000 0.000 -0.001
6
638:G+E(X)+0.33E(Z)+CD 4
46.485 -0.1
156 13.085 48.292 0.003 0.002 -0.012
6
639:G+E(X)-0.3E(Z)+CD 4
46.203 -0.1
155 -1.3999 46.224 -0.000 0.002 -0.011
6
640:G-E(X)+0.3E(Z)+CD -446.199 -0.1
158 1.413
3 46.221 0.000 -0.001 0.011
6
641:G-E(X)-0.3E
E(Z)+CD -446.481 -0.1
157 -13.0771 48.285 -0.003 -0.002 0.012
6
642:G+0.3E(X)++E(Z)+CD 1
14.374 -0.1
158 25.898 29.620 0.006 0.002 -0.004
6
643:G+0.3E(X)-E(Z)+CD 1
13.434 -0.1
154 -22.3883 26.105 -0.005 -0.000 -0.003
6
644:G-0.3E(X)+E(Z)+CD -113.431 -0.1
158 22.396 26.115 0.005 0.001 0.003
6
645:G+0.3E(X)-E(Z)+CD -114.371 -0.1
155 -25.8884 29.606 -0.006 -0.001 0.004
22 4
401:G+LR+0.5W W(+X)+CR+0.6TT(+20) 33.232 0.5
561 -0.9788 3.423 -0.000 0.000 -0.001
4
402:G+LR+0.5W W(+X)+CR+0.6TT(-20) 00.783 -0.8
879 -0.1422 1.185 0.000 0.000 -0.000
4
403:G+LR+0.5W W(+X)+CL+0.6TT(+20) 33.232 0.5
561 -0.9788 3.423 -0.000 0.000 -0.001
4
404:G+LR+0.5W W(+X)+CL+0.6TT(-20) 00.783 -0.8
879 -0.1422 1.185 0.000 0.000 -0.000
4
405:G+LR+0.5W W(-X)+CR+0.6T(+20) --0.790 0.5561 -0.9599 1.363 -0.000 0.000 0.000
4
406:G+LR+0.5W W(-X)+CR+0.6T(-20) --3.239 -0.8
879 -0.1233 3.359 0.000 0.000 0.001
4
407:G+LR+0.5W W(-X)+CL+0.6T((+20) --0.790 0.5561 -0.9599 1.363 -0.000 0.000 0.000
4
408:G+LR+0.5W W(-X)+CL+0.6T((-20) --3.239 -0.8
879 -0.1233 3.359 0.000 0.000 0.001
4
409:G+LR+0.5W W(+Z)+CR+0.6TT(+20) 00.618 0.5
565 1.644
4 1.845 0.000 0.000 -0.000
4
410:G+LR+0.5W W(+Z)+CR+0.6TT(-20) --1.832 -0.8
875 2.481
1 3.205 0.001 0.000 0.001
4
411:G+LR+0.5W W(+Z)+CL+0.6T(+20) 00.618 0.5
565 1.644
4 1.845 0.000 0.000 -0.000
4
412:G+LR+0.5W W(+Z)+CL+0.6T(-20) --1.832 -0.8
875 2.481
1 3.205 0.001 0.000 0.001
4
413:G+LR+0.5W W(-Z)+CR+0.6T(+20) 00.759 0.5
565 -5.7055 5.783 -0.002 0.000 -0.000
4
414:G+LR+0.5W W(-Z)+CR+0.6T(-20) --1.691 -0.8
875 -4.8699 5.228 -0.001 0.000 0.001
4
415:G+LR+0.5W W(-Z)+CL+0.6T((+20) 00.759 0.5
565 -5.7055 5.783 -0.002 0.000 -0.000
4
416:G+LR+0.5W W(-Z)+CL+0.6T((-20) --1.691 -0.8
875 -4.8699 5.228 -0.001 0.000 0.001
4
417:G+LR+0.5W W(+X)+CR 22.007 -0.1
159 -0.5600 2.090 -0.000 0.000 -0.001
4
418:G+LR+0.5W W(+X)+CL 22.007 -0.1
159 -0.5600 2.090 -0.000 0.000 -0.001
4
419:G+LR+0.5W W(-X)+CR --2.015 -0.1
159 -0.541 2.092 -0.000 0.000 0.001
4
420:G+LR+0.5W W(-X)+CL) --2.015 -0.1
159 -0.541 2.092 -0.000 0.000 0.001
4
421:G+LR+0.5W W(+Z)+CR --0.607 -0.1
155 2.062
2 2.156 0.001 0.000 0.000
4
422:G+LR+0.5W W(+Z)+CL --0.607 -0.1
155 2.062
2 2.156 0.001 0.000 0.000
4
423:G+LR+0.5W W(-Z)+CR --0.466 -0.1
155 -5.2877 5.310 -0.002 0.000 0.000

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 115 / 13
39
ERC AKH R
Railway Project
P
4
424:G+LR+0.5W
W(-Z)+CL --0.466 -0.1
155 -5.2877 5.310 -0.002 0.000 0.000
4
425:G+LR+0.5W
W(+X)+0.6T(+200) 33.232 0.5
561 -0.9788 3.423 -0.000 0.000 -0.001
4
426:G+LR+0.5W
W(+X)+0.6T(-20) 00.783 -0.8
879 -0.1422 1.185 0.000 0.000 -0.000
4
427:G+LR+0.5W
W(-X)+0.6T(+20) --0.790 0.5561 -0.9599 1.363 -0.000 0.000 0.000
4
428:G+LR+0.5W
W(-X)+0.6T(-20)) --3.239 -0.8
879 -0.1233 3.359 0.000 0.000 0.001
4
429:G+LR+0.5W
W(+Z)+0.6T(+200) 00.618 0.5
565 1.644
4 1.845 0.000 0.000 -0.000
4
430:G+LR+0.5W
W(+Z)+0.6T(-20) --1.832 -0.8
875 2.4811 3.205 0.001 0.000 0.001
4
431:G+LR+0.5W
W(-Z)+0.6T(+20) 00.759 0.5
565 -5.7055 5.783 -0.002 0.000 -0.000
4
432:G+LR+0.5W
W(-Z)+0.6T(-20) --1.691 -0.8
875 -4.8699 5.228 -0.001 0.000 0.001
4
433:G+LR+CR++0.6T(+20) 11.224 0.5548 -0.4188 1.405 -0.000 0.000 -0.000
4
434:G+LR+CR++0.6T(-20) --1.225 -0.8
892 0.4199 1.572 0.000 0.000 0.000
4
435:G+LR+CL+0.6T(+20) 11.224 0.5548 -0.4188 1.405 -0.000 0.000 -0.000
4
436:G+LR+CL+0.6T(-20) --1.225 -0.8
892 0.4199 1.572 0.000 0.000 0.000
4
437:G+LR+0.5W
W(+X) 22.007 -0.1
159 -0.5600 2.090 -0.000 0.000 -0.001
4
438:G+LR+0.5W
W(-X) --2.015 -0.1
159 -0.541 2.092 -0.000 0.000 0.001
4
439:G+LR+0.5W
W(+Z) --0.607 -0.1
155 2.0622 2.156 0.001 0.000 0.000
4
440:G+LR+0.5W
W(-Z) --0.466 -0.1
155 -5.2877 5.310 -0.002 0.000 0.000
4
441:G+LR+CR --0.000 -0.1
172 0.0000 0.172 0.000 0.000 0.000
4
442:G+LR+CL --0.000 -0.1
172 0.0000 0.172 0.000 0.000 0.000
4
443:G+LR+0.6T
T(+20) 11.224 0.5548 -0.4188 1.405 -0.000 0.000 -0.000
4
444:G+LR+0.6T
T(-20) --1.225 -0.8
892 0.4199 1.572 0.000 0.000 0.000
4
445:G+LR --0.000 -0.1
172 0.0000 0.172 0.000 0.000 0.000
4
446:G+W(+X)+00.7LR+CR+0.6TT(+20) 55.240 0.5
587 -1.5388 5.493 -0.000 0.000 -0.002
4
447:G+W(+X)+00.7LR+CR+0.6TT(-20) 22.791 -0.8
853 -0.7022 3.002 -0.000 0.000 -0.001
4
448:G+W(+X)+00.7LR+CL+0.6TT(+20) 55.240 0.5
587 -1.5388 5.493 -0.000 0.000 -0.002
4
449:G+W(+X)+00.7LR+CL+0.6TT(-20) 22.791 -0.8
853 -0.7022 3.002 -0.000 0.000 -0.001
4
450:G+W(-X)+0.7LR+CR+0.6T(+20) --2.804 0.5587 -1.501 3.234 -0.000 0.000 0.001
4
451:G+W(-X)+0.7LR+CR+0.6T(-20) --5.254 -0.8
853 -0.6644 5.364 -0.000 0.000 0.002
4
452:G+W(-X)+0.7LR+CL+0.6T((+20) --2.804 0.5587 -1.501 3.234 -0.000 0.000 0.001
4
453:G+W(-X)+0.7LR+CL+0.6T((-20) --5.254 -0.8
853 -0.6644 5.364 -0.000 0.000 0.002
4
454:G+W(+Z)+0
0.7LR+CR+0.6T T(+20) 00.011 0.5
594 3.706
6 3.754 0.001 0.000 -0.000
4
455:G+W(+Z)+0
0.7LR+CR+0.6T T(-20) --2.439 -0.8
845 4.5422 5.224 0.001 -0.000 0.001
4
456:G+W(+Z)+0
0.7LR+CL+0.6T(+20) 00.011 0.5
594 3.706
6 3.754 0.001 0.000 -0.000
4
457:G+W(+Z)+0
0.7LR+CL+0.6T(-20) --2.439 -0.8
845 4.5422 5.224 0.001 -0.000 0.001
4
458:G+W(-Z)+0.7LR+CR+0.6T(+20) 00.293 0.5
595 -10.9992 11.012 -0.003 0.001 -0.000
4
459:G+W(-Z)+0.7LR+CR+0.6T(-20) --2.156 -0.8
845 -10.1556 10.417 -0.003 0.000 0.001
4
460:G+W(-Z)+0.7LR+CL+0.6T((+20) 00.293 0.5
595 -10.9992 11.012 -0.003 0.001 -0.000
4
461:G+W(-Z)+0.7LR+CL+0.6T((-20) --2.156 -0.8
845 -10.1556 10.417 -0.003 0.000 0.001
4
462:G+W(+X)+00.7LR+CR 44.015 -0.1
133 -1.1200 4.171 -0.000 0.000 -0.001
4
463:G+W(+X)+00.7LR+CL 44.015 -0.1
133 -1.1200 4.171 -0.000 0.000 -0.001
4
464:G+W(-X)+0.7LR+CR --4.029 -0.1
133 -1.0833 4.174 -0.000 0.000 0.001
4
465:G+W(-X)+0.7LR+CL --4.029 -0.1
133 -1.0833 4.174 -0.000 0.000 0.001
4
466:G+W(+Z)+0
0.7LR+CR --1.214 -0.1
126 4.1244 4.301 0.001 0.000 0.000
4
467:G+W(+Z)+0
0.7LR+CL --1.214 -0.1
126 4.1244 4.301 0.001 0.000 0.000
4
468:G+W(-Z)+0.7LR+CR --0.931 -0.1
125 -10.5774 10.616 -0.003 0.000 0.000
4
469:G+W(-Z)+0.7LR+CL --0.931 -0.1
125 -10.5774 10.616 -0.003 0.000 0.000
4
470:G+W(+X)+00.7LR+0.6T(+20
0) 55.240 0.5
587 -1.5388 5.493 -0.000 0.000 -0.002
4
471:G+W(+X)+00.7LR+0.6T(-20) 22.791 -0.8
853 -0.7022 3.002 -0.000 0.000 -0.001
4
472:G+W(-X)+0.7LR+0.6T(+20) --2.804 0.5587 -1.501 3.234 -0.000 0.000 0.001
4
473:G+W(-X)+0.7LR+0.6T(-20)) --5.254 -0.8
853 -0.6644 5.364 -0.000 0.000 0.002
4
474:G+W(+Z)+0
0.7LR+0.6T(+200) 00.011 0.5
594 3.706
6 3.754 0.001 0.000 -0.000
4
475:G+W(+Z)+0
0.7LR+0.6T(-20) --2.439 -0.8
845 4.5422 5.224 0.001 -0.000 0.001
4
476:G+W(-Z)+0.7LR+0.6T(+20) 00.293 0.5
595 -10.9992 11.012 -0.003 0.001 -0.000
4
477:G+W(-Z)+0.7LR+0.6T(-20) --2.156 -0.8
845 -10.1556 10.417 -0.003 0.000 0.001
4
478:G+W(+X)+CCR+0.6T(+20) 55.240 0.6
617 -1.5399 5.496 -0.000 0.000 -0.002
4
479:G+W(+X)+CCR+0.6T(-20) 22.791 -0.8
823 -0.7033 2.993 -0.000 0.000 -0.001
4
480:G+W(+X)+CCL+0.6T(+20) 55.240 0.6
617 -1.5399 5.496 -0.000 0.000 -0.002
4
481:G+W(+X)+CCL+0.6T(-20) 22.791 -0.8
823 -0.7033 2.993 -0.000 0.000 -0.001
4
482:G+W(-X)+C
CR+0.6T(+20) --2.804 0.6617 -1.501 3.240 -0.000 0.000 0.001
4
483:G+W(-X)+C
CR+0.6T(-20) --5.254 -0.8
823 -0.6655 5.359 -0.000 -0.000 0.002
4
484:G+W(-X)+C
CL+0.6T(+20) --2.804 0.6617 -1.501 3.240 -0.000 0.000 0.001
4
485:G+W(-X)+C
CL+0.6T(-20) --5.254 -0.8
823 -0.6655 5.359 -0.000 -0.000 0.002
4
486:G+W(+Z)+C
CR+0.6T(+20) 00.011 0.6
624 3.706
6 3.758 0.001 0.000 -0.000
4
487:G+W(+Z)+C
CR+0.6T(-20) --2.438 -0.8
816 4.5422 5.219 0.001 -0.000 0.001
4
488:G+W(+Z)+C
CL+0.6T(+20) 00.011 0.6
624 3.706
6 3.758 0.001 0.000 -0.000
4
489:G+W(+Z)+C
CL+0.6T(-20) --2.438 -0.8
816 4.5422 5.219 0.001 -0.000 0.001
4
490:G+W(-Z)+C
CR+0.6T(+20) 00.293 0.6
625 -10.9993 11.014 -0.003 0.000 -0.000
4
491:G+W(-Z)+C
CR+0.6T(-20) --2.156 -0.8
815 -10.1557 10.415 -0.003 0.000 0.001
4
492:G+W(-Z)+C
CL+0.6T(+20) 00.293 0.6
625 -10.9993 11.014 -0.003 0.000 -0.000

