Professional Documents
Culture Documents
Riw Inr Tracker (New)
Riw Inr Tracker (New)
STATUS
CANCELLED
SUBMITED/ONGOING
ROAD WORKS INRS TRACKER
5 Fill Area 6 Cut Area 7 Suitable Fill / Backfilling 8 Subbase Material Asphalt
NEED TO RAISE s INTERNAL 1 2 2.1 3 4 5.1 5.2 5.3 4.1 4.2 6.1 6.2 7.1 7.2 7.3 8.1 8.2 8.3 8.4
CARRIAGE WAY
Joint survey checking Removal / Compaction Testing for In-situ CBR Testing for the and Evenness Testing Visual Inspection and Joint Survey Checking In-situ CBR and
LOCATION
of existing Site Visual Inspection for demolishment and Joint Survey checking Setting Out and In-situ CBR and
Sampling and Testing Surface Preparation Compaction Joint survey Trimming of the Cut Surface Preparation In-situ CBR and top of Suitable Fill for the formation Compaction Testing Evenness Testing for Sampling of Prime Application of Prime sampling, testing, Joint survey checking Field Density
ZONE
Sr No
From (CH) To (CH) and sampling of the testing of Verification for the Compaction testing of the Laying of Suitable Fill Material Sampling for the for the Laying of coring, inspection for for laying of asphalt comparison (Correlation Sampling and Testing of
situation - the site clearance Delivery of existing rock strata Trimming of the Fill Area of the Fill Area the Fill Area formation level Area of the Cut Area the Cut Area Material (Backfilling 0- (Backfilling 0- level (Top of Suitable Laying of Subbase Subbase for the Laying of the Laid Subbase Coat Material Coat laying of asphalt base base course class A Test) Subgrade Milling Material
topographic survey structure 75mm)..Layer 75mm) Fill Material- Subbase course class A
Bakcfilling 0-75mm)
ROA-INR-A00015/ROA-INR-
2 Qatar University Parking - CPR-01 1 GEN-INR-A00003 ROA-INR-A00002 NA QUA-INR-A00003 ROA-INR-A00012 QUA-INR-A00003 NA NA ROA-INR-A00014 ROA-INR-A00012 ROA-INR-A00012 A00015-01/ROA-INR- ROA-INR-A00495 ROA-INR-A00496 ROA-INR-A00497 ROA-INR-A00498
A00015-02
ROA-INR-A00071/ROA-INR-
ROA-INR-A00070/ROA- A00072/ROA-INR-A00072-
3 Qatar University Parking - CPR-01 1 GEN-INR-A00003 ROA-INR-A00002 NA QUA-INR-A00003 ROA-INR-A00012 QUA-INR-A00020 NA NA ROA-INR-A00068 ROA-INR-A00183
INR-A00070-01 01
ROA-INR-A00231 (2nd & Final ROA-INR-A00232 (2nd & ROA-INR-A00254 (2nd &
5 Qatar University Parking - CPR-01 2 0+293 0+423 layer) Final layer) Final layer)
ROA-INR-A00062/ROA-INR-
ROA-INR-A00027/ROA- ROA-INR-A00028-01/ROA- A00062-01/ROA-INR-A00062-
6 Qatar University Parking - CPR-01 2 0+423 0+513 GEN-INR-A00003 ROA-INR-A00025 GEN-INR-A00011 NA ROA-INR-A00026 QUA-INR-A00007 NA NA ROA-INR-A00055 ROA-INR-A00026 INR-A00027-01/ROA- INR-A00028-02/ROA-INR- 02 /ROA-INR-A00063 - (1st
INR-A00027-02 A00029 layer)
ROA-INR-A00100/ROA-INR-
ROA-INR-A00099/ROA-INR-
7 Qatar University Parking - CPR-01 2 0+423 0+513 A00099-01 (2nd & final layer)
A00100-01 (2nd & final
layer)
ROA-INR-A00059/ROA-
INR-A00059-01/ROA-
8 Qatar University Parking - CPR-01 3 0+000 0+198 GEN-INR-A00003 ROA-INR-A00061 NA NA ROA-INR-A00057 QUA-INR-A00009 ROA-INR-A00058
INR-A00059-02/ROA-
NA ROA-INR-A00057 QUA-INR-A00051
INR-A00060
ROA-INR-A00059/ROA- ROA-INR-A00289- 1st & final ROA-INR-A00290- 1st & final ROA-INR-A00291- 1st &
9 Qatar University Parking - CPR-01 3 0+000 0+298 GEN-INR-A00003 ROA-INR-A00061 NA NA ROA-INR-A00292 QUA-INR-A00010 ROA-INR-A00058
INR-A00060
NA ROA-INR-A00057 ROA-INR-A00287 ROA-INR-A00288
final
GEN-INR-
354 9 Qatar University Parking - CPR-01 2&3 0+000 0+513 A00068(Asphalt Cutting)
ROA-INR-A00465 ROA-INR-A00466 ROA-INR-A00467 ROA-INR-A00468 QUA-INR-A00100 ROA-INR-A00594 ROA-INR-A00745 ROA-INR-A00746 80m
9 Qatar University Parking - CPR-01 2&3 0+000 0+513 ROA-INR-A00478 ROA-INR-A00479 ROA-INR-A00480 ROA-INR-A00481 72m
116
117
STAT
US
APPROVED CLIENT CLIENT
Street Lighting Duct with Concrete Surround Street Lighting Duct with Aggregate Surround Street Lighting Cable with Aggregate Surround 23. Street Lighting Foundations Dry Utilities Ducts Wet Utilities Ducts
NEED TO RAISE s 20.1 20.2 20.3 20.4 21.1 21.2 21.3 21.4 22.1 22.2 22.3 22.4 23.1 23.2 23.3 23.4 23.5 23.6 24.1 24.2 24.3 24.4 25.1 25.2 25.3 25.4
of the Backfilling Visual Inspection for Joint Survey Checking, of Formwork; visual Compaction Testing Compaction Testing
Road Name
Joint Survey checking, Joint Survey checking, Visual Inspection for of the Backfilling Joint Survey checking, of the Backfilling Joint Survey Checking Joint survey checking Joint Survey Checking, Joint Survey Checking, Joint survey checking
LOCATION
Sampling and Testing Joint Survey checking Visual Inspection and layers of Street Bedding and Joint Setting Out and inspection and Joint survey checking Visual Inspection and of the Backfilling of the Backfilling
Setting Out and Setting Out and Bedding and Joint Visual Inspection of layers of Street Setting Out and Visual Inspection of layers of Street and Sampling for the of reinforcement, Visual Inspection for Compaction testing of Setting Out and Setting Out and and Visual Inspection Visual Inspection for
Sr No
Point
Type of Street Lighting and Visual Inspection Sampling of Surround Lighting Duct Survey Verification of compaction testing of sampling for the and Visual Inspection Sampling of Surround layers---Duct layers---Duct
Compaction Testing Compaction Testing Survey Verification of surround material Lighting Duct Compaction Testing surround material Lighting Duct casting of Blinding Anchor bolt and foot bitumen protection the backfilling layers Compaction Testing Compaction Testing for the Pipe laying Pipe Surround
Bedding Material for the Pipe laying concrete casting including Warning Street Lighting Cable foundation for street casting of street for the Pipe laying Concrete Casting including warning including warning
of Trench formation of Trench formation Pipe laying including Warning of Trench formation including Warning Concrete plate installation of Trench Formation of Trench Formation including Bedding
Tape Installation and laying lighting poles lighting foundation tape installation tape installation
Tape Installation Tape Installation
Mandrel Testing concrete
1 1
UTL-INR-A00063/UTL- UTL-INR-A00111/UTL-
1 CPR-01 Qatar University Street Light SL1 INR-A00063-01
UTL-INR-A00110
INR-A00111-01
UTL-INR-A00212
2
1 3
UTL-INR-A00063/UTL- UTL-INR-A00111/UTL- UTL-INR-A00199/UTL-
2 CPR-01 Qatar University Street Light SL1 INR-A00063-01
UTL-INR-A00110
INR-A00111-01 INR-A00212
4
1 7
UTL-INR-A00063/UTL- UTL-INR-A00111/UTL-
3 CPR-01 Qatar University Street Light SL1 INR-A00063-01
UTL-INR-A00110
INR-A00111-01
UTL-INR-A00213
8
1 9
UTL-INR-A00063/UTL- UTL-INR-A00111/UTL-
4 CPR-01 Qatar University Street Light SL1 INR-A00063-01
UTL-INR-A00110
INR-A00111-01
UTL-INR-A00213
10
11
5 CPR-01 Qatar University Street Light SL1 UTL-INR-A00112 UTL-INR-A00197 UTL-INR-A00198 UTL-INR-A00213
12
13
6 CPR-01 Qatar University Street Light SL1 UTL-INR-A00112 UTL-INR-A00197 UTL-INR-A00198 UTL-INR-A00214
14
15
7 CPR-01 Qatar University Street Light SL1 UTL-INR-A00112 UTL-INR-A00197 UTL-INR-A00198 UTL-INR-A00214
16
UTL-INR-A00339/UTL-
8 CPR-01 Qatar University Street Light FP1-RYB3-C1 Street Light Pole UTL-INR-A00456 UTL-INR-A00410 UTL-INR-A00481 UTL-INR-A00483 UTL-INR-A00337 UTL-INR-A00338
INR-A00339-01
UTL-INR-A00340 UTL-INR-A00341 UTL-INR-A00342
UTL-INR-A00305/UTL- UTL-INR-A00306/UTL-
9 CPR-01 Qatar University Street Light FP1-RYB4-C2 Street Light Pole UTL-INR-A00457 UTL-INR-A00411 UTL-INR-A00482 UTL-INR-A00484 UTL-INR-A00203 UTL-INR-A00206
INR-A00305-01 INR-A00306-01
UTL-INR-A00307 UTL-INR-A00308
UTL-INR-A00305/UTL- UTL-INR-A00306/UTL-
10 CPR-01 Qatar University Street Light FP1-RYB4-C3 Street Light Pole UTL-INR-A00457 UTL-INR-A00411 UTL-INR-A00482 UTL-INR-A00484 UTL-INR-A00203 UTL-INR-A00206
INR-A00305-01 INR-A00306-01
UTL-INR-A00307 UTL-INR-A00308
UTL-INR-A00309/UTL- UTL-INR-A00310/UTL-
11 CPR-01 Qatar University Street Light FP2-RYB3-C4 Street Light Pole UTL-INR-A00457 UTL-INR-A00411 UTL-INR-A00482 UTL-INR-A00484 UTL-INR-A00204 UTL-INR-A00207
INR-A00309-01 INR-A00310-01
UTL-INR-A00311 UTL-INR-A00312
UTL-INR-A00309/UTL- UTL-INR-A00310/UTL-
12 CPR-01 Qatar University Street Light FP2-RYB3-C5 Street Light Pole UTL-INR-A00457 UTL-INR-A00411 UTL-INR-A00482 UTL-INR-A00484 UTL-INR-A00204 UTL-INR-A00207
INR-A00309-01 INR-A00310-01
UTL-INR-A00311 UTL-INR-A00312
UTL-INR-A00313/UTL- UTL-INR-A00314/UTL-
13 CPR-01 Qatar University Street Light FP2-RYB3-C7 Street Light Pole UTL-INR-A00457 UTL-INR-A00411 UTL-INR-A00482 UTL-INR-A00484 UTL-INR-A00205 UTL-INR-A00208
INR-A00313-01 INR-A00314-01
UTL-INR-A00315 UTL-INR-A00316
UTL-INR-A00345/UTL-
14 CPR-01 Qatar University Street Light FP2-R3-C1 Street Light Pole UTL-INR-A00457 UTL-INR-A00411 UTL-INR-A00482 UTL-INR-A00484 UTL-INR-A00343 UTL-INR-A00344
INR-A00345-01
UTL-INR-A00346 UTL-INR-A00347 UTL-INR-A00348
UTL-INR-A00345/UTL-
15 CPR-01 Qatar University Street Light FP2-Y3-C2 Street Light Pole UTL-INR-A00457 UTL-INR-A00411 UTL-INR-A00482 UTL-INR-A00484 UTL-INR-A00343 UTL-INR-A00344
INR-A00345-01
UTL-INR-A00346 UTL-INR-A00347 UTL-INR-A00348
UTL-INR-A00345/UTL-
16 CPR-01 Qatar University Street Light FP2-B3-C3 Street Light Pole UTL-INR-A00457 UTL-INR-A00411 UTL-INR-A00482 UTL-INR-A00484 UTL-INR-A00343 UTL-INR-A00344
INR-A00345-01
UTL-INR-A00346 UTL-INR-A00347 UTL-INR-A00348
UTL-INR-A00345/UTL-
17 CPR-01 Qatar University Street Light FP2-B3-C6 Street Light Pole UTL-INR-A00457 UTL-INR-A00411 UTL-INR-A00482 UTL-INR-A00484 UTL-INR-A00343 UTL-INR-A00344
INR-A00345-01
UTL-INR-A00346 UTL-INR-A00347 UTL-INR-A00348
16 CPR-01 Qatar University Street Light FP2-B3-C3 to Duct 16 Trench Line UTL-INR-A00479 UTL-INR-A00480 UTL-INR-A00482 UTL-INR-A00484
16 CPR-01 Qatar University Street Light Duct 7 to Duct 6 to Duct 3 Trench Line UTL-INR-A00564 UTL-INR-A00565 UTL-INR-A00566 UTL-INR-A00567
119
APPROVED CLIENT ASHGAL
STATUS
CANCELLED
SUBMITED/ONGOING
ROAD WORKS INRS TRACKER
5 Fill Area 6 Cut Area 7 Suitable Fill / Backfilling 8 Subbase Material Asphalt
NEED TO RAISE s INTERNAL 1 2 2.1 3 4 5.1 5.2 5.3 6.1 6.2 7.1 7.2 7.3 8.1 8.2 8.3
CARRIAGE WAY
Joint survey checking Removal / Compaction Testing In-situ CBR Testing for and Evenness Testing In-situ CBR and
LOCATION
Joint Survey checking In-situ CBR and In-situ CBR and Visual Inspection and Joint Survey Checking sampling, testing, Joint survey checking
of existing Site Visual Inspection for demolishment and Setting Out and Sampling and Testing Surface Preparation Sampling and Testing Surface Praparation for the Laying of the Top of Suitable for the formation Sampling of laid Compaction Testing Evenness Testing for Sampling of Prime Application of Prime
ZONE
Sr No
From (CH) To (CH) and sampling of the Compaction testing of Compaction testing of Sampling for the for the Laying of coring, inspection for for laying of asphalt
situation - the site clearance Delivery of existing Trimming of the Fill Area of the Fill Area of the Cut Area of the Cut Area Suitable Fill Material Fill Material level (Top of Suitable Subbase for the Laying of the Laid Subbase Coat Material Coat laying of asphalt base base course class A
rock strata the Fill Area the Cut Area Laying of Subbase Subbase
topographic survey structure (Backfilling 0- (Backfilling 0-75mm) Fill Material- Subbase course class A
75mm)..Layer Bakcfilling 0-75mm)
ROA-INR-A00332/ROA- QUA-INR-A00057/QUA-
1 1 CBS-D4 Parking 0+020 0+275 GEN-INR-A00003 INR-A00332-01 INR-A00057-01 ROA-INR-A00419 ROA-INR-A00420
ROA-INR-A00408 (1st
2 CBS-D4 Parking 0+275 0+400 GEN-INR-A00003 Layer)
ROA-INR-A00422 (2nd
2 CBS-D4 Parking 0+310 0+400 GEN-INR-A00003 layer)
ROA-INR-A00332/ROA-
4 CBS-D4 Parking Swale GEN-INR-A00003 INR-A00332-01 GEN-INR-A00017 QUA-INR-A00015 ROA-INR-A00154 ROA-INR-A00153
115
116
119
STAT
US
APPROVED CLIENT CLIENT
20. Street Lighting Duct with Concrete Surround 21. Street Lighting Duct with Aggregate Surround 22. Street Lighting Cable with Aggregate Surround 23. Street Lighting Foundations Dry Utilities Ducts Wet Utilities Ducts Protection of Existing Line
NEED TO RAISE 20.1 20.2 20.3 20.4 21.1 21.2 21.3 21.4 22.1 22.2 22.3 22.4 23.1 23.2 23.3 23.4 23.5 23.6 24.1 24.2 24.3 24.4 25.1 25.2 25.3 25.4 26.1 26.2
Visual Inspection for Joint Survey Checking, of Formwork; visual Compaction Testing Compaction Testing
Road Name
Joint Survey checking, of the Backfilling Joint Survey checking, Visual Inspection for of the Backfilling Joint Survey checking, of the Backfilling Joint Survey Checking Joint survey checking Joint Survey Checking, Joint Survey Checking, Joint survey checking
LOCATION
Sampling and Testing Joint Survey checking Visual Inspection and Backfilling of Ducts Bedding and Joint Setting Out and inspection and Joint survey checking Visual Inspection and of the Backfilling of the Backfilling Visual Inspection for Visual Inspection for
Setting Out and layers of Street Setting out and Bedding and Joint Visual Inspection of layers of Street Setting Out and Visual Inspection of layers of Street and Sampling for the of reinforcement, Visual Inspection for Compaction testing of Setting Out and Setting Out and and Visual Inspection Visual Inspection for
Sr No
Point
Type of Street Lighting and Visual Inspection Sampling of Surround with warning tape & Survey Verification of compaction testing of sampling for the and Visual Inspection Sampling of Surround layers---Duct layers---Duct pipe surround amd the Installation of
Compaction Testing Lighting Duct Compaction Testing Survey Verification of surround material Lighting Duct Compaction Testing surround material Lighting Duct casting of Blinding Anchor bolt and foot bitumen protection the backfilling layers Compaction Testing Compaction Testing for the Pipe laying Pipe Surround
Bedding Material for the Pipe laying concrete casting Mandrel Testing Street Lighting Cable foundation for street casting of street for the Pipe laying Concrete Casting including warning including warning existing duct ends Protection Slab
of Trench formation including Warning of Trench formation Pipe laying including Warning of Trench formation including Warning Concrete plate installation of Trench Formation of Trench Formation including Bedding
laying lighting poles lighting foundation tape installation tape installation
Tape Installation Tape Installation Tape Installation
concrete
1 17 UTL-INR-A00295/UTL-
1 CBS-D4 Street Light SL1 UTL-INR-A00237 UTL-INR-A00238 UTL-INR-A00259 UTL-INR-A00260
INR-A00295-01
UTL-INR-A00458 UTL-INR-A00422 UTL-INR-A00485 UTL-INR-A00487
18
1 19 UTL-INR-A00295/UTL-
2 CBS-D4 Street Light SL1 UTL-INR-A00237 UTL-INR-A00238 UTL-INR-A00259 UTL-INR-A00260
INR-A00295-01
UTL-INR-A00459 UTL-INR-A00421 UTL-INR-A00486 UTL-INR-A00488
20
UTL-INR-A00317/UTL- UTL-INR-A00318/UTL-
CBS-D4 Street Light FP3-R2-C6 Street Light Pole UTL-INR-A00458 UTL-INR-A00422 UTL-INR-A00485 UTL-INR-A00487 UTL-INR-A00297 UTL-INR-A00298 UTL-INR-A00299 UTL-INR-A00300
INR-A00317-01 INR-A00318-01
UTL-INR-A00317/UTL- UTL-INR-A00318/UTL-
CBS-D4 Street Light FP3-Y2-C7 Street Light Pole UTL-INR-A00458 UTL-INR-A00422 UTL-INR-A00485 UTL-INR-A00487 UTL-INR-A00297 UTL-INR-A00298 UTL-INR-A00299 UTL-INR-A00300
INR-A00317-01 INR-A00318-01
119
APPROVED CLIENT ASHGAL
STATUS
CANCELLED
SUBMITED/ONGOING
ROAD WORKS INRS TRACKER
NEED TO RAISE s INTERNAL 1 2 2.1 3 4 5.1 5.2 5.3 6.1 6.2 7.1 7.2 7.3 8.1 8.2 8.3 8.4
CARRIAGE WAY
Joint survey checking Removal / Compaction Testing In-situ CBR Testing for In-situ CBR and
LOCATION
Joint Survey checking In-situ CBR and In-situ CBR and Joint survey Checking Visual Inspection and Joint Survey Checking
of existing Site Visual Inspection for demolishment and Setting Out and Sampling and Testing Surface Preparation Sampling and Testing Surface Praparation for the Laying of the Top of Suitable Compaction Testing Evenness Testing for
ZONE
Sr No
From (CH) To (CH) and sampling of the Compaction testing of Compaction testing of for the formation Sampling for the for the Laying of
situation - the site clearance Delivery of existing Trimming of the Fill Area of the Fill Area of the Cut Area of the Cut Area Suitable Fill Material Fill Material for the Laying of the Laid Subbase
rock strata the Fill Area the Cut Area level Laying of Subbase Subbase
topographic survey structure (Backfilling 0- (Backfilling 0-75mm) Subbase
75mm)..Layer
GEN-INR-A00073
1 1 CBH-A3-1 GEN-INR-A00055 ROA-INR-A00882
(Concrete)
QUA-INR-A00151 ROA-INR-A00984 QUA-INR-A00167 ROA-INR-A00985 ROA-INR-A00986 QUA-INR-A00168 ROA-INR-A00987 ROA-INR-A00988
ROA-INR-A01003 (1st
115 CBH-A3-1 0+000 0+080 layer)
ROA-INR-A01004 (2nd
116 CBH-A3-1 0+000 0+080 layer)
20. Street Lighting Duct with Concrete Surround 21. Street Lighting Duct with Aggregate Surround 22. Street Lighting Cable with Aggregate Surround 23. Street Lighting Foundations Dry Utilities Ducts Wet Utilities Ducts Protection of Existing Line
NEED TO RAISE 20.1 20.2 20.3 20.4 21.1 21.2 21.3 21.4 22.1 22.2 22.3 22.4 23.1 23.2 23.3 23.4 23.5 23.6 24.1 24.2 24.3 24.4 25.1 25.2 25.3 25.4 26.1 26.2
Visual Inspection for Joint Survey Checking, of Formwork; visual Compaction Testing Compaction Testing
Road Name
Joint Survey checking, of the Backfilling Joint Survey checking, Visual Inspection for of the Backfilling Joint Survey checking, of the Backfilling Joint Survey Checking Joint survey checking Joint Survey Checking, Joint Survey Checking, Joint survey checking
Duct Point
LOCATION
Sampling and Testing Joint Survey checking Visual Inspection and Backfilling of Ducts Bedding and Joint Setting Out and inspection and Joint survey checking Visual Inspection and of the Backfilling of the Backfilling Visual Inspection for Visual Inspection for
Setting Out and layers of Street Setting out and Bedding and Joint Visual Inspection of layers of Street Setting Out and Visual Inspection of layers of Street and Sampling for the of reinforcement, Visual Inspection for Compaction testing of Setting Out and Setting Out and and Visual Inspection Visual Inspection for
Sr No
Type of Street Lighting and Visual Inspection Sampling of Surround with warning tape & Survey Verification of compaction testing of sampling for the and Visual Inspection Sampling of Surround layers---Duct layers---Duct pipe surround amd the Installation of
Compaction Testing Lighting Duct Compaction Testing Survey Verification of surround material Lighting Duct Compaction Testing surround material Lighting Duct casting of Blinding Anchor bolt and foot bitumen protection the backfilling layers Compaction Testing Compaction Testing for the Pipe laying Pipe Surround
Bedding Material for the Pipe laying concrete casting Mandrel Testing Street Lighting Cable foundation for street casting of street for the Pipe laying Concrete Casting including warning including warning existing duct ends Protection Slab
