Jsa 09 Radiography
Jsa 09 Radiography
SEQUENCE
Yes /
OF BASIC JOB POTENTIAL HAZARDS PRECAUTIONS
No
STEPS
Plan the work involving Permit Applicant, Permit Issuer &
Lack of Information
Radiographer.
Non-compliance of MME
Following MME (ministry of municipality and health and
safety), Radiation Protection Manual Regulations for
Regulations, SAFERAD –
Procedures, Client specified safety Radiography.
procedure.
Ensure the correct tools & required PPEs are ready to use
In-appropriate Tools & PPE
prior to starting radiography work.
Planning & Presence of non – certified Ensure no person other than Radiographers is at site.
Preparation personnel at radiography site Suspend any ongoing work at radiography site.
Check the Isotope Storage Box for no radiation leak.
Radiation Leak Transport isotopes only in the purposely designed box and
vehicle in compliance to MME Region.
Accidental Entry of unauthorized Check the safe radiation level and barricade the area;
personnel installing radiation warning lights & alert sign
Unintended Shutdown of Identify UV / IR Detectors to be overridden in
equipment / Unit / System radiography work area.
Unauthorized Radiography Obtain radiography permit from Asset Owner
Radiographers’ have valid Competency Certificate from
Radiation Exposure
MME & Personnel Radiation Monitoring Equipment , film
Badge.
Presence of Flammable / Toxic Gas Ensure the worksite is free from flammable / toxic
in the Substation atmosphere.
Fire Keep fire extinguishers ready for use.
Radiography
Work Carry out the functional test of emergency retrieval kit for
Exposed Isotope
isotope.
Confirm & establish radio communication with Permit
Issuer.
Lack of Communication
Make an announcement prior to starting the
radiography
Dangerous Situation Alarm at Make the site safe before proceeding to designated
worksite mustering location.
Completion & Ensure the proper wind up and housekeeping of the
Unsecured Materials
Windup worksite.
Additional
Hazards
(Other than
indicated above)
Name: Designation:
MME / RPO, ID. No. Company:
JSA Done By
Controlling Team: Contract No;.(If Applicable):
Signature: Date: