Batching Plant Inspection Checklist
Report No.: 2
Customer / Project Name:

Concrete Company Name: Project (IPS) no:


Plant Name/ Spec:
Plant Type: In Site Facility Remote Erected
Company Representative:
( X) ( ) ( )
Last Calibration (DD- Calibration due Date (DD-
MM-YY): MM-YY)
Item Description Completion Date Initials
1 Materials Storage and Handling DD-MM-YY Contractor GE/TPI
Cement stored in suitable silos: Silos are water tight and constructed to allow
1.1
free movement to discharge openings.
Aggregates, Water and Admixtures: Are facilities adequate to provide for
1.2
separation of different cement and non-cementitious materials?
Material Handling: Are the loading of transports and the building of stockpiles
1.3
adequate to prevent segregation?
Stockpile Areas: Will stockpile areas prevent contamination and allow for free
1.4
draining?
1.5 Water Supply: Is there an adequate clean water supply?

1.6 Weather Facilities: Are cold and hot weather facilities adequate?
Admixtures: Are storage and handling systems for admixtures sufficient to
1.7
prevent freezing and maintain correct temperature range
Measurement Devices: Are the automatic measuring devices in working order
1.8
and in plain view of operator?
2 Batching Equipment DD-MM-YY Contractor GE/TPI
Scales: Is there a sticker on scales indicating the last calibration date and date
2.1
due for re-calibration or calibration certificates available for reference?

2.2 Test Weights: Are test weights available for testing accuracy of scales?
Weight Batchers: Are the batchers for weighing materials freely suspended
2.3
from the scale?
Weight Batchers: Is the cement weighed on scales or in weigh hoppers not
2.4
used for weighing other concrete materials?
Weight Batchers: Are cement batchers provided with dust seals between
2.5
charging mechanism hopper?
Weight Batchers: Is the weigh hopper vented to permit air to escape and is the
2.6
hopper self-cleaning?
Water Meters: Are the water meters equipped with a cut off device capable of
2.7 stopping the flow within specified tolerance and does the operator have a clear
view of meters during batching operations?
Dispensers for liquid admixture: Is there a separate dispenser for each liquid
2.8
admixture in regular use?
Dispensers for liquid admixture: Do the volumetric admixture dispensers
provide a visual indication, or interlock cut off, when liquid admixture supply is
2.9
not available to the dispenser? (This is to prevent the dispensing of air instead
of admixture.)
Is batching equipment able to take into account the moisture content of
2.10
aggregates?
Page 01/03
Document Number:
GE RENEWABLE ENERGY
REN_IN_QA_Civil_002
Revision: 1.0
Batching Plant Inspection Checklist
Report No.: 2
3 Accuracy of Batching Plant DD-MM-YY Contractor GE/TPI
Calibration: Has the cement and aggregate scale been calibrated and is
3.1
calibration certificate available for reference?
Calibration: Have the water meters been calibrated and is the calibration
3.2
certificate available for reference?
Calibration: Have the admixtures dispensers been calibrated and is the
3.3
calibration certificate available for reference?
Recorders: Are permanent records provided of the quantity of cement,
3.4
aggregate and water measured for a particular batch of concrete?
3.5 Recorders: Are the recorders properly protected and capable of being locked?
Recorders: Are provisions made for identifying the particular batch with the
3.6
corresponding delivery ticket?
Recorders: Do the recorders register when empty and are the recorders used
3.7
for all ingredients?
Ticketing System: Does the delivery ticket/Batch report provide the following
3.8
information?
a. Name of Concrete company

b. Plant designation if there is more than one batch plant

c. Serial number of ticket/Batch

d. Name of purchaser

e. Name of location of job

f. Specific class or mix design of concrete in conformance with job specifications

g. Volume of concrete

h. Date of batch

i. Time batch was loaded


Amount of water withheld from the mix (this will allow the receiver to know how
j.
much water can be added at the site)
k. Type and name of admixture(s) and amount(s) batched

3.9 Batch ticket/report attached to this checklist?


4 Delivery Fleet/ Transit Mixer DD-MM-YY Contractor GE/TPI
Trucks: Is the total number of trucks/transit mixers available for use adequate?
4.1
_____________Nos
Chutes: Are the charging and discharge openings and chute in good condition,
4.2 free of appreciable accumulations of cement or concrete and with a clean and
smooth surface?
Meters: On units equipped to batch the mixing water, is the equipment in
4.3
proper working condition with gage glasses?
Meters: Are the water meters clean legibly graduated; water pump or injection
system in good working order with nozzles unobstructed and without leakage?
4.4
into mixer?

4.5 Meters: are trucks equipped with revolution counters?


Page 02/03
Document Number:
GE RENEWABLE ENERGY
REN_IN_QA_Civil_002
Revision: 1.0
Batching Plant Inspection Checklist
Report No.: 2
5 Quality Control DD-MM-YY Contractor GE/TPI
5.1 Are quality control personnel independent of plant line personnel?
Are test facilities adequate to perform physical tests of aggregates and
5.2
cement?
5.3 Are these inspection records on file?
Is the batch plant certified by the applicable regulatory body and is the relevant
5.4
documentation available for reference?
Is the batch plant close enough to the job site to deliver concrete within code
5.5
and specification requirements?
Has a sample batch been made and have tests been approved by
5.6
engineering?
Authorisation
6 Audit Conclusion
Date DD-MM-YY
Contractor GE/TPI

The Batch Plant has adequate facilities, certifications and qualified personnel
to perform the work required in accordance with applicable codes and contract
6.1
specifications, and is hereby authorised to provide Concrete Batching services
to the project.

Recommendations and Remarks

Contractor Acceptance Sign : Name/ Company: Date:

Final Acceptance Signed by: Name & Date:

GE/TPI Customer GE/TPI Customer


Page 03/03