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 116 / 13
39
ERC AKH R
Railway Project
P
4
493:G+W(-Z)+C
CL+0.6T(-20) --2.156 -0.8
815 -10.1557 10.415 -0.003 0.000 0.001
4
494:G+W(+X)+00.7LR 44.015 -0.1
133 -1.1200 4.171 -0.000 0.000 -0.001
4
495:G+W(-X)+0.7LR --4.029 -0.1
133 -1.0833 4.174 -0.000 0.000 0.001
4
496:G+W(+Z)+0
0.7LR --1.214 -0.1
126 4.1244 4.301 0.001 0.000 0.000
4
497:G+W(-Z)+0.7LR --0.931 -0.1
125 -10.5774 10.616 -0.003 0.000 0.000
4
498:G+W(+X)+CCR 44.016 -0.1
103 -1.121 4.170 -0.000 0.000 -0.001
4
499:G+W(+X)+CCL 44.016 -0.1
103 -1.121 4.170 -0.000 0.000 -0.001
5
500:G+W(-X)+C
CR --4.029 -0.1
103 -1.0833 4.173 -0.000 0.000 0.001
5
501:G+W(-X)+C
CL --4.029 -0.1
103 -1.0833 4.173 -0.000 0.000 0.001
5
502:G+W(+Z)+C
CR --1.214 -0.0
096 4.1244 4.300 0.001 -0.000 0.000
5
503:G+W(+Z)+C
CL --1.214 -0.0
096 4.1244 4.300 0.001 -0.000 0.000
5
504:G+W(-Z)+C
CR --0.931 -0.0
095 -10.5775 10.616 -0.003 0.000 0.000
5
505:G+W(-Z)+C
CL --0.931 -0.0
095 -10.5775 10.616 -0.003 0.000 0.000
5
506:G+W(+X)+00.6T(+20) 55.240 0.6
617 -1.5399 5.496 -0.000 0.000 -0.002
5
507:G+W(+X)+00.6T(-20) 22.791 -0.8
823 -0.7033 2.993 -0.000 0.000 -0.001
5
508:G+W(-X)+0.6T(+20) --2.804 0.6617 -1.501 3.240 -0.000 0.000 0.001
5
509:G+W(-X)+0.6T(-20) --5.254 -0.8
823 -0.6655 5.359 -0.000 -0.000 0.002
5
510:G+W(+Z)+0
0.6T(+20) 00.011 0.6
624 3.706
6 3.758 0.001 0.000 -0.000
5
511:G+W(+Z)+0
0.6T(-20) --2.438 -0.8
816 4.5422 5.219 0.001 -0.000 0.001
5
512:G+W(-Z)+0.6T(+20) 00.293 0.6
625 -10.9993 11.014 -0.003 0.000 -0.000
5
513:G+W(-Z)+0.6T(-20) --2.156 -0.8
815 -10.1557 10.415 -0.003 0.000 0.001
5
514:G+W(+X) 44.016 -0.1
103 -1.121 4.170 -0.000 0.000 -0.001
5
515:G+W(-X) --4.029 -0.1
103 -1.0833 4.173 -0.000 0.000 0.001
5
516:G+W(+Z) --1.214 -0.0
096 4.1244 4.300 0.001 -0.000 0.000
5
517:G+W(-Z) --0.931 -0.0
095 -10.5775 10.616 -0.003 0.000 0.000
5
518:G+CR+0.7L
LR+0.5W(+X)+0 0.6T(+20) 33.232 0.5
574 -0.9788 3.425 -0.000 0.000 -0.001
5
519:G+CR+0.7L
LR+0.5W(+X)+0 0.6T(-20) 00.783 -0.8
866 -0.1422 1.176 0.000 0.000 -0.000
5
520:G+CL+0.7L
LR+0.5W(+X)+0.6T(+20) 33.232 0.5
574 -0.9788 3.425 -0.000 0.000 -0.001
5
521:G+CL+0.7L
LR+0.5W(+X)+0.6T(-20) 00.783 -0.8
866 -0.1422 1.176 0.000 0.000 -0.000
5
522:G+CR+0.7L
LR+0.5W(-X)+0.6T(+20) --0.790 0.5574 -0.9599 1.369 -0.000 0.000 0.000
5
523:G+CR+0.7L
LR+0.5W(-X)+0.6T(-20) --3.239 -0.8
866 -0.1233 3.355 0.000 0.000 0.001
5
524:G+CL+0.7L
LR+0.5W(-X)+0.6T(+20) --0.790 0.5574 -0.9599 1.369 -0.000 0.000 0.000
5
525:G+CL+0.7L
LR+0.5W(-X)+0.6T(-20) --3.239 -0.8
866 -0.1233 3.355 0.000 0.000 0.001
5
526:G+CR+0.7L
LR+0.5W(+Z)+0 0.6T(+20) 00.618 0.5
578 1.644
4 1.849 0.000 0.000 -0.000
5
527:G+CR+0.7L
LR+0.5W(+Z)+0 0.6T(-20) --1.832 -0.8
862 2.4800 3.202 0.001 0.000 0.001
5
528:G+CL+0.7L
LR+0.5W(+Z)+0.6T(+20) 00.618 0.5
578 1.644
4 1.849 0.000 0.000 -0.000
5
529:G+CL+0.7L
LR+0.5W(+Z)+0.6T(-20) --1.832 -0.8
862 2.4800 3.202 0.001 0.000 0.001
5
530:G+CR+0.7L
LR+0.5W(-Z)+0..6T(+20) 00.759 0.5
578 -5.7055 5.784 -0.002 0.000 -0.000
5
531:G+CR+0.7L
LR+0.5W(-Z)+0..6T(-20) --1.691 -0.8
862 -4.8699 5.226 -0.001 0.000 0.001
5
532:G+CL+0.7L
LR+0.5W(-Z)+0.6T(+20) 00.759 0.5
578 -5.7055 5.784 -0.002 0.000 -0.000
5
533:G+CL+0.7L
LR+0.5W(-Z)+0.6T(-20) --1.691 -0.8
862 -4.8699 5.226 -0.001 0.000 0.001
5
534:G+CR+0.7L
LR+0.5W(+X) 22.007 -0.1
146 -0.5600 2.089 -0.000 0.000 -0.001
5
535:G+CL+0.7L
LR+0.5W(+X) 22.007 -0.1
146 -0.5600 2.089 -0.000 0.000 -0.001
5
536:G+CR+0.7L
LR+0.5W(-X) --2.015 -0.1
146 -0.541 2.091 -0.000 0.000 0.001
5
537:G+CL+0.7L
LR+0.5W(-X) --2.015 -0.1
146 -0.541 2.091 -0.000 0.000 0.001
5
538:G+CR+0.7L
LR+0.5W(+Z) --0.607 -0.1
142 2.0622 2.155 0.001 0.000 0.000
5
539:G+CL+0.7L
LR+0.5W(+Z) --0.607 -0.1
142 2.0622 2.155 0.001 0.000 0.000
5
540:G+CR+0.7L
LR+0.5W(-Z) --0.466 -0.1
142 -5.2877 5.309 -0.002 0.000 0.000
5
541:G+CL+0.7L
LR+0.5W(-Z) --0.466 -0.1
142 -5.2877 5.309 -0.002 0.000 0.000
5
542:G+CR+0.7L
LR+0.6T(+20) 11.224 0.5561 -0.4188 1.410 -0.000 0.000 -0.000
5
543:G+CR+0.7L
LR+0.6T(-20) --1.225 -0.8
879 0.4188 1.565 0.000 0.000 0.000
5
544:G+CL+0.7L
LR+0.6T(+20) 11.224 0.5561 -0.4188 1.410 -0.000 0.000 -0.000
5
545:G+CL+0.7L
LR+0.6T(-20) --1.225 -0.8
879 0.4188 1.565 0.000 0.000 0.000
5
546:G+CR+0.5W
W(+X)+0.6T(+20 0) 33.232 0.6
604 -0.9788 3.431 -0.000 0.000 -0.001
5
547:G+CR+0.5W
W(+X)+0.6T(-200) 00.783 -0.8
836 -0.1422 1.154 0.000 0.000 -0.000
5
548:G+CL+0.5W
W(+X)+0.6T(+200) 33.232 0.6
604 -0.9788 3.431 -0.000 0.000 -0.001
5
549:G+CL+0.5W
W(+X)+0.6T(-20) 00.783 -0.8
836 -0.1422 1.154 0.000 0.000 -0.000
5
550:G+CR+0.5W
W(-X)+0.6T(+200) --0.790 0.6604 -0.9599 1.382 -0.000 0.000 0.000
5
551:G+CR+0.5W
W(-X)+0.6T(-20)) --3.239 -0.8
836 -0.1233 3.348 0.000 0.000 0.001
5
552:G+CL+0.5W
W(-X)+0.6T(+20) --0.790 0.6604 -0.9599 1.382 -0.000 0.000 0.000
5
553:G+CL+0.5W
W(-X)+0.6T(-20)) --3.239 -0.8
836 -0.1233 3.348 0.000 0.000 0.001
5
554:G+CR+0.5W
W(+Z)+0.6T(+20 0) 00.618 0.6
607 1.644
4 1.858 0.000 0.000 -0.000
5
555:G+CR+0.5W
W(+Z)+0.6T(-200) --1.832 -0.8
832 2.4800 3.194 0.001 0.000 0.001
5
556:G+CL+0.5W
W(+Z)+0.6T(+200) 00.618 0.6
607 1.644
4 1.858 0.000 0.000 -0.000
5
557:G+CL+0.5W
W(+Z)+0.6T(-20) --1.832 -0.8
832 2.4800 3.194 0.001 0.000 0.001
5
558:G+CR+0.5W
W(-Z)+0.6T(+200) 00.759 0.6
608 -5.7055 5.788 -0.002 0.000 -0.000
5
559:G+CR+0.5W
W(-Z)+0.6T(-20)) --1.690 -0.8
832 -4.8699 5.221 -0.001 0.000 0.001
5
560:G+CL+0.5W
W(-Z)+0.6T(+20) 00.759 0.6
608 -5.7055 5.788 -0.002 0.000 -0.000
5
561:G+CL+0.5W
W(-Z)+0.6T(-20) --1.690 -0.8
832 -4.8699 5.221 -0.001 0.000 0.001

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 117 / 13
39
ERC AKH R
Railway Project
P
5
562:G+CR+0.7LLR --0.000 -0.1
159 0.0000 0.159 0.000 0.000 0.000
5
563:G+CL+0.7LLR --0.000 -0.1
159 0.0000 0.159 0.000 0.000 0.000
5
564:G+CR+0.5WW(+X) 22.008 -0.1
116 -0.560
0 2.088 -0.000 0.000 -0.001
5
565:G+CL+0.5WW(+X) 22.008 -0.1
116 -0.560
0 2.088 -0.000 0.000 -0.001
5
566:G+CR+0.5WW(-X) --2.015 -0.1
116 -0.541 2.089 -0.000 0.000 0.001
5
567:G+CL+0.5WW(-X) --2.015 -0.1
116 -0.541 2.089 -0.000 0.000 0.001
5
568:G+CR+0.5WW(+Z) --0.607 -0.1
112 2.0622 2.153 0.001 0.000 0.000
5
569:G+CL+0.5WW(+Z) --0.607 -0.1
112 2.0622 2.153 0.001 0.000 0.000
5
570:G+CR+0.5WW(-Z) --0.466 -0.1
112 -5.287
7 5.309 -0.002 0.000 0.000
5
571:G+CL+0.5WW(-Z) --0.466 -0.1
112 -5.287
7 5.309 -0.002 0.000 0.000
5
572:G+CR+0.6TT(+20) 11.224 0.5591 -0.418
8 1.422 -0.000 0.000 -0.000
5
573:G+CR+0.6TT(-20) --1.225 -0.8
849 0.4188 1.548 0.000 0.000 0.000
5
574:G+CL+0.6TT(+20) 11.224 0.5591 -0.418
8 1.422 -0.000 0.000 -0.000
5
575:G+CL+0.6TT(-20) --1.225 -0.8
849 0.4188 1.548 0.000 0.000 0.000
5
576:G+CR --0.000 -0.1
129 0.0000 0.129 0.000 0.000 0.000
5
577:G+CL --0.000 -0.1
129 0.0000 0.129 0.000 0.000 0.000
5
578:G+T(+20)+00.7LR+0.5W(+X
X)+CR 44.049 1.0
054 -1.257
7 4.368 -0.000 0.000 -0.001
5
579:G+T(-20)+0
0.7LR+0.5W(+X)+CR --0.034 -1.3
346 0.1377 1.353 0.000 0.000 0.000
5
580:G+T(+20)+00.7LR+0.5W(+X
X)+CL 44.049 1.0
054 -1.257
7 4.368 -0.000 0.000 -0.001
5
581:G+T(-20)+0
0.7LR+0.5W(+X)+CL --0.034 -1.3
346 0.1377 1.353 0.000 0.000 0.000
5
582:G+T(+20)+00.7LR+0.5W(-X)+CR 00.026 1.0
054 -1.238
8 1.626 -0.000 0.000 -0.000
5
583:G+T(-20)+0
0.7LR+0.5W(-X))+CR --4.056 -1.3
346 0.1566 4.276 0.000 0.000 0.001
5
584:G+T(+20)+00.7LR+0.5W(-X)+CL 00.026 1.0
054 -1.238
8 1.626 -0.000 0.000 -0.000
5
585:G+T(-20)+0
0.7LR+0.5W(-X))+CL --4.056 -1.3
346 0.1566 4.276 0.000 0.000 0.001
5
586:G+T(+20)+00.7LR+0.5W(+Z
Z)+CR 11.434 1.0057 1.366
6 2.245 0.000 0.000 -0.000
5
587:G+T(-20)+0
0.7LR+0.5W(+Z)+CR --2.648 -1.3
342 2.7599 4.053 0.001 0.000 0.001
5
588:G+T(+20)+00.7LR+0.5W(+Z
Z)+CL 11.434 1.0057 1.366
6 2.245 0.000 0.000 -0.000
5
589:G+T(-20)+0
0.7LR+0.5W(+Z)+CL --2.648 -1.3
342 2.7599 4.053 0.001 0.000 0.001
5
590:G+T(+20)+00.7LR+0.5W(-Z)+CR 11.575 1.0058 -5.984
4 6.277 -0.002 0.000 -0.000
5
591:G+T(-20)+0
0.7LR+0.5W(-Z)+CR --2.507 -1.3
342 -4.590
0 5.400 -0.001 0.000 0.001
5
592:G+T(+20)+00.7LR+0.5W(-Z)+CL 11.575 1.0058 -5.984
4 6.277 -0.002 0.000 -0.000
5
593:G+T(-20)+0
0.7LR+0.5W(-Z)+CL --2.507 -1.3
342 -4.590
0 5.400 -0.001 0.000 0.001
5
594:G+T(+20)+00.7LR+0.5W(+X
X) 44.049 1.0
054 -1.257
7 4.368 -0.000 0.000 -0.001
5
595:G+T(-20)+0
0.7LR+0.5W(+X) --0.034 -1.3
346 0.1377 1.353 0.000 0.000 0.000
5
596:G+T(+20)+00.7LR+0.5W(-X) 00.026 1.0
054 -1.238
8 1.626 -0.000 0.000 -0.000
5
597:G+T(-20)+0
0.7LR+0.5W(-X)) --4.056 -1.3
346 0.1566 4.276 0.000 0.000 0.001
5
598:G+T(+20)+00.7LR+0.5W(+Z
Z) 11.434 1.0057 1.366
6 2.245 0.000 0.000 -0.000
5
599:G+T(-20)+0
0.7LR+0.5W(+Z) --2.648 -1.3
342 2.7599 4.053 0.001 0.000 0.001
6
600:G+T(+20)+00.7LR+0.5W(-Z) 11.575 1.0058 -5.984
4 6.277 -0.002 0.000 -0.000
6
601:G+T(-20)+0
0.7LR+0.5W(-Z) --2.507 -1.3
342 -4.590
0 5.400 -0.001 0.000 0.001
6
602:G+T(+20)+00.7LR+CR 22.041 1.0
041 -0.696
6 2.394 -0.000 0.000 -0.001
6
603:G+T(-20)+0
0.7LR+CR --2.042 -1.3
359 0.6977 2.550 0.000 0.000 0.001
6
604:G+T(+20)+00.7LR+CL 22.041 1.0
041 -0.696
6 2.394 -0.000 0.000 -0.001
6
605:G+T(-20)+0
0.7LR+CL --2.042 -1.3
359 0.6977 2.550 0.000 0.000 0.001
6
606:G+T(+20)+00.5W(+X)+CR 44.049 1.0
084 -1.257
7 4.376 -0.000 0.000 -0.001
6
607:G+T(-20)+0
0.5W(+X)+CR --0.034 -1.3
316 0.1377 1.324 0.000 0.000 0.000
6
608:G+T(+20)+00.5W(+X)+CL 44.049 1.0
084 -1.257
7 4.376 -0.000 0.000 -0.001
6
609:G+T(-20)+0
0.5W(+X)+CL --0.034 -1.3
316 0.1377 1.324 0.000 0.000 0.000
6
610:G+T(+20)+00.5W(-X)+CR 00.027 1.0
084 -1.238
8 1.646 -0.000 0.000 -0.000
6
611:G+T(-20)+0
0.5W(-X)+CR --4.056 -1.3
316 0.1555 4.267 0.000 0.000 0.001
6
612:G+T(+20)+00.5W(-X)+CL 00.027 1.0
084 -1.238
8 1.646 -0.000 0.000 -0.000
6
613:G+T(-20)+0
0.5W(-X)+CL --4.056 -1.3
316 0.1555 4.267 0.000 0.000 0.001
6
614:G+T(+20)+00.5W(+Z)+CR 11.434 1.0087 1.365
5 2.259 0.000 0.000 -0.000
6
615:G+T(-20)+0
0.5W(+Z)+CR --2.648 -1.3
312 2.7599 4.043 0.001 -0.000 0.001
6
616:G+T(+20)+00.5W(+Z)+CL 11.434 1.0087 1.365
5 2.259 0.000 0.000 -0.000
6
617:G+T(-20)+0
0.5W(+Z)+CL --2.648 -1.3
312 2.7599 4.043 0.001 -0.000 0.001
6
618:G+T(+20)+00.5W(-Z)+CR 11.575 1.0088 -5.984
4 6.283 -0.002 0.000 -0.000
6
619:G+T(-20)+0
0.5W(-Z)+CR --2.507 -1.3
312 -4.591 5.392 -0.001 0.000 0.001
6
620:G+T(+20)+00.5W(-Z)+CL 11.575 1.0088 -5.984
4 6.283 -0.002 0.000 -0.000
6
621:G+T(-20)+0
0.5W(-Z)+CL --2.507 -1.3
312 -4.591 5.392 -0.001 0.000 0.001
6
622:G+T(+20)+00.7LR 22.041 1.0
041 -0.696
6 2.394 -0.000 0.000 -0.001
6
623:G+T(-20)+0
0.7LR --2.042 -1.3
359 0.6977 2.550 0.000 0.000 0.001
6
624:G+T(+20)+00.5W(+X) 44.049 1.0
084 -1.257
7 4.376 -0.000 0.000 -0.001
6
625:G+T(-20)+0
0.5W(+X) --0.034 -1.3
316 0.1377 1.324 0.000 0.000 0.000
6
626:G+T(+20)+00.5W(-X) 00.027 1.0
084 -1.238
8 1.646 -0.000 0.000 -0.000
6
627:G+T(-20)+0
0.5W(-X) --4.056 -1.3
316 0.1555 4.267 0.000 0.000 0.001
6
628:G+T(+20)+00.5W(+Z) 11.434 1.0087 1.365
5 2.259 0.000 0.000 -0.000
6
629:G+T(-20)+0
0.5W(+Z) --2.648 -1.3
312 2.7599 4.043 0.001 -0.000 0.001
6
630:G+T(+20)+00.5W(-Z) 11.575 1.0088 -5.984
4 6.283 -0.002 0.000 -0.000

