EPC Contractor: Client :

REPLACEMENT OF FLOATING ROOF OIL STORAGE TANKS


NO.1 & NO.17 AT ES-SIDER TERMINAL

Crude Oil Storage Tanks Data Sheet (500,000 BBL)

Contract No: Discipline Doc Sequence Revision

1424 GE LI 2501 00 Page 2 of 8

Page Revision Page Revision


No. 00 01 02 03 04 05 06 No. 00 01 02 03 04 05 06

1 X 29

2 X 30

3 X 31

4 X 32

5 X 33

6 X 34

7 X 35

8 X 36

9 37

10 38

11 39

12 40

13 41

14 42

15 43

16 44

17 45

18 46

19 47

20 48

21 49

22 50

23 51

24 52

25 53

26 54

27 55

28 56
Replacement of damaged tanks No. 1 & 17 at Essider tank farm

Document Delivery Schedule

ABBREVIATION INDEX
ITEM ABBREVIATION DESCRIPTION
1 ST STRUCTURE
2 PR PROCESS
3 PD PIPING AND INSTRUMENT DIAGRAM
4 PI PIPING
5 MS MECHANICAL STATIC
6 MA MACHINERY (ROTARY)
7 IN INSTRUMENT
8 EL ELECTRICAL
9 CP CATHODIC PROTECTION
10 FF FIREFIGHTING
11 QC QUALITY CONTROL
12 CC CALCULATION
13 DS DATA SHEET
14 SP SPECIFICATION
15 MT MATERIAL TAKE OFF
16 MR MATERIAL REQUISITION
17 DW DRAWING
18 PR PROCEDURE
19 IX INDEX
20 DA DIAGRAM
21 SD SINGLE LINE DIAGRAM
22 TD TYPICAL DRAWING
23 LI LIST
24 T01 TANK NO.1
25 IFI ISSUED FOR INFORMATION
26 IFA ISSUED FOR APPROVAL

NOTES:

1- Paper size will be finalized during detail design stage.


2- Date of first issue is tentative and will be finalized after project award.
3- Three (3) sets of hard copies will be handed over to client after each document final
issue.

3
Replacement of damaged tanks No. 1 & 17 at Essider tank farm

Tank No. 1 Document Delivery Schedule


DATE OF
DOCUMENT DOC. PAPER
DOCUMENT TITLE DICIPLINE PURPOSE OF ISSUE FIRST
NUMBER TYPE SIZE
ISSUE

ENGINEERING (DETAIL DESIGN)


STRUCTURE ST
FOUNDATION DRAWING FOR TANK NO.1 1424-T01-ST-DW-9003 ST DW ISSUE FOR APPROVAL 15 January 2019 NOTE 1
PROCESS PR
PIPING & INSTRUMENTATION DIAGRAM FOR TANK NO.1 1424-T01-PR-PD-1002 PR PD ISSUE FOR APPROVAL 5 January 2019 NOTE 1
MECHANICAL STATIC MS
MECHANICAL CALCULATION BOOK FOR TANK NO.1 1424-T01-MF-CC-2501 MS CC ISSUE FOR APPROVAL 10 January 2019 NOTE 1
FLOATING ROOF CALCULATION BOOK FOR NO.1 1424-T01-MF-CC-2502 MS CC ISSUE FOR APPROVAL 10 January 2019 NOTE 1
GENERAL ARRANGEMENT DRAWING FOR TANK NO.1 1424-T01-MF-DW-2505 MS DW ISSUE FOR APPROVAL 11 January 2019 NOTE 1
BOTTOM PLATE ARRANGEMENT DRAWING FOR TANK NO.1 1424-T01-MF-DW-2507 MS DW ISSUE FOR APPROVAL 12 January 2019 NOTE 1
SHELL PLATE ARRANGEMENT DRAWING FOR TANK NO.1 1424-T01-MF-DW-2508 MS DW ISSUE FOR APPROVAL 13 January 2019 NOTE 1
UPPER DECK PLATE ARRANGEMENT DRAWING FOR TANK NO.1 1424-T01-MF-DW-2513 MS DW ISSUE FOR APPROVAL 14 January 2019 NOTE 1
LOWER DECK PLATE ARRANGEMENT DRAWING FOR TANK NO.1 1424-T01-MF-DW-2514 MS DW ISSUE FOR APPROVAL 14 January 2019 NOTE 1

