01

SCHEDULE OF BEAMS

REBARING OF BEAM ON THIS SIDE B1 230 380 3 12 - - 3 12 - - 1 12 8 100 8 100


MIN. 200MM INSIDE USING REBARING
REBARING OF BEAM ON CHEMICAL (DOWELS TO BE LEFT MIN. BR1 230 380 3 12 - - 5 12 - - 1 12 8 75 8 75
THIS SIDE 200MM INSIDE 1000MM & TO BE LAPPED WITH NEW B2 150 380 2 12 - - 2 12 - - - - 8 100 8 100
USING REBARING CHEMICAL BEAM BARS NOTE : ALL BEAM MIN. REBARING INTO EXISTING MEMBER 200MM.
(DOWELS TO BE LEFT MIN.
1000MM & TO BE LAPPED SUNK
WITH NEW BEAM BARS SLAB
SCHEDULE OF SLAB

B1
Y
BR1 X BOTTOM STEEL TOP STEEL EXTRA TOP STEEL
SUNK SLAB SLAB
REMARKS
MKD THICKNESS MAIN SPAN OTHER SPAN MAIN SPAN OTHER SPAN MAIN SPAN OTHER SPAN
SLAB
B2

Z BEAM TOP AT
Y
SUNK TOP LEVEL S1 110 #08@125 C/C #08@125 C/C #08@125 C/C #08@125 C/C -- -- PLAIN DOUBLE MESH SLAB
BR1
S2 110 #08@125 C/C #08@125 C/C #08@125 C/C #08@125 C/C -- -- PLAIN DOUBLE MESH SLAB
REBARING OF BEAM ON REBARING OF BEAM
THIS SIDE 200MM INSIDE ON THIS SIDE NOTE : REFER SECTIONAL DETAILS ACCORDING TO SLAB
USING REBARING CHEMICAL EXISTING MIN. 200MM INSIDE USING
REBARING CHEMICAL
(DOWELS TO BE LEFT MIN.
1000MM & TO BE LAPPED STRUCTURE (DOWELS TO BE LEFT MIN.
WITH NEW BEAM BARS 1000MM & TO BE LAPPED PROPOSED
REGULAR SLAB TOP LEVEL
WITH NEW BEAM BARS BRACKET
RCC BEAM 8@150 C/C
STEEL BOTHWAYS AT TOP FACE
PROPOSED EXISTING
150
BEAM B2 STEEL BOTHWAYS
AT TOP FACE SUNK TOP LEVEL
150
8@150 C/C EXISTING EXISTING SUNK SLAB 110
RCC BEAM
110
REBARING INSIDE BY 6" STEEL BOTHWAYS AT
USE REBARING CHECMICAL BOTTOM FACE, 8@150 C/C
STAGGERED STAGGERED
STEEL BOTHWAYS DOWELS 8MM @ 6" C/C
AT BOTTOM FACE DOWELS 8MM @ 8" C/C NEW BEAM "B1"
8@150 C/C (BEAM TOP AT SUNK TOP)

TYP. SECTION X-Y AT REBARING OF PROPOSED OF SLAB "S1"


TYP. SECTION Y-Z AT REBARING OF SLAB "S2"

IMPORTANT INSTRUCTIONS :
STRUCTURAL LAYOUT AT FIRST SLAB LEVEL 1) GRADE OF CONCRETE = M25
2) GRADE OF STEEL = FE500
3) COVER TO BEAM = 30MM,
4) COVER TO SLAB = 20MM
5) ALL DIMENSIONS WILL BE AS PER ARCHITECTURAL DRAWING UNLESS OTHERWISE
SPECIFIED.
6) ADD SUPPORT TO 2ND SLAB (BELOW EXTENDED PORTION) FROM BELOW UNLESS
UNTIL ABOVE SLAB IS COMPLETED.
*** IMP NOTE : BEFORE DOING REBARING AT ANY SURFACE, CHIP OFF EXISTING 7) EXISTING STRUCTURAL STABILITY WILL NOT BE OUR RESPONSIBILITY.
PLASTER & COLOR FROM THAT EXISTING CONCRETE SURFACE, 8) REFER ARCHITECTURAL DRAWINGS ALONG WITH THIS DRAWING.
*** DO MIN. 150MM REBARING BY USING ADHESIVE CHEMICAL & BEFORE DOING 9) DISCREPANCY IF ANY SHALL BE DISCUSSED WITH STRUCTURAL ENGINEER.
CONCRETING APPLY RBR ADHESIVE CHEMICAL OVER THE SURFACE , BEFORE
LAYING NEW CONCRETE. TYPICAL RING HOOK