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 118 / 13
39
ERC AKH R
Railway Project
P
6
631:G+T(-20)+00.5W(-Z) --2.507 -1.3
312 -4.591 5.392 -0.001 0.000 0.001
6
632:G+T(+20)+C CR 22.041 1.0
071 -0.6977 2.408 -0.000 0.000 -0.001
6
633:G+T(-20)+CCR --2.042 -1.3
329 0.697
7 2.534 0.000 0.000 0.001
6
634:G+T(+20)+C CL 22.041 1.0
071 -0.6977 2.408 -0.000 0.000 -0.001
6
635:G+T(-20)+CCL --2.042 -1.3
329 0.697
7 2.534 0.000 0.000 0.001
6
636:G+T(+20) 22.041 1.0
071 -0.6977 2.408 -0.000 0.000 -0.001
6
637:G+T(-20) --2.042 -1.3
329 0.697
7 2.534 0.000 0.000 0.001
6
638:G+E(X)+0.33E(Z)+CD 3
34.254 -0.1
127 13.686 36.888 0.004 0.001 -0.010
6
639:G+E(X)-0.3E(Z)+CD 3
34.398 -0.1
128 -1.8877 34.450 -0.001 0.001 -0.010
6
640:G-E(X)+0.3E(Z)+CD -334.399 -0.1
130 1.887
7 34.451 0.001 -0.001 0.010
6
641:G-E(X)-0.3E
E(Z)+CD -334.255 -0.1
131 -13.6886 36.888 -0.004 -0.000 0.010
6
642:G+0.3E(X)++E(Z)+CD 1
10.058 -0.1
127 27.725 29.494 0.008 -0.000 -0.003
6
643:G+0.3E(X)-E(Z)+CD 1
10.537 -0.1
130 -24.1885 26.382 -0.007 0.001 -0.003
6
644:G-0.3E(X)+E(Z)+CD -110.538 -0.1
128 24.186 26.382 0.007 -0.001 0.003
6
645:G+0.3E(X)-E(Z)+CD -110.059 -0.1
131 -27.7225 29.494 -0.008 0.001 0.003
24 4
401:G+LR+0.5W W(+X)+CR+0.6T T(+20) 33.243 0.6
664 0.215
5 3.317 -0.000 0.000 -0.001
4
402:G+LR+0.5W W(+X)+CR+0.6T T(-20) 00.733 -1.0
060 -1.3088 1.836 -0.000 0.000 -0.000
4
403:G+LR+0.5W W(+X)+CL+0.6T T(+20) 33.243 0.6
664 0.215
5 3.317 -0.000 0.000 -0.001
4
404:G+LR+0.5W W(+X)+CL+0.6T T(-20) 00.733 -1.0
060 -1.3088 1.836 -0.000 0.000 -0.000
4
405:G+LR+0.5W W(-X)+CR+0.6T(+20) --0.725 0.6664 0.236
6 1.011 -0.000 0.000 0.000
4
406:G+LR+0.5W W(-X)+CR+0.6T(-20) --3.234 -1.0
060 -1.2888 3.639 -0.000 0.000 0.001
4
407:G+LR+0.5W W(-X)+CL+0.6T((+20) --0.725 0.6664 0.236
6 1.011 -0.000 0.000 0.000
4
408:G+LR+0.5W W(-X)+CL+0.6T((-20) --3.234 -1.0
060 -1.2888 3.639 -0.000 0.000 0.001
4
409:G+LR+0.5W W(+Z)+CR+0.6T T(+20) 00.674 0.6
666 2.828
8 2.983 0.001 0.000 -0.000
4
410:G+LR+0.5W W(+Z)+CR+0.6T T(-20) --1.836 -1.0
058 1.305
5 2.489 0.000 0.000 0.000
4
411:G+LR+0.5W W(+Z)+CL+0.6T(+20) 00.674 0.6
666 2.828
8 2.983 0.001 0.000 -0.000
4
412:G+LR+0.5W W(+Z)+CL+0.6T(-20) --1.836 -1.0
058 1.305
5 2.489 0.000 0.000 0.000
4
413:G+LR+0.5W W(-Z)+CR+0.6T(+20) 00.359 0.6
675 -4.5333 4.597 -0.001 0.000 -0.000
4
414:G+LR+0.5W W(-Z)+CR+0.6T(-20) --2.151 -1.0
049 -6.0566 6.512 -0.001 0.000 0.001
4
415:G+LR+0.5W W(-Z)+CL+0.6T((+20) 00.359 0.6
675 -4.5333 4.597 -0.001 0.000 -0.000
4
416:G+LR+0.5W W(-Z)+CL+0.6T((-20) --2.151 -1.0
049 -6.0566 6.512 -0.001 0.000 0.001
4
417:G+LR+0.5W W(+X)+CR 11.988 -0.1
198 -0.5477 2.071 -0.000 0.000 -0.000
4
418:G+LR+0.5W W(+X)+CL 11.988 -0.1
198 -0.5477 2.071 -0.000 0.000 -0.000
4
419:G+LR+0.5W W(-X)+CR --1.979 -0.1
198 -0.5266 2.058 -0.000 0.000 0.000
4
420:G+LR+0.5W W(-X)+CL) --1.979 -0.1
198 -0.5266 2.058 -0.000 0.000 0.000
4
421:G+LR+0.5W W(+Z)+CR --0.581 -0.1
196 2.067
7 2.156 0.000 0.000 0.000
4
422:G+LR+0.5W W(+Z)+CL --0.581 -0.1
196 2.067
7 2.156 0.000 0.000 0.000
4
423:G+LR+0.5W W(-Z)+CR --0.896 -0.1
187 -5.2944 5.373 -0.001 0.000 0.000
4
424:G+LR+0.5W W(-Z)+CL --0.896 -0.1
187 -5.2944 5.373 -0.001 0.000 0.000
4
425:G+LR+0.5W W(+X)+0.6T(+200) 33.243 0.6
664 0.215
5 3.317 -0.000 0.000 -0.001
4
426:G+LR+0.5W W(+X)+0.6T(-20) 00.733 -1.0
060 -1.3088 1.836 -0.000 0.000 -0.000
4
427:G+LR+0.5W W(-X)+0.6T(+20) --0.725 0.6664 0.236
6 1.011 -0.000 0.000 0.000
4
428:G+LR+0.5W W(-X)+0.6T(-20)) --3.234 -1.0
060 -1.2888 3.639 -0.000 0.000 0.001
4
429:G+LR+0.5W W(+Z)+0.6T(+200) 00.674 0.6
666 2.828
8 2.983 0.001 0.000 -0.000
4
430:G+LR+0.5W W(+Z)+0.6T(-20) --1.836 -1.0
058 1.305
5 2.489 0.000 0.000 0.000
4
431:G+LR+0.5W W(-Z)+0.6T(+20) 00.359 0.6
675 -4.5333 4.597 -0.001 0.000 -0.000
4
432:G+LR+0.5W W(-Z)+0.6T(-20) --2.151 -1.0
049 -6.0566 6.512 -0.001 0.000 0.001
4
433:G+LR+CR+ +0.6T(+20) 11.254 0.6
650 0.767
7 1.607 0.000 0.000 -0.000
4
434:G+LR+CR+ +0.6T(-20) --1.256 -1.0
074 -0.7566 1.817 -0.000 0.000 0.000
4
435:G+LR+CL+0.6T(+20) 11.254 0.6
650 0.767
7 1.607 0.000 0.000 -0.000
4
436:G+LR+CL+0.6T(-20) --1.256 -1.0
074 -0.7566 1.817 -0.000 0.000 0.000
4
437:G+LR+0.5W W(+X) 11.988 -0.1
198 -0.5477 2.071 -0.000 0.000 -0.000
4
438:G+LR+0.5W W(-X) --1.979 -0.1
198 -0.5266 2.058 -0.000 0.000 0.000
4
439:G+LR+0.5W W(+Z) --0.581 -0.1
196 2.067
7 2.156 0.000 0.000 0.000
4
440:G+LR+0.5W W(-Z) --0.896 -0.1
187 -5.2944 5.373 -0.001 0.000 0.000
4
441:G+LR+CR --0.001 -0.2
212 0.005
5 0.212 -0.000 0.000 0.000
4
442:G+LR+CL --0.001 -0.2
212 0.005
5 0.212 -0.000 0.000 0.000
4
443:G+LR+0.6T T(+20) 11.254 0.6
650 0.767
7 1.607 0.000 0.000 -0.000
4
444:G+LR+0.6T T(-20) --1.256 -1.0
074 -0.7566 1.817 -0.000 0.000 0.000
4
445:G+LR --0.001 -0.2
212 0.005
5 0.212 -0.000 0.000 0.000
4
446:G+W(+X)+0 0.7LR+CR+0.6T T(+20) 55.232 0.6
694 -0.3377 5.289 -0.000 0.000 -0.001
4
447:G+W(+X)+0 0.7LR+CR+0.6T T(-20) 22.722 -1.0
030 -1.8600 3.454 -0.001 0.000 -0.001
4
448:G+W(+X)+0 0.7LR+CL+0.6T T(+20) 55.232 0.6
694 -0.3377 5.289 -0.000 0.000 -0.001
4
449:G+W(+X)+0 0.7LR+CL+0.6T T(-20) 22.722 -1.0
030 -1.8600 3.454 -0.001 0.000 -0.001
4
450:G+W(-X)+0.7LR+CR+0.6T(+20) --2.703 0.6694 -0.2966 2.806 -0.000 0.000 0.001
4
451:G+W(-X)+0.7LR+CR+0.6T(-20) --5.213 -1.0
030 -1.8199 5.617 -0.001 -0.000 0.001
4
452:G+W(-X)+0.7LR+CL+0.6T((+20) --2.703 0.6694 -0.2966 2.806 -0.000 0.000 0.001
4
453:G+W(-X)+0.7LR+CL+0.6T((-20) --5.213 -1.0
030 -1.8199 5.617 -0.001 -0.000 0.001
4
454:G+W(+Z)+0 0.7LR+CR+0.6T T(+20) 00.093 0.6
697 4.890
0 4.940 0.001 0.000 -0.000