of Trench formation including Warning of Trench formation Pipe laying including Warning of Trench formation including Warning Concrete plate installation of Trench Formation of Trench Formation including Bedding
laying lighting poles lighting foundation tape installation tape installation
Tape Installation Tape Installation Tape Installation
concrete
119
APPROVED CLIENT ASHGAL
STATUS
CANCELLED
SUBMITED/ONGOING
ROAD WORKS INRS TRACKER
NEED TO RAISE s INTERNAL 1 2 2.1 3 4 5.1 5.2 5.3 6.1 6.2 7.1 7.2 7.3 8.1 8.2 8.3 8.4
Joint survey checking Removal / Compaction Testing In-situ CBR Testing for and Evenness Testing In-situ CBR and
LOCATION
Joint Survey checking In-situ CBR and In-situ CBR and Visual Inspection and Joint Survey Checking
of existing Site Visual Inspection for demolishment and Setting Out and Sampling and Testing Surface Preparation Surface Praparation for the Laying of the Top of Suitable for the formation Compaction Testing Evenness Testing for
Sr No
ZONE
From (CH) To (CH) and sampling of the Compaction testing of Compaction testing of Sampling for the for the Laying of
situation - the site clearance Delivery of existing Trimming of the Fill Area of the Fill Area of the Cut Area Suitable Fill Material Fill Material level (Top of Suitable for the Laying of the Laid Subbase
rock strata the Fill Area the Cut Area Laying of Subbase Subbase
topographic survey structure (Backfilling 0- (Backfilling 0-75mm) Fill Material- Subbase
75mm)..Layer Bakcfilling 0-75mm)
1 1 CBS-A12 GEN-INR-A00071 ROA-INR-A01209 GEN-INR-A00088 QUA-INR-A00201 ROA-INR-A01104 QUA-INR-A00202 ROA-INR-A01105 ROA-INR-A01106 ROA-INR-A01107 ROA-INR-A01108
114
115
116
117
APPROVED CLIENT ASHGAL
STATUS
CANCELLED
SUBMITED/ONGOING
ROAD WORKS INRS TRACKER
NEED TO RAISE s INTERNAL 1 2 2.1 3 4 5.1 5.2 5.3 6.1 6.2 7.1 7.2 7.3 8.1 8.2 8.3 8.4
CARRIAGE WAY
Joint survey checking Removal / Compaction Testing In-situ CBR Testing for and Evenness Testing In-situ CBR and
LOCATION
Joint Survey checking In-situ CBR and In-situ CBR and Visual Inspection and Joint Survey Checking
of existing Site Visual Inspection for demolishment and Setting Out and Sampling and Testing Surface Preparation Sampling and Testing Surface Praparation for the Laying of the Top of Suitable for the formation Compaction Testing Evenness Testing for
ZONE
Sr No
From (CH) To (CH) and sampling of the Compaction testing of Compaction testing of Sampling for the for the Laying of
situation - the site clearance Delivery of existing Trimming of the Fill Area of the Fill Area of the Cutl Area of the Cut Area Suitable Fill Material Fill Material level (Top of Suitable for the Laying of the Laid Subbase
rock strata the Fill Area the Cut Area Laying of Subbase Subbase
topographic survey structure (Backfilling 0- (Backfilling 0-75mm) Fill Material- Subbase
75mm)..Layer Bakcfilling 0-75mm)
1 1 CBS-A61 GEN-INR-A00072 ROA-INR-A01210 QUA-INR-A00199 ROA-INR-A01096 QUA-INR-A00196 ROA-INR-A01100 ROA-INR-A01101 QUA-INR-A00200 ROA-INR-A01102 ROA-INR-A01103
114
115
116
117
APPROVED CLIENT ASHGAL
STATUS
CANCELLED
SUBMITED/ONGOING
ROAD WORKS INRS TRACKER
NEED TO RAISE s INTERNAL 1 2 2.1 3 4 5.1 5.2 5.3 6.1 6.2 7.1 7.2 7.3 8.1 8.2 8.3 8.4
CARRIAGE WAY
Joint survey checking Removal / Compaction Testing In-situ CBR Testing for and Evenness Testing In-situ CBR and
LOCATION
Joint Survey checking In-situ CBR and In-situ CBR and Visual Inspection and Joint Survey Checking
of existing Site Visual Inspection for demolishment and Setting Out and Sampling and Testing Surface Preparation Sampling and Testing Surface Praparation for the Laying of the Top of Suitable for the formation Compaction Testing Evenness Testing for
ZONE
Sr No
From (CH) To (CH) and sampling of the Compaction testing of Compaction testing of Sampling for the for the Laying of
situation - the site clearance Delivery of existing Trimming of the Fill Area of the Fill Area of the Cut Area of the Cut Area Suitable Fill Material Fill Material level (Top of Suitable for the Laying of the Laid Subbase
rock strata the Fill Area the Cut Area Laying of Subbase Subbase
topographic survey structure (Backfilling 0- (Backfilling 0-75mm) Fill Material- Subbase
75mm)..Layer Bakcfilling 0-75mm)
ROA-INR-A01007 (2nd
114 1 CBS-A5 layer)
ROA-INR-A01016 (3rd
115 1 CBS-A5 layer)
ROA-INR-A01017 (4th
116 1 CBS-A5 layer)
STATUS
CANCELLED
SUBMITED/ONGOING
ROAD WORKS INRS TRACKER
5 Fill Area 6 Cut Area 7 Suitable Fill / Backfilling 8 Subbase Material Asphalt
NEED TO RAISE s INTERNAL 1 2 2.1 3 4 5.1 5.2 5.3 6.1 6.2 7.1 7.2 7.3 8.1 8.2 8.3 8.4
CARRIAGE WAY
Joint survey checking Removal / Visual Inspection of Compaction Testing In-situ CBR Testing for and Evenness Testing Visual Inspection and Joint Survey Checking In-situ CBR and
LOCATION
Joint Survey checking In-situ CBR and In-situ CBR and sampling, testing, Joint survey checking
of existing Site Visual Inspection for demolishment and Setting Out and Rockfill Layer, Sampling and Testing of Surface Preparation Compaction testing of Sampling and Testing Surface Praparation Compaction for the Laying of the Top of Suitable for the formation Compaction Testing Evenness Testing for Sampling of Prime Application of Prime
Sr No
ZONE
From (CH) To (CH) situation - the site clearance Delivery of existing and sampling of the Trimming Transportation and the Fill Area of the Fill Area of the Cut Area of the Cut Area testing of Suitable Fill Material Fill Material Sampling for the
level (Top of Suitable Laying for the Laying of for the Laying of the Laid Subbase Coat Material Coat
coring, inspection for Coring of Laid Asphalt for laying of asphalt
rock strata the Fill Area the Cut Area of Subbase Subbase laying of asphalt base base course class A
topographic survey structure Plate Load Test (Backfilling 0- (Backfilling 0-75mm) Fill Material- Subbase course class A
75mm)..Layer Bakcfilling 0-75mm)
ROA-INR-A00553 (Final
3 CPR-02 Parking layer)
ROA-INR-A00555 ROA-INR-A00556 ROA-INR-A00560 ROA-INR-A00579 ROA-INR-A00580 ROA-INR-A00581 QUA-INR-A00122 ROA-INR-A00744 ROA-INR-A00824 ROA-INR-A00944 ROA-INR-A00825 30,000m²
3 CPR-02 Parking ROA-INR-A00579 ROA-INR-A00620 ROA-INR-A00621 QUA-INR-A00122 ROA-INR-A00744 ROA-INR-A00824 ROA-INR-A00944 ROA-INR-A00825 40,000m²
GEN-INR-A00037
4 CPR-02 Parking (Asphalt)
GEN-INR-A00038
5 CPR-02 Parking (Ooredo Duct)
GEN-INR-A00040 (Traffic
6 CPR-02 Parking Signs)
ROA-INR-A00410 (1st
116 7 CPR-02 Parking layer)
ROA-INR-A00453 (Final
116 8 CPR-02 Parking layer)
119
120
STAT
US
APPROVED CLIENT CLIENT
20. Street Lighting Duct with Concrete Surround 21. Street Lighting Duct with Aggregate Surround 22. Street Lighting Cable with Aggregate Surround 23. Street Lighting Foundations Dry Utilities Ducts Wet Utilities Ducts Protection of Existing Line
NEED TO RAISE 20.1 20.2 20.3 20.4 21.1 21.2 21.3 21.4 22.1 22.2 22.3 22.4 23.1 23.2 23.3 23.4 23.5 23.6 24.1 24.2 24.3 24.4 25.1 25.2 25.3 25.4 26.1 26.2
Survey checking, Visual Inspection for Joint Survey Checking Joint survey checking of Formwork; visual Joint Survey Checking, Joint survey checking Visual Inspection and Compaction Testing Compaction Testing
Road Name
Sampling and Testing Joint Survey checking, Joint Survey checking Visual Inspection and of the Backfilling Backfilling of Ducts Joint Survey checking, Visual Inspection for of the Backfilling Backfilling of Ducts Joint of the Backfilling of the Backfilling Joint Survey Checking, Joint survey checking
LOCATION
Setting Out and layers of Street Setting out and Bedding and Joint Visual Inspection of layers of Street Setting Out and Bedding and Joint Setting Out and inspection and of the Backfilling Visual Inspection for Visual Inspection for
of Visual Inspection of layers of Street compaction testing of and Sampling for the of reinforcement, Visual Inspection for Compaction testing of Setting Out and Setting Out and and Visual Inspection Visual Inspection for
Sr No
Point
Type of Street Lighting Compaction Testing and Visual Inspection Sampling of Surround Lighting Duct with warning tape & Compaction Testing Survey Verification of surround material Lighting Duct with warning tape & Compaction Testing Survey Verification sampling for the bitumen protection the backfilling layers Compaction Testing and Visual Inspection Sampling of Surround layers---Duct layers---Duct pipe surround amd the Installation of
Bedding Material of Trench formation for the Pipe laying concrete casting including Warning Mandrel Testing of Trench formation Pipe laying including Warning Mandrel Testing of Trench formation Street Lighting Cable surround material Lighting Duct
including Warning foundation for street casting of Blinding Anchor bolt and foot
Concrete plate installation casting of street of Trench Formation for the Pipe laying Concrete Casting including warning Compaction Testing
of Trench Formation
for the Pipe laying
including Bedding
Pipe Surround including warning existing duct ends Protection Slab
Tape Installation Tape Installation laying Tape Installation lighting poles lighting foundation tape installation tape installation
concrete
1 1
1 Depot1 CPR-02 Link Road Street Light SL1
2
1 3
2 Depot1 CPR-02 Link Road Street Light SL1
4
1 5 UTL-INR-A00430/UTL- UTL-INR-A00431/UTL-
2 CPR-02 Street Light SL1 INR-A00606 INR-A00607
UTL-INR-A00455 UTL-INR-A00477 UTL-INR-A00553
6
1 7
2 CPR-02 Street Light SL1 UTL-INR-A00430 UTL-INR-A00431 UTL-INR-A00455 UTL-INR-A00477 UTL-INR-A00553
8
1 9
2 CPR-02 Street Light SL1 UTL-INR-A00430 UTL-INR-A00431 UTL-INR-A00455 UTL-INR-A00477 UTL-INR-A00553
10
1 11
2 CPR-02 Street Light SL1 UTL-INR-A00514 UTL-INR-A00515 UTL-INR-A00516 UTL-INR-A00517 UTL-INR-A00556
12
1 13
2 CPR-02 Street Light SL1 UTL-INR-A00461 UTL-INR-A00462 UTL-INR-A00463 UTL-INR-A00478 UTL-INR-A00554
14
1 15
2 CPR-02 Street Light SL1 UTL-INR-A00461 UTL-INR-A00462 UTL-INR-A00463 UTL-INR-A00478 UTL-INR-A00554
16
1 17
2 CPR-02 Street Light SL1 UTL-INR-A00461 UTL-INR-A00462 UTL-INR-A00463 UTL-INR-A00478 UTL-INR-A00554
18
1 19
2 CPR-02 Street Light SL1 UTL-INR-A00461 UTL-INR-A00462 UTL-INR-A00463 UTL-INR-A00478 UTL-INR-A00554
20
1 21
2 CPR-02 Street Light SL1 UTL-INR-A00461 UTL-INR-A00462 UTL-INR-A00463 UTL-INR-A00478 UTL-INR-A00554
22
1 23
2 CPR-02 Street Light SL1 UTL-INR-A00464 UTL-INR-A00465 UTL-INR-A00466 UTL-INR-A00489 UTL-INR-A00555
24
1 25
2 CPR-02 Street Light SL1 UTL-INR-A00464 UTL-INR-A00465 UTL-INR-A00466 UTL-INR-A00489 UTL-INR-A00555
26
1 27
2 CPR-02 Street Light SL1 UTL-INR-A00464 UTL-INR-A00465 UTL-INR-A00466 UTL-INR-A00489 UTL-INR-A00555
28
1 29
2 CPR-02 Street Light SL1 UTL-INR-A00464 UTL-INR-A00465 UTL-INR-A00466 UTL-INR-A00489 UTL-INR-A00555
30
1 31
2 CPR-02 Street Light SL1 UTL-INR-A00464 UTL-INR-A00465 UTL-INR-A00466 UTL-INR-A00489 UTL-INR-A00555
32
1 33
2 CPR-02 Street Light SL1 UTL-INR-A00430 UTL-INR-A00431 UTL-INR-A00455 UTL-INR-A00477 UTL-INR-A00553
34
CPR-02 Street Light FP1-RYB2-C5 to Duct 34 Sleeve UTL-INR-A00432 UTL-INR-A00433 UTL-INR-A00490 UTL-INR-A00493 UTL-INR-A00561
CPR-02 Street Light Duct 9 to FP1-RYB1-C3 to Duct Pt.8 Sleeve UTL-INR-A00432 UTL-INR-A00433 UTL-INR-A00490 UTL-INR-A00493 UTL-INR-A00561
CPR-02 Street Light FP1-RYB2-C2 to FP1-RYB2-C1 Sleeve UTL-INR-A00467 UTL-INR-A00468 UTL-INR-A00491 UTL-INR-A00494 UTL-INR-A00562
CPR-02 Street Light FP1-RYB2-C1 to FP1-RYB3-C1 Sleeve UTL-INR-A00469 UTL-INR-A00470 UTL-INR-A00492 UTL-INR-A00495 UTL-INR-A00563
FP1-RYB3-C1
CPR-02 Street Light FP1-RYB1-C1 Trench Line UTL-INR-A00438 UTL-INR-A00439 UTL-INR-A00496 UTL-INR-A00498
FP1-RYB1-C2
FP1-RYB3-C5
FP1-RYB3-C4
CPR-02 Street Light FP1-RYB3-C3 Trench Line UTL-INR-A00471 UTL-INR-A00472 UTL-INR-A00497 UTL-INR-A00499
FP1-RYB3-C2
FP1-RYB3-C1
FP1-RYB1-C2 to Duct 5
Duct 7 to FP1-RYB1-C3
CPR-02 Street Light Trench Line UTL-INR-A00927 UTL-INR-A00928 UTL-INR-A00929 UTL-INR-A00930
to FP1-RYB1-C4
to FP1-RYB2-C5
FP1-RYB2-C2
CPR-02 Street Light FP1-RYB2-C1 Trench Line UTL-INR-A00923 UTL-INR-A00924 UTL-INR-A00925 UTL-INR-A00926
FP1-RYB3-C1
CPR-02 Street Light FP1-RYB1-C1 Street Light Pole UTL-INR-A00436 UTL-INR-A00437 UTL-INR-A00623 UTL-INR-A00624 UTL-INR-A00625 UTL-INR-A00626
CPR-02 Street Light FP1-RYB1-C2 Street Light Pole UTL-INR-A00436 UTL-INR-A00437 UTL-INR-A00623 UTL-INR-A00624 UTL-INR-A00625 UTL-INR-A00626
CPR-02 Street Light FP1-RYB1-C3 Street Light Pole UTL-INR-A00434 UTL-INR-A00435 UTL-INR-A00627 UTL-INR-A00628 UTL-INR-A00629 UTL-INR-A00630
CPR-02 Street Light FP1-RYB1-C4 Street Light Pole UTL-INR-A00434 UTL-INR-A00435 UTL-INR-A00627 UTL-INR-A00628 UTL-INR-A00629 UTL-INR-A00630
CPR-02 Street Light FP1-RYB2-C5 Street Light Pole UTL-INR-A00434 UTL-INR-A00435 UTL-INR-A00627 UTL-INR-A00628 UTL-INR-A00629 UTL-INR-A00630
CPR-02 Street Light FP1-RYB2-C2 Street Light Pole UTL-INR-A00631 UTL-INR-A00632 UTL-INR-A00633 UTL-INR-A00634 UTL-INR-A00635 UTL-INR-A00636
CPR-02 Street Light FP1-RYB3-C3 Street Light Pole UTL-INR-A00631 UTL-INR-A00632 UTL-INR-A00633 UTL-INR-A00634 UTL-INR-A00635 UTL-INR-A00636
CPR-02 Street Light FP1-RYB3-C4 Street Light Pole UTL-INR-A00631 UTL-INR-A00632 UTL-INR-A00633 UTL-INR-A00634 UTL-INR-A00635 UTL-INR-A00636
CPR-02 Street Light FP1-RYB3-C5 Street Light Pole UTL-INR-A00631 UTL-INR-A00632 UTL-INR-A00633 UTL-INR-A00634 UTL-INR-A00635 UTL-INR-A00636
CPR-02 Street Light FP1-RYB2-C1 Street Light Pole UTL-INR-A00637 UTL-INR-A00638 UTL-INR-A00639 UTL-INR-A00640 UTL-INR-A00641 UTL-INR-A00642
CPR-02 Street Light FP1-RYB3-C1 Street Light Pole UTL-INR-A00637 UTL-INR-A00638 UTL-INR-A00639 UTL-INR-A00640 UTL-INR-A00641 UTL-INR-A00642
CPR-02 Street Light FP1-RYB3-C2 Street Light Pole UTL-INR-A00637 UTL-INR-A00638 UTL-INR-A00639 UTL-INR-A00640 UTL-INR-A00641 UTL-INR-A00642
119
APPROVED CLIENT ASHGAL
STATUS
CANCELLED
SUBMITED/ONGOING
ROAD WORKS INRS TRACKER
5 Fill Area 6 Cut Area 7 Suitable Fill / Backfilling 8 Subbase Material Asphalt
NEED TO RAISE s INTERNAL 1 2 2.1 3 4 5.1 5.2 5.3 6.1 6.2 7.1 7.2 7.3 8.1 8.2 8.3 8.4
CARRIAGE WAY
Compaction Testing In-situ CBR Testing for Joint survey Checking Joint survey checking,
Road Name
LOCATION
of existing Site Visual Inspection for demolishment and Joint Survey checking Setting Out and Setting Out and Surface Preparation Joint survey checking In-situ CBR and In-situ CBR and for the formation Visual Inspection and Joint Survey Checking Compaction sampling, testing, Joint survey checking
for the formation Sampling and Testing Surface Preparation Compaction testing of Sampling and Testing Surface Praparation Compaction for the Laying of the Top of Suitable level Testing Evenness Testing for Sampling of Prime Application of Prime
ZONE
Sr No
From (CH) To (CH) situation - the site clearance Delivery of existing and sampling of the Trimming Trimming of Swale of Swale of the Fill Area of the Fill Area of the Cut Area of the Cut Area testing of Suitable Fill Material Fill Material (Top of Suitable Sampling for the for the Laying of for the Laying of the Laid Subbase Coat Material Coat
coring, inspection for for laying of asphalt
rock strata level the Fill Area the Cut Area Fill Material- Laying of Subbase Subbase laying of asphalt base base course class B
topographic survey structure (Backfilling 0- (Backfilling 0-75mm) Bakcfilling 0-75mm) Subbase course class B
75mm)..Layer
ROA-INR-A00801 (1st
1 1 Commercial Boulevard Plot BC C2/06 & BC C2/07 GEN-INR-A00067 ROA-INR-A00751 ROA-INR-A00764 ROA-INR-A00920 ROA-INR-A00921 QUA-INR-A00127 ROA-INR-A00760 ROA-INR-A00761 QUA-INR-A00128 ROA-INR-A00762 ROA-INR-A00763
layer)
ROA-INR-A00802 (2nd
1 1 Commercial Boulevard Plot BC C2/06 & BC C2/07 GEN-INR-A00067 ROA-INR-A00751 ROA-INR-A00764
layer)
ROA-INR-A00851 (3rd
1 1 Commercial Boulevard Plot BC C2/06 & BC C2/07 GEN-INR-A00067 ROA-INR-A00751 ROA-INR-A00764
layer)
ROA-INR-A00852 (4th
1 1 Commercial Boulevard Plot BC C2/06 & BC C2/07 GEN-INR-A00067 ROA-INR-A00751 ROA-INR-A00764
layer)
ROA-INR-A00853 (5th
1 1 Commercial Boulevard Plot BC C2/06 & BC C2/07 GEN-INR-A00067 ROA-INR-A00751 ROA-INR-A00764
layer)
ROA-INR-A00862 (6th
1 1 Commercial Boulevard Plot BC C2/06 & BC C2/07 GEN-INR-A00067 ROA-INR-A00751 ROA-INR-A00764
layer)
ROA-INR-A00706 (1st
114 2 Commercial Boulevard Plot BC C2/08 & BC C2/09 GEN-INR-A00065 ROA-INR-A00680 ROA-INR-A00682 ROA-INR-A00904 ROA-INR-A00905 QUA-INR-A00107 ROA-INR-A00684 ROA-INR-A00686 QUA-INR-A00110 ROA-INR-A00688 ROA-INR-A00690
layer)
ROA-INR-A00707 (2nd
114 2 Commercial Boulevard Plot BC C2/08 & BC C2/09 layer)
ROA-INR-A00708 (3rd
114 2 Commercial Boulevard Plot BC C2/08 & BC C2/09 layer)
ROA-INR-A00765 (4th
114 2 Commercial Boulevard Plot BC C2/08 & BC C2/09 layer)
ROA-INR-A00766 (5th
114 2 Commercial Boulevard Plot BC C2/08 & BC C2/09 layer)
ROA-INR-A00709 (1st
114 2 Commercial Boulevard Plot BC C2/10 & BC C2/11 GEN-INR-A00065 ROA-INR-A00681 ROA-INR-A00683 ROA-INR-A00906 ROA-INR-A00907 QUA-INR-A00108 ROA-INR-A00685 ROA-INR-A00687 QUA-INR-A00111 ROA-INR-A00689 ROA-INR-A00691
layer)
ROA-INR-A00710 (2nd
114 2 Commercial Boulevard Plot BC C2/10 & BC C2/11 layer)
ROA-INR-A00711 (3rd
114 2 Commercial Boulevard Plot BC C2/10 & BC C2/11 layer)
ROA-INR-A00767 (4th
114 2 Commercial Boulevard Plot BC C2/10 & BC C2/11 layer)
ROA-INR-A00768 (5th
114 2 Commercial Boulevard Plot BC C2/10 & BC C2/11 layer)
ROA-INR-A00712 (1st
114 2 Commercial Boulevard Plot BC C2/12 & BC C2/13 GEN-INR-A00065 ROA-INR-A00671 ROA-INR-A00672 ROA-INR-A00908 ROA-INR-A00909 ROA-INR-A00692 QUA-INR-A00109 ROA-INR-A00673 ROA-INR-A00674 QUA-INR-A00112 ROA-INR-A00675 ROA-INR-A00676
layer)
ROA-INR-A00902 (1st
114 2 Commercial Boulevard Plot BC C2/14 GEN-INR-A00065 ROA-INR-A00890 QUA-INR-A00150 ROA-INR-A00891 ROA-INR-A00910 ROA-INR-A00911 QUA-INR-A00109 ROA-INR-A00892 ROA-INR-A00893 QUA-INR-A00112 ROA-INR-A00894 ROA-INR-A00895
layer)
ROA-INR-A00903 (2nd
2 Commercial Boulevard Plot BC C2/14 GEN-INR-A00065
layer)
ROA-INR-A01167 (1st
1 1 Commercial Boulevard Plot BC C2/19 , BC C2/20 GEN-INR-A00054 ROA-INR-A01119 GEN-INR-A00095 (slab) ROA-INR-A01120 QUA-INR-A00105 ROA-INR-A01137 ROA-INR-A01138 QUA-INR-A00106 ROA-INR-A01139 ROA-INR-A01140
layer)
ROA-INR-A01168 (2nd
1 Commercial Boulevard Plot BC C2/19 , BC C2/20 layer)
ROA-INR-A01169 (3rd
1 Commercial Boulevard Plot BC C2/19 , BC C2/20 layer)
ROA-INR-A01170 (4th
1 Commercial Boulevard Plot BC C2/19 , BC C2/20 layer)
117
APPROVED CLIENT ASHGAL
STATUS
CANCELLED
SUBMITED/ONGOING
ROAD WORKS INRS TRACKER
NEED TO RAISE s INTERNAL 1 2 2.1 3 4 5.1 5.2 5.3 6.1 6.2 7.1 7.2 7.3 8.1 8.2 8.3 8.4
Joint survey checking Removal / Compaction Testing In-situ CBR Testing for and Evenness Testing In-situ CBR and
LOCATION
Joint Survey checking In-situ CBR and In-situ CBR and Visual Inspection and Joint Survey Checking
of existing Site Visual Inspection for demolishment and Setting Out and Sampling and Testing Surface Preparation Surface Praparation for the Laying of the Top of Suitable for the formation Compaction Testing Evenness Testing for
