2) Prior to Radiographic * Public Safety Proper Staging with Life Line for Radiographic if doing on
Operation elevated place.* Subcontractor shall provide advance Schedule
of the on planned activities to SECL.* Access Road to specific
exposure area shall becordoned off with yellow rope, radiation
warningsignboard and in warning light to be displayed
3) Handling of Personal Safety* Only approved personal with badge shall handle /operate
RadiographicMaterial Public Safety Radiographic projector.* The personnel shall always work
s with safetyprinciple of " Time shielding and distance"*
Monitor the dosi level with radiation survey meter * Ensure
that the specific exposure area is clearedof unauthorized
person and monitor the controlledarea to prevent unauthorized
entry
Completion of Source not return to Monitor the dosi level after retracting thesource into the
Exposure /Operation shieldposition projector.* Check the projector and ensure that the sourcehas
been returned and in locked position.* Ensure that the
radiographic equipment has beenremoved from site and inform
the safetydepartment and security on the work completion.
Movement within site * Lost of equipment* The radiographic projector shall never be leftunattended and it
Isotope drop-out shall always be monitor byapproved agency competent person.*
Ensure that the isotope is in locked position prior to moving
the projector
. Emergency * Fire at Site* Accident * Ensure that the isotope is retracted and in lockedposition.*
at Site (Personnel)* Removed the projector, boundary and warningsigns for rescue team.*
Accident at Site Attend to injuries and if further treatment isrequire, ceased
(Equipment operation and inform safety officer/security .* Try retract
isotope back into projector andmonitor with the survey meter
if the isotope isjammed, carry out emergency procedures.* Notify
details to safety dept. as soon as possible