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 119 / 13
39
ERC AKH R
Railway Project
P
4
455:G+W(+Z)+0
0.7LR+CR+0.6T T(-20) --2.416 -1.0
027 3.3666 4.269 0.001 0.000 0.001
4
456:G+W(+Z)+0
0.7LR+CL+0.6T(+20) 00.093 0.6
697 4.890
0 4.940 0.001 0.000 -0.000
4
457:G+W(+Z)+0
0.7LR+CL+0.6T(-20) --2.416 -1.0
027 3.3666 4.269 0.001 0.000 0.001
4
458:G+W(-Z)+0.7LR+CR+0.6T(+20) --0.537 0.7715 -9.8322 9.873 -0.002 -0.000 0.000
4
459:G+W(-Z)+0.7LR+CR+0.6T(-20) --3.046 -1.0
008 -11.3556 11.800 -0.002 -0.000 0.001
4
460:G+W(-Z)+0.7LR+CL+0.6T((+20) --0.537 0.7715 -9.8322 9.873 -0.002 -0.000 0.000
4
461:G+W(-Z)+0.7LR+CL+0.6T((-20) --3.046 -1.0
008 -11.3556 11.800 -0.002 -0.000 0.001
4
462:G+W(+X)+00.7LR+CR 33.977 -0.1
168 -1.0999 4.130 -0.000 0.000 -0.001
4
463:G+W(+X)+00.7LR+CL 33.977 -0.1
168 -1.0999 4.130 -0.000 0.000 -0.001
4
464:G+W(-X)+0.7LR+CR --3.958 -0.1
168 -1.0588 4.100 -0.000 0.000 0.001
4
465:G+W(-X)+0.7LR+CL --3.958 -0.1
168 -1.0588 4.100 -0.000 0.000 0.001
4
466:G+W(+Z)+0
0.7LR+CR --1.161 -0.1
165 4.1288 4.291 0.001 0.000 0.000
4
467:G+W(+Z)+0
0.7LR+CL --1.161 -0.1
165 4.1288 4.291 0.001 0.000 0.000
4
468:G+W(-Z)+0.7LR+CR --1.791 -0.1
146 -10.5994 10.745 -0.002 -0.000 0.000
4
469:G+W(-Z)+0.7LR+CL --1.791 -0.1
146 -10.5994 10.745 -0.002 -0.000 0.000
4
470:G+W(+X)+00.7LR+0.6T(+20
0) 55.232 0.6
694 -0.3377 5.289 -0.000 0.000 -0.001
4
471:G+W(+X)+00.7LR+0.6T(-20) 22.722 -1.0
030 -1.8600 3.454 -0.001 0.000 -0.001
4
472:G+W(-X)+0.7LR+0.6T(+20) --2.703 0.6694 -0.2966 2.806 -0.000 0.000 0.001
4
473:G+W(-X)+0.7LR+0.6T(-20)) --5.213 -1.0
030 -1.8199 5.617 -0.001 -0.000 0.001
4
474:G+W(+Z)+0
0.7LR+0.6T(+200) 00.093 0.6
697 4.890
0 4.940 0.001 0.000 -0.000
4
475:G+W(+Z)+0
0.7LR+0.6T(-20) --2.416 -1.0
027 3.3666 4.269 0.001 0.000 0.001
4
476:G+W(-Z)+0.7LR+0.6T(+20) --0.537 0.7715 -9.8322 9.873 -0.002 -0.000 0.000
4
477:G+W(-Z)+0.7LR+0.6T(-20) --3.046 -1.0
008 -11.3556 11.800 -0.002 -0.000 0.001
4
478:G+W(+X)+CCR+0.6T(+20) 55.232 0.7
730 -0.3388 5.294 -0.000 0.000 -0.001
4
479:G+W(+X)+CCR+0.6T(-20) 22.722 -0.9
994 -1.861 3.444 -0.001 0.000 -0.001
4
480:G+W(+X)+CCL+0.6T(+20) 55.232 0.7
730 -0.3388 5.294 -0.000 0.000 -0.001
4
481:G+W(+X)+CCL+0.6T(-20) 22.722 -0.9
994 -1.861 3.444 -0.001 0.000 -0.001
4
482:G+W(-X)+C
CR+0.6T(+20) --2.703 0.7730 -0.2977 2.815 -0.000 0.000 0.001
4
483:G+W(-X)+C
CR+0.6T(-20) --5.213 -0.9
994 -1.8200 5.610 -0.001 -0.000 0.001
4
484:G+W(-X)+C
CL+0.6T(+20) --2.703 0.7730 -0.2977 2.815 -0.000 0.000 0.001
4
485:G+W(-X)+C
CL+0.6T(-20) --5.213 -0.9
994 -1.8200 5.610 -0.001 -0.000 0.001
4
486:G+W(+Z)+C
CR+0.6T(+20) 00.094 0.7
733 4.889
9 4.944 0.001 0.000 -0.000
4
487:G+W(+Z)+C
CR+0.6T(-20) --2.416 -0.9
991 3.3655 4.260 0.001 0.000 0.001
4
488:G+W(+Z)+C
CL+0.6T(+20) 00.094 0.7
733 4.889
9 4.944 0.001 0.000 -0.000
4
489:G+W(+Z)+C
CL+0.6T(-20) --2.416 -0.9
991 3.3655 4.260 0.001 0.000 0.001
4
490:G+W(-Z)+C
CR+0.6T(+20) --0.536 0.7751 -9.8333 9.877 -0.002 -0.000 0.000
4
491:G+W(-Z)+C
CR+0.6T(-20) --3.046 -0.9
972 -11.3557 11.798 -0.002 -0.000 0.001
4
492:G+W(-Z)+C
CL+0.6T(+20) --0.536 0.7751 -9.8333 9.877 -0.002 -0.000 0.000
4
493:G+W(-Z)+C
CL+0.6T(-20) --3.046 -0.9
972 -11.3557 11.798 -0.002 -0.000 0.001
4
494:G+W(+X)+00.7LR 33.977 -0.1
168 -1.0999 4.130 -0.000 0.000 -0.001
4
495:G+W(-X)+0.7LR --3.958 -0.1
168 -1.0588 4.100 -0.000 0.000 0.001
4
496:G+W(+Z)+0
0.7LR --1.161 -0.1
165 4.1288 4.291 0.001 0.000 0.000
4
497:G+W(-Z)+0.7LR --1.791 -0.1
146 -10.5994 10.745 -0.002 -0.000 0.000
4
498:G+W(+X)+CCR 33.977 -0.1
132 -1.1000 4.129 -0.000 0.000 -0.001
4
499:G+W(+X)+CCL 33.977 -0.1
132 -1.1000 4.129 -0.000 0.000 -0.001
5
500:G+W(-X)+C
CR --3.958 -0.1
132 -1.0588 4.099 -0.000 -0.000 0.001
5
501:G+W(-X)+C
CL --3.958 -0.1
132 -1.0588 4.099 -0.000 -0.000 0.001
5
502:G+W(+Z)+C
CR --1.161 -0.1
129 4.1277 4.289 0.001 0.000 0.000
5
503:G+W(+Z)+C
CL --1.161 -0.1
129 4.1277 4.289 0.001 0.000 0.000
5
504:G+W(-Z)+C
CR --1.791 -0.1
111 -10.5995 10.746 -0.002 -0.000 0.000
5
505:G+W(-Z)+C
CL --1.791 -0.1
111 -10.5995 10.746 -0.002 -0.000 0.000
5
506:G+W(+X)+00.6T(+20) 55.232 0.7
730 -0.3388 5.294 -0.000 0.000 -0.001
5
507:G+W(+X)+00.6T(-20) 22.722 -0.9
994 -1.861 3.444 -0.001 0.000 -0.001
5
508:G+W(-X)+0.6T(+20) --2.703 0.7730 -0.2977 2.815 -0.000 0.000 0.001
5
509:G+W(-X)+0.6T(-20) --5.213 -0.9
994 -1.8200 5.610 -0.001 -0.000 0.001
5
510:G+W(+Z)+0
0.6T(+20) 00.094 0.7
733 4.889
9 4.944 0.001 0.000 -0.000
5
511:G+W(+Z)+0
0.6T(-20) --2.416 -0.9
991 3.3655 4.260 0.001 0.000 0.001
5
512:G+W(-Z)+0.6T(+20) --0.536 0.7751 -9.8333 9.877 -0.002 -0.000 0.000
5
513:G+W(-Z)+0.6T(-20) --3.046 -0.9
972 -11.3557 11.798 -0.002 -0.000 0.001
5
514:G+W(+X) 33.977 -0.1
132 -1.1000 4.129 -0.000 0.000 -0.001
5
515:G+W(-X) --3.958 -0.1
132 -1.0588 4.099 -0.000 -0.000 0.001
5
516:G+W(+Z) --1.161 -0.1
129 4.1277 4.289 0.001 0.000 0.000
5
517:G+W(-Z) --1.791 -0.1
111 -10.5995 10.746 -0.002 -0.000 0.000
5
518:G+CR+0.7L
LR+0.5W(+X)+0 0.6T(+20) 33.243 0.6
679 0.215
5 3.320 -0.000 0.000 -0.001
5
519:G+CR+0.7L
LR+0.5W(+X)+0 0.6T(-20) 00.733 -1.0
044 -1.3099 1.828 -0.000 0.000 -0.000
5
520:G+CL+0.7L
LR+0.5W(+X)+0.6T(+20) 33.243 0.6
679 0.215
5 3.320 -0.000 0.000 -0.001
5
521:G+CL+0.7L
LR+0.5W(+X)+0.6T(-20) 00.733 -1.0
044 -1.3099 1.828 -0.000 0.000 -0.000
5
522:G+CR+0.7L
LR+0.5W(-X)+0.6T(+20) --0.724 0.6679 0.235
5 1.021 -0.000 0.000 0.000
5
523:G+CR+0.7L
LR+0.5W(-X)+0.6T(-20) --3.234 -1.0
044 -1.2888 3.635 -0.000 0.000 0.001

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 120 / 13
39
ERC AKH R
Railway Project
P
5
524:G+CL+0.7LLR+0.5W(-X)+0.6T(+20) --0.724 0.6679 0.235
5 1.021 -0.000 0.000 0.000
5
525:G+CL+0.7LLR+0.5W(-X)+0.6T(-20) --3.234 -1.0
044 -1.288
8 3.635 -0.000 0.000 0.001
5
526:G+CR+0.7LLR+0.5W(+Z)+0 0.6T(+20) 00.674 0.6
681 2.828
8 2.986 0.001 0.000 -0.000
5
527:G+CR+0.7LLR+0.5W(+Z)+0 0.6T(-20) --1.836 -1.0
043 1.3055 2.482 0.000 0.000 0.000
5
528:G+CL+0.7LLR+0.5W(+Z)+0.6T(+20) 00.674 0.6
681 2.828
8 2.986 0.001 0.000 -0.000
5
529:G+CL+0.7LLR+0.5W(+Z)+0.6T(-20) --1.836 -1.0
043 1.3055 2.482 0.000 0.000 0.000
5
530:G+CR+0.7LLR+0.5W(-Z)+0..6T(+20) 00.359 0.6
690 -4.533
3 4.599 -0.001 0.000 -0.000
5
531:G+CR+0.7LLR+0.5W(-Z)+0..6T(-20) --2.151 -1.0
033 -6.056
6 6.510 -0.001 -0.000 0.001
5
532:G+CL+0.7LLR+0.5W(-Z)+0.6T(+20) 00.359 0.6
690 -4.533
3 4.599 -0.001 0.000 -0.000
5
533:G+CL+0.7LLR+0.5W(-Z)+0.6T(-20) --2.151 -1.0
033 -6.056
6 6.510 -0.001 -0.000 0.001
5
534:G+CR+0.7LLR+0.5W(+X) 11.988 -0.1
183 -0.547
7 2.070 -0.000 0.000 -0.000
5
535:G+CL+0.7LLR+0.5W(+X) 11.988 -0.1
183 -0.547
7 2.070 -0.000 0.000 -0.000
5
536:G+CR+0.7LLR+0.5W(-X) --1.979 -0.1
183 -0.526
6 2.056 -0.000 0.000 0.000
5
537:G+CL+0.7LLR+0.5W(-X) --1.979 -0.1
183 -0.526
6 2.056 -0.000 0.000 0.000
5
538:G+CR+0.7LLR+0.5W(+Z) --0.581 -0.1
181 2.0666 2.154 0.000 0.000 0.000
5
539:G+CL+0.7LLR+0.5W(+Z) --0.581 -0.1
181 2.0666 2.154 0.000 0.000 0.000
5
540:G+CR+0.7LLR+0.5W(-Z) --0.896 -0.1
172 -5.295
5 5.373 -0.001 0.000 0.000
5
541:G+CL+0.7LLR+0.5W(-Z) --0.896 -0.1
172 -5.295
5 5.373 -0.001 0.000 0.000
5
542:G+CR+0.7LLR+0.6T(+20) 11.254 0.6
665 0.766
6 1.613 0.000 0.000 -0.000
5
543:G+CR+0.7LLR+0.6T(-20) --1.256 -1.0
059 -0.757
7 1.808 -0.000 0.000 0.000
5
544:G+CL+0.7LLR+0.6T(+20) 11.254 0.6
665 0.766
6 1.613 0.000 0.000 -0.000
5
545:G+CL+0.7LLR+0.6T(-20) --1.256 -1.0
059 -0.757
7 1.808 -0.000 0.000 0.000
5
546:G+CR+0.5WW(+X)+0.6T(+20 0) 33.243 0.7
715 0.214
4 3.328 -0.000 0.000 -0.001
5
547:G+CR+0.5WW(+X)+0.6T(-200) 00.733 -1.0
008 -1.310
0 1.808 -0.000 0.000 -0.000
5
548:G+CL+0.5WW(+X)+0.6T(+200) 33.243 0.7
715 0.214
4 3.328 -0.000 0.000 -0.001
5
549:G+CL+0.5WW(+X)+0.6T(-20) 00.733 -1.0
008 -1.310
0 1.808 -0.000 0.000 -0.000
5
550:G+CR+0.5WW(-X)+0.6T(+200) --0.724 0.7715 0.234
4 1.044 -0.000 0.000 0.000
5
551:G+CR+0.5WW(-X)+0.6T(-20)) --3.234 -1.0
008 -1.289
9 3.625 -0.000 0.000 0.001
5
552:G+CL+0.5WW(-X)+0.6T(+20) --0.724 0.7715 0.234
4 1.044 -0.000 0.000 0.000
5
553:G+CL+0.5WW(-X)+0.6T(-20)) --3.234 -1.0
008 -1.289
9 3.625 -0.000 0.000 0.001
5
554:G+CR+0.5WW(+Z)+0.6T(+20 0) 00.674 0.7
717 2.827
7 2.993 0.001 0.000 -0.000
5
555:G+CR+0.5WW(+Z)+0.6T(-200) --1.836 -1.0
007 1.3044 2.467 0.000 0.000 0.000
5
556:G+CL+0.5WW(+Z)+0.6T(+200) 00.674 0.7
717 2.827
7 2.993 0.001 0.000 -0.000
5
557:G+CL+0.5WW(+Z)+0.6T(-20) --1.836 -1.0
007 1.3044 2.467 0.000 0.000 0.000
5
558:G+CR+0.5WW(-Z)+0.6T(+200) 00.359 0.7
726 -4.534
4 4.606 -0.001 0.000 -0.000
5
559:G+CR+0.5WW(-Z)+0.6T(-20)) --2.151 -0.9
998 -6.057
7 6.505 -0.001 -0.000 0.001
5
560:G+CL+0.5WW(-Z)+0.6T(+20) 00.359 0.7
726 -4.534
4 4.606 -0.001 0.000 -0.000
5
561:G+CL+0.5WW(-Z)+0.6T(-20) --2.151 -0.9
998 -6.057
7 6.505 -0.001 -0.000 0.001
5
562:G+CR+0.7LLR --0.001 -0.1
197 0.0055 0.197 -0.000 0.000 0.000
5
563:G+CL+0.7LLR --0.001 -0.1
197 0.0055 0.197 -0.000 0.000 0.000
5
564:G+CR+0.5WW(+X) 11.988 -0.1
147 -0.548
8 2.068 -0.000 0.000 -0.000
5
565:G+CL+0.5WW(+X) 11.988 -0.1
147 -0.548
8 2.068 -0.000 0.000 -0.000
5
566:G+CR+0.5WW(-X) --1.979 -0.1
147 -0.527
7 2.054 -0.000 0.000 0.000
5
567:G+CL+0.5WW(-X) --1.979 -0.1
147 -0.527
7 2.054 -0.000 0.000 0.000
5
568:G+CR+0.5WW(+Z) --0.581 -0.1
145 2.0655 2.150 0.000 0.000 0.000
5
569:G+CL+0.5WW(+Z) --0.581 -0.1
145 2.0655 2.150 0.000 0.000 0.000
5
570:G+CR+0.5WW(-Z) --0.896 -0.1
136 -5.296
6 5.373 -0.001 -0.000 0.000
5
571:G+CL+0.5WW(-Z) --0.896 -0.1
136 -5.296
6 5.373 -0.001 -0.000 0.000
5
572:G+CR+0.6TT(+20) 11.254 0.7
701 0.765
5 1.628 0.000 0.000 -0.000
5
573:G+CR+0.6TT(-20) --1.256 -1.0
023 -0.758
8 1.788 -0.000 0.000 0.000
5
574:G+CL+0.6TT(+20) 11.254 0.7
701 0.765
5 1.628 0.000 0.000 -0.000
5
575:G+CL+0.6TT(-20) --1.256 -1.0
023 -0.758
8 1.788 -0.000 0.000 0.000
5
576:G+CR --0.001 -0.1
161 0.0044 0.161 -0.000 0.000 0.000
5
577:G+CL --0.001 -0.1
161 0.0044 0.161 -0.000 0.000 0.000
5
578:G+T(+20)+00.7LR+0.5W(+XX)+CR 44.080 1.2
254 0.722
2 4.329 0.000 0.000 -0.001
5
579:G+T(-20)+0
0.7LR+0.5W(+X)+CR --0.103 -1.6
619 -1.816
6 2.435 -0.001 0.000 0.000
5
580:G+T(+20)+00.7LR+0.5W(+XX)+CL 44.080 1.2
254 0.722
2 4.329 0.000 0.000 -0.001
5
581:G+T(-20)+0
0.7LR+0.5W(+X)+CL --0.103 -1.6
619 -1.816
6 2.435 -0.001 0.000 0.000
5
582:G+T(+20)+00.7LR+0.5W(-X)+CR 00.112 1.2
254 0.743
3 1.462 0.000 0.000 -0.000
5
583:G+T(-20)+0
0.7LR+0.5W(-X))+CR --4.071 -1.6
619 -1.796
6 4.735 -0.001 0.000 0.001
5
584:G+T(+20)+00.7LR+0.5W(-X)+CL 00.112 1.2
254 0.743
3 1.462 0.000 0.000 -0.000
5
585:G+T(-20)+0
0.7LR+0.5W(-X))+CL --4.071 -1.6
619 -1.796
6 4.735 -0.001 0.000 0.001
5
586:G+T(+20)+00.7LR+0.5W(+ZZ)+CR 11.511 1.2
256 3.336
6 3.871 0.001 0.000 -0.000
5
587:G+T(-20)+0
0.7LR+0.5W(+Z)+CR --2.673 -1.6
617 0.7977 3.224 0.000 0.000 0.001
5
588:G+T(+20)+00.7LR+0.5W(+ZZ)+CL 11.511 1.2
256 3.336
6 3.871 0.001 0.000 -0.000
5
589:G+T(-20)+0
0.7LR+0.5W(+Z)+CL --2.673 -1.6
617 0.7977 3.224 0.000 0.000 0.001
5
590:G+T(+20)+00.7LR+0.5W(-Z)+CR 11.196 1.2
265 -4.025
5 4.385 -0.001 0.000 -0.000
5
591:G+T(-20)+0
0.7LR+0.5W(-Z)+CR --2.988 -1.6
608 -6.564
4 7.389 -0.001 -0.000 0.001
5
592:G+T(+20)+00.7LR+0.5W(-Z)+CL 11.196 1.2
265 -4.025
5 4.385 -0.001 0.000 -0.000