Sr No
ZONE
From (CH) To (CH) and sampling of the Compaction testing of Compaction testing of Sampling for the for the Laying of
situation - the site clearance Delivery of existing Trimming of the Fill Area of the Fill Area of the Cut Area Suitable Fill Material Fill Material level (Top of Suitable for the Laying of the Laid Subbase
rock strata the Fill Area the Cut Area Laying of Subbase Subbase
topographic survey structure (Backfilling 0- (Backfilling 0-75mm) Fill Material- Subbase
75mm)..Layer Bakcfilling 0-75mm)
114
115
116
117
STAT
US
APPROVED CLIENT CLIENT
20. Street Lighting Duct with Concrete Surround 21. Street Lighting Duct with Aggregate Surround 22. Street Lighting Cable with Aggregate Surround 23. Street Lighting Foundations Dry Utilities Ducts Wet Utilities Ducts Protection of Existing Line
NEED TO RAISE 20.1 20.2 20.3 20.4 21.1 21.2 21.3 21.4 22.1 22.2 22.3 22.4 23.1 23.2 23.3 23.4 23.5 23.6 24.1 24.2 24.3 24.4 25.1 25.2 25.3 25.4 26.1 26.2
Compaction Testing
TYPE OF ROAD
of the Backfilling of the Backfilling Joint Survey Checking, of Formwork; visual Compaction Testing Compaction Testing
Road Name
Joint Survey checking, Joint Survey checking, Visual Inspection for Joint Survey checking, of the Backfilling Joint Survey Checking Joint survey checking Joint Survey Checking, Joint Survey Checking, Joint survey checking
LOCATION
Joint Survey checking Visual Inspection and layers of Street layers of Street Setting Out and inspection and Joint survey checking Visual Inspection and of the Backfilling of the Backfilling Visual Inspection for Visual Inspection for
Setting Out and Setting out and Bedding and Joint Visual Inspection of Setting Out and Visual Inspection for Visual Inspection of layers of Street and Sampling for the of reinforcement, Visual Inspection for Compaction testing of Setting Out and Setting Out and and Visual Inspection Visual Inspection for
Sr No
Point
Type and Visual Inspection Sampling of Surround Lighting Duct Lighting Duct compaction testing of sampling for the and Visual Inspection Sampling of Surround layers---Duct layers---Duct pipe surround amd the Installation of
Compaction Testing Compaction Testing Survey Verification of surround material Compaction Testing Bedding surround material Lighting Duct casting of Blinding Anchor bolt and foot bitumen protection the backfilling layers Compaction Testing Compaction Testing for the Pipe laying Pipe Surround
for the Pipe laying concrete casting including Warning including Warning foundation for street casting of street for the Pipe laying Concrete Casting including warning including warning existing duct ends Protection Slab
of Trench formation of Trench formation Pipe laying of Trench formation including Warning Concrete plate installation of Trench Formation of Trench Formation including Bedding
Tape Installation & Tape Installation & lighting poles lighting foundation tape installation tape installation
Tape Installation
Mandrel Test Mandrel Test concrete
1 1
1 QASSAR-DEC Street Light
2
SL1 UTL-INR-A00754 UTL-INR-A00755 UTL-INR-A00756 UTL-INR-A00757
1
2 QASSAR-DEC Street Light Sleeve UTL-INR-A00768 UTL-INR-A00769 UTL-INR-A00770 UTL-INR-A00771
1
2 QASSAR-DEC Street Light Trench UTL-INR-A00758 UTL-INR-A00759
119
APPROVED CLIENT ASHGAL
STATUS
CANCELLED
SUBMITED/ONGOING
ROAD WORKS INRS TRACKER
Swale 5 Fill Area 6 Cut Area 7 Suitable Fill / Backfilling 8 Subbase Material Prime Coat Asphalt Fence
NEED TO RAISE s INTERNAL 1 2 2.1 3 4 5.1 5.2 5.3 6.1 6.2 7.1 7.2 7.3 8.1 8.2 8.3 8.4
CARRIAGE WAY
Joint survey checking Removal / Compaction Testing In-situ CBR Testing for and Evenness Testing In-situ CBR and the installation of
LOCATION
Joint Survey checking Joint survey checking In-situ CBR and In-situ CBR and Visual Inspection and Joint Survey Checking sampling, testing, Joint survey checking the foundation Concrete casting of
of existing Site Visual Inspection for demolishment and Setting Out and Setting Out and Surface Preparation Sampling and Testing Surface Preparation Sampling and Testing Surface Praparation for the Laying of the Top of Suitable for the formation Compaction Testing Evenness Testing for Sampling of Prime Application of Prime coring, security fences and
ZONE
Sr No
From (CH) To (CH) and sampling of the for the formation Compaction testing of Compaction testing of Sampling for the for the Laying of inspection for for laying of asphalt excavation and pole pole foundation for
situation - the site clearance Delivery of existing Trimming Trimming of Swale of Swale of the Fill Area of the Fill Area of the Cut Area of the Cut Area Suitable Fill Material Fill Material level (Top of Suitable for the Laying of the Laid Subbase Coat Material Coat laying of asphalt base base course class A other accessories
rock strata level the Fill Area the Cut Area Laying of Subbase Subbase installation of security fence
topographic survey structure (Backfilling 0- (Backfilling 0-75mm) Fill Material- Subbase course class A (brackets,
security fence
75mm)..Layer Bakcfilling 0-75mm) doors...etc.)
ROA-INR-A00483/ROA-
1 1 Depot 1-CPR2 Link Road GEN-INR-A00027 ROA-INR-A00482 ROA-INR-A00943 ROA-INR-A00648 QUA-INR-A00086 INR-A00483-01 ROA-INR-A00493
ROA-INR-A00646 (1st
114 1 Depot 1-CPR2 Link Road QUA-INR-A00115 ROA-INR-A00694 ROA-INR-A00695 QUA-INR-A00113 ROA-INR-A00638 ROA-INR-A00639 QUA-INR-A00114 ROA-INR-A00640 ROA-INR-A00641
Layer)
ROA-INR-A00647 (2nd
115 1 Depot 1-CPR2 Link Road Layer)
ROA-INR-A00668 (3rd
115 1 Depot 1-CPR2 Link Road Layer)
ROA-INR-A00670
ROA-INR-A00679 ROA-INR-A00669
115 1 Depot 1-CPR2 Link Road (FinalLayer) (FinalLayer)
(FinalLayer) - Refer to ROA-INR-A00716 ROA-INR-A00717 ROA-INR-A00718 ROA-INR-A00719 QUA-INR-A00173 ROA-INR-A01008 ROA-INR-A01028 ROA-INR-A01029
ROA-INR-A00648
117
STAT
US
APPROVED CLIENT CLIENT
20. Street Lighting Duct with Concrete Surround 21. Street Lighting Duct with Aggregate Surround 22. Street Lighting Cable with Aggregate Surround 23. Street Lighting Foundations Dry Utilities Ducts Wet Utilities Ducts Protection of Existing Line
NEED TO RAISE 20.1 20.2 20.3 20.4 21.1 21.2 21.3 21.4 22.1 22.2 22.3 22.4 23.1 23.2 23.3 23.4 23.5 23.6 24.1 24.2 24.3 24.4 25.1 25.2 25.3 25.4 26.1 26.2
of the Backfilling Joint Survey checking, Visual Inspection for Joint Survey Checking Joint survey checking of inspection
Formwork; visual Joint Survey Checking, Joint survey checking Visual Inspection and Compaction Testing Compaction Testing
Road Name
Sampling and Testing Joint Survey checking, Joint Survey checking Visual Inspection and of the Backfilling Backfilling of Ducts Joint Survey checking, Visual Inspection for of the Backfilling of the Backfilling Joint Survey Checking, Joint survey checking
LOCATION
Bedding and Joint Setting Out and and of the Backfilling Visual Inspection for Visual Inspection for
Setting Out and layers of Street Setting out and Bedding and Joint Visual Inspection of layers of Street Setting Out and Survey Verification of Visual Inspection of layers of Street compaction testing of and Sampling for the of reinforcement, Visual Inspection for Compaction testing of Setting Out and Setting Out and and Visual Inspection Visual Inspection for
Sr No
Point
Type of Street Lighting
Compaction Testing
and Visual Inspection Sampling of Surround
Lighting Duct
with warning tape &
Compaction Testing Survey Verification of surround material Lighting Duct Compaction Testing
sampling for the and Visual Inspection Sampling of Surround layers---Duct layers---Duct pipe surround amd the Installation of
Cable surround material Lighting Duct for street casting of Blinding Anchor bolt and foot bitumen protection the backfilling layers Compaction Testing Compaction Testing for the Pipe laying Pipe Surround
Bedding Material of Trench formation for the Pipe laying concrete casting Mandrel Testing including Warning of Trench formation Street Lighting including Warning foundation casting of street of Trench Formation for the Pipe laying Concrete Casting including warning including warning existing duct ends Protection Slab
including Warning of Trench formation Pipe laying Concrete plate installation of Trench Formation including Bedding
laying lighting poles lighting foundation tape installation tape installation
Tape Installation Tape Installation Tape Installation concrete
1 1
1 Depot-1 CPR-02 Street Light SL1 UTL-INR-A00473 UTL-INR-A00474 UTL-INR-A00475 UTL-INR-A00476 UTL-INR-A00681
2
1 3
2 Depot-1 CPR-02 Street Light SL1 UTL-INR-A00473 UTL-INR-A00474 UTL-INR-A00475 UTL-INR-A00476 UTL-INR-A00681
4
FP1-B4-C18
Depot-1 CPR-02 Street Light Trench Line UTL-INR-A00538 UTL-INR-A00539 UTL-INR-A00540 UTL-INR-A00541
FP1-R4-C13
FP1-R4-C13
Depot-1 CPR-02 Street Light Trench Line UTL-INR-A00542 UTL-INR-A00543 UTL-INR-A00544 UTL-INR-A00545
Ducts 1 to 6 including 11
119
APPROVED CLIENT ASHGAL
STATUS
CANCELLED
SUBMITED/ONGOING ROAD WORKS INRS TRACKER
5 Fill Area 6 Cut Area 7 Suitable Fill / Backfilling 8 Subbase Material Prime Coat Asphalt Road marking Fence Maintenance Pit Fence&Barrier
NEED TO RAISE s INTERNAL 1 2 2.1 3 4 5.1 5.2 5.3 4.1 4.2 6.1 6.2 7.1 7.2 7.3 8.1 8.2 8.3 30.1
CARRIAGE WAY
Visual Inspection and Joint survey Checking Visual inspection for Visual inspection for
TYPE OF ROAD
Visual inspection for the installation of Joint survey checking Visual inspection for Concrete casting of
Road Name
Joint survey checking Removal / Compaction Testing In-situ CBR Testing for and Evenness Testing Visual Inspection and In-situ CBR and Joint survey checking,
Setting Out of the Joint survey checking Visual inspection of the installation of
LOCATION
Joint Survey checking In-situ CBR and Joint survey In-situ CBR and sampling, testing, Joint survey checking Visual Inspection for the the foundation Concrete casting of the foundation
of existing Site Visual Inspection for demolishment and Setting Out and Sampling and Testing Surface Preparation Compaction Trimming of the Cut Surface Praparation Compaction for the Laying of the Top of Suitable for the formation Joint Survey Checking Compaction Testing Evenness Testing for Sampling of Prime Application of Prime security fences and excavation and the sampling for reinforcement and excavation and pole pole foundation for barrier and security
ZONE
Sr No
From (CH) To (CH) situation - the site clearance Delivery of existing and sampling of the Trimming Stone Pitching of the Fill Area of the Fill Area testing of Verification for the Area of the Cut Area testing of Suitable Fill Material Fill Material level (Top of Suitable for the Laying of for the Laying of the Laid Subbase Coat Material Coat
coring, inspection for for laying of asphalt application and testing of excavation and pole pole foundation for other accessories formation the casting of blinding joint survet checking Casting of Concrete Snagging security fence & fences and other
rock strata the Fill Area formation level the Cut Area laying of asphalt base base course class A Road Marking installation of security security fence and compaction installation of barrier
topographic survey structure (Backfilling 0- (Backfilling 0-75mm) Fill Material- Subbase Subbase course class A (brackets, concrete formwork barrier accessories (brackets,
fence testing and security fence
75mm)..Layer Bakcfilling 0-75mm) doors...etc.) doors...etc.)
GEN-INR-A00002 / GEN- ROA-INR-A00006/ROA- ROA-INR-A00019/ROA- ROA-INR-A00036/ROA- ROA-INR-A00024 (1st ROA-INR-A00130 / ROA- QUA-INR-A00031/QUA- ROA-INR-A01034 - ROA-INR-A01035 -
1 Jelaiah Parking Depot-1 (Fill Area) 0+000 0+160 INR-A00004
ROA-INR-A00003 NA QUA-INR-A00002 ROA-INR-A00105 QUA-INR-A00001 INR-A00035/ROA-INR- INR-A00018
ROA-INR-A00045 ROA-INR-A00034 ROA-INR-A00013 INR-A00036-01/ROA- layer) INR-A00130-01(Mock- ROA-INR-A00131 ROA-INR-A00132
INR-A00031-01
ROA-INR-A00160 ROA-INR-A00171 ROA-INR-A00237 ROA-INR-A00277
cancelled cancelled
ROA-INR-A01036
A00035-01 INR-A00036-02 Up)/ROA-INR-A00130-02
ROA-INR-A00142/ROA-
4 Jelaiah Parking Depot-1 0+160 0+180 INR-A00142-01
ROA-INR-A00143 ROA-INR-A00144 QUA-INR-A00031 ROA-INR-A00157 ROA-INR-A00193 ROA-INR-A00237 ROA-INR-A00277
ROA-INR-A00145/ROA-
8 Jelaiah Parking Depot-1 0+180 0+360 INR-A00145-01
ROA-INR-A00146 ROA-INR-A00147 QUA-INR-A00031 ROA-INR-A00158 ROA-INR-A00194 ROA-INR-A00237 ROA-INR-A00277
ROA-INR-A00148/ROA-
9 Jelaiah Parking Depot-1 0+360 0+380 INR-A00148-01
ROA-INR-A00149 ROA-INR-A00150 QUA-INR-A00031 ROA-INR-A00159 ROA-INR-A00195 ROA-INR-A00237 ROA-INR-A00277
GEN-INR-A00002 / GEN-
13 Jelaiah Parking Depot-1 Emergeny Flood Area B Swale INR-A00004
ROA-INR-A00003 NA QUA-INR-A00002 ROA-INR-A00107 ROA-INR-A00469 QUA-INR-A00001 NA NA ROA-INR-A00054 ROA-INR-A00030 ROA-INR-A00031 ROA-INR-A00277
ROA-INR-A00111/ROA-
14 Jelaiah Parking Depot-1 Earth Bund Area INR-A00111-01/ROA- ROA-INR-A00356 ROA-INR-A00470 ROA-INR-A00277
INR-A00380 (Final Level)
ROA-INR-A00238 - ROA-
ROA-INR-A00280/ROA-
15 Jelaiah Parking Depot-1 Fence A INR-A00238-01(Mock ROA-INR-A00239
INR-A00280-01
ROA-INR-A00277
Up)
ROA-INR-A00244 / ROA-
16 Jelaiah Parking Depot-1 Fence B INR-A00244-01(Mock ROA-INR-A00245/ROA- ROA-INR-A00281/ROA- ROA-INR-A00277
Up) INR-A00245-01 INR-A00281-01
125
APPROVED CLIENT ASHGAL
STATUS
CANCELLED
SUBMITED/ONGOING
ROAD WORKS INRS TRACKER
Swale 5 Fill Area 6 Cut Area 7 Suitable Fill / Backfilling 8 Subbase Material
NEED TO RAISE s INTERNAL 1 2 2.1 3 4 5.1 5.2 5.3 6.1 6.2 7.1 7.2 7.3 8.1 8.2 8.3 8.4
CARRIAGE WAY
Joint survey checking Removal / Compaction Testing In-situ CBR Testing for In-situ CBR and
LOCATION
Joint Survey checking In-situ CBR and In-situ CBR and for the formation Visual Inspection and Joint Survey Checking
of existing Site Visual Inspection for demolishment and Setting Out and Setting Out and Surface Preparation Joint Survey checking Sampling and Testing Surface Preparation Sampling and Testing Surface Praparation for the Laying of the Top of Suitable Compaction Testing Evenness Testing for
ZONE
Sr No
From (CH) To (CH) and sampling of the Compaction testing of Compaction testing of level (Top of Suitable Sampling for the for the Laying of
situation - the site clearance Delivery of existing Trimming Trimming of Swale of Swale of Swales of the Fill Area of the Fill Area of the Cut Area of the Cut Area Suitable Fill Material Fill Material for the Laying of the Laid Subbase
rock strata the Fill Area the Cut Area Fill Material- Laying of Subbase Subbase
topographic survey structure (Backfilling 0- (Backfilling 0-75mm) Subbase
Bakcfilling 0-75mm)
75mm)..Layer
ROA-INR-A00599 (1st
3 Fox Hills 1 1,2,3 & 4 GEN-INR-A00023 ROA-INR-A00507 QUA-INR-A00101 ROA-INR-A00587 ROA-INR-A00747 ROA-INR-A00748 ROA-INR-A00795 QUA-INR-A00098 ROA-INR-A00595 ROA-INR-A00596 QUA-INR-A00099 ROA-INR-A00597 ROA-INR-A00598
Layer)
ROA-INR-A00604 (2nd
3 Fox Hills 1 1,2&3 Layer)
ROA-INR-A00624 (3rd
3 Fox Hills 1 1,2&3 Layer)
ROA-INR-A00650 (4th
3 Fox Hills 1 1,2&3 Layer)
ROA-INR-A00651 (5th
3 Fox Hills 1 1,2&3 Layer)
ROA-INR-A00693 (6th
3 Fox Hills 1 1,2&3 Layer)
ROA-INR-A00600 (1st
3 Fox Hills 1 5&6 ROA-INR-A00587 ROA-INR-A00749 ROA-INR-A00750 ROA-INR-A00796 QUA-INR-A00098 ROA-INR-A00595 ROA-INR-A00596 QUA-INR-A00099 ROA-INR-A00597 ROA-INR-A00598
Layer)
ROA-INR-A00605 (2nd
3 Fox Hills 1 5&6 Layer)
ROA-INR-A00613 (3rd
3 Fox Hills 1 5&6 Layer)
ROA-INR-A00625 (4th
3 Fox Hills 1 5&6 Layer)
ROA-INR-A00652 (5th
3 Fox Hills 1 5&6 Layer)
ROA-INR-A00653 (6th
3 Fox Hills 1 5&6 Layer)
115
116
117
APPROVED CLIENT ASHGAL
STATUS
CANCELLED
SUBMITED/ONGOING
ROAD WORKS INRS TRACKER
5 Fill Area 6 Cut Area 7 Suitable Fill / Backfilling 8 Subbase Material Kerbstone Paving Block
NEED TO RAISE s INTERNAL 1 2 2.1 3 4 5.1 5.2 5.3 6.1 6.2 7.1 7.2 7.3 8.1 8.2 8.3 8.4
CARRIAGE WAY
Joint survey checking Removal / Compaction Testing In-situ CBR Testing for and Evenness Testing Visual Inspection and Joint Survey Checking In-situ CBR and Visual Inspection of Visual Inspection for the
LOCATION
of existing Site Visual Inspection for demolishment and Joint Survey checking Setting Out and In-situ CBR and
Sampling and Testing Surface Preparation Compaction In-situ CBR and Evenness Testing for Formwork and Casting of and Visual Inspection for Compaction Testing for Visual Inspection and
testing of Surface Praparation Compaction for the Laying of the Top of Suitable for the formation Compaction Testing laying of washed sand
ZONE
Sr No
From (CH) To (CH) situation - the site clearance Delivery of existing and sampling of the Trimming of the Fill Area of the Fill Area of the Cut Area testing of Suitable Fill Material Fill Material Sampling for the
level (Top of Suitable Laying for the Laying of for the Laying of the Laid Subbase Kerbstone Foundation Kerbstone Installation the laying of Suitable Fill sampling for the laying of bedding and installation
topographic survey structure rock strata the Fill Area the Cut Area (Backfilling 0- (Backfilling 0-75mm) Fill Material- of Subbase Subbase Subbase (Type xx) including concrete Material (Backfilling 0- Subbase of paving blocks
75mm)..Layer Bakcfilling 0-75mm) backing (Type xx) 75mm) - ... Layer
117
APPROVED CLIENT ASHGAL
STATUS
CANCELLED
SUBMITED/ONGOING ROAD WORKS INRS TRACKER
5 Fill Area 6 Cut Area 7 Suitable Fill / Backfilling 8 Subbase Material Prime coat Milling Material Fence
NEED TO RAISE s INTERNAL 1 2 2.1 3 4 5.1 5.2 5.3 6.1 6.2 7.1 7.2 7.3 8.1 8.2 8.3
CARRIAGE WAY
Joint survey checking Removal / Compaction Testing In-situ CBR Testing for and Evenness Testing In-situ CBR and the installation of
LOCATION
Joint Survey checking In-situ CBR and In-situ CBR and Visual Inspection and Joint Survey Checking Visual inspection for Joint survey checking the foundation Concrete casting of Formwork completed
of existing Site Visual Inspection for demolishment and Setting Out and Sampling and Testing Surface Preparation Sampling and Testing Surface Praparation for the Laying of the top of Suitable for the formation level Compaction Testing Evenness Testing for Sampling of Prime Application of Prime security fences and
ZONE
Sr No
From (CH) To (CH) and sampling of the Compaction testing of Compaction testing of Sampling for the for the Laying of laying of Milling for laying of asphalt excavation and pole pole foundation for before the desgin
situation - the site clearance Delivery of existing Trimming of the Fill Area of the Fill Area of the Cut Area of the Cut Area Suitable Fill Material Fill Material (Top of Suitable Fill for the Laying of the Laid Subbase Coat Material Coat Material Milling Material other accessories
rock strata the Fill Area the Cut Area Laying of Subbase Subbase installation of security security fence changed
topographic survey structure (Backfilling 0- (Backfilling 0-75mm) Material-Bakcfilling 0- Subbase (brackets,
fence
75mm)..Layer 75mm) doors...etc.)