4
1

Replacement of damaged tanks No. 1 & 17 at Essider tank farm

Tank No. 1 Document Delivery Schedule


DATE OF
DOCUMENT DOC. PAPER
DOCUMENT TITLE DICIPLINE PURPOSE OF ISSUE FIRST
NUMBER TYPE SIZE
ISSUE
ENGINEERING (DETAIL DESIGN)
STRUCTURE ST
CALCULATION REPORT FOR TANK NO.1 FOUNDATION 1424-T01-ST-CC-9002 ST CC ISSUE FOR INFORMATION 4 January 2019 NOTE 1
PROCESS PR
PROCESS DATA SHEET FOR STORAGE TANK NO.1 1424-T01-PR-DS-1001 PR DS ISSUE FOR INFORMATION 4 January 2019 NOTE 1
PIPING PI
PIPING MATERIAL SPECIFICATION (PMS) FOR TANK NO. 1 1424-T01-PI-SP-3005 PI SP ISSUE FOR INFORMATION 5 January 2019 NOTE 1
PIPING MATERIAL MTO FOR TANK NO. 1 1424-T01-PI-MT-3010 PI MT ISSUE FOR INFORMATION 30 January 2019 NOTE 1
MR FOR PIPING MATERIAL TANK NO. 1 1424-T01-PI-MR-3004 PI MR ISSUE FOR INFORMATION 30 January 2019 NOTE 1
MECHANICAL STATIC MS
DATA SHEET FOR ROOF DRAIN SYSTEM OF TANK NO.1 1424-T01-MF-DS-2568 MS DS ISSUE FOR INFORMATION 14 January 2019 NOTE 1
DATA SHEET FOR TANK NO.1 SEALING SYSTEM 1424-T01-MF-DS-2569 MS DS ISSUE FOR INFORMATION 14 January 2019 NOTE 1
NOZZLE ORIENTATION DRAWING FOR TANK NO.1 1424-T01-MF-DW-2506 MS DW ISSUE FOR INFORMATION 14 January 2019 NOTE 1
SHELL MANHOLE DRAWING FOR TANK NO.1 1424-T01-MF-DW-2509 MS DW ISSUE FOR INFORMATION 16 January 2019 NOTE 1
SHELL NOZZLE DRAWING FOR TANK NO.1 1424-T01-MF-DW-2510 MS DW ISSUE FOR INFORMATION 18 January 2019 NOTE 1
WATER DRAW OFF SUMP DRAWING FOR TANK NO.1 1424-T01-MF-DW-2511 MS DW ISSUE FOR INFORMATION 21 January 2019 NOTE 1
STAIRWAY DETAIL DRAWING FOR TANK NO.1 1424-T01-MF-DW-2512 MS DW ISSUE FOR INFORMATION 22 January 2019 NOTE 1
DECK STRUCTURE DETAIL DRAWING FOR TANK NO.1 1424-T01-MF-DW-2515 MS DW ISSUE FOR INFORMATION 24 January 2019 NOTE 1
FLOATING ROOF SUPPORT DRAWING FOR TANK NO.1 1424-T01-MF-DW-2516 MS DW ISSUE FOR INFORMATION 26 January 2019 NOTE 1
AUTOMATIC BLEEDER VENT DRAWING FOR TANK NO.1 1424-T01-MF-DW-2517 MS DW ISSUE FOR INFORMATION 28 January 2019 NOTE 1
ANTI-ROTATION PIPE DRAWING FOR TANK NO.1 1424-T01-MF-DW-2518 MS DW ISSUE FOR INFORMATION 30 January 2019 NOTE 1
DIP GUIDE POLE DETAIL FOR TANK NO.1 1424-T01-MF-DW-2519 MS DW ISSUE FOR INFORMATION 1 February 2019 NOTE 1
DECK MANHOLE DRAWING FOR TANK NO.1 1424-T01-MF-DW-2520 MS DW ISSUE FOR INFORMATION 4 February 2019 NOTE 1
ROLLING LADDER & RUNWAY DETAIL DRAWING TANK NO.1 1424-T01-MF-DW-2521 MS DW ISSUE FOR INFORMATION 5 February 2019 NOTE 1
FLOATING ROOF DRAIN DRAWING FOR TANK NO.1 1424-T01-MF-DW-2522 MS DW ISSUE FOR INFORMATION 7 February 2019 NOTE 1
FLOATING ROOF EMERGENCE DRAIN DETAIL DRAWING FOR TANK NO.1 1424-T01-MF-DW-2523 MS DW ISSUE FOR INFORMATION 9 February 2019 NOTE 1