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 121 / 13
39
ERC AKH R
Railway Project
P
5
593:G+T(-20)+00.7LR+0.5W(-Z)+CL --2.988 -1.6
608 -6.5644 7.389 -0.001 -0.000 0.001
5
594:G+T(+20)+00.7LR+0.5W(+XX) 44.080 1.2
254 0.722
2 4.329 0.000 0.000 -0.001
5
595:G+T(-20)+00.7LR+0.5W(+X) --0.103 -1.6
619 -1.8166 2.435 -0.001 0.000 0.000
5
596:G+T(+20)+00.7LR+0.5W(-X) 00.112 1.2
254 0.743
3 1.462 0.000 0.000 -0.000
5
597:G+T(-20)+00.7LR+0.5W(-X)) --4.071 -1.6
619 -1.7966 4.735 -0.001 0.000 0.001
5
598:G+T(+20)+00.7LR+0.5W(+ZZ) 11.511 1.2
256 3.336
6 3.871 0.001 0.000 -0.000
5
599:G+T(-20)+00.7LR+0.5W(+Z) --2.673 -1.6
617 0.797
7 3.224 0.000 0.000 0.001
6
600:G+T(+20)+00.7LR+0.5W(-Z) 11.196 1.2
265 -4.0255 4.385 -0.001 0.000 -0.000
6
601:G+T(-20)+00.7LR+0.5W(-Z) --2.988 -1.6
608 -6.5644 7.389 -0.001 -0.000 0.001
6
602:G+T(+20)+00.7LR+CR 22.091 1.2
240 1.274
4 2.744 0.000 0.000 -0.001
6
603:G+T(-20)+00.7LR+CR --2.092 -1.6
633 -1.2655 2.940 -0.000 0.000 0.001
6
604:G+T(+20)+00.7LR+CL 22.091 1.2
240 1.274
4 2.744 0.000 0.000 -0.001
6
605:G+T(-20)+00.7LR+CL --2.092 -1.6
633 -1.2655 2.940 -0.000 0.000 0.001
6
606:G+T(+20)+00.5W(+X)+CR 44.080 1.2
290 0.721
1 4.339 0.000 0.000 -0.001
6
607:G+T(-20)+00.5W(+X)+CR --0.103 -1.5
583 -1.8177 2.412 -0.001 0.000 0.000
6
608:G+T(+20)+00.5W(+X)+CL 44.080 1.2
290 0.721
1 4.339 0.000 0.000 -0.001
6
609:G+T(-20)+00.5W(+X)+CL --0.103 -1.5
583 -1.8177 2.412 -0.001 0.000 0.000
6
610:G+T(+20)+00.5W(-X)+CR 00.112 1.2
290 0.742
2 1.492 0.000 0.000 -0.000
6
611:G+T(-20)+00.5W(-X)+CR --4.071 -1.5
583 -1.7977 4.723 -0.001 -0.000 0.001
6
612:G+T(+20)+00.5W(-X)+CL 00.112 1.2
290 0.742
2 1.492 0.000 0.000 -0.000
6
613:G+T(-20)+00.5W(-X)+CL --4.071 -1.5
583 -1.7977 4.723 -0.001 -0.000 0.001
6
614:G+T(+20)+00.5W(+Z)+CR 11.511 1.2
291 3.335
5 3.882 0.001 0.000 -0.000
6
615:G+T(-20)+00.5W(+Z)+CR --2.673 -1.5
581 0.796
6 3.206 0.000 0.000 0.001
6
616:G+T(+20)+00.5W(+Z)+CL 11.511 1.2
291 3.335
5 3.882 0.001 0.000 -0.000
6
617:G+T(-20)+00.5W(+Z)+CL --2.673 -1.5
581 0.796
6 3.206 0.000 0.000 0.001
6
618:G+T(+20)+00.5W(-Z)+CR 11.196 1.3
301 -4.0266 4.397 -0.001 0.000 -0.000
6
619:G+T(-20)+00.5W(-Z)+CR --2.988 -1.5
572 -6.5655 7.382 -0.001 -0.000 0.001
6
620:G+T(+20)+00.5W(-Z)+CL 11.196 1.3
301 -4.0266 4.397 -0.001 0.000 -0.000
6
621:G+T(-20)+00.5W(-Z)+CL --2.988 -1.5
572 -6.5655 7.382 -0.001 -0.000 0.001
6
622:G+T(+20)+00.7LR 22.091 1.2
240 1.274
4 2.744 0.000 0.000 -0.001
6
623:G+T(-20)+00.7LR --2.092 -1.6
633 -1.2655 2.940 -0.000 0.000 0.001
6
624:G+T(+20)+00.5W(+X) 44.080 1.2
290 0.721
1 4.339 0.000 0.000 -0.001
6
625:G+T(-20)+00.5W(+X) --0.103 -1.5
583 -1.8177 2.412 -0.001 0.000 0.000
6
626:G+T(+20)+00.5W(-X) 00.112 1.2
290 0.742
2 1.492 0.000 0.000 -0.000
6
627:G+T(-20)+00.5W(-X) --4.071 -1.5
583 -1.7977 4.723 -0.001 -0.000 0.001
6
628:G+T(+20)+00.5W(+Z) 11.511 1.2
291 3.335
5 3.882 0.001 0.000 -0.000
6
629:G+T(-20)+00.5W(+Z) --2.673 -1.5
581 0.796
6 3.206 0.000 0.000 0.001
6
630:G+T(+20)+00.5W(-Z) 11.196 1.3
301 -4.0266 4.397 -0.001 0.000 -0.000
6
631:G+T(-20)+00.5W(-Z) --2.988 -1.5
572 -6.5655 7.382 -0.001 -0.000 0.001
6
632:G+T(+20)+CCR 22.091 1.2
275 1.273
3 2.760 0.000 0.000 -0.001
6
633:G+T(-20)+CCR --2.092 -1.5
597 -1.2666 2.921 -0.000 0.000 0.001
6
634:G+T(+20)+CCL 22.091 1.2
275 1.273
3 2.760 0.000 0.000 -0.001
6
635:G+T(-20)+CCL --2.092 -1.5
597 -1.2666 2.921 -0.000 0.000 0.001
6
636:G+T(+20) 22.091 1.2
275 1.273
3 2.760 0.000 0.000 -0.001
6
637:G+T(-20) --2.092 -1.5
597 -1.2666 2.921 -0.000 0.000 0.001
6
638:G+E(X)+0.33E(Z)+CD 4
46.886 -0.1
160 13.664 48.837 0.003 0.002 -0.012
6
639:G+E(X)-0.3E(Z)+CD 4
46.631 -0.1
159 -1.9266 46.671 -0.000 0.002 -0.012
6
640:G-E(X)+0.3E(Z)+CD -446.633 -0.1
163 1.933
3 46.673 0.000 -0.001 0.012
6
641:G-E(X)-0.3E
E(Z)+CD -446.887 -0.1
162 -13.6557 48.836 -0.003 -0.002 0.012
6
642:G+0.3E(X)++E(Z)+CD 1
14.452 -0.1
162 27.747 31.285 0.007 0.002 -0.004
6
643:G+0.3E(X)-E(Z)+CD 1
13.603 -0.1
159 -24.2220 27.779 -0.006 -0.000 -0.003
6
644:G-0.3E(X)+E(Z)+CD -113.604 -0.1
163 24.227 27.786 0.006 0.001 0.003
6
645:G+0.3E(X)-E(Z)+CD -114.453 -0.1
160 -27.7339 31.279 -0.007 -0.001 0.004
54 4
401:G+LR+0.5W W(+X)+CR+0.6TT(+20) --1.134 -15..897 0.1844 15.938 0.000 -0.000 -0.003
4
402:G+LR+0.5W W(+X)+CR+0.6TT(-20) 55.301 -17..478 -0.0800 18.264 0.000 -0.000 -0.004
4
403:G+LR+0.5W W(+X)+CL+0.6TT(+20) --1.134 -15..897 0.1844 15.938 0.000 -0.000 -0.003
4
404:G+LR+0.5W W(+X)+CL+0.6TT(-20) 55.301 -17..478 -0.0800 18.264 0.000 -0.000 -0.004
4
405:G+LR+0.5W W(-X)+CR+0.6T(+20) --5.282 -20..623 1.4733 21.340 0.000 -0.000 -0.002
4
406:G+LR+0.5W W(-X)+CR+0.6T(-20) 11.153 -22..205 1.2100 22.267 0.000 -0.000 -0.003
4
407:G+LR+0.5W W(-X)+CL+0.6T((+20) --5.282 -20..623 1.4733 21.340 0.000 -0.000 -0.002
4
408:G+LR+0.5W W(-X)+CL+0.6T((-20) 11.153 -22..205 1.2100 22.267 0.000 -0.000 -0.003
4
409:G+LR+0.5W W(+Z)+CR+0.6TT(+20) --3.914 -22..913 9.2466 25.017 -0.000 -0.000 -0.003
4
410:G+LR+0.5W W(+Z)+CR+0.6TT(-20) 22.521 -24..495 8.9833 26.211 -0.000 -0.000 -0.004
4
411:G+LR+0.5W W(+Z)+CL+0.6T(+20) --3.914 -22..913 9.2466 25.017 -0.000 -0.000 -0.003
4
412:G+LR+0.5W W(+Z)+CL+0.6T(-20) 22.521 -24..495 8.9833 26.211 -0.000 -0.000 -0.004
4
413:G+LR+0.5W W(-Z)+CR+0.6T(+20) --4.008 -18..650 -5.1900 19.769 -0.000 -0.000 -0.002
4
414:G+LR+0.5W W(-Z)+CR+0.6T(-20) 22.428 -20..231 -5.4533 21.093 -0.000 -0.000 -0.003
4
415:G+LR+0.5W W(-Z)+CL+0.6T((+20) --4.008 -18..650 -5.1900 19.769 -0.000 -0.000 -0.002
4
416:G+LR+0.5W W(-Z)+CL+0.6T((-20) 22.428 -20..231 -5.4533 21.093 -0.000 -0.000 -0.003

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 122 / 13
39
ERC AKH R
Railway Project
P
4
417:G+LR+0.5W
W(+X)+CR 22.084 -16..687 0.052
2 16.817 0.000 -0.000 -0.003
4
418:G+LR+0.5W
W(+X)+CL 22.084 -16..687 0.052
2 16.817 0.000 -0.000 -0.003
4
419:G+LR+0.5W
W(-X)+CR --2.065 -21..414 1.342
2 21.555 0.000 -0.000 -0.002
4
420:G+LR+0.5W
W(-X)+CL) --2.065 -21..414 1.342
2 21.555 0.000 -0.000 -0.002
4
421:G+LR+0.5W
W(+Z)+CR --0.696 -23..704 9.114
4 25.405 -0.000 -0.000 -0.004
4
422:G+LR+0.5W
W(+Z)+CL --0.696 -23..704 9.114
4 25.405 -0.000 -0.000 -0.004
4
423:G+LR+0.5W
W(-Z)+CR --0.790 -19..440 -5.3222 20.171 -0.000 -0.000 -0.003
4
424:G+LR+0.5W
W(-Z)+CL --0.790 -19..440 -5.3222 20.171 -0.000 -0.000 -0.003
4
425:G+LR+0.5W
W(+X)+0.6T(+200) --1.134 -15..897 0.184
4 15.938 0.000 -0.000 -0.003
4
426:G+LR+0.5W
W(+X)+0.6T(-20) 55.301 -17..478 -0.0800 18.264 0.000 -0.000 -0.004
4
427:G+LR+0.5W
W(-X)+0.6T(+20) --5.282 -20..623 1.473
3 21.340 0.000 -0.000 -0.002
4
428:G+LR+0.5W
W(-X)+0.6T(-20)) 11.153 -22..205 1.210
0 22.267 0.000 -0.000 -0.003
4
429:G+LR+0.5W
W(+Z)+0.6T(+200) --3.914 -22..913 9.246
6 25.017 -0.000 -0.000 -0.003
4
430:G+LR+0.5W
W(+Z)+0.6T(-20) 22.521 -24..495 8.983
3 26.211 -0.000 -0.000 -0.004
4
431:G+LR+0.5W
W(-Z)+0.6T(+20) --4.008 -18..650 -5.1900 19.769 -0.000 -0.000 -0.002
4
432:G+LR+0.5W
W(-Z)+0.6T(-20) 22.428 -20..231 -5.4533 21.093 -0.000 -0.000 -0.003
4
433:G+LR+CR++0.6T(+20) --3.219 -21..687 2.803
3 22.103 0.000 -0.000 -0.003
4
434:G+LR+CR++0.6T(-20) 33.217 -23..268 2.540
0 23.626 0.000 -0.000 -0.004
4
435:G+LR+CL+0.6T(+20) --3.219 -21..687 2.803
3 22.103 0.000 -0.000 -0.003
4
436:G+LR+CL+0.6T(-20) 33.217 -23..268 2.540
0 23.626 0.000 -0.000 -0.004
4
437:G+LR+0.5W
W(+X) 22.084 -16..687 0.052
2 16.817 0.000 -0.000 -0.003
4
438:G+LR+0.5W
W(-X) --2.065 -21..414 1.342
2 21.555 0.000 -0.000 -0.002
4
439:G+LR+0.5W
W(+Z) --0.696 -23..704 9.114
4 25.405 -0.000 -0.000 -0.004
4
440:G+LR+0.5W
W(-Z) --0.790 -19..440 -5.3222 20.171 -0.000 -0.000 -0.003
4
441:G+LR+CR --0.001 -22..478 2.671
1 22.636 0.000 -0.000 -0.003
4
442:G+LR+CL --0.001 -22..478 2.671
1 22.636 0.000 -0.000 -0.003
4
443:G+LR+0.6T
T(+20) --3.219 -21..687 2.803
3 22.103 0.000 -0.000 -0.003
4
444:G+LR+0.6T
T(-20) 33.217 -23..268 2.540
0 23.626 0.000 -0.000 -0.004
4
445:G+LR --0.001 -22..478 2.671
1 22.636 0.000 -0.000 -0.003
4
446:G+W(+X)+00.7LR+CR+0.6TT(+20) 00.950 -8.2
236 -2.6588 8.706 0.000 -0.000 -0.003
4
447:G+W(+X)+00.7LR+CR+0.6TT(-20) 77.386 -9.8
817 -2.921 12.628 0.000 -0.000 -0.004
4
448:G+W(+X)+00.7LR+CL+0.6TT(+20) 00.950 -8.2
236 -2.6588 8.706 0.000 -0.000 -0.003
4
449:G+W(+X)+00.7LR+CL+0.6TT(-20) 77.386 -9.8
817 -2.921 12.628 0.000 -0.000 -0.004
4
450:G+W(-X)+0.7LR+CR+0.6T(+20) --7.346 -17..690 -0.0799 19.155 0.000 -0.000 -0.001
4
451:G+W(-X)+0.7LR+CR+0.6T(-20) --0.911 -19..271 -0.3422 19.296 0.000 -0.000 -0.002
4
452:G+W(-X)+0.7LR+CL+0.6T((+20) --7.346 -17..690 -0.0799 19.155 0.000 -0.000 -0.001
4
453:G+W(-X)+0.7LR+CL+0.6T((-20) --0.911 -19..271 -0.3422 19.296 0.000 -0.000 -0.002
4
454:G+W(+Z)+0
0.7LR+CR+0.6T T(+20) --4.610 -22..270 15.467 27.503 -0.000 -0.000 -0.003
4
455:G+W(+Z)+0
0.7LR+CR+0.6T T(-20) 11.826 -23..851 15.203 28.343 -0.000 -0.000 -0.004
4
456:G+W(+Z)+0
0.7LR+CL+0.6T(+20) --4.610 -22..270 15.467 27.503 -0.000 -0.000 -0.003
4
457:G+W(+Z)+0
0.7LR+CL+0.6T(-20) 11.826 -23..851 15.203 28.343 -0.000 -0.000 -0.004
4
458:G+W(-Z)+0.7LR+CR+0.6T(+20) --4.797 -13..742 -13.4005 19.788 -0.000 -0.000 -0.001
4
459:G+W(-Z)+0.7LR+CR+0.6T(-20) 11.639 -15..323 -13.6669 20.599 -0.000 -0.000 -0.002
4
460:G+W(-Z)+0.7LR+CL+0.6T((+20) --4.797 -13..742 -13.4005 19.788 -0.000 -0.000 -0.001
4
461:G+W(-Z)+0.7LR+CL+0.6T((-20) 11.639 -15..323 -13.6669 20.599 -0.000 -0.000 -0.002
4
462:G+W(+X)+00.7LR+CR 44.168 -9.0
027 -2.7900 10.326 0.000 -0.000 -0.003
4
463:G+W(+X)+00.7LR+CL 44.168 -9.0
027 -2.7900 10.326 0.000 -0.000 -0.003
4
464:G+W(-X)+0.7LR+CR --4.128 -18..480 -0.211 18.937 0.000 -0.000 -0.001
4
465:G+W(-X)+0.7LR+CL --4.128 -18..480 -0.211 18.937 0.000 -0.000 -0.001
4
466:G+W(+Z)+0
0.7LR+CR --1.392 -23..060 15.335 27.729 -0.000 -0.000 -0.003
4
467:G+W(+Z)+0
0.7LR+CL --1.392 -23..060 15.335 27.729 -0.000 -0.000 -0.003
4
468:G+W(-Z)+0.7LR+CR --1.579 -14..533 -13.5337 19.924 -0.000 -0.000 -0.002
4
469:G+W(-Z)+0.7LR+CL --1.579 -14..533 -13.5337 19.924 -0.000 -0.000 -0.002
4
470:G+W(+X)+00.7LR+0.6T(+20
0) 00.950 -8.2
236 -2.6588 8.706 0.000 -0.000 -0.003
4
471:G+W(+X)+00.7LR+0.6T(-20) 77.386 -9.8
817 -2.921 12.628 0.000 -0.000 -0.004
4
472:G+W(-X)+0.7LR+0.6T(+20) --7.346 -17..690 -0.0799 19.155 0.000 -0.000 -0.001
4
473:G+W(-X)+0.7LR+0.6T(-20)) --0.911 -19..271 -0.3422 19.296 0.000 -0.000 -0.002
4
474:G+W(+Z)+0
0.7LR+0.6T(+200) --4.610 -22..270 15.467 27.503 -0.000 -0.000 -0.003
4
475:G+W(+Z)+0
0.7LR+0.6T(-20) 11.826 -23..851 15.203 28.343 -0.000 -0.000 -0.004
4
476:G+W(-Z)+0.7LR+0.6T(+20) --4.797 -13..742 -13.4005 19.788 -0.000 -0.000 -0.001
4
477:G+W(-Z)+0.7LR+0.6T(-20) 11.639 -15..323 -13.6669 20.599 -0.000 -0.000 -0.002
4
478:G+W(+X)+CCR+0.6T(+20) 00.950 -3.8
873 -3.1777 5.098 -0.000 -0.000 -0.002
4
479:G+W(+X)+CCR+0.6T(-20) 77.386 -5.4
454 -3.4400 9.805 0.000 -0.000 -0.003
4
480:G+W(+X)+CCL+0.6T(+20) 00.950 -3.8
873 -3.1777 5.098 -0.000 -0.000 -0.002
4
481:G+W(+X)+CCL+0.6T(-20) 77.386 -5.4
454 -3.4400 9.805 0.000 -0.000 -0.003
4
482:G+W(-X)+C
CR+0.6T(+20) --7.346 -13..327 -0.5988 15.229 0.000 0.000 0.000
4
483:G+W(-X)+C
CR+0.6T(-20) --0.911 -14..908 -0.861 14.960 0.000 -0.000 -0.001
4
484:G+W(-X)+C
CL+0.6T(+20) --7.346 -13..327 -0.5988 15.229 0.000 0.000 0.000
4
485:G+W(-X)+C
CL+0.6T(-20) --0.911 -14..908 -0.861 14.960 0.000 -0.000 -0.001