ROA-INR-A00199 (1st
3 P50-4A Expansion Part 1 HW-2051 0+250 0+425 layer)
ROA-INR-A00201 (2nd
4 P50-4A Expansion Part 1 HW-2051 0+300 0+400 layer)
ROA-INR-A00203 (3rd
5 P50-4A Expansion Part 1 HW-2051 0+300 0+400 layer)
ROA-INR-A00208 (1st
9 P50-4A Expansion Part 2 HW-2051 0+275 0+375 Layer)
ROA-INR-A00116 (2nd
12 P50-4A Expansion Part 1 HW-2052 layer)
ROA-INR-A00136 (Final ROA-INR-A00138 (Final ROA-INR-A00139 (Final ROA-INR-A00246 / ROA- QUA-INR-A00129/QUA- ROA-INR-A00769/ROA- ROA-INR-A00775/ROA- ROA-INR-A00781/ROA-
13 P50-4A Expansion Part 1 HW-2052 layer) layer) layer) INR-A00246-01(Mock ROA-INR-A00246 ROA-INR-A00247 ROA-INR-A00248
INR-A00190 INR-A01072 INR-A01183 INR-A01193
Up)
ROA-INR-A00167(2nd
19 P50-4A Expansion Part 4 HW-2052 layer)
ROA-INR-A00095/ROA- ROA-INR-A00112/ROA- ROA-INR-A00151 (Final ROA-INR-A00114 (Final ROA-INR-A00115 (Final ROA-INR-A00526/ROA- QUA-INR-A00134/QUA- ROA-INR-A00774/ROA- ROA-INR-A00780/ROA- ROA-INR-A00786/ROA-
24 P50-4A Expansion Part 6 HW-2052 GEN-INR-A00012 ROA-INR-A00078 NA NA ROA-INR-A00088 QUA-INR-A00018
INR-A00095-01
ROA-INR-A00096 QUA-INR-A00024
INR-A00112-01
ROA-INR-A00113
layer) layer) layer)
ROA-INR-A00525
INR-A00526-01
ROA-INR-A00527 ROA-INR-A00528
INR-A00195 INR-A01076 INR-A01188 INR-A01197
27 Al Bayt Stadium Parking (Last Mile) Fence SW-3 & SW-4 GEN-INR-A00001 ROA-INR-A00821 ROA-INR-A00822 ROA-INR-A00823
119
STAT
US
APPROVED CLIENT CLIENT
Street Lighting Duct with Concrete Surround Street Lighting Duct with Aggregate Surround Street Lighting Cable with Aggregate Surround 23. Street Lighting Foundations Dry Utilities Ducts Wet Utilities Ducts Protection of Existing Line
NEED TO RAISE 20.1 20.2 20.3 20.4 21.1 21.2 21.3 21.4 22.1 22.2 22.3 22.4 23.1 23.2 23.3 23.4 23.5 23.6 24.1 24.2 24.3 24.4 25.1 25.2 25.3 25.4 26.1 26.2
of the Backfilling Joint Survey checking, Visual Inspection for of the Backfilling Joint Survey checking, Visual Inspection for Joint Survey Checking Joint survey checking of inspection
Formwork; visual Survey Checking, Joint survey checking Visual Inspection and Compaction Testing Compaction Testing
Road Name
Sampling and Testing Joint Survey checking, Joint Survey checking Visual Inspection and Application of of the Backfilling Visual Inspection for Compaction testing of Joint of the Backfilling Joint Survey Checking, Joint survey checking
LOCATION
layers of Street Bedding and Joint Setting Out and and of the Backfilling Visual Inspection for Visual Inspection for
Setting Out and Bitumen paint Setting Out and Bedding and Joint Visual Inspection of layers of Street Setting Out and Visual Inspection of layers of Street compaction testing of and Sampling for the of reinforcement, Setting Out and Setting Out and and Visual Inspection Visual Inspection for
Sr No
Point
Type of Street Lighting Compaction Testing and Visual Inspection Sampling of Surround Protection on Lighting Duct Compaction Testing Survey Verification of surround material Lighting Duct Compaction Testing Survey Verification of surround material Lighting Duct casting of Blinding Anchor bolt and foot sampling for the bitumen protection the backfilling layers Compaction Testing and Visual Inspection Sampling of Surround layers---Duct Compaction Testing for the Pipe laying Pipe Surround layers---Duct pipe surround amd the Installation of
Bedding Material of Trench formation for the Pipe laying concrete casting including Warning of including Warning of Trench formation Street Lighting Cable including Warning foundation for street casting of street and Waterpoofing of Trench Formation for the Pipe laying Concrete Casting including warning including warning existing duct ends Protection Slab
concrete Ducts Trench formation Pipe laying Concrete plate installation of Trench Formation including Bedding
Tape Installation and laying lighting poles lighting foundation tape installation tape installation
Tape Installation Tape Installation
Mandrel Testing concrete
1 P50-4A Al Bayt Expansion Street Light (HW 1 UTL-INR-A00059/UTL- UTL-INR-A00218/UTL- UTL-INR-A00219/UTL- UTL-INR-A00220/UTL- UTL-INR-A00221/UTL-
1 2052) SL1 QUA-INR-A00038
INR-A00059-01 INR-A00319 INR-A00320 INR-A00321 INR-A00322
2
1 P50-4A Al Bayt Expansion Street Light (HW 3 UTL-INR-A00059/UTL- UTL-INR-A00218/UTL- UTL-INR-A00219/UTL- UTL-INR-A00220/UTL- UTL-INR-A00221/UTL-
2 2052) SL1 INR-A00059-01 INR-A00319 INR-A00320 INR-A00321 INR-A00322
4
1 P50-4A Al Bayt Expansion Street Light (HW 5 UTL-INR-A00209/UTL- UTL-INR-A00218/UTL- UTL-INR-A00219/UTL- UTL-INR-A00220/UTL- UTL-INR-A00221/UTL-
3 2052) SL1 INR-A00209-01 INR-A00319 INR-A00320 INR-A00321 INR-A00322
6
1 P50-4A Al Bayt Expansion Street Light (HW 7 UTL-INR-A00059/UTL- UTL-INR-A00221/UTL-
4 2052) SL1 INR-A00059-01
UTL-INR-A00218 UTL-INR-A00219 UTL-INR-A00220
INR-A00221-01
8
1 P50-4A Al Bayt Expansion Street Light (HW 9 UTL-INR-A00059/UTL- UTL-INR-A00221/UTL-
5 2052) SL1 INR-A00059-01
UTL-INR-A00218 UTL-INR-A00219 UTL-INR-A00220
INR-A00221-01
10
1 11
P50-4A Al Bayt Expansion Street Light (HW UTL-INR-A00001/UTL-
6 2052) SL1 INR-A00001-01
UTL-INR-A00002 UTL-INR-A00019 UTL-INR-A00020 UTL-INR-A00020
12
1 27 UTL-INR-A00229/UTL-
P50-4A Al Bayt Expansion Street Light (HW UTL-INR-A00060/UTL-
14 2052) SL1 INR-A00060-01
UTL-INR-A00226 UTL-INR-A00227 UTL-INR-A00228 INR-A00296/UTL-INR-
28 A00323
1 29 UTL-INR-A00229/UTL-
P50-4A Al Bayt Expansion Street Light (HW UTL-INR-A00060/UTL-
15 2052) SL1 INR-A00060-01
UTL-INR-A00226 UTL-INR-A00227 UTL-INR-A00228 INR-A00296/UTL-INR-
30 A00323
P50-4A Al Bayt Expansion Street Light (HW UTL-INR-A00368/UTL- UTL-INR-A00369/UTL- UTL-INR-A00370/UTL- UTL-INR-A00371/UTL-
24 2052) FP1-R5-C1 Street Light Pole UTL-INR-A00161 UTL-INR-A00162
INR-A00368-01 INR-A00369-01 INR-A00370-01 INR-A00371-01
P50-4A Al Bayt Expansion Street Light (HW UTL-INR-A00368/UTL- UTL-INR-A00369/UTL- UTL-INR-A00370/UTL- UTL-INR-A00371/UTL-
25 2052) FP1-Y5-C2 Street Light Pole UTL-INR-A00161 UTL-INR-A00162
INR-A00368-01 INR-A00369-01 INR-A00370-01 INR-A00371-01
P50-4A Al Bayt Expansion Street Light (HW UTL-INR-A00368/UTL- UTL-INR-A00369/UTL- UTL-INR-A00370/UTL- UTL-INR-A00371/UTL-
26 2052) FP1-B5-C3 Street Light Pole UTL-INR-A00161 UTL-INR-A00162
INR-A00368-01 INR-A00369-01 INR-A00370-01 INR-A00371-01
P50-4A Al Bayt Expansion Street Light (HW UTL-INR-A00368/UTL- UTL-INR-A00369/UTL- UTL-INR-A00370/UTL- UTL-INR-A00371/UTL-
27 2052) FP1-R5-C4 Street Light Pole UTL-INR-A00161 UTL-INR-A00162
INR-A00368-01 INR-A00369-01 INR-A00370-01 INR-A00371-01
P50-4A Al Bayt Expansion Street Light (HW UTL-INR-A00368/UTL- UTL-INR-A00369/UTL- UTL-INR-A00370/UTL- UTL-INR-A00371/UTL-
28 2052) FP1-Y5-C5 Street Light Pole UTL-INR-A00161 UTL-INR-A00162
INR-A00368-01 INR-A00369-01 INR-A00370-01/UTL- INR-A00371-01
INR-A00682
P50-4A Al Bayt Expansion Street Light (HW UTL-INR-A00368/UTL- UTL-INR-A00369/UTL- UTL-INR-A00370/UTL- UTL-INR-A00371/UTL-
29 2052) FP1-R5-C7 Street Light Pole UTL-INR-A00161 UTL-INR-A00162
INR-A00368-01 INR-A00369-01 INR-A00370-01 INR-A00371-01
P50-4A Al Bayt Expansion Street Light (HW Street Light Pole (High UTL-INR-A00350/UTL-
23 2052) FP1-B3-C3 Mast)
UTL-INR-A00163 UTL-INR-A00164 UTL-INR-A00210 UTL-INR-A00211 UTL-INR-A00349
INR-A00350-01
P50-4A Al Bayt Expansion Street Light (HW Street Light Pole (High UTL-INR-A00216/UTL- UTL-INR-A00373/UTL-
30 2052) FP1-B4-C3 Mast)
UTL-INR-A00196 UTL-INR-A00215
INR-A00216-01
UTL-INR-A00217 UTL-INR-A00372
INR-A00373-01
P50-4A Al Bayt Expansion Street Light (HW Street Light Pole (High UTL-INR-A00352/UTL-
30 2052) FP1-R4-C1 Mast)
UTL-INR-A00281 UTL-INR-A00282 UTL-INR-A00283 UTL-INR-A00284 UTL-INR-A00351
INR-A00352-01
P50-4A Al Bayt Expansion Street Light (HW Street Light Pole (High UTL-INR-A00354/UTL-
30 2052) FP1-Y4-C2 Mast)
UTL-INR-A00291 UTL-INR-A00292 UTL-INR-A00293 UTL-INR-A00294 UTL-INR-A00353
INR-A00354-01
P50-4A Al Bayt Expansion Street Light (HW Street Light Pole (High
30 2052) FP1-Y3-C2 Mast)
UTL-INR-A00383 UTL-INR-A00384 UTL-INR-A00385 UTL-INR-A00386 UTL-INR-A00387 UTL-INR-A00500
P50-4A Al Bayt Expansion Street Light (HW Street Light Pole (High
30 2052) FP1-R2-C1 Mast)
UTL-INR-A00383 UTL-INR-A00384 UTL-INR-A00385 UTL-INR-A00386 UTL-INR-A00387 UTL-INR-A00500
P50-4A Al Bayt Expansion Street Light (HW Street Light Pole (High
30 2052) FP1-B2-C3 Mast)
UTL-INR-A00383 UTL-INR-A00384 UTL-INR-A00385 UTL-INR-A00386 UTL-INR-A00387 UTL-INR-A00500
STATUS
CANCELLED
SUBMITED/ONGOING
ROAD WORKS INRS TRACKER
NEED TO RAISE s INTERNAL 1 2 2.1 3 4 5.1 5.2 5.3 6.1 6.2 7.1 7.2 7.3 8.1 8.2 8.3 8.4
Joint survey checking Removal / Compaction Testing In-situ CBR Testing for and Evenness Testing In-situ CBR and
LOCATION
Joint Survey checking In-situ CBR and In-situ CBR and Visual Inspection and Joint Survey Checking
of existing Site Visual Inspection for demolishment and Setting Out and Sampling and Testing Surface Preparation Sampling and Testing Surface Praparation for the Laying of the Top of Suitable for the formation Compaction Testing Evenness Testing for
ZONE
Sr No
From (CH) To (CH) and sampling of the Compaction testing of Compaction testing of Sampling for the for the Laying of
situation - the site clearance Delivery of existing Trimming of the Fill Area of the Fill Area of the Cut Area of the Cut Area Suitable Fill Material Fill Material level (Top of Suitable for the Laying of the Laid Subbase
rock strata the Fill Area the Cut Area Laying of Subbase Subbase
topographic survey structure (Backfilling 0- (Backfilling 0-75mm) Fill Material- Subbase
75mm)..Layer Bakcfilling 0-75mm)
ROA-INR-A00724 (1st
1 1 P51 Access (Al Bayt) 1051 1+000 1+250 GEN-INR-A00066 ROA-INR-A00642 QUA-INR-A00116 ROA-INR-A00720 ROA-INR-A00721 QUA-INR-A00117 ROA-INR-A00722 ROA-INR-A00723 Layer)
ROA-INR-A00725 (2nd
Layer)
ROA-INR-A00726 (3rd
Layer)
ROA-INR-A00731 (1st
1 2 P51 Access (Al Bayt) 1052 1+250 1+600 GEN-INR-A00066 ROA-INR-A00643 QUA-INR-A00118 ROA-INR-A00727 ROA-INR-A00728 QUA-INR-A00119 ROA-INR-A00729 ROA-INR-A00730 Layer)
ROA-INR-A00732 (2nd
Layer)
ROA-INR-A00733 (3rd
Layer)
ROA-INR-A00734 (4th
Layer)
ROA-INR-A00856 (5th
P51 Access (Al Bayt) 1052 1+450 1+600 Layer)
ROA-INR-A00877 (1st
1 3 P51 Access (Al Bayt) 1053 1+600 1+900 GEN-INR-A00066 ROA-INR-A00649 QUA-INR-A00120 ROA-INR-A00735 ROA-INR-A00736 QUA-INR-A00121 ROA-INR-A00737 ROA-INR-A00738 Layer)
ROA-INR-A00878 (2ND
1 P51 Access (Al Bayt) 1053 1+600 1+700 Layer)
ROA-INR-A00879 (3rd
1 P51 Access (Al Bayt) 1053 1+600 1+700 Layer)
ROA-INR-A00880 (4th
1 P51 Access (Al Bayt) 1053 1+600 1+700 Layer)
ROA-INR-A00739 (1st
1 P51 Access (Al Bayt) 1053 1+700 1+781 Layer)
ROA-INR-A00740 (2nd
P51 Access (Al Bayt) 1053 1+700 1+781 Layer)
ROA-INR-A00741 (3rd
P51 Access (Al Bayt) 1053 1+700 1+781 Layer)
ROA-INR-A00742 (4th
P51 Access (Al Bayt) 1053 1+700 1+781 Layer)
ROA-INR-A00743 (5th
P51 Access (Al Bayt) 1053 1+700 1+781 Layer)
ROA-INR-A00826 (6th
P51 Access (Al Bayt) 1053 1+700 1+781 Layer)
ROA-INR-A00854 (7th
P51 Access (Al Bayt) 1053 1+700 1+781 Layer)
ROA-INR-A00855 (8th
P51 Access (Al Bayt) 1053 1+700 1+781 Layer)
1 4 P51 Access (Al Bayt) 1054 1+900 2+200 GEN-INR-A00066 ROA-INR-A00649 QUA-INR-A00136 ROA-INR-A00827 ROA-INR-A00829 QUA-INR-A00137 ROA-INR-A00828 ROA-INR-A00830
1 5 P51 Access (Al Bayt) 1055 2+200 2+563 GEN-INR-A00066 ROA-INR-A00649 QUA-INR-A00138 ROA-INR-A00831 ROA-INR-A00832 QUA-INR-A00139 ROA-INR-A00833 ROA-INR-A00834
1 6 P51 Access (Al Bayt) 1056 1+000 1+250 GEN-INR-A00066 ROA-INR-A00797 QUA-INR-A00140 ROA-INR-A00835 ROA-INR-A00836 QUA-INR-A00141 ROA-INR-A00837 ROA-INR-A00838
1 7 P51 Access (Al Bayt) 1057 1+250 1+580 GEN-INR-A00066 ROA-INR-A00797 QUA-INR-A00142 ROA-INR-A00839 ROA-INR-A00840 QUA-INR-A00143 ROA-INR-A00841 ROA-INR-A00842
ROA-INR-A01015 (1st
1 8 P51 Access (Al Bayt) 1058 1+580 1+900 GEN-INR-A00066 ROA-INR-A00797 QUA-INR-A00144 ROA-INR-A00843 ROA-INR-A00844 QUA-INR-A00145 ROA-INR-A00845 ROA-INR-A00846 layer)
ROA-INR-A01018 (2nd
8 P51 Access (Al Bayt) 1058 1+750 1+900 layer)
ROA-INR-A01053 (3rd
8 P51 Access (Al Bayt) 1058 1+750 1+900 layer)
ROA-INR-A01019 (1st
1 9 P51 Access (Al Bayt) 1059 1+900 2+175 GEN-INR-A00066 ROA-INR-A00797 QUA-INR-A00146 ROA-INR-A00847 ROA-INR-A00848 QUA-INR-A00147 ROA-INR-A00849 ROA-INR-A00850 layer)
ROA-INR-A01020 (2nd
9 P51 Access (Al Bayt) 1059 1+900 2+150 GEN-INR-A00066 ROA-INR-A00797 layer)
ROA-INR-A01054 (3rd
9 P51 Access (Al Bayt) 1059 1+900 2+150 GEN-INR-A00066 ROA-INR-A00797 layer)
ROA-INR-A01021 (1st
1 10 P51 Access (Al Bayt) 1060 2+150 2+300 GEN-INR-A00066 ROA-INR-A00797 QUA-INR-A00146 ROA-INR-A00847 ROA-INR-A00848 QUA-INR-A00147 ROA-INR-A00849 ROA-INR-A00850 layer)
ROA-INR-A01022 (2nd
10 P51 Access (Al Bayt) 1060 2+150 2+225 GEN-INR-A00066 ROA-INR-A00797 layer)
ROA-INR-A01023 (3rd
10 P51 Access (Al Bayt) 1060 2+150 2+225 GEN-INR-A00066 ROA-INR-A00797 layer)
ROA-INR-A01055 (4th
10 P51 Access (Al Bayt) 1060 2+150-2+225 2+225-2+300 GEN-INR-A00066 ROA-INR-A00797 layer)
ROA-INR-A01056 (5th
10 P51 Access (Al Bayt) 1060 2+150-2+225 2+225-2+300 GEN-INR-A00066 ROA-INR-A00797 layer)
ROA-INR-A01109 (6th
10 P51 Access (Al Bayt) 1060 2+150-2+225 2+225-2+300 GEN-INR-A00066 ROA-INR-A00797 layer)
ROA-INR-A01110 (7th
10 P51 Access (Al Bayt) 1060 2+150-2+225 2+225-2+300 GEN-INR-A00066 ROA-INR-A00797 layer)
ROA-INR-A01111 (8th
10 P51 Access (Al Bayt) 1060 2+150-2+225 2+225-2+300 GEN-INR-A00066 ROA-INR-A00797 layer)
ROA-INR-A01112 (9th
10 P51 Access (Al Bayt) 1060 2+150-2+225 2+225-2+300 GEN-INR-A00066 ROA-INR-A00797 layer)
ROA-INR-A01157 (10th
10 P51 Access (Al Bayt) 1060 2+150-2+225 2+225-2+300 GEN-INR-A00066 ROA-INR-A00797 layer)
117
STAT
US
APPROVED CLIENT CLIENT
20. Street Lighting Duct with Concrete Surround 21. Street Lighting Duct with Aggregate Surround 22. Street Lighting Cable with Aggregate Surround 23. Street Lighting Foundations Dry Utilities Ducts Wet Utilities Ducts Protection of Existing Line
NEED TO RAISE 20.1 20.2 20.3 20.4 21.1 21.2 21.3 21.4 22.1 22.2 22.3 22.4 23.1 23.2 23.3 23.4 23.5 23.6 24.1 24.2 24.3 24.4 25.1 25.2 25.3 25.4 26.1 26.2
Compaction Testing
TYPE OF ROAD
of the Backfilling of the Backfilling Joint Survey Checking, of Formwork; visual Compaction Testing Compaction Testing
Road Name
Joint Survey checking, Joint Survey checking, Visual Inspection for Joint Survey checking, of the Backfilling Joint Survey Checking Joint survey checking Joint Survey Checking, Joint Survey Checking, Joint survey checking
LOCATION
Joint Survey checking Visual Inspection and layers of Street layers of Street Setting Out and inspection and Joint survey checking Visual Inspection and of the Backfilling of the Backfilling Visual Inspection for Visual Inspection for
Setting Out and Setting out and Bedding and Joint Visual Inspection of Setting Out and Visual Inspection for Visual Inspection of layers of Street and Sampling for the of reinforcement, Visual Inspection for Compaction testing of Setting Out and Setting Out and and Visual Inspection Visual Inspection for
Sr No
Point
Type and Visual Inspection Sampling of Surround Lighting Duct Lighting Duct compaction testing of sampling for the and Visual Inspection Sampling of Surround layers---Duct layers---Duct pipe surround amd the Installation of
Compaction Testing Compaction Testing Survey Verification of surround material Compaction Testing Bedding surround material Lighting Duct casting of Blinding Anchor bolt and foot bitumen protection the backfilling layers Compaction Testing Compaction Testing for the Pipe laying Pipe Surround
for the Pipe laying concrete casting including Warning including Warning foundation for street casting of street for the Pipe laying Concrete Casting including warning including warning existing duct ends Protection Slab
of Trench formation of Trench formation Pipe laying of Trench formation including Warning Concrete plate installation of Trench Formation of Trench Formation including Bedding
Tape Installation & Tape Installation & lighting poles lighting foundation tape installation tape installation
Tape Installation
Mandrel Test Mandrel Test concrete
119
APPROVED CLIENT ASHGAL
STATUS
CANCELLED
SUBMITED/ONGOING
ROAD WORKS INRS TRACKER
NEED TO RAISE s INTERNAL 1 2 2.1 3 4 5.1 5.2 5.3 6.1 6.2 7.1 7.2 7.3 8.1 8.2 8.3 8.4
Joint survey checking Removal / Compaction Testing In-situ CBR Testing for and Evenness Testing In-situ CBR and
LOCATION
Joint Survey checking In-situ CBR and In-situ CBR and Visual Inspection and Joint Survey Checking
of existing Site Visual Inspection for demolishment and Setting Out and Sampling and Testing Surface Preparation Surface Praparation for the Laying of the Top of Suitable for the formation Compaction Testing Evenness Testing for
Sr No
ZONE
From (CH) To (CH) and sampling of the Compaction testing of Compaction testing of Sampling for the for the Laying of
situation - the site clearance Delivery of existing Trimming of the Fill Area of the Fill Area of the Cut Area Suitable Fill Material Fill Material level (Top of Suitable for the Laying of the Laid Subbase
rock strata the Fill Area the Cut Area Laying of Subbase Subbase
topographic survey structure (Backfilling 0- (Backfilling 0-75mm) Fill Material- Subbase
75mm)..Layer Bakcfilling 0-75mm)
114
115
116
117
APPROVED CLIENT ASHGAL
STATUS
CANCELLED
SUBMITED/ONGOING
ROAD WORKS INRS TRACKER
5 Fill Area 6 Cut Area 7 Suitable Fill / Backfilling 8 Subbase Material Culvert
NEED TO RAISE s INTERNAL 1 2 2.1 3 4 5.1 5.2 5.3 6.1 6.2 7.1 7.2 7.3 8.1 8.2 8.3 8.4 27.1 27.2 27.3 27.4 27.5 27.6 27.7
CARRIAGE WAY
Visual Inspection and Joint survey Checking Compaction Testing Joint Survey checking
TYPE OF ROAD
Joint survey checking Removal / Compaction Testing In-situ CBR Testing for and Evenness Testing In-situ CBR and Visual inspection of Joint Survey checking of the Backfilling of Formwork; Visual
LOCATION
