You are on page 1of 1

Pl.

Provide for both MS Line Please provide this arrangement


for both MS line. If it is under the
PT scope of PC chennai or PEM
Delhi then please show it by
Hidden line. (Typ.)

TE TE TE TI TW

Please show the Isolating Device.

RH

General Comments:
Please assure that
1. Temp. element shall be provided for each drain valve.
2. All drain valves shall be provided the locking device.

Digitally signed by Sushil


Kumar Arjaria
DN: CN = Sushil Kumar
Please provide M.O. After isolating valves as provided for MTPS Ph II. Arjaria, C = US, O =
DVC, OU = Engineering
and Planning
Reason: I have reviewed
this document and
Approved under CAT.III
Date: 2008.03.06
12:50:54 +05'30'

You might also like