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 123 / 13
39
ERC AKH R
Railway Project
P
4
486:G+W(+Z)+C
CR+0.6T(+20) --4.610 -17..907 14.948 23.777 -0.000 -0.000 -0.002
4
487:G+W(+Z)+C
CR+0.6T(-20) 11.826 -19..488 14.684 24.469 -0.000 -0.000 -0.003
4
488:G+W(+Z)+C
CL+0.6T(+20) --4.610 -17..907 14.948 23.777 -0.000 -0.000 -0.002
4
489:G+W(+Z)+C
CL+0.6T(-20) 11.826 -19..488 14.684 24.469 -0.000 -0.000 -0.003
4
490:G+W(-Z)+C
CR+0.6T(+20) --4.797 -9.3
379 -13.9224 17.460 -0.000 -0.000 -0.001
4
491:G+W(-Z)+C
CR+0.6T(-20) 11.639 -10..960 -14.1888 18.003 -0.000 -0.000 -0.002
4
492:G+W(-Z)+C
CL+0.6T(+20) --4.797 -9.3
379 -13.9224 17.460 -0.000 -0.000 -0.001
4
493:G+W(-Z)+C
CL+0.6T(-20) 11.639 -10..960 -14.1888 18.003 -0.000 -0.000 -0.002
4
494:G+W(+X)+00.7LR 44.168 -9.0
027 -2.7900 10.326 0.000 -0.000 -0.003
4
495:G+W(-X)+0.7LR --4.128 -18..480 -0.211 18.937 0.000 -0.000 -0.001
4
496:G+W(+Z)+0
0.7LR --1.392 -23..060 15.335 27.729 -0.000 -0.000 -0.003
4
497:G+W(-Z)+0.7LR --1.579 -14..533 -13.5337 19.924 -0.000 -0.000 -0.002
4
498:G+W(+X)+CCR 44.168 -4.6
664 -3.3088 7.076 -0.000 -0.000 -0.002
4
499:G+W(+X)+CCL 44.168 -4.6
664 -3.3088 7.076 -0.000 -0.000 -0.002
5
500:G+W(-X)+C
CR --4.128 -14..117 -0.7299 14.727 0.000 -0.000 -0.000
5
501:G+W(-X)+C
CL --4.128 -14..117 -0.7299 14.727 0.000 -0.000 -0.000
5
502:G+W(+Z)+C
CR --1.392 -18..697 14.816 23.897 -0.000 -0.000 -0.003
5
503:G+W(+Z)+C
CL --1.392 -18..697 14.816 23.897 -0.000 -0.000 -0.003
5
504:G+W(-Z)+C
CR --1.579 -10..170 -14.0556 17.421 -0.000 -0.000 -0.001
5
505:G+W(-Z)+C
CL --1.579 -10..170 -14.0556 17.421 -0.000 -0.000 -0.001
5
506:G+W(+X)+00.6T(+20) 00.950 -3.8
873 -3.1777 5.098 -0.000 -0.000 -0.002
5
507:G+W(+X)+00.6T(-20) 77.386 -5.4
454 -3.4400 9.805 0.000 -0.000 -0.003
5
508:G+W(-X)+0.6T(+20) --7.346 -13..327 -0.5988 15.229 0.000 0.000 0.000
5
509:G+W(-X)+0.6T(-20) --0.911 -14..908 -0.861 14.960 0.000 -0.000 -0.001
5
510:G+W(+Z)+0
0.6T(+20) --4.610 -17..907 14.948 23.777 -0.000 -0.000 -0.002
5
511:G+W(+Z)+0
0.6T(-20) 11.826 -19..488 14.684 24.469 -0.000 -0.000 -0.003
5
512:G+W(-Z)+0.6T(+20) --4.797 -9.3
379 -13.9224 17.460 -0.000 -0.000 -0.001
5
513:G+W(-Z)+0.6T(-20) 11.639 -10..960 -14.1888 18.003 -0.000 -0.000 -0.002
5
514:G+W(+X) 44.168 -4.6
664 -3.3088 7.076 -0.000 -0.000 -0.002
5
515:G+W(-X) --4.128 -14..117 -0.7299 14.727 0.000 -0.000 -0.000
5
516:G+W(+Z) --1.392 -18..697 14.816 23.897 -0.000 -0.000 -0.003
5
517:G+W(-Z) --1.579 -10..170 -14.0556 17.421 -0.000 -0.000 -0.001
5
518:G+CR+0.7L
LR+0.5W(+X)+0 0.6T(+20) --1.134 -14..027 -0.0399 14.073 0.000 -0.000 -0.003
5
519:G+CR+0.7L
LR+0.5W(+X)+0 0.6T(-20) 55.301 -15..608 -0.3022 16.486 0.000 -0.000 -0.004
5
520:G+CL+0.7L
LR+0.5W(+X)+0.6T(+20) --1.134 -14..027 -0.0399 14.073 0.000 -0.000 -0.003
5
521:G+CL+0.7L
LR+0.5W(+X)+0.6T(-20) 55.301 -15..608 -0.3022 16.486 0.000 -0.000 -0.004
5
522:G+CR+0.7L
LR+0.5W(-X)+0.6T(+20) --5.282 -18..754 1.251
1 19.523 0.000 -0.000 -0.002
5
523:G+CR+0.7L
LR+0.5W(-X)+0.6T(-20) 11.153 -20..335 0.987
7 20.391 0.000 -0.000 -0.003
5
524:G+CL+0.7L
LR+0.5W(-X)+0.6T(+20) --5.282 -18..754 1.251
1 19.523 0.000 -0.000 -0.002
5
525:G+CL+0.7L
LR+0.5W(-X)+0.6T(-20) 11.153 -20..335 0.987
7 20.391 0.000 -0.000 -0.003
5
526:G+CR+0.7L
LR+0.5W(+Z)+0 0.6T(+20) --3.914 -21..043 9.024
4 23.229 -0.000 -0.000 -0.003
5
527:G+CR+0.7L
LR+0.5W(+Z)+0 0.6T(-20) 22.521 -22..625 8.760
0 24.392 -0.000 -0.000 -0.004
5
528:G+CL+0.7L
LR+0.5W(+Z)+0.6T(+20) --3.914 -21..043 9.024
4 23.229 -0.000 -0.000 -0.003
5
529:G+CL+0.7L
LR+0.5W(+Z)+0.6T(-20) 22.521 -22..625 8.760
0 24.392 -0.000 -0.000 -0.004
5
530:G+CR+0.7L
LR+0.5W(-Z)+0..6T(+20) --4.008 -16..780 -5.4122 18.081 -0.000 -0.000 -0.002
5
531:G+CR+0.7L
LR+0.5W(-Z)+0..6T(-20) 22.428 -18..361 -5.6766 19.371 -0.000 -0.000 -0.003
5
532:G+CL+0.7L
LR+0.5W(-Z)+0.6T(+20) --4.008 -16..780 -5.4122 18.081 -0.000 -0.000 -0.002
5
533:G+CL+0.7L
LR+0.5W(-Z)+0.6T(-20) 22.428 -18..361 -5.6766 19.371 -0.000 -0.000 -0.003
5
534:G+CR+0.7L
LR+0.5W(+X) 22.084 -14..817 -0.1700 14.964 0.000 -0.000 -0.003
5
535:G+CL+0.7L
LR+0.5W(+X) 22.084 -14..817 -0.1700 14.964 0.000 -0.000 -0.003
5
536:G+CR+0.7L
LR+0.5W(-X) --2.065 -19..544 1.119
9 19.685 0.000 -0.000 -0.002
5
537:G+CL+0.7L
LR+0.5W(-X) --2.065 -19..544 1.119
9 19.685 0.000 -0.000 -0.002
5
538:G+CR+0.7L
LR+0.5W(+Z) --0.696 -21..834 8.892
2 23.586 -0.000 -0.000 -0.003
5
539:G+CL+0.7L
LR+0.5W(+Z) --0.696 -21..834 8.892
2 23.586 -0.000 -0.000 -0.003
5
540:G+CR+0.7L
LR+0.5W(-Z) --0.790 -17..570 -5.5444 18.441 -0.000 -0.000 -0.003
5
541:G+CL+0.7L
LR+0.5W(-Z) --0.790 -17..570 -5.5444 18.441 -0.000 -0.000 -0.003
5
542:G+CR+0.7L
LR+0.6T(+20) --3.218 -19..817 2.581
1 20.242 0.000 -0.000 -0.003
5
543:G+CR+0.7L
LR+0.6T(-20) 33.217 -21..398 2.317
7 21.762 0.000 -0.000 -0.004
5
544:G+CL+0.7L
LR+0.6T(+20) --3.218 -19..817 2.581
1 20.242 0.000 -0.000 -0.003
5
545:G+CL+0.7L
LR+0.6T(-20) 33.217 -21..398 2.317
7 21.762 0.000 -0.000 -0.004
5
546:G+CR+0.5W
W(+X)+0.6T(+20 0) --1.134 -9.6
664 -0.5577 9.746 0.000 -0.000 -0.002
5
547:G+CR+0.5W
W(+X)+0.6T(-200) 55.302 -11..245 -0.821 12.459 0.000 -0.000 -0.003
5
548:G+CL+0.5W
W(+X)+0.6T(+200) --1.134 -9.6
664 -0.5577 9.746 0.000 -0.000 -0.002
5
549:G+CL+0.5W
W(+X)+0.6T(-20) 55.302 -11..245 -0.821 12.459 0.000 -0.000 -0.003
5
550:G+CR+0.5W
W(-X)+0.6T(+200) --5.282 -14..390 0.732
2 15.347 0.000 -0.000 -0.001
5
551:G+CR+0.5W
W(-X)+0.6T(-20)) 11.153 -15..971 0.469
9 16.020 0.000 -0.000 -0.002
5
552:G+CL+0.5W
W(-X)+0.6T(+20) --5.282 -14..390 0.732
2 15.347 0.000 -0.000 -0.001
5
553:G+CL+0.5W
W(-X)+0.6T(-20)) 11.153 -15..971 0.469
9 16.020 0.000 -0.000 -0.002
5
554:G+CR+0.5W
W(+Z)+0.6T(+20 0) --3.914 -16..680 8.505
5 19.128 -0.000 -0.000 -0.002