Joint Survey checking In-situ CBR and In-situ CBR and Visual Inspection and Joint Survey Checking Joint Survey and Joint Visual Inspection and and Visual inspection Visual inspection for and Sampling for the
of existing Site Visual Inspection for demolishment and Setting Out and Sampling and Testing Surface Preparation Sampling and Testing Surface Praparation for the Laying of the Top of Suitable for the formation Compaction Testing Evenness Testing for reinforcement for the and compaction layers Joint Survey Checking Inspection and
ZONE
Sr No
From (CH) To (CH) and sampling of the Compaction testing of Compaction testing of Sampling for the for the Laying of Inspection of Sampling of Culvert for the Pipe Laying Pipe Surround of… Casting of Blinding
situation - the site clearance Delivery of existing Trimming of the Fill Area of the Fill Area of the Cut Area of the Cut Area Suitable Fill Material Fill Material level (Top of Suitable for the Laying of the Laid Subbase Inlet and Outlet Testing of Trench of..duct..including of Reinforcement Sampling for the
rock strata the Fill Area the Cut Area Laying of Subbase Subbase Formwork Concrete including Bedding of… duct Concrete of Culvert
topographic survey structure (Backfilling 0- (Backfilling 0-75mm) Fill Material- Subbase Structures of Culvert Formation..of duct.. warning tape Casting of Culvert
duct Inlet
75mm)..Layer Bakcfilling 0-75mm) installation Inlet Concrete
ROA-INR-A00562 (2nd
1 P53 Access (Al Bayt) 1+025 1+340 Layer)
ROA-INR-A00515 (1st
1 1 P53 Access (Al Bayt) 1+340 1+560 GEN-INR-A00032
Layer)
ROA-INR-A00549 (2nd
1 1 P53 Access (Al Bayt) 1+340 1+560 GEN-INR-A00032
Layer)
ROA-INR-A00381/ROA-
2 P53 Access (Al Bayt) 1+025 2+550 GEN-INR-A00032 INR-A00381-01 na QUA-INR-A00074 ROA-INR-A00409 QUA-INR-A00071 ROA-INR-A00439 ROA-INR-A00440
ROA-INR-A00381/ROA- ROA-INR-A00382/ROA-
1 3 P53 Access (Al Bayt) 1+540 2+540 GEN-INR-A00032 INR-A00381-01 na QUA-INR-A00074 QUA-INR-A00072 INR-A00382-01 ROA-INR-A00383 QUA-INR-A00073 ROA-INR-A00439 ROA-INR-A00440
ROA-INR-A00442 (1st
3 P53 Access (Al Bayt) 1+560 2+100 GEN-INR-A00032 QUA-INR-A0081 ROA-INR-A00439 ROA-INR-A00440
layer)
ROA-INR-A00452 (2nd
3 P53 Access (Al Bayt) 1+560 2+100 layer)
ROA-INR-A00475 (3rd
3 P53 Access (Al Bayt) 1+560 2+100 Layer)
ROA-INR-A00491 (4th
3 P53 Access (Al Bayt) 1+560 2+100 Layer)
ROA-INR-A00563 (5th
3 P53 Access (Al Bayt) 1+560 1+650 Layer)
ROA-INR-A00523 (1st
3 P53 Access (Al Bayt) 2+100 2+300 layer)
ROA-INR-A00463 (1st
3 P53 Access (Al Bayt) 2+300 2+600 layer)
ROA-INR-A00476 (2nd
3 P53 Access (Al Bayt) 2+300 2+600 Layer)
ROA-INR-A00490 (3rd
3 P53 Access (Al Bayt) 2+300 2+600 Layer)
ROA-INR-A00550 (4th
3 P53 Access (Al Bayt) 2+300 2+600 Layer)
ROA-INR-A00564 (5th
3 P53 Access (Al Bayt) 2+420 2+470 Layer)
ROA-INR-A00524 (1st
3 P53 Access (Al Bayt) 2+600 3+400 layer)
115 4 P53 Access (Al Bayt) 2+540 3+838 GEN-INR-A00032 ROA-INR-A00405 na QUA-INR-A00074 QUA-INR-A00078 ROA-INR-A00406 ROA-INR-A00407 QUA-INR-A00079 ROA-INR-A00439 ROA-INR-A00440
ROA-INR-A00454 (1st
116 5 P53 Access (Al Bayt) 3+400 3+838 layer)
ROA-INR-A00464 (2nd
116 5 P53 Access (Al Bayt) 3+400 3+838 layer)
ROA-INR-A00477 (3rd
116 5 P53 Access (Al Bayt) 3+400 3+838 Layer)
ROA-INR-A00492 (4th
116 5 P53 Access (Al Bayt) 3+400 3+838 Layer)
ROA-INR-A00551 (5th
116 5 P53 Access (Al Bayt) 3+400 3+838 Layer)
5 P53 Access (Al Bayt) Culvert 2 DRA-INR-A00005 DRA-INR-A00006 DRA-INR-A00012 DRA-INR-A00013 DRA-INR-A00014
5 P53 Access (Al Bayt) Culvert 3 DRA-INR-A00007 DRA-INR-A00008 DRA-INR-A00012 DRA-INR-A00013 DRA-INR-A00014
117
STAT
US
APPROVED CLIENT CLIENT
Street Lighting Duct with Concrete Surround Street Lighting Duct with Aggregate Surround Street Lighting Cable with Aggregate Surround 23. Street Lighting Foundations Dry Utilities Ducts Wet Utilities Ducts Protection of Existing Line
NEED TO RAISE 20.1 20.2 20.3 20.4 21.1 21.2 21.3 21.4 22.1 22.2 22.3 22.4 23.1 23.2 23.3 23.4 23.5 23.6 24.1 24.2 24.3 24.4 25.1 25.2 25.3 25.4 26.1 26.2
of the Backfilling Joint Survey checking, Visual Inspection for Joint Survey Checking Joint survey checking of Formwork; visual Survey Checking, Joint survey checking Visual Inspection and Compaction Testing Compaction Testing
Road Name
Sampling and Testing Joint Survey checking, Joint Survey checking Visual Inspection and Application of of the Backfilling Backfilling of Ducts Joint Survey checking, Visual Inspection for of the Backfilling Visual Inspection for Compaction testing of Joint of the Backfilling Joint Survey Checking, Joint survey checking
LOCATION
Setting Out and Bitumen paint layers of Street Setting Out and Bedding and Joint Visual Inspection of layers of Street Setting Out and Bedding and Joint Setting Out and inspection and of the Backfilling Visual Inspection for Visual Inspection for
of Visual Inspection of layers of Street compaction testing of and Sampling for the of reinforcement, Setting Out and Setting Out and and Visual Inspection Visual Inspection for
Sr No
Point
Type of Street Lighting Compaction Testing and Visual Inspection Sampling of Surround Protection on Lighting Duct with warning tape & Compaction Testing Survey Verification of surround material Lighting Duct Compaction Testing Survey Verification sampling for the bitumen protection the backfilling layers Compaction Testing and Visual Inspection Sampling of Surround layers---Duct layers---Duct pipe surround amd the Installation of
Bedding Material of Trench formation for the Pipe laying concrete casting concrete Ducts including Warning Mandrel Testing of Trench formation Pipe laying including Warning of Trench formation Street Lighting Cable surround material Lighting Duct
including Warning foundation for street casting of Blinding Anchor bolt and foot
Concrete plate installation casting of street and Waterpoofing of Trench Formation for the Pipe laying Concrete Casting including warning Compaction Testing
of Trench Formation
for the Pipe laying
including Bedding
Pipe Surround including warning existing duct ends Protection Slab
Tape Installation Tape Installation laying Tape Installation lighting poles lighting foundation tape installation tape installation
concrete
5 P53 Access (Al Bayt) Street Light FP3-R2-C4 St Light Pole UTL-INR-A00557 UTL-INR-A00558
5 P53 Access (Al Bayt) Street Light FP3-Y2-C5 St Light Pole UTL-INR-A00557 UTL-INR-A00558
5 P53 Access (Al Bayt) Street Light FP3-B2-C6 St Light Pole UTL-INR-A00557 UTL-INR-A00558
5 P53 Access (Al Bayt) Street Light FP3-R2-C7 St Light Pole UTL-INR-A00557 UTL-INR-A00558
5 P53 Access (Al Bayt) Street Light FP3-Y2-C8 St Light Pole UTL-INR-A00557 UTL-INR-A00558
5 P53 Access (Al Bayt) Street Light FP3-B2-C9 St Light Pole UTL-INR-A00559 UTL-INR-A00560
5 P53 Access (Al Bayt) Street Light FP3-R2-C10 St Light Pole UTL-INR-A00559 UTL-INR-A00560
5 P53 Access (Al Bayt) Street Light FP3-Y2-C11 St Light Pole UTL-INR-A00559 UTL-INR-A00560
5 P53 Access (Al Bayt) Street Light FP3-B2-C12 St Light Pole UTL-INR-A00559 UTL-INR-A00560
UTL-INR-A00408/UTL- UTL-INR-A00409/UTL-
11 P53 Access (Al Bayt) Street Light 97 Ooredo UTL-INR-A00406 UTL-INR-A00407
INR-A00408-01 INR-A00409-01
UTL-INR-A00408/UTL- UTL-INR-A00409/UTL-
12 P53 Access (Al Bayt) Street Light 98 EN6 UTL-INR-A00406 UTL-INR-A00407
INR-A00408-01 INR-A00409-01
UTL-INR-A00408/UTL- UTL-INR-A00409/UTL-
13 P53 Access (Al Bayt) Street Light 99 TYPE H UTL-INR-A00406 UTL-INR-A00407
INR-A00408-01 INR-A00409-01
130
131
APPROVED CLIENT ASHGAL
STATUS
CANCELLED
SUBMITED/ONGOING
ROAD WORKS INRS TRACKER
NEED TO RAISE s INTERNAL 1 2 2.1 3 4 5.1 5.2 5.3 6.1 6.2 7.1 7.2 7.3 8.1 8.2 8.3 8.4
Joint survey checking Removal / Compaction Testing In-situ CBR Testing for and Evenness Testing In-situ CBR and
LOCATION
Joint Survey checking In-situ CBR and In-situ CBR and Visual Inspection and Joint Survey Checking
of existing Site Visual Inspection for demolishment and Setting Out and Sampling and Testing Surface Preparation Surface Praparation for the Laying of the Top of Suitable for the formation Compaction Testing Evenness Testing for
Sr No
ZONE
From (CH) To (CH) and sampling of the Compaction testing of Compaction testing of Sampling for the for the Laying of
situation - the site clearance Delivery of existing Trimming of the Fill Area of the Fill Area of the Cut Area Suitable Fill Material Fill Material level (Top of Suitable for the Laying of the Laid Subbase
rock strata the Fill Area the Cut Area Laying of Subbase Subbase
topographic survey structure (Backfilling 0- (Backfilling 0-75mm) Fill Material- Subbase
75mm)..Layer Bakcfilling 0-75mm)
114
115
116
117
APPROVED CLIENT ASHGAL
STATUS
CANCELLED
SUBMITED/ONGOING
ROAD WORKS INRS TRACKER
NEED TO RAISE s INTERNAL 1 2 2.1 3 4 5.1 5.2 5.3 6.1 6.2 7.1 7.2 7.3 8.1 8.2 8.3 8.4
Joint survey checking Removal / Compaction Testing In-situ CBR Testing for and Evenness Testing In-situ CBR and
LOCATION
Joint Survey checking In-situ CBR and In-situ CBR and Visual Inspection and Joint Survey Checking
of existing Site Visual Inspection for demolishment and Setting Out and Sampling and Testing Surface Preparation Surface Praparation for the Laying of the Top of Suitable for the formation Compaction Testing Evenness Testing for
Sr No
ZONE
From (CH) To (CH) and sampling of the Compaction testing of Compaction testing of Sampling for the for the Laying of
situation - the site clearance Delivery of existing Trimming of the Fill Area of the Fill Area of the Cut Area Suitable Fill Material Fill Material level (Top of Suitable for the Laying of the Laid Subbase
rock strata the Fill Area the Cut Area Laying of Subbase Subbase
topographic survey structure (Backfilling 0- (Backfilling 0-75mm) Fill Material- Subbase
75mm)..Layer Bakcfilling 0-75mm)
114
115
116
117
APPROVED CLIENT ASHGAL
STATUS
CANCELLED
SUBMITED/ONGOING
ROAD WORKS INRS TRACKER
NEED TO RAISE s INTERNAL 1 2 2.1 3 4 5.1 5.2 5.3 6.1 6.2 7.1 7.2 7.3 8.1 8.2 8.3 8.4
CARRIAGE WAY
Joint survey checking Removal / Compaction Testing In-situ CBR Testing for and Evenness Testing In-situ CBR and
LOCATION
Joint Survey checking In-situ CBR and In-situ CBR and Visual Inspection and Joint Survey Checking
of existing Site Visual Inspection for demolishment and Setting Out and Sampling and Testing Surface Preparation Sampling and Testing Surface Praparation for the Laying of the Top of Suitable for the formation Compaction Testing Evenness Testing for
ZONE
Sr No
From (CH) To (CH) and sampling of the Compaction testing of Compaction testing of Sampling for the for the Laying of
situation - the site clearance Delivery of existing Trimming of the Fill Area of the Fill Area of the Cut Area of the Cut Area Suitable Fill Material Fill Material level (Top of Suitable for the Laying of the Laid Subbase
rock strata the Fill Area the Cut Area Laying of Subbase Subbase
topographic survey structure (Backfilling 0- (Backfilling 0-75mm) Fill Material- Subbase
75mm)..Layer Backfilling 0-75mm)
117
APPROVED CLIENT ASHGAL
STATUS
CANCELLED
SUBMITED/ONGOING
ROAD WORKS INRS TRACKER
5 Fill Area 6 Cut Area 7 Suitable Fill / Backfilling 8 Subbase Material Asphalt Kerbstone Grated Channel
NEED TO RAISE s INTERNAL 1 2 2.1 3 4 5.1 5.2 5.3 6.1 6.2 7.1 7.2 7.3 8.1 8.2 8.3 8.4 28.1 28.2 28.3 28.4 28.5 28.6
CARRIAGE WAY
ZONE/PART
Road Name
Joint survey checking Removal / Compaction Testing In-situ CBR Testing for and Evenness Testing In-situ CBR and Visual Inspection of and Visual Inspection Visual inspection for the
LOCATION
Joint Survey checking Joint survey checking, In-situ CBR and In-situ CBR and Visual Inspection and Joint Survey Checking sampling, testing, Joint survey checking Joint Survey Checking and Visual inspection for the Visual Inspection and Visual Inspection and Compaction testing of the
of existing Site Visual Inspection for demolishment and Setting Out and Surface Preparation Sampling and Testing Surface Preparation Laying & Plate Load Sampling and Testing Surface Praparation for the Laying of the Top of Suitable for the formation Compaction Testing Evenness Testing for Sampling of Prime Application of Prime Formwork and for Kerbstone installation of precast
Sr No
From (CH) To (CH) and sampling of the Setting Out of the Compaction testing of Compaction testing of Sampling for the for the Laying of coring, inspection for for laying of asphalt Sampling for the casting of installation of Sampling for the casting of sampling for the Flowable backfilling layers besides
situation - the site clearance Delivery of existing Trimming of Swale of the Fill Area of the Fill Area Testing or Rock Fill of the Cut Area of the Cut Area Suitable Fill Material Fill Material level (Top of Suitable for the Laying of the Laid Subbase Coat Material Coat laying of asphalt base base course class A Casting of Kerbstone Installation including grated channels and side
rock strata excavation formation the Fill Area the Cut Area Laying of Subbase Subbase Blinding Concrete waterproofing membrane Blinding Concrete Concrete the grated channel
topographic survey structure (Backfilling 0- (Backfilling 0-75mm) Fill Material- Subbase course class A Foundation (Type xx) concrete backing waterproofing
75mm)..Layer Bakcfilling 0-75mm) (Type xx)
ROA-INR-A00428/ROA-
1 1 P70 Ras Abu Aboud 1 GEN-INR-A00025
INR-A00428-01
ROA-INR-A00421 ROA-INR-A00494 QUA-INR-A00085 ROA-INR-A00473 ROA-INR-A00474 ROA-INR-A00529 ROA-INR-A00530 ROA-INR-A00531 ROA-INR-A00532
ROA-INR-A00552 (2nd
3 P70 Ras Abu Aboud 3 Final Layer)
3 P70 Ras Abu Aboud Grated Channel DRA-INR-A00026 DRA-INR-A00027 DRA-INR-A00028 DRA-INR-A00029 n/a DRA-INR-A00030
117
STAT
US
APPROVED CLIENT CLIENT
20. Street Lighting Duct with Concrete Surround 21. Street Lighting Duct with Aggregate Surround 22. Street Lighting Cable with Aggregate Surround 23. Street Lighting Foundations Dry Utilities Ducts Wet Utilities Ducts Protection of Existing Line Trench Line
NEED TO RAISE 20.1 20.2 20.3 20.4 21.1 21.2 21.3 21.4 22.1 22.2 22.3 22.4 23.1 23.2 23.3 23.4 23.5 23.6 24.1 24.2 24.3 24.4 25.1 25.2 25.3 25.4 26.1 26.2
Visual Inspection for Joint Survey Checking, of Formwork; visual Compaction Testing Compaction Testing
Road Name
Joint Survey checking, Application of of the Backfilling Joint Survey checking, Visual Inspection for of the Backfilling Joint Survey checking, of the Backfilling Joint Survey Checking Joint survey checking Joint Survey Checking, Joint Survey Checking, Joint survey checking
LOCATION
Sampling and Testing Joint Survey checking Visual Inspection and Backfilling of Ducts Bedding and Joint Setting Out and inspection and Joint survey checking Visual Inspection and of the Backfilling of the Backfilling Visual Inspection for Visual Inspection for Joint Survey Checking Joint Survey Checking
Setting Out and Bitumen paint layers of Street Setting out and Bedding and Joint Visual Inspection of layers of Street Setting Out and Visual Inspection of layers of Street and Sampling for the of reinforcement, Visual Inspection for Compaction testing of Setting Out and Setting Out and and Visual Inspection Visual Inspection for
Sr No
Point
Type of Street Lighting and Visual Inspection Sampling of Surround with warning tape & Survey Verification of compaction testing of sampling for the and Visual Inspection Sampling of Surround layers---Duct layers---Duct pipe surround amd the Installation of for Setting Out and and Visual Inspection
Compaction Testing Protection on Lighting Duct Compaction Testing Survey Verification of surround material Lighting Duct Compaction Testing surround material Lighting Duct casting of Blinding Anchor bolt and foot bitumen protection the backfilling layers Compaction Testing Compaction Testing for the Pipe laying Pipe Surround
Bedding Material for the Pipe laying concrete casting Mandrel Testing Street Lighting Cable foundation for street casting of street for the Pipe laying Concrete Casting including warning including warning existing duct ends Protection Slab Inspection of Trial Pits of Trench Formation
of Trench formation concrete Ducts including Warning of Trench formation Pipe laying including Warning of Trench formation including Warning Concrete plate installation of Trench Formation of Trench Formation including Bedding
laying lighting poles lighting foundation tape installation tape installation
Tape Installation Tape Installation Tape Installation
concrete
1 3
1 P70 Ras Abu Aboud Street Light
4
SL2 UTL-INR-A00412 UTL-INR-A00413 UTL-INR-A00418 UTL-INR-A00419 UTL-INR-A00420 UTL-INR-A00423
1 5
1 P70 Ras Abu Aboud Street Light
6
SL2 UTL-INR-A00412 UTL-INR-A00413 UTL-INR-A00418 UTL-INR-A00419 UTL-INR-A00420 UTL-INR-A00423
1 7
1 P70 Ras Abu Aboud Street Light
8
SL2 UTL-INR-A00412 UTL-INR-A00413 UTL-INR-A00418 UTL-INR-A00419 UTL-INR-A00420 UTL-INR-A00423
1 9
1 P70 Ras Abu Aboud Street Light
10
SL2 UTL-INR-A00412 UTL-INR-A00413 UTL-INR-A00418 UTL-INR-A00419 UTL-INR-A00420 UTL-INR-A00423
1 10
1 P70 Ras Abu Aboud Street Light
11
Sleeve UTL-INR-A00414 UTL-INR-A00415
1 11
1 P70 Ras Abu Aboud Street Light SL2 UTL-INR-A00424 UTL-INR-A00425 UTL-INR-A00426 UTL-INR-A00427 UTL-INR-A00428 UTL-INR-A00429
12
1 13
UTL-INR-A00248/UTL-
1 P70 Ras Abu Aboud Street Light SL1 UTL-INR-A00247
INR-A00248-01
UTL-INR-A00426 UTL-INR-A00427 UTL-INR-A00428 UTL-INR-A00429
14
1 15
UTL-INR-A00230/UTL- UTL-INR-A00231/UTL- UTL-INR-A00234/UTL- UTL-INR-A00286/UTL-
2 P70 Ras Abu Aboud Street Light SL1 INR-A00230-01 INR-A00231-01 INR-A00234-01
UTL-INR-A00167 UTL-INR-A00258
INR-A00286-01
16
1 17
UTL-INR-A00230/UTL- UTL-INR-A00231/UTL- UTL-INR-A00234/UTL- UTL-INR-A00286/UTL-
3 P70 Ras Abu Aboud Street Light SL1 INR-A00230-01 INR-A00231-01 INR-A00234-01
UTL-INR-A00167 UTL-INR-A00258
INR-A00286-01
18
1 19
UTL-INR-A00230/UTL- UTL-INR-A00231/UTL- UTL-INR-A00234/UTL- UTL-INR-A00286/UTL-
4 P70 Ras Abu Aboud Street Light SL1 INR-A00230-01 INR-A00231-01 INR-A00234-01
UTL-INR-A00167 UTL-INR-A00258
INR-A00286-01
20
1 21
