Project Title Cable No

Project No Conductor Size

Connection
Diagram Cable Schedule
Origin Destination

Inspection Activity OR Deficiency


Check By Date Comment Date
Acceptance Criteria Cleared
Cable Supports: Cable fixed &
supported correctly
Installation: Installed as per
manufacturer’s specifications
Segregation: Cable is segregated,
wherever practicable, from
instrumentation cabling
Origin Destination Deficiency
Comment Date
By Date By Date Cleared

Numbering: Cable correctly numbered


at each gland or entry point
Glanding: Glands are fitted correctly.
Denso tape installed where applicable
Wire Number: Wire numbers installed
as per connection diagram
Terminations: Lugs correct size &
type. Terminations tightened correctly
Screens: Terminated as per standard
practice
Deficiency
Check By Date Comment Date
Cleared
Insulation Resistance: Cable tested
after installation. Record results on
page 2 (attached)
Continuity: Each conductor checked
(point to point)

TEST EQUIPMENT USED

MTE No Serial No Cal. Due Date

MTE No Serial No Cal. Due Date

Checked By Licence No Date

Signature

Project Title Cable No

TEST RESULTS

Insulation Resistance Test Voltage Reading

005-000-PNF-140 Page 1 of 2
Rev 6 File:_emsservice /conversion/tmp/activity_task_scratch/736436473.doc
Cable Installation Report

1. Red core to earth volts mohms

2. Red core to white core volts mohms

3. Red core to blue core volts mohms

4. Red core to black core volts mohms

5. White core to earth volts mohms

6. White core to blue core volts mohms

7. White core to black core volts mohms

8. Blue core to earth volts mohms

9. Blue core to black core volts mohms

10. Black core to earth volts mohms

11. Intrinsically safe circuit cable and Dekron cable. Each volts > 10 mohm Pass / Fail
core in turn to all other cores plus screens and earth

Earth Continuity Reading


1. Earth conductor at destination to earth connection at source ohms

2. Earth stud at destination to metal frame or structure ohms

REMARKS

005-000-PNF-140 Page 2 of 2
Rev 6 File:_emsservice /conversion/tmp/activity_task_scratch/736436473.doc