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 124 / 13
39
ERC AKH R
Railway Project
P
5
555:G+CR+0.5WW(+Z)+0.6T(-200) 22.522 -18..261 8.2411 20.193 -0.000 -0.000 -0.003
5
556:G+CL+0.5WW(+Z)+0.6T(+200) --3.914 -16..680 8.5055 19.128 -0.000 -0.000 -0.002
5
557:G+CL+0.5WW(+Z)+0.6T(-20) 22.522 -18..261 8.2411 20.193 -0.000 -0.000 -0.003
5
558:G+CR+0.5WW(-Z)+0.6T(+200) --4.008 -12..417 -5.931 14.332 -0.000 -0.000 -0.001
5
559:G+CR+0.5WW(-Z)+0.6T(-20)) 22.428 -13..998 -6.195
5 15.499 -0.000 -0.000 -0.002
5
560:G+CL+0.5WW(-Z)+0.6T(+20) --4.008 -12..417 -5.931 14.332 -0.000 -0.000 -0.001
5
561:G+CL+0.5WW(-Z)+0.6T(-20) 22.428 -13..998 -6.195
5 15.499 -0.000 -0.000 -0.002
5
562:G+CR+0.7LLR --0.001 -20..608 2.4499 20.753 0.000 -0.000 -0.003
5
563:G+CL+0.7LLR --0.001 -20..608 2.4499 20.753 0.000 -0.000 -0.003
5
564:G+CR+0.5WW(+X) 22.084 -10..454 -0.689
9 10.682 0.000 -0.000 -0.002
5
565:G+CL+0.5WW(+X) 22.084 -10..454 -0.689
9 10.682 0.000 -0.000 -0.002
5
566:G+CR+0.5WW(-X) --2.064 -15..181 0.6000 15.332 0.000 -0.000 -0.001
5
567:G+CL+0.5WW(-X) --2.064 -15..181 0.6000 15.332 0.000 -0.000 -0.001
5
568:G+CR+0.5WW(+Z) --0.696 -17..471 8.3733 19.386 -0.000 -0.000 -0.003
5
569:G+CL+0.5WW(+Z) --0.696 -17..471 8.3733 19.386 -0.000 -0.000 -0.003
5
570:G+CR+0.5WW(-Z) --0.790 -13..207 -6.063
3 14.554 -0.000 -0.000 -0.002
5
571:G+CL+0.5WW(-Z) --0.790 -13..207 -6.063
3 14.554 -0.000 -0.000 -0.002
5
572:G+CR+0.6TT(+20) --3.218 -15..454 2.0622 15.920 0.000 -0.000 -0.002
5
573:G+CR+0.6TT(-20) 33.217 -17..035 1.7988 17.429 0.000 -0.000 -0.003
5
574:G+CL+0.6TT(+20) --3.218 -15..454 2.0622 15.920 0.000 -0.000 -0.002
5
575:G+CL+0.6TT(-20) 33.217 -17..035 1.7988 17.429 0.000 -0.000 -0.003
5
576:G+CR --0.001 -16..245 1.9300 16.359 0.000 -0.000 -0.003
5
577:G+CL --0.001 -16..245 1.9300 16.359 0.000 -0.000 -0.003
5
578:G+T(+20)+00.7LR+0.5W(+XX)+CR --3.279 -13..500 0.0499 13.892 0.000 -0.000 -0.002
5
579:G+T(-20)+0
0.7LR+0.5W(+X)+CR 77.447 -16..135 -0.390
0 17.775 0.000 -0.000 -0.004
5
580:G+T(+20)+00.7LR+0.5W(+XX)+CL --3.279 -13..500 0.0499 13.892 0.000 -0.000 -0.002
5
581:G+T(-20)+0
0.7LR+0.5W(+X)+CL 77.447 -16..135 -0.390
0 17.775 0.000 -0.000 -0.004
5
582:G+T(+20)+00.7LR+0.5W(-X)+CR --7.428 -18..226 1.3399 19.727 0.000 -0.000 -0.001
5
583:G+T(-20)+0
0.7LR+0.5W(-X))+CR 33.298 -20..862 0.9000 21.140 0.000 -0.000 -0.003
5
584:G+T(+20)+00.7LR+0.5W(-X)+CL --7.428 -18..226 1.3399 19.727 0.000 -0.000 -0.001
5
585:G+T(-20)+0
0.7LR+0.5W(-X))+CL 33.298 -20..862 0.9000 21.140 0.000 -0.000 -0.003
5
586:G+T(+20)+00.7LR+0.5W(+ZZ)+CR --6.059 -20..516 9.1122 23.252 -0.000 -0.000 -0.002
5
587:G+T(-20)+0
0.7LR+0.5W(+Z)+CR 44.667 -23..152 8.6722 25.159 -0.000 -0.000 -0.004
5
588:G+T(+20)+00.7LR+0.5W(+ZZ)+CL --6.059 -20..516 9.1122 23.252 -0.000 -0.000 -0.002
5
589:G+T(-20)+0
0.7LR+0.5W(+Z)+CL 44.667 -23..152 8.6722 25.159 -0.000 -0.000 -0.004
5
590:G+T(+20)+00.7LR+0.5W(-Z)+CR --6.153 -16..253 -5.324
4 18.176 -0.000 -0.000 -0.002
5
591:G+T(-20)+0
0.7LR+0.5W(-Z)+CR 44.573 -18..888 -5.764
4 20.270 -0.000 -0.000 -0.003
5
592:G+T(+20)+00.7LR+0.5W(-Z)+CL --6.153 -16..253 -5.324
4 18.176 -0.000 -0.000 -0.002
5
593:G+T(-20)+0
0.7LR+0.5W(-Z)+CL 44.573 -18..888 -5.764
4 20.270 -0.000 -0.000 -0.003
5
594:G+T(+20)+00.7LR+0.5W(+XX) --3.279 -13..500 0.0499 13.892 0.000 -0.000 -0.002
5
595:G+T(-20)+0
0.7LR+0.5W(+X) 77.447 -16..135 -0.390
0 17.775 0.000 -0.000 -0.004
5
596:G+T(+20)+00.7LR+0.5W(-X) --7.428 -18..226 1.3399 19.727 0.000 -0.000 -0.001
5
597:G+T(-20)+0
0.7LR+0.5W(-X)) 33.298 -20..862 0.9000 21.140 0.000 -0.000 -0.003
5
598:G+T(+20)+00.7LR+0.5W(+ZZ) --6.059 -20..516 9.1122 23.252 -0.000 -0.000 -0.002
5
599:G+T(-20)+0
0.7LR+0.5W(+Z) 44.667 -23..152 8.6722 25.159 -0.000 -0.000 -0.004
6
600:G+T(+20)+00.7LR+0.5W(-Z) --6.153 -16..253 -5.324
4 18.176 -0.000 -0.000 -0.002
6
601:G+T(-20)+0
0.7LR+0.5W(-Z) 44.573 -18..888 -5.764
4 20.270 -0.000 -0.000 -0.003
6
602:G+T(+20)+00.7LR+CR --5.364 -19..290 2.6699 20.199 0.000 -0.000 -0.002
6
603:G+T(-20)+0
0.7LR+CR 55.362 -21..925 2.2299 22.681 0.000 -0.000 -0.004
6
604:G+T(+20)+00.7LR+CL --5.364 -19..290 2.6699 20.199 0.000 -0.000 -0.002
6
605:G+T(-20)+0
0.7LR+CL 55.362 -21..925 2.2299 22.681 0.000 -0.000 -0.004
6
606:G+T(+20)+00.5W(+X)+CR --3.279 -9.1
136 -0.469
9 9.719 0.000 -0.000 -0.002
6
607:G+T(-20)+0
0.5W(+X)+CR 77.447 -11..772 -0.909
9 13.959 0.000 -0.000 -0.003
6
608:G+T(+20)+00.5W(+X)+CL --3.279 -9.1
136 -0.469
9 9.719 0.000 -0.000 -0.002
6
609:G+T(-20)+0
0.5W(+X)+CL 77.447 -11..772 -0.909
9 13.959 0.000 -0.000 -0.003
6
610:G+T(+20)+00.5W(-X)+CR --7.427 -13..863 0.8200 15.749 0.000 -0.000 -0.001
6
611:G+T(-20)+0
0.5W(-X)+CR 33.299 -16..499 0.3811 16.829 0.000 -0.000 -0.002
6
612:G+T(+20)+00.5W(-X)+CL --7.427 -13..863 0.8200 15.749 0.000 -0.000 -0.001
6
613:G+T(-20)+0
0.5W(-X)+CL 33.299 -16..499 0.3811 16.829 0.000 -0.000 -0.002
6
614:G+T(+20)+00.5W(+Z)+CR --6.059 -16..153 8.5933 19.274 -0.000 -0.000 -0.002
6
615:G+T(-20)+0
0.5W(+Z)+CR 44.667 -18..788 8.1544 21.006 -0.000 -0.000 -0.003
6
616:G+T(+20)+00.5W(+Z)+CL --6.059 -16..153 8.5933 19.274 -0.000 -0.000 -0.002
6
617:G+T(-20)+0
0.5W(+Z)+CL 44.667 -18..788 8.1544 21.006 -0.000 -0.000 -0.003
6
618:G+T(+20)+00.5W(-Z)+CR --6.153 -11..890 -5.843
3 14.607 -0.000 -0.000 -0.001
6
619:G+T(-20)+0
0.5W(-Z)+CR 44.573 -14..525 -6.282
2 16.473 -0.000 -0.000 -0.003
6
620:G+T(+20)+00.5W(-Z)+CL --6.153 -11..890 -5.843
3 14.607 -0.000 -0.000 -0.001
6
621:G+T(-20)+0
0.5W(-Z)+CL 44.573 -14..525 -6.282
2 16.473 -0.000 -0.000 -0.003
6
622:G+T(+20)+00.7LR --5.364 -19..290 2.6699 20.199 0.000 -0.000 -0.002
6
623:G+T(-20)+0
0.7LR 55.362 -21..925 2.2299 22.681 0.000 -0.000 -0.004

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 125 / 13
39
ERC AKH R
Railway Project
P
6
624:G+T(+20)+00.5W(+X) --3.279 -9.1
136 -0.4699 9.719 0.000 -0.000 -0.002
6
625:G+T(-20)+00.5W(+X) 77.447 -11..772 -0.9099 13.959 0.000 -0.000 -0.003
6
626:G+T(+20)+00.5W(-X) --7.427 -13..863 0.820
0 15.749 0.000 -0.000 -0.001
6
627:G+T(-20)+00.5W(-X) 33.299 -16..499 0.381
1 16.829 0.000 -0.000 -0.002
6
628:G+T(+20)+00.5W(+Z) --6.059 -16..153 8.593
3 19.274 -0.000 -0.000 -0.002
6
629:G+T(-20)+00.5W(+Z) 44.667 -18..788 8.154
4 21.006 -0.000 -0.000 -0.003
6
630:G+T(+20)+00.5W(-Z) --6.153 -11..890 -5.8433 14.607 -0.000 -0.000 -0.001
6
631:G+T(-20)+00.5W(-Z) 44.573 -14..525 -6.2822 16.473 -0.000 -0.000 -0.003
6
632:G+T(+20)+CCR --5.364 -14..927 2.150
0 16.006 0.000 -0.000 -0.002
6
633:G+T(-20)+CCR 55.363 -17..562 1.711
1 18.442 0.000 -0.000 -0.003
6
634:G+T(+20)+CCL --5.364 -14..927 2.150
0 16.006 0.000 -0.000 -0.002
6
635:G+T(-20)+CCL 55.363 -17..562 1.711
1 18.442 0.000 -0.000 -0.003
6
636:G+T(+20) --5.364 -14..927 2.150
0 16.006 0.000 -0.000 -0.002
6
637:G+T(-20) 55.363 -17..562 1.711
1 18.442 0.000 -0.000 -0.003
6
638:G+E(X)+0.33E(Z)+CD 4
40.569 -16..401 15.044 46.273 0.000 0.000 -0.009
6
639:G+E(X)-0.3E(Z)+CD 4
40.512 -16..066 0.517
7 43.584 0.000 0.000 -0.009
6
640:G-E(X)+0.3E(Z)+CD -440.513 -16..424 3.344
4 43.843 0.000 -0.001 0.004
6
641:G-E(X)-0.3E
E(Z)+CD -440.570 -16..088 -11.1884 45.053 0.000 -0.001 0.004
6
642:G+0.3E(X)++E(Z)+CD 1
12.257 -16..801 27.897 34.796 0.000 0.000 -0.005
6
643:G+0.3E(X)-E(Z)+CD 1
12.067 -15..682 -20.5227 28.511 0.000 -0.000 -0.004
6
644:G-0.3E(X)+E(Z)+CD -112.068 -16..807 24.387 31.982 0.000 -0.000 -0.001
6
645:G+0.3E(X)-E(Z)+CD -112.258 -15..688 -24.0337 31.211 0.000 -0.001 -0.000

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 126 / 13
39
ERC AKH R
Railway Project
P

APPE
ENDIX E JOINT CALCULAT
A TIONS

Joint 1: HE-A300 Column Base


B Conn
nection:

HE-A3300
HE-A30
00

General IInformatio
on
Collumn: HEA 30
00

Matterial: S 235
Hb1 = 29
90 mm Colummn height
Wb11 = 30
00 mm Colummn width
twb1 = 8,5
5 mm Web tthickness
tFb1 = 14
4 mm Flang
ge thickness
Ab = 12,53 cm2
11 Sectioon area
Iby = 8263,5 cm4
18 Mome ent of inertia
Wpl = 383,4 cm3
13 Plastiic section mod dulus
W= 259,55 cm3
12 Elastiic section mod dulus
fyb = 23
35 MPa Resisstance

End
dplate:

Matterial: S 235
hp = 72
20 mm Plate height
bp = 72
20 mm Plate width
tp = 45
5 mm Plate thickness
fyp = 21
15 MPa Resisstance

Stifffeners:

Matterial: S 235
h= 30
00 mm Heigh
ht of stiffener
h1 = 50
0 mm Loweer height

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 127 / 13
39
ERC AKH R
Railway Project
P
l1 = 20
0 mm Lengtth of upper paart of the stiffen
ner
es = 0 mm
m Shift
fst = 15
5 mm Thickkness of flange
e stiffeners
tst = 15
5 mm Thickkness of trapezzoidal stiffeners

An
nchorage:

Classs: 5.6
6
Typpe: Plate
d= 36
6 mm Diame eter
h= 70
00 mm Lengtth of anchor bolt
hefff = 60
00 mm Effecttive length of anchor
a bolt
nc = 4 Numb ber of columns s
nr = 4 Numb ber of rows
n= 12
2 Numb ber of anchor bolts
d1 = 75
5 mm Distannce to upper and
a lower edge of column bbase
d2 = 75
5 mm Distannce to left and
d right edge off column basee
a1;bb1;c1 = 19
90;190;190; mm Row sspacing
a2;bb2;c2 = 19
90;190;190; mm Colummn spacing

Welds:

aw = 5 mm
m Thickkness of welds
s near web
af = 10
0 mm Thickkness of welds
s near flanges
asv = 10
0 mm Thickkness of welds
s between coluumn and stiffeeners
ash = 10
0 mm Thickkness of welds
s between coluumn base andd stiffener

Fou
undation:

Hf = 12
200 mm Found dation height
Wf = 12
200 mm Found dation width
Lf = 12
200 mm Found dation length
tg = 30
0 mm Thickkness of levelinng layer (grout)
fck.f = 20
0 MPa Chara acteristic resis
stance - concrete
fck.g = 20
0 MPa Chara acteristic resis
stance - grout
YC = 1,5
5 Partiaal safety factorr
Cf.g = 0,5
5 Frictio
on coefficient - grout

Saffety factors:

γM0 = 1
γM1 = 1
γM2 = 1,25
γM3 = 1,25

se: Case 1:
Cas

Nod
dal forces:

N= -61 kN Axial force


Mz = 24
45 kNm Bend ing moment along
a web
My = 31
1 kNm Bend ing moment along
a flange
Vz = 50
0 kN Shea r force along web
w

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 128 / 13
39
ERC AKH R
Railway Project
P
Vy = 0 kN
k Shea r force along flange
f

Capacity
y verificatio
on
Res
sults of calcu
ulations

Res
sistances of components
c

Ft,Rdd = 29
94,12 kN Tenssion resistance
e of a single anchor bolt [ttab.3.4]
Ft,Rdd,p = 15
51,2 kN Resisstance for pullling out of con
ncrete E
EN-1992-1-1 point
p 8.4.2
Fvj,RRd= 14
42,5 kN Totall shear capaciity of anchor bolt
b E
EN 1993-1-8 [6
6.2.2]
Mc,RRd = 52
28,96 kNm Desiggn moment re esistance of the section E
EN 1993-1-1 [6
6.2.5]
Classs: 1 Sectiion class E
EN 1993-1-1 [5
5.5.2]

__________
___________
____________
____________
____________
___________
________________________
____________
___

Compres
ssion resis
stance
fcd = 13,33 MPa Compressiion capacity [EN-1992-1-1
1 3.1.6]
c= 98,97 mm Additional bearing width [6.2.5(4)]
βj = 0,67 Reduction coefficient [6.2.5(7)]
fy = 215 MPa Endplate reesistance
fj = 14,81 MPa Bearing ressistance unde
er endplate [6.2.5(7)]
fjd = 95,03 MPa Capacity o
of node [6.2.5(7)]
Acn = 4448,06 cm2 Bearing areea under column [6.2.8.2(1)]

Com
mpression ca
apacity of node:

Nc,Rd = Fc= Acn* fjd

N c,Rd = 8767,3
33 kN

Verrification of compression
c capacity :