UTL-INR-A00230/UTL- UTL-INR-A00231/UTL- UTL-INR-A00234/UTL-
5 P70 Ras Abu Aboud Street Light SL1 INR-A00230-01 INR-A00231-01 INR-A00234-01
UTL-INR-A00427 UTL-INR-A00428 UTL-INR-A00429
22
1 23
UTL-INR-A00248/UTL-
6 P70 Ras Abu Aboud Street Light SL1 UTL-INR-A00247
INR-A00248-01
UTL-INR-A00426 UTL-INR-A00427 UTL-INR-A00428 UTL-INR-A00429
24
1 25 UTL-INR-A00240/UTL-
4 P70 Ras Abu Aboud Street Light SL1 UTL-INR-A00239
INR-A00240-01
UTL-INR-A00426 UTL-INR-A00427 UTL-INR-A00428 UTL-INR-A00429
26
1 27 UTL-INR-A00240/UTL- UTL-INR-A00290/UTL-
8 P70 Ras Abu Aboud Street Light SL1 UTL-INR-A00239
INR-A00240-01
UTL-INR-A00287 UTL-INR-A00288 UTL-INR-A00289
INR-A00290-01
28
1 29 UTL-INR-A00242/UTL- UTL-INR-A00290/UTL-
9 P70 Ras Abu Aboud Street Light SL1 UTL-INR-A00241
INR-A00242-01
UTL-INR-A00287 UTL-INR-A00288 UTL-INR-A00289
INR-A00290-01
30
1 31 UTL-INR-A00242/UTL- UTL-INR-A00290/UTL-
10 P70 Ras Abu Aboud Street Light SL1 UTL-INR-A00241
INR-A00242-01
UTL-INR-A00287 UTL-INR-A00288 UTL-INR-A00289
INR-A00290-01
32
UTL-INR-A00232/UTL- UTL-INR-A00233/UTL-
11 P70 Ras Abu Aboud Street Light FP1-Y5-C2 Street Light Pole INR-A00232-01 INR-A00233-01
UTL-INR-A00232/UTL- UTL-INR-A00233/UTL-
12 P70 Ras Abu Aboud Street Light FP1-B5-C3 Street Light Pole INR-A00232-01 INR-A00233-01
UTL-INR-A00232/UTL- UTL-INR-A00233/UTL-
13 P70 Ras Abu Aboud Street Light FP1-R4-C13 Street Light Pole INR-A00232-01 INR-A00233-01
UTL-INR-A00232/UTL- UTL-INR-A00233/UTL-
14 P70 Ras Abu Aboud Street Light FP1-B4-C12 Street Light Pole INR-A00232-01 INR-A00233-01
UTL-INR-A00244/UTL-
15 P70 Ras Abu Aboud Street Light FP1-Y5-C5 Street Light Pole UTL-INR-A00243 INR-A00244-01
UTL-INR-A00244/UTL-
16 P70 Ras Abu Aboud Street Light FP1-R5-C7 Street Light Pole UTL-INR-A00243 INR-A00244-01
UTL-INR-A00244/UTL-
17 P70 Ras Abu Aboud Street Light FP1-Y5-C8 Street Light Pole UTL-INR-A00243 INR-A00244-01
UTL-INR-A00246/UTL-
18 P70 Ras Abu Aboud Street Light FP1-B5-C9 Street Light Pole UTL-INR-A00245 INR-A00246-01
UTL-INR-A00246/UTL-
19 P70 Ras Abu Aboud Street Light FP1-R5-C10 Street Light Pole UTL-INR-A00245 INR-A00246-01
21 P70 Ras Abu Aboud Street Light FP1-R4-C1 Street Light Pole UTL-INR-A00416 UTL-INR-A00417
21 P70 Ras Abu Aboud Street Light FP1-Y4-C2 Street Light Pole UTL-INR-A00416 UTL-INR-A00417
21 P70 Ras Abu Aboud Street Light FP1-B4-C3 Street Light Pole UTL-INR-A00416 UTL-INR-A00417
21 P70 Ras Abu Aboud Street Light FP1-R4-C4 Street Light Pole UTL-INR-A00416 UTL-INR-A00417
20 P70 Ras Abu Aboud Street Light FP1-Y4-C11 Street Light Pole UTL-INR-A00249 UTL-INR-A00250
21 P70 Ras Abu Aboud Street Light FP1-R5-C4 Street Light Pole UTL-INR-A00249 UTL-INR-A00250
119
APPROVED CLIENT ASHGAL
STATUS
CANCELLED
SUBMITED/ONGOING
ROAD WORKS INRS TRACKER
5 Fill Area 6 Cut Area 7 Suitable Fill / Backfilling 8 Subbase Material Asphalt Protection of Existing Lines Snagging
NEED TO RAISE s INTERNAL 1 2 2.1 3 4 5.1 5.2 5.3 6.1 6.2 7.1 7.2 7.3 8.1 8.2 8.3 27.1 27.2
CARRIAGE WAY
Joint survey checking Removal / Compaction Testing In-situ CBR Testing for and Evenness Testing In-situ CBR and Visual Inspection of Compaction Testing of
LOCATION
Joint Survey checking Concrete Protection In-situ CBR and In-situ CBR and Visual Inspection and Joint Survey Checking sampling, testing, Joint survey checking
of existing Site Visual Inspection for demolishment and Setting Out and Surface Praparation Sampling and Testing Surface Preparation Sampling and Testing Surface Praparation for the Laying of the Top of Suitable for the formation Compaction Testing Evenness Testing for Sampling of Prime Application of Prime Pipe Surround and the Backfilling Layers of Snagging of Road
ZONE
Sr No
From (CH) To (CH) and sampling of the of Existing Compaction testing of Compaction testing of Sampling for the for the Laying of coring, inspection for for laying of asphalt
situation - the site clearance Delivery of existing Trimming of Swale of the Fill Area of the Fill Area of the Cut Area of the Cut Area Suitable Fill Material Fill Material level (Top of Suitable for the Laying of the Laid Subbase Coat Material Coat laying of asphalt base base course class A Existing Duct Ends dcut including Warning Works
rock strata Dewatering Pipe the Fill Area the Cut Area Laying of Subbase Subbase
topographic survey structure (Backfilling 0- (Backfilling 0-75mm) Fill Material- Subbase course class A (Existing) Tape Installation
75mm)..Layer Bakcfilling 0-75mm)
ROA-INR-A00357 - 1st
1 1 P71B FZ Ras Bu Fantas Junction GEN-INR-A00020 ROA-INR-A00301 QUA-INR-A00055 QUA-INR-A00054 layer
ROA-INR-A00360- 2nd
1 2 P71B FZ Ras Bu Fantas Junction GEN-INR-A00020 ROA-INR-A00301 QUA-INR-A00055 QUA-INR-A00054 layer
ROA-INR-A00358 - 1st
7 P71B FZ Ras Bu Fantas Roundabout GEN-INR-A00020 ROA-INR-A00336 QUA-INR-A00058 ROA-INR-A00359 ROA-INR-A00351 na na na layer
ROA-INR-A00362 - 2nd
8 P71B FZ Ras Bu Fantas Roundabout GEN-INR-A00020 layer
ROA-INR-A00335/ROA- ROA-INR-A00363 -
1 10 P71B FZ Ras Bu Fantas Swale Emergency flood Area - 1 GEN-INR-A00020 na QUA-INR-A00053 ROA-INR-A00334 INR-A00335-01 na na na na na na na 1stlayer
ROA-INR-A00364 - 2nd
11 P71B FZ Ras Bu Fantas Swale Emergency flood Area - 1 GEN-INR-A00020 layer
ROA-INR-A00365 - 3rd
12 P71B FZ Ras Bu Fantas Swale Emergency flood Area - 1 GEN-INR-A00020 layer
GEN-INR-A00034(SL
115 16 P71B FZ Ras Bu Fantas Fdn)
GEN-INR-
115 17 P71B FZ Ras Bu Fantas A00035(Fences)
GEN-INR-
115 18 P71B FZ Ras Bu Fantas A00036(Asphalt)
117
APPROVED CLIENT ASHGAL
STATUS
CANCELLED
SUBMITED/ONGOING
ROAD WORKS INRS TRACKER
5 Fill Area 6 Cut Area 7 Suitable Fill / Backfilling 8 Subbase Material Prime Coat Asphalt Swale
NEED TO RAISE s INTERNAL 1 2 2.1 3 4 5.1 5.2 5.3 6.1 6.2 7.1 7.2 7.3 8.1 8.2 8.3 8.4
CARRIAGE WAY
Joint survey checking Removal / Joint survey checking, Compaction Testing In-situ CBR Testing for and Evenness Testing Visual Inspection and Joint Survey Checking In-situ CBR and
LOCATION
of existing Site Visual Inspection for demolishment and Joint Survey checking Setting Out and In-situ CBR and
Setting Out of the Sampling and Testing Surface Preparation Compaction In-situ CBR and sampling, testing, Coring for laying of Joint survey checking
testing of Sampling and Testing Surface Praparation Compaction for the Laying of the Top of Suitable for the formation Compaction Testing Evenness Testing for Sampling of Prime Application of Prime Setting Out and Surface Preparation
ZONE
Sr No
From (CH) To (CH) situation - the site clearance Delivery of existing and sampling of the Trimming excavation formation of the Fill Area of the Fill Area of the Cut Area of the Cut Area testing of Suitable Fill Material Fill Material Sampling for the
level (Top of Suitable Laying for the Laying of for the Laying of the Laid Subbase Coat Material Coat
coring, inspection for asphalt base course for laying of asphalt
Trimming of Swale of Swale
rock strata the Fill Area the Cut Area of Subbase Subbase laying of asphalt base class A base course class A
topographic survey structure level (Backfilling 0- (Backfilling 0-75mm) Fill Material- Subbase course class A
75mm)..Layer Bakcfilling 0-75mm)
ROA-INR-A00395 (final
1 2 P92 Bus Hub and Staging (Lusail) A GEN-INR-A00028 ROA-INR-A00333
layer)
ROA-INR-A00396 ROA-INR-A00397 ROA-INR-A00485 ROA-INR-A00486 ROA-INR-A00487 ROA-INR-A00488 QUA-INR-A00096 ROA-INR-A00572 ROA-INR-A00582 ROA-INR-A00883 ROA-INR-A00583
2 P92 Bus Hub and Staging (Lusail) A (Access) ROA-INR-A01198 ROA-INR-A01199 ROA-INR-A01200 ROA-INR-A01201 ROA-INR-A01202 ROA-INR-A01203
ROA-INR-A00554 (2nd
115 6 P92 Bus Hub and Staging (Lusail) C 0+080 0+150 layer)
ROA-INR-A00575/ROA-
9 P92 Bus Hub and Staging (Lusail) B Swale ROA-INR-A00574
INR-A00575-01
ROA-INR-A00576/ROA- ROA-INR-A00577/ROA-
10 P92 Bus Hub and Staging (Lusail) C Swale INR-A00576-01 INR-A00577-01
117
STAT
US
APPROVED CLIENT CLIENT
20. Street Lighting Duct with Concrete Surround 21. Street Lighting Duct with Aggregate Surround 22. Street Lighting Cable with Aggregate Surround 23. Street Lighting Foundations Dry Utilities Ducts Wet Utilities Ducts Protection of Existing Line
NEED TO RAISE 20.1 20.2 20.3 20.4 21.1 21.2 21.3 21.4 22.1 22.2 22.3 22.4 23.1 23.2 23.3 23.4 23.5 23.6 24.1 24.2 24.3 24.4 25.1 25.2 25.3 25.4 26.1 26.2
of the Backfilling of the Backfilling Joint Survey checking, Visual Inspection for Joint Survey Checking Joint survey checking of inspection
Formwork; visual Joint Survey Checking, Joint survey checking Visual Inspection and Compaction Testing Compaction Testing
Road Name
Sampling and Testing Joint Survey checking, Joint Survey checking Visual Inspection and Application of Backfilling of Ducts Joint Survey checking, Visual Inspection for of the Backfilling of the Backfilling Joint Survey Checking, Joint survey checking
LOCATION
layers of Street layers of Street Bedding and Joint Setting Out and and of the Backfilling Visual Inspection for Visual Inspection for
Setting Out and Bitumen paint Setting out and Bedding and Joint Visual Inspection of Setting Out and Survey Verification of Visual Inspection of layers of Street compaction testing of and Sampling for the of reinforcement, Visual Inspection for Compaction testing of Setting Out and Setting Out and and Visual Inspection Visual Inspection for
Sr No
Point
Type of Street Lighting
Compaction Testing
and Visual Inspection Sampling of Surround
Protection on
Lighting Duct with warning tape &
Compaction Testing Survey Verification of surround material
Lighting Duct
Compaction Testing Street Lighting Cable surround material Lighting Duct
sampling for the and Visual Inspection Sampling of Surround layers---Duct layers---Duct pipe surround amd the Installation of
for street casting of Blinding Anchor bolt and foot bitumen protection the backfilling layers Compaction Testing Compaction Testing for the Pipe laying Pipe Surround
Bedding Material of Trench formation for the Pipe laying concrete casting including Warning Mandrel Testing including Warning including Warning foundation casting of street of Trench Formation for the Pipe laying Concrete Casting including warning including warning existing duct ends Protection Slab
concrete Ducts of Trench formation Pipe laying Tape Installation & of Trench formation Concrete plate installation of Trench Formation including Bedding
Tape Installation & laying lighting poles lighting foundation tape installation tape installation
Tape Installation
mandrel test Mandrel Testing concrete
1 1 UTL-INR-A00388/UTL- UTL-INR-A00389/UTL-
P92 Bus Hub and Staging A SL1 UTL-INR-A00359 UTL-INR-A00360 UTL-INR-A00361 UTL-INR-A00362
INR-A00388-01 INR-A00389-01
2
UTL-INR-A00358/UTL-
P92 Bus Hub and Staging A as highlighted Sleeve UTL-INR-A00355 UTL-INR-A00356 UTL-INR-A00357
INR-A00358-01
P92 Bus Hub and Staging A FP1-RYB2-C1 Street Light Pole UTL-INR-A00363 UTL-INR-A00364 UTL-INR-A00914 UTL-INR-A00915 UTL-INR-A00916 UTL-INR-A00917
P92 Bus Hub and Staging A FP1-RYB2-C2 Street Light Pole UTL-INR-A00363 UTL-INR-A00364 UTL-INR-A00914 UTL-INR-A00915 UTL-INR-A00916 UTL-INR-A00917
P92 Bus Hub and Staging A FP1-RYB2-C3 Street Light Pole UTL-INR-A00363 UTL-INR-A00364 UTL-INR-A00914 UTL-INR-A00915 UTL-INR-A00916 UTL-INR-A00917
UTL-INR-A00366/UTL-
P92 Bus Hub and Staging A FP1-RYB2-C4 Street Light Pole UTL-INR-A00365
INR-A00913
UTL-INR-A00914 UTL-INR-A00915 UTL-INR-A00916 UTL-INR-A00917
UTL-INR-A00366/UTL-
P92 Bus Hub and Staging A FP1-R2-C5 Street Light Pole UTL-INR-A00365
INR-A00913
UTL-INR-A00379/UTL-
P92 Bus Hub and Staging B FP1-R1-C1 Street Light Pole UTL-INR-A00378
INR-A00918
UTL-INR-A00379/UTL-
P92 Bus Hub and Staging B FP1-Y1-C6 Street Light Pole UTL-INR-A00378
INR-A00918
UTL-INR-A00379/UTL-
P92 Bus Hub and Staging B FP1-RYB1-C2 Street Light Pole UTL-INR-A00378
INR-A00918
UTL-INR-A00922 UTL-INR-A00919 UTL-INR-A00920 UTL-INR-A00921
UTL-INR-A00379/UTL-
P92 Bus Hub and Staging B FP1-RYB1-C3 Street Light Pole UTL-INR-A00378
INR-A00918
UTL-INR-A00922 UTL-INR-A00919 UTL-INR-A00920 UTL-INR-A00921
UTL-INR-A00379/UTL-
P92 Bus Hub and Staging B FP1-RYB1-C4 Street Light Pole UTL-INR-A00378
INR-A00918
UTL-INR-A00922 UTL-INR-A00919 UTL-INR-A00920 UTL-INR-A00921
UTL-INR-A00379/UTL-
P92 Bus Hub and Staging B FP1-RYB1-C5 Street Light Pole UTL-INR-A00378
INR-A00918
UTL-INR-A00922 UTL-INR-A00919 UTL-INR-A00920 UTL-INR-A00921
1 1
P92 Bus Hub and Staging C SL1 UTL-INR-A00576 UTL-INR-A00577 UTL-INR-A00578 UTL-INR-A00591 UTL-INR-A00592 UTL-INR-A00592
2
1 3
P92 Bus Hub and Staging C SL1 UTL-INR-A00576 UTL-INR-A00577 UTL-INR-A00578 UTL-INR-A00591 UTL-INR-A00592 UTL-INR-A00592
4
1 5
P92 Bus Hub and Staging C SL1 UTL-INR-A00570 UTL-INR-A00571 UTL-INR-A00572 UTL-INR-A00593 UTL-INR-A00594 UTL-INR-A00594
6
1 7
P92 Bus Hub and Staging C SL1 UTL-INR-A00570 UTL-INR-A00571 UTL-INR-A00572 UTL-INR-A00593 UTL-INR-A00594 UTL-INR-A00594
8
1 9
P92 Bus Hub and Staging C SL2 UTL-INR-A00582 UTL-INR-A00583 UTL-INR-A00584 UTL-INR-A00675 UTL-INR-A00676 UTL-INR-A00676
10
1 11
P92 Bus Hub and Staging C SL1 UTL-INR-A00573 UTL-INR-A00574 UTL-INR-A00575 UTL-INR-A00677 UTL-INR-A00678 UTL-INR-A00678
12
1 13
P92 Bus Hub and Staging C SL1 UTL-INR-A00573 UTL-INR-A00574 UTL-INR-A00575 UTL-INR-A00677 UTL-INR-A00678 UTL-INR-A00678
14
1 15
P92 Bus Hub and Staging C SL1 UTL-INR-A00573 UTL-INR-A00574 UTL-INR-A00575 UTL-INR-A00677 UTL-INR-A00678 UTL-INR-A00678
16
1 17
P92 Bus Hub and Staging C SL1 UTL-INR-A00579 UTL-INR-A00580 UTL-INR-A00581 UTL-INR-A00679 UTL-INR-A00680 UTL-INR-A00680
18
1 19
P92 Bus Hub and Staging C SL1 UTL-INR-A00579 UTL-INR-A00580 UTL-INR-A00581 UTL-INR-A00679 UTL-INR-A00680 UTL-INR-A00680
20
1 21
P92 Bus Hub and Staging C SL1 UTL-INR-A00579 UTL-INR-A00580 UTL-INR-A00581 UTL-INR-A00679 UTL-INR-A00680 UTL-INR-A00680
22
P92 Bus Hub and Staging C Duct Point 8-9 & 10-16 Sleeve UTL-INR-A00587 UTL-INR-A00588 UTL-INR-A00589 UTL-INR-A00590
P92 Bus Hub and Staging C FP1-RYB1-C1 Street Light Pole UTL-INR-A00568 UTL-INR-A00643 UTL-INR-A00644 UTL-INR-A00645 UTL-INR-A00646 UTL-INR-A00647
P92 Bus Hub and Staging C FP1-RYB1-C2 Street Light Pole UTL-INR-A00568 UTL-INR-A00643 UTL-INR-A00644 UTL-INR-A00645 UTL-INR-A00646 UTL-INR-A00647
P92 Bus Hub and Staging C FP1-RYB1-C3 Street Light Pole UTL-INR-A00585 UTL-INR-A00648 UTL-INR-A00649 UTL-INR-A00650 UTL-INR-A00651 UTL-INR-A00652
P92 Bus Hub and Staging C FP1-RYB1-C4 Street Light Pole UTL-INR-A00585 UTL-INR-A00648 UTL-INR-A00649 UTL-INR-A00650 UTL-INR-A00651 UTL-INR-A00652
P92 Bus Hub and Staging C FP1-RYB2-C1 Street Light Pole UTL-INR-A00568 UTL-INR-A00643 UTL-INR-A00644 UTL-INR-A00645 UTL-INR-A00646 UTL-INR-A00647
P92 Bus Hub and Staging C FP1-RYB2-C2 Street Light Pole UTL-INR-A00568 UTL-INR-A00643 UTL-INR-A00644 UTL-INR-A00645 UTL-INR-A00646 UTL-INR-A00647
P92 Bus Hub and Staging C FP1-RYB2-C3 Street Light Pole UTL-INR-A00586 UTL-INR-A00658 UTL-INR-A00659 UTL-INR-A00660 UTL-INR-A00661 UTL-INR-A00662
P92 Bus Hub and Staging C FP1-RYB3-C1 Street Light Pole UTL-INR-A00569 UTL-INR-A00653 UTL-INR-A00654 UTL-INR-A00655 UTL-INR-A00656 UTL-INR-A00657
P92 Bus Hub and Staging C FP1-RYB3-C2 Street Light Pole UTL-INR-A00569 UTL-INR-A00653 UTL-INR-A00654 UTL-INR-A00655 UTL-INR-A00656 UTL-INR-A00657
P92 Bus Hub and Staging C FP1-RYB3-C3 Street Light Pole UTL-INR-A00569 UTL-INR-A00653 UTL-INR-A00654 UTL-INR-A00655 UTL-INR-A00656 UTL-INR-A00657
P92 Bus Hub and Staging C FP1-RYB3-C4 Street Light Pole UTL-INR-A00586 UTL-INR-A00658 UTL-INR-A00659 UTL-INR-A00660 UTL-INR-A00661 UTL-INR-A00662
119
APPROVED CLIENT ASHGAL
STATUS
CANCELLED
SUBMITED/ONGOING ROAD WORKS INRS TRACKER
5 Fill Area 6 Cut Area 7 Suitable Fill / Backfilling 8 Subbase Material Asphalt
NEED TO RAISE s INTERNAL 1 2 2.1 3 4 5.1 5.2 5.3 6.1 6.2 7.1 7.2 7.3 8.1 8.2 8.3 8.4
CARRIAGE WAY
Joint survey checking Removal / Surface preparation / Compaction Testing In-situ CBR Testing for and Evenness Testing In-situ CBR and
LOCATION
Joint Survey checking Setting Out and In-situ CBR and In-situ CBR and Visual Inspection and Joint Survey Checking sampling, testing, Joint survey checking
of existing Site Visual Inspection for demolishment and Joint Verification of Sampling and Testing Surface Preparation Sampling and Testing Surface Praparation for the Laying of the Top of Suitable for the formation Compaction Testing Evenness Testing for Sampling of Prime Application of Prime
ZONE
Sr No
From (CH) To (CH) and sampling of the Trimming (Bus Compaction testing of Compaction testing of Sampling for the for the Laying of coring, inspection for for laying of asphalt
situation - the site clearance Delivery of existing Formation Level of the Fill Area of the Fill Area of the Cut Area of the Cut Area Suitable Fill Material Fill Material level (Top of Suitable for the Laying of the Laid Subbase Coat Material Coat laying of asphalt base base course class A
rock strata parking & Swale Area) the Fill Area the Cut Area Laying of Subbase Subbase
topographic survey structure (Swale Area) (Backfilling 0- (Backfilling 0-75mm) Fill Material- Subbase course class A
75mm)..Layer Bakcfilling 0-75mm)
ROA-INR-A00172 (1st
1 1 P94 Parking 0+250 0+408 GEN-INR-A00014 ROA-INR-A00117 GEN-INR-A00019 QUA-INR-A00027 ROA-INR-A00156 QUA-INR-A00026 ROA-INR-A00128 ROA-INR-A00129 QUA-INR-A00030 ROA-INR-A00213 ROA-INR-A00214 Layer) / ROA-INR-
A00172-01 (Mock Up)
ROA-INR-A00184 (2nd
2 P94 Parking 0+350 0+408 ROA-INR-A00156 ROA-INR-A00213 ROA-INR-A00214
Layer)
ROA-INR-A00200 (3rd
3 P94 Parking 0+360 0+408 ROA-INR-A00156 ROA-INR-A00213 ROA-INR-A00214
Layer)
QUA-INR-A00062/QUA- ROA-INR-A00457/ROA-
4 P94 Parking 0+308 0+408 INR-A00062-01 ROA-INR-A00434 INR-A00857 ROA-INR-A00458
ROA-INR-A00202 / ROA-
5 P94 Parking Swale/Pond ROA-INR-A00156 INR-A00202-01(Mock
Up)
ROA-INR-A00204 (Exc
6 P94 Parking Swale/Pond ROA-INR-A00156
Formation)
116
116
116
117
STAT
US
APPROVED CLIENT CLIENT