5
2

Replacement of damaged tanks No. 1 & 17 at Essider tank farm

Tank No. 1 Document Delivery Schedule


DATE OF
DOCUMENT DOC. PAPER
DOCUMENT TITLE DICIPLINE PURPOSE OF ISSUE FIRST
NUMBER TYPE SIZE
ISSUE
RIM VENT DETAIL DRAWING FOR TANK NO.1 1424-T01-MF-DW-2524 MS DW ISSUE FOR INFORMATION 11 February 2019 NOTE 1
ROOF EARTHING DRAWING FOR TANK NO.1 1424-T01-MF-DW-2525 MS DW ISSUE FOR INFORMATION 13 February 2019 NOTE 1
FOAM DAM DRAWING FOR TANK NO.1 1424-T01-MF-DW-2526 MS DW ISSUE FOR INFORMATION 15 February 2019 NOTE 1
GAUGE SAMPLING HATCH DETAIL DRAWING FOR TANK NO.1 1424-T01-MF-DW-2527 MS DW ISSUE FOR INFORMATION 25 February 2019 NOTE 1
COOLING WATER SYSTEM DETAIL DRAWING FOR TANK NO.1 1424-T01-MF-DW-2528 MS DW ISSUE FOR INFORMATION 19 February 2019 NOTE 1
FOAM POURER SYSTEM DETAIL DRAWING FOR TANK NO.1 1424-T01-MF-DW-2529 MS DW ISSUE FOR INFORMATION 21 February 2019 NOTE 1
ANCHOR CHAIR DRAWING FOR TANK NO.1 1424-T01-MF-DW-2530 MS DW ISSUE FOR INFORMATION 23 February 2019 NOTE 1
SETTLEMENT CHECK PIECES DRAWING FOR TANK NO.1 1424-T01-MF-DW-2531 MS DW ISSUE FOR INFORMATION 25 February 2019 NOTE 1
EARTH LUG DETAIL DRAWING FOR TANK NO.1 1424-T01-MF-DW-2532 MS DW ISSUE FOR INFORMATION 27 February 2019 NOTE 1
NAME PLATE DETAIL DRAWING FOR TANK NO.1 1424-T01-MF-DW-2533 MS DW ISSUE FOR INFORMATION 28 February 2019 NOTE 1
NDT MAP FOR TANK NO.1 1424-T01-MF-DW-2563 MS DW ISSUE FOR INFORMATION 2 March 2019 NOTE 1
ERECTION & FABRICATION FOR TANK NO.1 1424-T01-MF-PR-2572 MS PR ISSUE FOR INFORMATION 4 March 2019 NOTE 1
MTO FOR TANK NO.1 1424-T01-MF-MT-2576 MS MT ISSUE FOR INFORMATION 15 January 2019 NOTE 1
MR FOR CRUDE OIL STORAGE TANK NO.1 SEALING SYSTEM 1424-T01-MF-MR-2566 MS MR ISSUE FOR INFORMATION 15 January 2019 NOTE 1
MR FOR PLATE OF TANK NO.1 1424-T01-MF-MR-2567 MS MR ISSUE FOR INFORMATION 15 January 2019 NOTE 1
MR FOR ROOF DRAIN SYSTEM OF TANK NO.1 1424-T01-MF-MR-2577 MS MR ISSUE FOR INFORMATION 15 January 2019 NOTE 1
MECHANICAL ROTARY MR
DATA SHEET FOR MIXER OF TANK NO.1 1424-T01-MA-DS-2201 MR DS ISSUE FOR INFORMATION 15 January 2019 NOTE 1
MATERIAL REQUISITION FOR MIXER OF TANK NO.1 1424-T01-MA-MR-2203 MR MR ISSUE FOR INFORMATION 21 January 2019 NOTE 1
INSTRUMENT IN
DATA SHEET FOR LEVEL SWITCH OF TANK NO.1 1424-T01-IN-DS-4001 IN DS ISSUE FOR INFORMATION 15 January 2019 NOTE 1
DATA SHEET FOR LEVEL TRANSMITTER OF TANK NO.1 1424-T01-IN-DS-4002 IN DS ISSUE FOR INFORMATION 21 January 2019 NOTE 1
DATA SHEET FOR LEVEL GAUGE OF TANK NO.1 1424-T01-IN-DS-4003 IN DS ISSUE FOR INFORMATION 25 January 2019 NOTE 1
DATA SHEET FOR MOV OF TANK NO.1 1424-T01-IN-DS-4004 IN DS ISSUE FOR INFORMATION 30 January 2019 NOTE 1
DATA SHEET FOR CONTROL VALVE OF TANK NO.1 1424-T01-IN-DS-4005 IN DS ISSUE FOR INFORMATION 4 February 2019 NOTE 1
DATA SHEET FOR F&G DEVICES OF TANK NO.1 1424-T01-IN-DS-4006 IN DS ISSUE FOR INFORMATION 9 February 2019 NOTE 1