N/ Nc,Rd = 0,01 < 1.0 The cond


dition is satisfied (1%)

Bending resistance

Be
ending in web
w plane
e
Calculation case
e:

Casse 1: Compresssion (right sid


de), tension (le
eft side)

e= -4016,39 mm Eccentricityy
Z= 423 mm Internal forrces level arm [tab. 6.7]
ome ega = 0,73 Reduction coefficient [tab. 6.3]
beffft,wc = 718,44 mm Effective le ength determmined for exte ernal row of [6.2.6.3]
bolts
Ft,wwc,Rd = 1048,83 kN Tension ca apacity of web b [6.2.6.3]
FC,ffc,Rd = 1916,53 kN Compressiion capacity of flange and web w [6.2.6.7]
Ft,pll,1 = 604,78 kN Capacity o of plate near le
eft flange of co
olumn [6.2.6.11]
Ft,pll,3 = 604,78 kN Capacity p plate near rightt flange of colu
umn [6.2.6.11]
FT,l,,Rd = 604,78 kN Tension ca apacity of left side
s of node [6.2.8.3]
FTr,Rd = 604,78 kN Tension ca apacity of rightt side of node [6.2.8.3]
FCl,Rd = 1916,53 kN Compressiion capacity of left side of node [6.2.8.3]
FCr,,Rd = 1916,53 kN Compressiion capacity of right side of node [6.2.8.3]

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 129 / 13
39
ERC AKH R
Railway Project
P
MRdd1 = 268,87 kNm Bending ressistance of lefft side of node
e [tab. 6.7]
MRdd2 = 756,98 kNm Bending ressistance of rig
ght side of nodde [tab. 6.7]
MRdd = 268,87 kNm Bending re
esistance of no ode

Verrification of bending
b capac
city:

Mz / MRdz = 0,91 < 1.0 The co


ondition is satis
sfied (91%)

Be
ending in a plane off flanges
Calculation case
e:

Casse 1: Compresssion (right sid


de), tension (le
eft side)

e= -508,2 mm Eccentricityy
Z= 435 mm Internal forrces level arm [tab. 6.7]
ome ega = 0,69 Reduction coefficient [tab. 6.3]
beffft,wc = 806,06 mm Effective le ength determmined for exte ernal row of [6.2.6.3]
bolts
Ft,wwc,Rd = 1111,64 kN Tension ca apacity of web b [6.2.6.3]
FC,ffc,Rd = 1916,53 kN Compressiion capacity of flange and web w [6.2.6.7]
Ft,pll,1 = 604,78 kN Capacity o of plate near le
eft flange of co
olumn [6.2.6.11]
Ft,pll,3 = 604,78 kN Capacity p plate near rightt flange of colu
umn [6.2.6.11]
FT,l,,Rd = 604,78 kN Tension ca apacity of left side
s of node [6.2.8.3]
FTr,Rd = 604,78 kN Tension ca apacity of rightt side of node [6.2.8.3]
FCl,Rd = 1916,53 kN Compressiion capacity of left side of node [6.2.8.3]
FCr,,Rd = 1916,53 kN Compressiion capacity of right side of node [6.2.8.3]
MRdd1 = 416,25 kNm Bending ressistance of lefft side of nodee [tab. 6.7]
MRdd2 = 534,14 kNm Bending ressistance of rigght side of nodde [tab. 6.7]
MRdd = 416,25 kNm Bending re esistance of no ode

Verrification of bending
b capac
city :

My / MRdy = 0,07
7 < 1.0 The co
ondition is satisfied (7%)

Bia
axial bend
ding verification:
Mz / MRdzz + My / MRdy = 0,98 > 1.0 The
T condition is satisfied (988%)

__________
___________
____________
____________
____________
___________
________________________
____________
___

Shear verrification

Sh
hear in web plane
Fv,RRd = 142,5 kN Shear capaacity of anchoor bolt [6.2.2(7)]
Fb,RRd = 706,15 kN Bearing ca
apacity of anch hor bolt [tab.3.4]
Fvj,RRd = 142,5 kN Total shea r capacity of anchor
a bolt
Ff,RRd = 30,5 kN Slip capaciity of node [6.2.2(6)]

She
ear capacity of
o connection
n:

Vj,Rdzz = n*Fvj,Rd + Ff,Rd + Fv,Rd,wg,z

Vj,Rdz= 1740
0,53 kN

Veriification of sh
hear capacity
y:

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 130 / 13
39
ERC AKH R
Railway Project
P
Vz / Vj,Rdz= 0,03
3 <1.0 The co
ondition is satis
sfied (3%)

Sh
hear in a plane
p of fla
anges
Fv,RRd = 142,5 kN Shear capaacity of anchoor bolt [6.2.2(7)]
Fb,RRd = 706,15 kN Bearing ca
apacity of anch hor bolt [tab.3.4]
Fvj,RRd = 142,5 kN Total shea r capacity of anchor
a bolt
Ff,RRd = 30,5 kN Slip capaciity of node [6.2.2(6)]

She
ear capacity of
o connection
n:

Vj,Rdyy = n*Fvj,Rd + Ff,Rd + Fv,Rd,wg,y

Vj,Rdy= 1740
0,53 kN

Veriification of sh
hear capacity
y:

Vy / Vj,Rdy= 0 < 1.0 The con


ndition is satisffied (0%)

Bia
axial shea
ar verificattion:
Vy / Vj,Rddy + Vz / Vj,Rdz= 0,03 < 1.0 The
T condition is satisfied (3%
%)

__________
___________
____________
____________
____________
___________
________________________
____________
___

Welds co
ontrol

Horizontal weld check

Forrces applied along


a flanges
s

Aw = 534,55 cm2 Tottal area of welds


Awz = 312,8 cm2 Are
ea of horizonta al welds
Iwy = m4
168524,9 cm Mooment of inertia of welds abo out Y axis
σperpp = τperp = 16,23 MPa Pe rpendicular sttress in welds
τpar = 1,6 MPa Pa rallel stress in
n welds
βw = 0,8 Ap propriate corrrelation factor [ta
b.4
.1]

Sqrt[(σperp + 3(τperp + τ par2)]<= fu/(βw * γ M2); 32,57 MP


2 2
Pa < 360 MPa The conditionn is satisfied (9%)
(

σperp <= 0,9**fu / γM2;16,23 MPa < 259,2 MPa The con
ndition is satissfied (6%)

Forrces applied along


a flanges
s

Aw = 534,55 cm2 Tottal area of welds


Awy = 221,75 cm2 Are
ea of vertical welds
w
Iwz = m4
162865,4 cm Mooment of inertia a of welds abo out Z axis
σperpp = τperp = 2,89 MPa Perrpendicular strress in welds
τpar = 0 MPa Parrallel stress in welds
βw = 0,8 Apppropriate corre elation factor [ta
b.4
.1]

Sqrt[(σperp2 + 3(τperp2 + τ parr2)]<= fu/(βw * γ M2); 5,79 MPa


a < 360 MPa The conditionn is satisfied (2
2%)

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 131 / 13
39
ERC AKH R
Railway Project
P
σperp <= 0,9*fu / γM2;2,89 M
MPa < 259,2 MPa
M The con
ndition is satisffied (1%)

Verrtical weld check


c

Forrces applied along


a web

Averzz = 120 cm2 Are


ea of vertical welds
w
Nfz = 918,18 kN Forrce from colum mn on vertical welds
σperpp = τperp = 4,17 MPa Perrpendicular strress in welds
τpar = 76,52 MPa Parrallel stress in welds

Sqrt[(σperp2 + 3(τ
S 3 perp2 + τ par2)]]<= fu/(βw * γM
M2); 132,79 MP
Pa < 360 MPa The conditionn is satisfied (37%)
(

σperp <= 0,9*fu / γM2;4,17 M


MPa < 259,2 MPa
M The con
ndition is satisffied (2%)

Forrces applied along


a flages

Averyy = 120 cm 2 Are


ea of vertical welds
w
Nfy = 918,18 kN Forrce from colum mn on vertical welds
σperpp = τperp = 0 MPa Perrpendicular strress in welds
τpar = 11,15 MPa Parrallel stress in welds

Sqrt[(σperp2 + 3(τperp2 + τ par2)]<= fu/(βw * γ M2); 19,32 MP


Pa < 360 MPa The conditionn is satisfied (5%)
(

σperp <= 0,,9*fu / γM2;0 M Pa < 259,2 MPa The condition is satisfieed (0%)

Additiona
al conditio
on
1 < 1.0 The condition is sattisfied
N / Nc,Rd = 0,01

M / Mc,Rd = 0,46
6 < 1.0 The condition
c is sattisfied

V / Vc,Rd = 0,03
3 < 1.0 The co
ondition is satisfied

Final veriification
Con
nnection veriffication:

Verrification of connection FEd – force FRd - capacitty Rattio FEd/FRd


Compressioon capacity N = -61 kN N c,Rd = 8767,33 kN 1%
Mz = 245 kNm Mj,Rdz = 264,93 kNm 92 %
Bending ca
apacity
Myy = 31 kNm Mj,RRdy = 373,25 kNm 8%
Vz = 50 kN Vj,Rdzz = 1740,533 kN 3%
Shear capa
acity
Vyy = 0 kN Vj,Rdy = 1740,533 kN 0%
Horizontal w
welds - forcee in web planne 32,5
57 MPa 360 MPa 9%
Horizontal w
welds - forcee in flanges plane
p 5,79
9 MPa 360 MPa 2%
Vertical we
elds - force in
n web plane 1322,79 MPa 360 MPa 37 %
Vertical we
elds - force in
n flanges plan
ne 19,3
32 MPa 360 MPa 5%
Compressio on capacity ofo column N = -61 kN Nc,Rd = 5323,41 kkN 1%
Bending caapacity of collumn M = 245 kNm Mc,Rdd = 528,96 kN
Nm 46 %
Shear capaacity of colummn V = 50 kN Vc,Rd = 1482,65 kkN 3%
Mz = 245 kNm Mj,Rdz = 264,93 kNm
Bi-axial ben
nding 98 %
Myy = 31 kNm Mj,RRdy = 373,25 kNm

Vz = 50 kN Vj,Rdzz = 1740,533 kN
Biaxial shear 3%
Vyy = 0 kN Vj,Rdy = 1740,533 kN

The connection
c con
nforms to the (EN 1993-1-8
8:2005/AC:20009)

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 132 / 13
39
ERC AKH R
Railway Project
P

Joint 2: H
HE-A300 Column
C – IPE400 Be
eam Conn
nection:

____________
_____________
_____________
_____________
_____________
_____________
_________

Connectiion name : IPE400TOOHEA300 COLUMN FLA ANGE


Connectiion ID : 6V
Design code : BS 5950--1:2000 (Am
mendments 2001)
2
____________
_____________
_____________
_____________
_____________
_____________
_________

Family : End plate (FEP)

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 133 / 13
39
ERC AKH R
Railway Project
P
Type : Beam - Column flange
f (BCF)

IPE40
00 IPE
E400
HE-A3000

ATA
GENERAL DA

Consider ho ole deformation in bolts : No


Is column en nd : Yes
Consider sh heared edges in shapes : No
Consider sh heared edges in shapes : No
Beam with b beveled edges : No
Corrosive innfluences : No
First membe er length : m]
6.00 [m
Structural in
ntegrity : No

MEMBERS:

Beam
Section = IPE 400
Material = S235

Support
Section = EN_HE 300A
3
Material = S235

N(S):
CONNECTION

n: End plate
Connection

End plate
Section = PL 1x16xx26
Material = S235
L = m]
26.00 [cm Length
b = 16.00 [cm
m] Width
End plate (bbeam side)
Weld = E42
s = 0.80 [cm]
End plate (ssupport side)
nc = 2 Number ofo columns
nr = 3 Row nummber
e1 = 3.50 [cm] Longitudiinal edge distan
nce on the plate
e2 = 3.50 [cm] Transverse edge distanc ce on the plate
p = 9.50 [cm] Longitudiinal spacing
g = 9.00 [cm] Transversal spacing
bolt = M16 G8__8
LOADS
Members Load Type V2 V3 M33 M22 Axial
[Ton] [Ton] [Ton*m] [Ton*m] [Ton]
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Beam 6V - DL Design n 10.80 -- -- -- 0.80
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

GEOMETRIC CONSIDERATIIONS

s
Dimensions Unit Value Min. value Maax. value Sta
a. Reference
es
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
End plate

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 134 / 13
39
ERC AKH R
Railway Project
P
Length [cm] 26.00 24.00 33.10 BCSA-
JSCSC p11,
p83, p156
End plate ((support side)
Vertical ccenter-to-center spacing (pitch) [cm] 9.50 4.00 14.00 Cl. 6.2.1.1,
2
Cl. 6.2.1.2
Vertical e
edge distance [cm] 3.50 2.25 11.90 Cl. 6.2.2.4
4,
Cl. 6.2.2.5
5
al edge distance
Horizonta e [cm] 3.50 2.25 11.90 Cl. 6.2.2.4
4,
Cl. 6.2.2.5
5
Support
Vertical ccenter-to-center spacing (pitch) [cm] 9.50 4.00 19.60 Cl. 6.2.1.1,
2
Cl. 6.2.1.2
al center-to-centter spacing (gag
Horizonta ge) [cm] 9.00 9.00 14.00 BCSA-
JSCSC p87
al edge distance
Horizonta e [cm] 10.50 2.25 16.66 Cl. 6.2.2.4
4,
Cl. 6.2.2.5
5
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

DESIGN CHEC
CK

Verification
n Unit Capacity
C Demand Ctrll EQ Ratio Reference
es
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
End plate ((beam side)
Weld cap
pacity [Ton] 61.31 10.80 6V - DL 0.18 Cl. 6.8.7.2
2
Beam
Web plain n shear [Ton] 28.93 10.80 6V - DL 0.37 Cl. 4.2.3
End plate ((support side)
Bolts she
ear [Ton] 36.02 10.80 6V - DL 0.30 3,
Cl. 6.3.3.3
BCSA-
JSCSC p24,
p93,
BCSA-
JSCSC p93
ear
Plain she [Ton] 33.64 5.40 6V - DL 0.16 BCSA-
JSCSC p158
ear
Block she [Ton] 36.84 5.40 6V - DL 0.15 Cl. 6.2.4
Bearing [Ton] 22.52 5.40 6V - DL 0.24 BCSA-
JSCSC p94
Support
Web plain
n shear [Ton] 63.41 5.40 6V - DL 0.09 BCSA-
JSCSC p158
Bearing [Ton] 10.51 1.80 6V - DL 0.17 3
Cl. 6.3.3.3
Structural iintegrity (plate side)
s
Plate tenssion [Ton] 38.45 7.65 6V - DL 0.20 BCSA-
JSCSC p97
Structural iintegrity (beam side)
Tension [Ton] 48.80 7.65 6V - DL 0.16 BCSA-
JSCSC p98
Weld tenssion [Ton] 69.35 7.65 6V - DL 0.11 BCSA-
JSCSC p99
Structural iintegrity (support side)
Bolt tensiion [Ton] 42.43 7.65 6V - DL 0.18 3
Cl. 6.3.4.3
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Critical stre
ength ratio 0.37
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Joint 3: HE-A300 Column – SHS120x


x5 Link Be
eam Conne
ection:

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 135 / 13
39
ERC AKH R
Railway Project
P

HE
E-A300
S
SHS120x
x5

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 136 / 13
39
ERC AKH R
Railway Project
P

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 137 / 13
39
ERC AKH R
Railway Project
P
Joint 4: HE-A300 Column – SHS80x4
4 Link Bea
am Conne
ection:

SHS
HS80x4

HE-A3000

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 138 / 13
39
ERC AKH R
Railway Project
P

Permanen
nt Way Maintenance Building AKH
H – YMI – DD –DW11X – D – CE – REP – 00001 – 0 17.05.2016
This report m
must not be eith her loaned, cop
pied or otherwisse reproduced ini whole or in part
p or used forr any purpos
without the p
prior written perrmission of Yapıı Merkezi. © Yaapi Merkezi Ins aat ve Sanayi A.Ş.,2015
A Page:
P 139 / 13
39

You might also like