20. Street Lighting Duct with Concrete Surround 21. Street Lighting Duct with Aggregate Surround 22. Street Lighting Cable with Aggregate Surround 23. Street Lighting Foundations Dry Utilities Ducts Wet Utilities Ducts Protection of Existing Line
NEED TO RAISE s 20.1 20.2 20.3 20.4 21.1 21.2 21.3 21.4 22.1 22.2 22.3 22.4 23.1 23.2 23.3 23.4 23.5 23.6 24.1 24.2 24.3 24.4 25.1 25.2 25.3 25.4 26.1 26.2
CARRIAGE WAY
Visual Inspection for Joint Survey Checking, Compaction Testing Compaction Testing
Road Name
Joint Survey checking, of the Backfilling Joint Survey checking, Visual Inspection for of the Backfilling Joint Survey checking, of the Backfilling Joint Survey Checking Joint survey checking of Formwork; visual Joint Survey Checking, Joint Survey Checking, Joint survey checking
LOCATION
Sampling and Testing Joint Survey checking Visual Inspection and Backfilling of Ducts Bedding and Joint Setting Out and Joint survey checking Visual Inspection and of the Backfilling of the Backfilling Visual Inspection for Visual Inspection for
Setting Out and layers of Street Setting out and Bedding and Joint Visual Inspection of layers of Street Setting Out and Visual Inspection of layers of Street and Sampling for the reinforcement, Anchor inspection and sampling Visual Inspection for Compaction testing of Setting Out and Setting Out and and Visual Inspection Visual Inspection for
Sr No
Point
Type of Street Lighting and Visual Inspection Sampling of Surround with warning tape & Survey Verification of compaction testing of and Visual Inspection Sampling of Surround layers---Duct layers---Duct pipe surround amd the Installation of
Compaction Testing Lighting Duct Compaction Testing Survey Verification of surround material Lighting Duct Compaction Testing surround material Lighting Duct casting of Blinding bolt and foot plate for the casting of street bitumen protection the backfilling layers Compaction Testing Compaction Testing for the Pipe laying Pipe Surround
Bedding Material for the Pipe laying concrete casting Mandrel Testing Street Lighting Cable foundation for street for the Pipe laying Concrete Casting including warning including warning existing duct ends Protection Slab
of Trench formation including Warning of Trench formation Pipe laying including Warning of Trench formation including Warning Concrete installation lighting foundation of Trench Formation of Trench Formation including Bedding
laying lighting poles tape installation tape installation
Tape Installation Tape Installation Tape Installation concrete
1 1 UTL-INR-A00159/UTL-
UTL-INR-A00003/UTL-
1 P94 parking (Lusail) Street Light SL1 QUA-INR-A00038
INR-A00003-01
UTL-INR-A00004 UTL-INR-A00021 UTL-INR-A00022 INR-A00159-01/UTL-
2 INR-A00159-02
1 3 UTL-INR-A00159/UTL-
UTL-INR-A00005/UTL-
2 P94 parking (Lusail) Street Light SL1 QUA-INR-A00038
INR-A00005-01
UTL-INR-A00006 UTL-INR-A00023 UTL-INR-A00024 INR-A00159-01/UTL-
4 INR-A00159-02
1 5 UTL-INR-A00159/UTL-
UTL-INR-A00007/UTL-
3 P94 parking (Lusail) Street Light SL1 QUA-INR-A00038
INR-A00007-01
UTL-INR-A00008 UTL-INR-A00025 UTL-INR-A00026 INR-A00159-01/UTL-
6 INR-A00159-02
1 7 UTL-INR-A00159/UTL-
UTL-INR-A00009/UTL-
4 P94 parking (Lusail) Street Light SL1 QUA-INR-A00038
INR-A00009-01
UTL-INR-A00010 UTL-INR-A00027 UTL-INR-A00028 INR-A00159-01/UTL-
8 INR-A00159-02
1 9 UTL-INR-A00159/UTL-
5 P94 parking (Lusail) Street Light SL1 QUA-INR-A00038 UTL-INR-A00017 UTL-INR-A00012 UTL-INR-A00029 UTL-INR-A00030 INR-A00159-01/UTL-
10 INR-A00159-02
FP1-B2-C6
UTL-INR-A00168 UTL-INR-A00013/UTL-
6 P94 parking (Lusail) Street Light Sleeve (Mandrel not done) INR-A00013-01
UTL-INR-A00014 UTL-INR-A00031 UTL-INR-A00032
FP1-Y2-C2
FP1-RYB1-C1
UTL-INR-A00169 UTL-INR-A00015/UTL-
7 P94 parking (Lusail) Street Light Sleeve (Mandrel not done) INR-A00015-01
UTL-INR-A00016 UTL-INR-A00033 UTL-INR-A00034
FP1-RYB1-C2
FP1-RYB1-C2
UTL-INR-A00170 UTL-INR-A00017/UTL-
8 P94 parking (Lusail) Street Light Sleeve (Mandrel not done) INR-A00017-01
UTL-INR-A00018 UTL-INR-A00035 UTL-INR-A00036
FP1-RYB1-C3
9 P94 parking (Lusail) Street Light FP1-R2-C7 Street Light Pole UTL-INR-A00836 UTL-INR-A00837 UTL-INR-A00838 UTL-INR-A008369 UTL-INR-A00037 UTL-INR-A00038 UTL-INR-A00828 UTL-INR-A00829 UTL-INR-A00830 UTL-INR-A00831
10 P94 parking (Lusail) Street Light FP1-B2-C6 Street Light Pole UTL-INR-A00836 UTL-INR-A00837 UTL-INR-A00838 UTL-INR-A008369 UTL-INR-A00039 UTL-INR-A00040 UTL-INR-A00828 UTL-INR-A00829 UTL-INR-A00830 UTL-INR-A00831
11 P94 parking (Lusail) Street Light FP1-Y2-C5 Street Light Pole UTL-INR-A00836 UTL-INR-A00837 UTL-INR-A00838 UTL-INR-A008369 UTL-INR-A00041 UTL-INR-A00042 UTL-INR-A00828 UTL-INR-A00829 UTL-INR-A00830 UTL-INR-A00831
12 P94 parking (Lusail) Street Light FP1-R2-C4 Street Light Pole UTL-INR-A00836 UTL-INR-A00837 UTL-INR-A00838 UTL-INR-A008369 UTL-INR-A00043 UTL-INR-A00044 UTL-INR-A00828 UTL-INR-A00829 UTL-INR-A00830 UTL-INR-A00831
13 P94 parking (Lusail) Street Light FP1-B2-C3 Street Light Pole UTL-INR-A00836 UTL-INR-A00837 UTL-INR-A00838 UTL-INR-A008369 UTL-INR-A00045 UTL-INR-A00046 UTL-INR-A00828 UTL-INR-A00829 UTL-INR-A00830 UTL-INR-A00831
14 P94 parking (Lusail) Street Light FP1-Y2-C2 Street Light Pole UTL-INR-A00836 UTL-INR-A00837 UTL-INR-A00838 UTL-INR-A008369 UTL-INR-A00047 UTL-INR-A00048 UTL-INR-A00828 UTL-INR-A00829 UTL-INR-A00830 UTL-INR-A00831
15 P94 parking (Lusail) Street Light FP1-R2-C1 Street Light Pole UTL-INR-A00836 UTL-INR-A00837 UTL-INR-A00838 UTL-INR-A008369 UTL-INR-A00049 UTL-INR-A00050 UTL-INR-A00828 UTL-INR-A00829 UTL-INR-A00830 UTL-INR-A00831
UTL-INR-A00087(Reinf.)/ UTL-INR-A00088(bottom)/
16 P94 parking (Lusail) Street Light FP1-RYB1-C1 Street Light Pole UTL-INR-A00832 UTL-INR-A00833 UTL-INR-A00834 UTL-INR-A00835 UTL-INR-A00051 UTL-INR-A00052
UTL-INR-A00087-01 UTL-INR-A00251(top)
UTL-INR-A00381 UTL-INR-A00382
UTL-INR-A00089(Reinf.)/ UTL-INR-A00090(bottom) /
17 P94 parking (Lusail) Street Light FP1-RYB1-C2 Street Light Pole UTL-INR-A00832 UTL-INR-A00833 UTL-INR-A00834 UTL-INR-A00835 UTL-INR-A00053 UTL-INR-A00054
UTL-INR-A00089-01 UTL-INR-A00252(top)
UTL-INR-A00381 UTL-INR-A00382
UTL-INR-A00113(Reinf.)/ UTL-INR-A00114(bottom) /
18 P94 parking (Lusail) Street Light FP1-RYB1-C3 Street Light Pole UTL-INR-A00832 UTL-INR-A00833 UTL-INR-A00834 UTL-INR-A00835 UTL-INR-A00055 UTL-INR-A00056
UTL-INR-A00113-01 UTL-INR-A00253(top)
UTL-INR-A00381 UTL-INR-A00382
119
APPROVED CLIENT ASHGAL
STATUS
CANCELLED
SUBMITED/ONGOING ROAD WORKS INRS TRACKER
5 Fill Area Rock Fill 6 Cut Area 7 Suitable Fill / Backfilling 8 Subbase Material Road base Asphalt Geotextile
NEED TO RAISE s INTERNAL 1 2 2.1 3 4 5.1 5.2 5.3 6.1 6.2 7.1 7.2 7.3 8.1 8.2 8.3 8.4
CARRIAGE WAY
ZONE/Point
Road Name
Joint survey checking Removal / Visual Inspection and and Evenness Testing In-situ CBR and Joint survey checking Visual Inspection Compaction Testing
LOCATION
Joint Survey checking In-situ CBR and In-situ CBR and In-situ CBR Testing for the Visual Inspection and Joint Survey Checking sampling, testing, Joint survey checking Checking Excavation
of existing Site Visual Inspection for demolishment and Joint Survery checking Setting Out and Sampling and Testing Surface Preparation Laying & Plate Load Sampling and Testing Surface Praparation Compaction Testing for the for the formation Compaction Testing Evenness Testing for Sampling of Prime Application of Prime and Visual and Sampling of of the Backfilling of
Sr No
From (CH) To (CH) and sampling of the Compaction testing of Compaction testing of Top of Suitable Fill Material Sampling for the for the Laying of coring, inspection for for laying of asphalt of Trench Formation
situation - the site clearance Delivery of existing of Formation Level Trimming of the Fill Area of the Fill Area Testing or Rock Fill of the Cut Area of the Cut Area Laying of Suitable Fill Material level (Top of Suitable for the Laying of the Laid Subbase Coat Material Coat laying of asphalt base base course class A Inspection for the Surround Concrete Surface Water
rock strata the Fill Area the Cut Area (Backfilling 0-75mm) Laying of Subbase Subbase and Geotextile
topographic survey structure (Backfilling 0-75mm)..Layer Fill Material- Subbase course class A Pipe laying Casting Drainage Pipe
Surround
Bakcfilling 0-75mm)
P94 - Link road 1 (Al Kheesa GEN-INR-A00022/ GEN- ROA-INR-A00236/ROA- GEN-INR-A00024/GEN- ROA-INR-A00241/ROA- ROA-INR-A00270/ROA- ROA-INR-A00272 - 1st Layer/ROA-
116 1 Access)
1 1+300 2+073 INR-A00022-01 INR-A00236-01 INR-A00024-01
ROA-INR-A00273 QUA-INR-A00036
INR-A00241-01
ROA-INR-A00242 QUA-INR-A00037
INR-A00270-01
ROA-INR-A00271
INR-A00272 Mock Up
P94 - Link road 2 (Al Kheesa ROA-INR-A00256/ROA- ROA-INR-A00295/ROA- ROA-INR-A00257/ROA- ROA-INR-A00293/ROA- ROA-INR-A00324/ROA- ROA-INR-A00325/ROA- ROA-INR-A00338/ROA-
116 4 Access)
2 0+990 1+203 INR-A00256-01
QUA-INR-A00045
INR-A00295-01
QUA-INR-A00039
INR-A00257-01
ROA-INR-A00258 QUA-INR-A00040
INR-A00293-01
ROA-INR-A00294
INR-A00324-01 INR-A00325-01
ROA-INR-A00326 ROA-INR-A00327
INR-A00338-01
ROA-INR-A00348 ROA-INR-A00430
QUA-INR-A00052/QUA-
7 P94 - Link road (Al Kheesa Access) Swale INR-A00052-01
117
APPROVED CLIENT ASHGAL
STATUS
CANCELLED
SUBMITED/ONGOING ROAD WORKS INRS TRACKER
20. Street Lighting Duct with Concrete Surround 21. Street Lighting Duct with Aggregate Surround 22. Street Lighting Cable with Aggregate Surround 23. Street Lighting Foundations Dry Utilities Ducts Wet Utilities Ducts Protection of Existing Line
NEED TO RAISE s 20.1 20.2 20.3 20.4 21.1 21.2 21.3 21.4 22.1 22.2 22.3 22.4 23.1 23.2 23.3 23.4 23.5 23.6 24.1 24.2 24.3 24.4 25.1 25.2 25.3 25.4 26.1 26.2
Visual Inspection for Joint Survey Checking, of Formwork; visual Compaction Testing
ZONE/Point
Road Name
Joint Survey checking, of the Backfilling Joint Survey checking, Visual Inspection for of the Backfilling Joint Survey checking, of the Backfilling Joint Survey Checking Joint survey checking Joint Survey Checking, Joint Survey Checking, Joint survey checking of the Backfilling
LOCATION
Joint Survey checking Visual Inspection and Backfilling of Ducts Bedding and Joint Setting Out and inspection and Joint survey checking Visual Inspection and of the Backfilling Backfilling of Ducts with Visual Inspection for Visual Inspection for Visual Inspection for
Setting Out and layers of Street Setting Out and Bedding and Joint Visual Inspection of layers of Street Setting Out and Visual Inspection of layers of Street and Sampling for the of reinforcement, Visual Inspection for Compaction testing of Setting Out and Setting Out and and Visual Inspection Visual Inspection for layers---Duct
Sr No
Duct Type and Visual Inspection Sampling of Surround with warning tape & Survey Verification of compaction testing of sampling for the and Visual Inspection Sampling of Surround layers---Duct warning tape & Mandrel Hydro Test Holiday Test the Installation of pipe surround and the Installation of
Compaction Testing Lighting Duct Compaction Testing Survey Verification of surround material Lighting Duct Compaction Testing surround material Lighting Duct casting of Blinding Anchor bolt and foot bitumen protection the backfilling layers Compaction Testing Compaction Testing for the Pipe laying Pipe Surround including warning
for the Pipe laying concrete casting Mandrel Testing Street Lighting Cable foundation for street casting of street for the Pipe laying Concrete Casting including warning Testing Protection Slab existing duct ends Protection Slab
of Trench formation including Warning of Trench formation Pipe laying including Warning of Trench formation including Warning Concrete plate installation of Trench Formation of Trench Formation including Bedding tape installation and
laying lighting poles lighting foundation tape installation
Tape Installation Tape Installation Tape Installation Mandrel Testing
concrete
P94 Link road 1 (Al Kheesa Access) -Street 07 UTL-INR-A00121/UTL- UTL-INR-A00122/UTL- UTL-INR-A00174/UTL-
4 Light PW DRY LEG UTL-INR-A00080
INR-A00121-01 INR-A00122-01
UTL-INR-A00235 UTL-INR-A00254 UTL-INR-A00256
INR-A00174-01
NA NA
08
P94 Link road 1 (Al Kheesa Access) -Street 31 UTL-INR-A00085/UTL- UTL-INR-A00145/UTL- UTL-INR-A00146/UTL- UTL-INR-A00186/UTL-
16 Light PW DRY LEG INR-A00085-01 INR-A00145-01 INR-A00146-01
UTL-INR-A00236 UTL-INR-A00255 UTL-INR-A00257
INR-A00186-01
NA NA
32
P94 Link road 1 (Al Kheesa Access) -Street 47 EX MV Cable UTL-INR-A00157 (not seen
23 Light Protection
UTL-INR-A00194
on site)
48
61
P94 Link road 2 (Al Kheesa Access) -Street
24 Light Ooredoo 2 Way UTL-INR-A00878 UTL-INR-A00879 UTL-INR-A00880 UTL-INR-A00881 UTL-INR-A00881
62
P94 Link road 2 (Al Kheesa Access) -Street 77 EX Ooredoo UTL-INR-A00061 - not
28 Light Protection required
78
P94 Link road 2 (Al Kheesa Access) -Street 79 EX Potable UTL-INR-A00062 - not
29 Light Protection required
80
93 UTL-INR-A00155/UTL-INR-
P94 - Link road (Al Kheesa Temporary
29 Access) A EN4 UTL-INR-A00099 UTL-INR-A00100 UTL-INR-A00104 UTL-INR-A00105 A00155-01/UTL-INR-A00155-
94 02
101 UTL-INR-A00156/UTL-INR-
P94 - Link road (Al Kheesa Temporary
29 Access) B EN4 UTL-INR-A00101 UTL-INR-A00102 UTL-INR-A00106 UTL-INR-A00107 A00156-01/UTL-INR-A00156-
02
102
P94 - Link road (Al Kheesa Temporary 105 EX Ooredoo UTL-INR-A00098 (not seen
29 Access) B Protection on site)
106
P94 - Link road (Al Kheesa Temporary 107 EX MV Cable UTL-INR-A00108 (not seen
29 Access) B Protection on site)
108
STATUS
CANCELLED
SUBMITED/ONGOING
ROAD WORKS INRS TRACKER
5 Fill Area 6 Cut Area 7 Suitable Fill / Backfilling 8 Subbase Material Road Base Kerbstone
NEED TO RAISE s INTERNAL 1 2 2.1 3 4 5.1 5.2 5.3 6.1 6.2 7.1 7.2 7.3 8.1 8.2 8.3 8.4 30.1 30.2 30.3 30.4
CARRIAGE WAY
Joint survey checking Removal / Compaction Testing In-situ CBR Testing for and Evenness Testing Visual Inspection and Joint Survey Checking In-situ CBR and In-situ CBR and Visual Inspection of and Visual Inspection
LOCATION
Joint Survey checking In-situ CBR and In-situ CBR and Evenness Testing for Visual Inspection ans Joint Survey Checking Compaction
of existing Site Visual Inspection for demolishment and Setting Out and Sampling and Testing Surface Preparation Compaction testing of Sampling and Testing Surface Praparation Compaction for the Laying of the Top of Suitable for the formation Compaction Testing for the laying of Road for the laying Testing Evenness Testing for Formwork and for Kerbstone
Sr No
ZONE
From (CH) To (CH) situation - the site clearance Delivery of existing and sampling of the Trimming of the Fill Area of the Fill Area of the Cut Area of the Cut Area testing of Suitable Fill Material Fill Material Sampling for the
level (Top of Suitable Laying for the Laying of for the Laying of the Laid Subbase sampling for the of Road the laid Road Base Casting of Kerbstone Installation including
rock strata the Fill Area the Cut Area of Subbase Subbase laying of Road Base Base
topographic survey structure (Backfilling 0- (Backfilling 0-75mm) Fill Material- Subbase Base Foundation (Type xx) concrete backing
75mm)..Layer Bakcfilling 0-75mm) (Type xx)
ROA-INR-A01009 (1st
1 1 VVIP Access Lusail GEN-INR-A00026 GEN-INR-A00069 (Fence) QUA-INR-A00162 ROA-INR-A00945 ROA-INR-A00946 QUA-INR-A00163 ROA-INR-A00947 ROA-INR-A00948
layer)
ROA-INR-A01098 ROA-INR-A01099
ROA-INR-A01010 (2nd
114 layer)
ROA-INR-A01011 (3rd
layer)
116
116
STAT
US
APPROVED CLIENT CLIENT
20. Street Lighting Duct with Concrete Surround 21. Street Lighting Duct with Aggregate Surround 22. Street Lighting Cable with Aggregate Surround 23. Street Lighting Foundations Dry Utilities Ducts Wet Utilities Ducts Protection of Existing Line
NEED TO RAISE 20.1 20.2 20.3 20.4 21.1 21.2 21.3 21.4 22.1 22.2 22.3 22.4 23.1 23.2 23.3 23.4 23.5 23.6 24.1 24.2 24.3 24.4 25.1 25.2 25.3 25.4 26.1 26.2
of the Backfilling Visual Inspection for Joint Survey Checking, of Formwork; visual Compaction Testing Compaction Testing
Road Name
Joint Survey checking, Joint Survey checking, Visual Inspection for of the Backfilling Joint Survey checking, of the Backfilling Joint Survey Checking Joint survey checking Joint Survey Checking, Joint survey checking Joint Survey Checking, Joint survey checking
Duct Point
LOCATION
Joint Survey checking Visual Inspection and layers of Street Bedding and Joint Setting Out and inspection and Visual Inspection and of the Backfilling of the Backfilling Visual Inspection for Visual Inspection for
Setting Out and Setting out and Bedding and Joint Visual Inspection of layers of Street Setting Out and Visual Inspection of layers of Street and Sampling for the of reinforcement, Visual Inspection for Compaction testing of Setting Out and and Visual Inspection Visual Inspection for Setting Out and and Visual Inspection Visual Inspection for
Sr No
Type and Visual Inspection Sampling of Surround Lighting Duct Survey Verification of compaction testing of sampling for the Sampling of Surround layers---Duct layers---Duct pipe surround amd the Installation of
Compaction Testing Compaction Testing Survey Verification of surround material Lighting Duct Compaction Testing surround material Lighting Duct casting of Blinding Anchor bolt and foot bitumen protection the backfilling layers Compaction Testing for the Existing … bitumen protection Compaction Testing for the Pipe laying Pipe Surround
for the Pipe laying concrete casting including Warning Street Lighting Cable foundation for street casting of street Concrete Casting including warning including warning existing duct ends Protection Slab
of Trench formation of Trench formation Pipe laying including Warning of Trench formation including Warning Concrete plate installation of Trench Formation Concrete Protection of Trench Formation including Bedding
Tape Installation & laying lighting poles lighting foundation tape installation tape installation
Tape Installation Tape Installation
Mnadrel Test concrete
6
1 VVIP Access Lusail
7