6
3

Replacement of damaged tanks No. 1 & 17 at Essider tank farm

Tank No. 1 Document Delivery Schedule


DATE OF
DOCUMENT DOC. PAPER
DOCUMENT TITLE DICIPLINE PURPOSE OF ISSUE FIRST
NUMBER TYPE SIZE
ISSUE
DATA SHEET FOR TEMPERATURE TRANSMITTER OF TANK NO.1 1424-T01-IN-DS-4022 IN DS ISSUE FOR INFORMATION 14 February 2019 NOTE 1
INSTRUMENT INDEX OF TANK NO.1 1424-T01-IN-IX-4007 IN IX ISSUE FOR INFORMATION 19 February 2019 NOTE 1
JB WIRING DIAGRAM OF TANK NO.1 1424-T01-IN-DA-4011 IN DA ISSUE FOR INFORMATION 25 February 2019 NOTE 1
MATERIAL REQUISITION FOR FIEL INSTRUMENT OF TANK NO.1 1424-T01-IN-MR-4014 IN MR ISSUE FOR INFORMATION 16 February 2019 NOTE 1
MATERIAL REQUISITION FOR MOV OF TANK NO.1 1424-T01-IN-MR-4017 IN MR ISSUE FOR INFORMATION 19 February 2019 NOTE 1
MATERIAL REQUISITION FOR F&G DEVICES OF TANK NO.1 1424-T01-IN-MR-4019 IN MR ISSUE FOR INFORMATION 20 February 2019 NOTE 1
MATERIAL REQUISITION FOR INSTRUMENT CABLE OF TANK NO.1 1424-T01-IN-MR-4020 IN MR ISSUE FOR INFORMATION 22 February 2019 NOTE 1
MATERIAL REQUISITION FOR INSTRUMENT JB & GLAND OF TANK NO.1 1424-T01-IN-MR-4021 IN MR ISSUE FOR INFORMATION 25 February 2019 NOTE 1
ELECTRICAL EL
13MCC-3, SINGLE LINE DIAGRAM 1424-T01-EL-SD-5001 EL SD ISSUE FOR INFORMATION 21 January 2019 NOTE 1
13MCC-6, SINGLE LINE DIAGRAM 1424-T01-EL-SD-5002 EL SD ISSUE FOR INFORMATION 25 January 2019 NOTE 1
ELECTRICAL CABLE ROUTING LAYOUT OF TANK NO.1 1424-T01-EL-DW-5012 EL DW ISSUE FOR INFORMATION 30 January 2019 NOTE 1
TYPICAL POWER INSTALLATION DETAIL 1424-T01-EL-TD-5013 EL TD ISSUE FOR INFORMATION 30 January 2019 NOTE 1
TYPICAL EARTHING INSTALLATION DETAIL 1424-T01-EL-TD-5014 EL TD ISSUE FOR INFORMATION 4 February 2019 NOTE 1
TYPICAL INSTALLATION DETAIL DRAWING 1424-T01-EL-TD-5015 EL TD ISSUE FOR INFORMATION 9 February 2019 NOTE 1
POWER AND CONTROL CABLE SCHEDULE 13- MCC-3 ES-SIDER 1424-T01-EL-LI-5016 EL LI ISSUE FOR INFORMATION 4 February 2019 NOTE 1
POWER AND CONTROL CABLE SCHEDULE 13- MCC-6 ES-SIDER 1424-T01-EL-LI-5017 EL LI ISSUE FOR INFORMATION 6 February 2019 NOTE 1
LOAD LIST FOR TANK NO.1 1424-T01-EL-LI-5025 EL LI ISSUE FOR INFORMATION 15 January 2019 NOTE 1
MR FOR ELECTRICAL POWER, CONTROL AND EARTHING CABLES OF TANK NO.1 1424-T01-EL-MR-5022 EL MR ISSUE FOR INFORMATION 4 February 2019 NOTE 1
MR FOR BULCK MATERIALS OF TANK NO.1 1424-T01-EL-MR-5023 EL MR ISSUE FOR INFORMATION 9 February 2019 NOTE 1
CATHODIC PROTECTION CP
CATHODIC PROTECTION CALCULATION OF TANK NO.1 1424-T01-CP-CC-6501 CP CC ISSUE FOR INFORMATION 15 January 2019 NOTE 1
DATA SHEET FOR CATHODIC PROTECTION MATERIALS OF TANK NO.1 1424-T01-CP-DS-6502 CP DS ISSUE FOR INFORMATION 18 January 2019 NOTE 1
DATA SHEET FOR CATHODIC PROTECTION TRANSFORMER RECTIFIER OF TANK NO.1 1424-T01-CP-DS-6503 CP DS ISSUE FOR INFORMATION 21 January 2019 NOTE 1
CATHODIC PROTECTION LAYOUT FOR TANK NO.1 1424-T01-CP-DW-6504 CP DW ISSUE FOR INFORMATION 24 January 2019 NOTE 1
INSTALLATION DETAIL FOR CATHODIC PROTECTION SYSTEM OF TANK NO.1 1424-T01-CP-DW-6505 CP DW ISSUE FOR INFORMATION 28 January 2019 NOTE 1