SL1 UTL-INR-A00824 UTL-INR-A00825 UTL-INR-A00826 UTL-INR-A00827
8
2 VVIP Access Lusail
9
SL1 UTL-INR-A00824 UTL-INR-A00825 UTL-INR-A00826 UTL-INR-A00827
119
APPROVED CLIENT ASHGAL
STATUS
CANCELLED
SUBMITED/ONGOING ROAD WORKS INRS TRACKER
5 Fill Area 6 Cut Area 7 Suitable Fill / Backfilling 8 Subbase Material Road Base Kerbstone
NEED TO RAISE s INTERNAL 1 2 2.1 3 4 5.1 5.2 5.3 6.1 6.2 7.1 7.2 7.3 8.1 8.2 8.3 8.4 30.1 30.2 30.3 30.4
CARRIAGE WAY
Joint survey checking Removal / Compaction Testing In-situ CBR Testing for and Evenness Testing In-situ CBR and In-situ CBR and Visual Inspection of and Visual Inspection
LOCATION
Joint Survey checking In-situ CBR and In-situ CBR and Visual Inspection and Joint Survey Checking Visual Inspection ans Joint Survey Checking
of existing Site Visual Inspection for demolishment and Setting Out and Sampling and Testing Surface Preparation Sampling and Testing Surface Praparation for the Laying of the Top of Suitable for the formation Compaction Testing Evenness Testing for Compaction Testing Evenness Testing for Formwork and Casting for Kerbstone
ZONE
Sr No
From (CH) To (CH) and sampling of the Compaction testing of Compaction testing of Sampling for the for the Laying of sampling for the for the laying of Road
situation - the site clearance Delivery of existing Trimming of the Fill Area of the Fill Area of the Cut Area of the Cut Area Suitable Fill Material Fill Material level (Top of Suitable for the Laying of the Laid Subbase for the laying of Road the laid Road Base of Kerbstone Installation including
rock strata the Fill Area the Cut Area Laying of Subbase Subbase laying of Road Base Base
topographic survey structure (Backfilling 0- (Backfilling 0-75mm) Fill Material- Subbase Base Foundation (Type xx) concrete backing
75mm)..Layer Bakcfilling 0-75mm) (Type xx)
ROA-INR-A01049 (1st
1 1 VIP Access Lusail (Egress) GEN-INR-A00070 GEN-INR-A00089 QUA-INR-A00187 ROA-INR-A01041 ROA-INR-A01042 QUA-INR-A00186 ROA-INR-A01030 ROA-INR-A01031
layer)
ROA-INR-A01164 ROA-INR-A01165
115
116
117
STAT
US
APPROVED CLIENT CLIENT
20. Street Lighting Duct with Concrete Surround 21. Street Lighting Duct with Aggregate Surround 22. Street Lighting Cable with Aggregate Surround 23. Street Lighting Foundations Dry Utilities Ducts Wet Utilities Ducts Protection of Existing Line
NEED TO RAISE 20.1 20.2 20.3 20.4 21.1 21.2 21.3 21.4 22.1 22.2 22.3 22.4 23.1 23.2 23.3 23.4 23.5 23.6 24.1 24.2 24.3 24.4 25.1 25.2 25.3 25.4 26.1 26.2
of the Backfilling Joint Survey checking, Visual Inspection for Joint Survey Checking Joint survey checking of inspection
Formwork; visual Compaction Testing Joint Survey Checking, Joint survey checking Compaction Testing
Road Name
Sampling and Testing Joint Survey checking, Joint Survey checking Visual Inspection and of the Backfilling Backfilling of Ducts Joint Survey checking, Visual Inspection for of the Backfilling Joint Survey Checking, Joint survey checking Visual Inspection and
Duct Point
LOCATION
Bedding and Joint Setting Out and and of the Backfilling of the Backfilling Visual Inspection for Visual Inspection for
Setting Out and layers of Street with warning tape Setting out and Bedding and Joint Visual Inspection of layers of Street Setting Out and Survey Verification of Visual Inspection of layers of Street compaction testing of and Sampling for the of reinforcement, Visual Inspection for Compaction testing of Setting Out and and Visual Inspection Sampling of Surround Visual Inspection for Setting Out and and Visual Inspection Visual Inspection for
Sr No
119
APPROVED CLIENT ASHGAL
STATUS
CANCELLED
SUBMITED/ONGOING
ROAD WORKS INRS TRACKER
5 Fill Area 6 Cut Area 7 Suitable Fill / Backfilling 8 Subbase Material Asphalt Kerbstone Culvert
NEED TO RAISE s INTERNAL 1 2 2.1 3 4 5.1 5.2 5.3 6.1 6.2 7.1 7.2 7.3 8.1 8.2 8.3 8.4 27.1 27.2 27.3 27.4 27.5 27.6 27.7
CARRIAGE WAY
Joint survey Checking Joint survey checking, Joint Survey checking Joint Sruvey checking Joint Survey checking of
Road Name
Joint survey checking Removal / Compaction Testing In-situ CBR Testing for In-situ CBR and Visual Inspection of and Visual Inspection Joint Survey checking of the Backfilling
LOCATION
Joint Survey checking In-situ CBR and In-situ CBR and for the formation Visual Inspection and Joint Survey Checking sampling, testing, Joint survey checking and Visual inspection Visual inspection for and Sampling for the Formwork; Visual
of existing Site Visual Inspection for demolishment and Setting Out and Sampling and Testing Surface Preparation Sampling and Testing Surface Praparation for the Laying of the Top of Suitable Compaction Testing Evenness Testing for Sampling of Prime Application of Prime Formwork and for Kerbstone and compaction layers Joint Survey Checking
ZONE
Sr No
From (CH) To (CH) and sampling of the Compaction testing of Compaction testing of level (Top of Suitable Sampling for the for the Laying of coring, inspection for for laying of asphalt for the Pipe Laying Pipe Surround of… Casting of Blinding Inspection and Sampling
situation - the site clearance Delivery of existing Trimming of the Fill Area of the Fill Area of the Cut Area of the Cut Area Suitable Fill Material Fill Material for the Laying of the Laid Subbase Coat Material Coat laying of asphalt base base course class A Casting of Kerbstone Installation including Testing of Trench of..duct..including of Reinforcement
rock strata the Fill Area the Cut Area Fill Material- Laying of Subbase Subbase including Bedding of… duct Concrete of Culvert for the Casting of Culvert
topographic survey structure (Backfilling 0- (Backfilling 0-75mm) Subbase course class A Foundation (Type xx) concrete backing Formation..of duct.. warning tape
Bakcfilling 0-75mm) duct Inlet Inlet Concrete
75mm)..Layer (Type xx) installation
ROA-INR-A00588 - 1st
1 1 Stage 5 Accesses HW-1001 Access 1 GEN-INR-A00033 ROA-INR-A00578 GEN-INR-A00062 no rqst Layer
ROA-INR-A00589 - 2nd
114 1 Stage 5 Accesses HW-1001 Access 1 Layer
ROA-INR-A00590 - 3rd
115 1 Stage 5 Accesses HW-1001 Access 1 Layer
ROA-INR-A00591 - 4th
1 Stage 5 Accesses HW-1001 Access 1 Layer
ROA-INR-A00592 - 5th
1 Stage 5 Accesses HW-1001 Access 1 Layer
ROA-INR-A00593 - 6th
1 Stage 5 Accesses HW-1001 Access 1 Layer
ROA-INR-A00607 - 7th
1 Stage 5 Accesses HW-1001 Access 1 Layer
ROA-INR-A00608 - 8th
1 Stage 5 Accesses HW-1001 Access 1 Layer
ROA-INR-A00609 - 9th
1 Stage 5 Accesses HW-1001 Access 1 Layer
ROA-INR-A00610 - 10th
1 Stage 5 Accesses HW-1001 Access 1 Layer
ROA-INR-A00611 - 11th
1 Stage 5 Accesses HW-1001 Access 1 Layer
ROA-INR-A00612 - 12th
1 Stage 5 Accesses HW-1001 Access 1 Layer
ROA-INR-A00645 - 13th
1 Stage 5 Accesses HW-1001 Access 1 & FinalLayer ROA-INR-A00654 ROA-INR-A00655 ROA-INR-A00959 ROA-INR-A00960 ROA-INR-A00961 ROA-INR-A00962 QUA-INR-A00171 ROA-INR-A00994 ROA-INR-A00996 ROA-INR-A00997
ROA-INR-A00626 - 1st
1 Stage 5 Accesses HW-1002 Access 2 GEN-INR-A00033 ROA-INR-A00603 GEN-INR-A00063 no rqst no rqst no rqst no rqst no rqst no rqst Layer
ROA-INR-A00627 - 2nd
1 Stage 5 Accesses HW-1002 Access 2 GEN-INR-A00033 ROA-INR-A00603 GEN-INR-A00063 Layer
ROA-INR-A00628 - 3rd
1 Stage 5 Accesses HW-1002 Access 2 GEN-INR-A00033 ROA-INR-A00603 GEN-INR-A00063 Layer
ROA-INR-A00629 - 4th
1 Stage 5 Accesses HW-1002 Access 2 GEN-INR-A00033 ROA-INR-A00603 GEN-INR-A00063 Layer
ROA-INR-A00630 - 5th
1 Stage 5 Accesses HW-1002 Access 2 GEN-INR-A00033 ROA-INR-A00603 GEN-INR-A00063 Layer
ROA-INR-A00631 - 6th
1 Stage 5 Accesses HW-1002 Access 2 GEN-INR-A00033 ROA-INR-A00603 GEN-INR-A00063 Layer
ROA-INR-A00632 - 7th
1 Stage 5 Accesses HW-1002 Access 2 GEN-INR-A00033 ROA-INR-A00603 GEN-INR-A00063 Layer
ROA-INR-A00633 - 8th
1 Stage 5 Accesses HW-1002 Access 2 GEN-INR-A00033 ROA-INR-A00603 GEN-INR-A00063 Layer
ROA-INR-A00637 - 9th
1 Stage 5 Accesses HW-1002 Access 2 GEN-INR-A00033 ROA-INR-A00603 GEN-INR-A00063 Layer
ROA-INR-A00644 - 10th
1 Stage 5 Accesses HW-1002 Access 2 GEN-INR-A00033 ROA-INR-A00603 GEN-INR-A00063 Layer
1 Stage 5 Accesses Existing Access GEN-INR-A00079 no rqst no rqst no rqst no rqst no rqst no rqst ROA-INR-A00980 ROA-INR-A00981
1 Stage 5 Accesses HW-1002 Access 1 - Culvert GEN-INR-A00033 ROA-INR-A00603 DRA-INR-A00020 DRA-INR-A00021 DRA-INR-A00022 DRA-INR-A00024
1 Stage 5 Accesses HW-1002 Access 2 - Culvert GEN-INR-A00033 ROA-INR-A00603 DRA-INR-A00017 DRA-INR-A00018 DRA-INR-A00019 DRA-INR-A00023
117
STAT
US
APPROVED CLIENT CLIENT
20. Street Lighting Duct with Concrete Surround 21. Street Lighting Duct with Aggregate Surround 22. Street Lighting Cable with Aggregate Surround 23. Street Lighting Foundations Dry Utilities Ducts Wet Utilities Ducts Protection of Existing Line
NEED TO RAISE 20.1 20.2 20.3 20.4 21.1 21.2 21.3 21.4 22.1 22.2 22.3 22.4 23.1 23.2 23.3 23.4 23.5 23.6 24.1 24.2 24.3 24.4 25.1 25.2 25.3 25.4 26.1 26.2
Visual Inspection for Joint Survey Checking, of Formwork; visual Compaction Testing Compaction Testing
Road Name
Joint Survey checking, of the Backfilling Joint Survey checking, Visual Inspection for of the Backfilling Joint Survey checking, of the Backfilling Joint Survey Checking Joint survey checking Joint Survey Checking, Joint Survey Checking, Joint survey checking
Duct Point
LOCATION
Sampling and Testing Joint Survey checking Visual Inspection and Backfilling of Ducts Bedding and Joint Setting Out and inspection and Joint survey checking Visual Inspection and of the Backfilling of the Backfilling Visual Inspection for Visual Inspection for
Setting Out and layers of Street Setting out and Bedding and Joint Visual Inspection of layers of Street Setting Out and Visual Inspection of layers of Street and Sampling for the of reinforcement, Visual Inspection for Compaction testing of Setting Out and Setting Out and and Visual Inspection Visual Inspection for
Sr No
Type of Street Lighting and Visual Inspection Sampling of Surround with warning tape & Survey Verification of compaction testing of sampling for the and Visual Inspection Sampling of Surround layers---Duct layers---Duct pipe surround amd the Installation of
Compaction Testing Lighting Duct Compaction Testing Survey Verification of surround material Lighting Duct Compaction Testing surround material Lighting Duct casting of Blinding Anchor bolt and foot bitumen protection the backfilling layers Compaction Testing Compaction Testing for the Pipe laying Pipe Surround
Bedding Material for the Pipe laying concrete casting Mandrel Testing Street Lighting Cable foundation for street casting of street for the Pipe laying Concrete Casting including warning including warning existing duct ends Protection Slab
of Trench formation including Warning of Trench formation Pipe laying including Warning of Trench formation including Warning Concrete plate installation of Trench Formation of Trench Formation including Bedding
laying lighting poles lighting foundation tape installation tape installation
Tape Installation Tape Installation Tape Installation
concrete
1 2 Stage 5 Accesses HW-1002 Street Light 2 EN6 UTL-INR-A00518 UTL-INR-A00519 UTL-INR-A00520 UTL-INR-A00521
1 3 Stage 5 Accesses HW-1002 Street Light 3 TYPE 2H UTL-INR-A00518 UTL-INR-A00519 UTL-INR-A00520 UTL-INR-A00521
4 Stage 5 Accesses HW-1002 Street Light 4 TYPE H UTL-INR-A00518 UTL-INR-A00519 UTL-INR-A00520 UTL-INR-A00521
5 Stage 5 Accesses HW-1002 Street Light 5 EN6 UTL-INR-A00518 UTL-INR-A00519 UTL-INR-A00520 UTL-INR-A00521
7 Stage 5 Accesses HW-1002 Street Light 7 Ooredoo 2W UTL-INR-A00522 UTL-INR-A00523 UTL-INR-A00524 UTL-INR-A00525
8 Stage 5 Accesses HW-1002 Street Light 8 QAF 2W UTL-INR-A00526 UTL-INR-A00527 UTL-INR-A00528 UTL-INR-A00529
8 Stage 5 Accesses HW-1001 Street Light 11 Existing LV Cable protection UTL-INR-A00598 UTL-INR-A00599 UTL-INR-A00600 UTL-INR-A00601
8 Stage 5 Accesses HW-1001 Street Light 13 EN6 UTL-INR-A00602 UTL-INR-A00603 UTL-INR-A00604 UTL-INR-A00605
8 Stage 5 Accesses HW-1001 Street Light 14 EN6 UTL-INR-A00530 UTL-INR-A00531 UTL-INR-A00532 UTL-INR-A00533
8 Stage 5 Accesses HW-1001 Street Light 15 TYPE 2H UTL-INR-A00534 UTL-INR-A00535 UTL-INR-A00536 UTL-INR-A00537
8 Stage 5 Accesses HW-1001 Street Light 16 TYPE H UTL-INR-A00534 UTL-INR-A00535 UTL-INR-A00536 UTL-INR-A00537
8 Stage 5 Accesses HW-1001 Street Light 17 EN6 UTL-INR-A00530 UTL-INR-A00531 UTL-INR-A00532 UTL-INR-A00533
8 Stage 5 Accesses HW-1001 Street Light 19 Ooredoo 2W UTL-INR-A00522 UTL-INR-A00523 UTL-INR-A00524 UTL-INR-A00525
8 Stage 5 Accesses HW-1001 Street Light 20 QAF 2W UTL-INR-A00526 UTL-INR-A00527 UTL-INR-A00528 UTL-INR-A00529
8 Stage 5 Accesses HW-1001 Street Light 22 SL2 UTL-INR-A00608 UTL-INR-A00609 UTL-INR-A00610 UTL-INR-A00611
119
APPROVED CLIENT ASHGAL
STATUS
CANCELLED
SUBMITED/ONGOING
ROAD WORKS INRS TRACKER
Swale 5 Fill Area 6 Cut Area 7 Suitable Fill / Backfilling 8 Subbase Material Prime coat Asphalt Road marking Corrugated Pipe
NEED TO RAISE s INTERNAL 1 2 2.1 3 4 5.1 5.2 5.3 6.1 6.2 7.1 7.2 7.3 8.1 8.2 8.3 8.4 30.1
CARRIAGE WAY
Joint survey checking Removal / Compaction Testing In-situ CBR Testing for and Evenness Testing In-situ CBR and Joint survey checking
LOCATION
Joint Survey checking In-situ CBR and In-situ CBR and Visual Inspection and Joint Survey Checking sampling, testing, Joint survey checking Visual Inspection for the Joint Survey Checking Visual Inspection and Visual Inspection for
of existing Site Visual Inspection for demolishment and Setting Out and Setting Out and Surface Preparation Sampling and Testing Surface Preparation Sampling and Testing Surface Praparation for the Laying of the Top of Suitable for the formation Compaction Testing Evenness Testing for Sampling of Prime Application of Prime and Visual Inspection
ZONE
Sr No
From (CH) To (CH) and sampling of the Compaction testing of Compaction testing of Sampling for the for the Laying of coring, inspection for for laying of asphalt application and testing of for the Excavation of Compaction Testing concrete Surround -
situation - the site clearance Delivery of existing Trimming Trimming of Swale of Swale of the Fill Area of the Fill Area of the Cut Area of the Cut Area Suitable Fill Material Fill Material level (Top of Suitable for the Laying of the Laid Subbase Coat Material Coat laying of asphalt base base course class A for the Pipe laying
rock strata the Fill Area the Cut Area Laying of Subbase Subbase Road Marking Currogated Pipe for the Corrugated Currogated Pipe
topographic survey structure (Backfilling 0- (Backfilling 0-75mm) Fill Material- Subbase course class A including Bedding
Pipe
75mm)..Layer Bakcfilling 0-75mm)
GEN-INR-A00052
114 (Concrete Slab)
DRA-INR-A00016/DRA-
1 MBH-LE.1 Corrugated Pipe DRA-INR-A00010 DRA-INR-A00011 DRA-INR-A00015
INR-A00025-01
117
STAT
US
APPROVED CLIENT CLIENT
20. Street Lighting Duct with Concrete Surround 21. Street Lighting Duct with Aggregate Surround 22. Street Lighting Cable with Aggregate Surround 23. Street Lighting Foundations Dry Utilities Ducts Wet Utilities Ducts Protection of Existing Line
NEED TO RAISE 20.1 20.2 20.3 20.4 21.1 21.2 21.3 21.4 22.1 22.2 22.3 22.4 23.1 23.2 23.3 23.4 23.5 23.6 24.1 24.2 24.3 24.4 25.1 25.2 25.3 25.4 26.1 26.2
Visual Inspection for Joint Survey Checking, of Formwork; visual Compaction Testing Compaction Testing
Road Name
Joint Survey checking, of the Backfilling Backfilling of Ducts Joint Survey checking, Visual Inspection for of the Backfilling Joint Survey checking, of the Backfilling Joint Survey Checking Joint survey checking Joint Survey Checking, Joint Survey Checking, Joint survey checking
Duct Point
LOCATION
Sampling and Testing Joint Survey checking Visual Inspection and Bedding and Joint Setting Out and inspection and Joint survey checking Visual Inspection and of the Backfilling of the Backfilling Visual Inspection for Visual Inspection for
Setting Out and layers of Street with warning tape Setting out and Bedding and Joint Visual Inspection of layers of Street Setting Out and Visual Inspection of layers of Street and Sampling for the of reinforcement, Visual Inspection for Compaction testing of Setting Out and Setting Out and and Visual Inspection Visual Inspection for
Sr No
Type of Street Lighting and Visual Inspection Sampling of Surround Survey Verification of compaction testing of sampling for the and Visual Inspection Sampling of Surround layers---Duct layers---Duct pipe surround amd the Installation of
Compaction Testing Lighting Duct including Mandrel Compaction Testing Survey Verification of surround material Lighting Duct Compaction Testing surround material Lighting Duct casting of Blinding Anchor bolt and foot bitumen protection the backfilling layers Compaction Testing Compaction Testing for the Pipe laying Pipe Surround
Bedding Material for the Pipe laying concrete casting Street Lighting Cable foundation for street casting of street for the Pipe laying Concrete Casting including warning including warning existing duct ends Protection Slab
of Trench formation including Warning Testing of Trench formation Pipe laying including Warning of Trench formation including Warning Concrete plate installation of Trench Formation of Trench Formation including Bedding
laying lighting poles lighting foundation tape installation tape installation
Tape Installation Tape Installation Tape Installation
concrete
1 1
1 MBH LE.1 Street Light SL1 UTL-INR-A00546 UTL-INR-A00547 UTL-INR-A00612 UTL-INR-A00613 UTL-INR-A00622
1 2
1 3
2 MBH LE.1 Street Light SL1 UTL-INR-A00546 UTL-INR-A00547 UTL-INR-A00612 UTL-INR-A00613 UTL-INR-A00622
4
5
3 MBH LE.1 Street Light SL1 UTL-INR-A00546 UTL-INR-A00547 UTL-INR-A00548 UTL-INR-A00549 UTL-INR-A00622
6
7
4 MBH LE.1 Street Light SL1 UTL-INR-A00546 UTL-INR-A00547 UTL-INR-A00612 UTL-INR-A00613 UTL-INR-A00622
8
10 MBH LE.1 Street Light FP1-R2-C1 St. Light UTL-INR-A00616 UTL-INR-A00617 UTL-INR-A00618 UTL-INR-A00619 UTL-INR-A00620 UTL-INR-A00621