7
4

Replacement of damaged tanks No. 1 & 17 at Essider tank farm

Tank No. 1 Document Delivery Schedule


DATE OF
DOCUMENT DOC. PAPER
DOCUMENT TITLE DICIPLINE PURPOSE OF ISSUE FIRST
NUMBER TYPE SIZE
ISSUE
MTO FOR CATHODIC PROTECTION SYSTEM OF TANK NO.1 1424-T01-CP-MT-6506 CP MT ISSUE FOR INFORMATION 30 January 2019 NOTE 1
MR FOR CATHODIC PROTECTION OF TANK NO.1 BOTTOM 1424-T01-CP-MR-6510 CP MR ISSUE FOR INFORMATION 2 February 2019 NOTE 1
MR FOR CATHODIC PROTECTION SYSTEM TRANSFORMER RECTIFIERS OF TANK NO.1 1424-T01-CP-MR-6511 CP MR ISSUE FOR INFORMATION 5 February 2019 NOTE 1
FIREFIGHTING FF
FIREWATER & FOAM DEMAND CALCULATION OF TANK NO.1 1424-T01-SF-CC-7002 FF CC ISSUE FOR INFORMATION 15 January 2019 NOTE 1
HYDRAULIC CALCULATION FOR TANKS WATER SPRAY SYSTEM OF TANK NO.1 1424-T01-SF-CC-7003 FF CC ISSUE FOR INFORMATION 17 January 2019 NOTE 1
HYDRAULIC CALCULATION FOR TANKS FOAM SYSTEM OF TANK NO.1 1424-T01-SF-CC-7004 FF CC ISSUE FOR INFORMATION 19 January 2019 NOTE 1
DATA SHEET FOR DELUGE SKIDS OF TANK NO.1 1424-T01-SF-DS-7005 FF DS ISSUE FOR INFORMATION 21 January 2019 NOTE 1
DATA SHEET FOR SPARAY NOZZLES OF TANK NO.1 1424-T01-SF-DS-7006 FF DS ISSUE FOR INFORMATION 26 January 2019 NOTE 1
DATA SHEET FOR FOAM PACKAGE OF TANK NO.1 1424-T01-SF-DS-7008 FF DS ISSUE FOR INFORMATION 31 January 2019 NOTE 1
DATA SHEET FOR INERT GAS RIM SEAL FIRE PROTECTION SYSTEMS OF TANK NO.1 1424-T01-SF-DS-7009 FF DS ISSUE FOR INFORMATION 5 February 2019 NOTE 1
DATA SHEET FOR FOAM POURER OF TANK NO.1 1424-T01-SF-DS-7015 FF DS ISSUE FOR INFORMATION 11 February 2019 NOTE 1
P&ID FOR WATER SPRAY SYSTEM OF TANK NO.1 1424-T01-SF-DW-7010 FF DW ISSUE FOR INFORMATION 15 February 2019 NOTE 1
P&ID FOR FOAM SYSTEM OF TANK NO.1 1424-T01-SF-DW-7011 FF DW ISSUE FOR INFORMATION 20 February 2019 NOTE 1
MATERIAL REQUISITION FOR FIRE FIGHTING EQUIPMENTS OF TANK NO.1 1424-T01-SF-MR-7014 FF MR ISSUE FOR INFORMATION 22 February 2019 NOTE 1
QUALITY CONTROL QC
INSPECTION AND TEST PLAN (ITP) OF TANK NO.1 1424-T01-QC-PR-6801 QC PR ISSUE FOR INFORMATION 21 January 2019 NOTE 1
WPS & PQR OF TANK NO.1 1424-T01-QC-PR-6802 QC PR ISSUE FOR INFORMATION 25 January 2019 NOTE 1
SURFACE PREPARATION AND PAINTING PROCEDURE OF TANK NO.1 1424-T01-QC-PR-6803 QC PR ISSUE FOR INFORMATION 30 January 2019 NOTE 1
HYDRO TEST PROCEDURE OF TANK NO.1 1424-T01-QC-PR-6804 QC PR ISSUE FOR INFORMATION 4 February 2019 NOTE 1
NON DESTRUCTIVE TEST PROCEDURES (NDT) OF TANK NO.1 1424-T01-QC-PR-6805 QC PR ISSUE FOR INFORMATION 9 February 2019 NOTE 1