Professional Documents
Culture Documents
INSTRUCTION MANUAL
FOR
Manufactured by:
SPECIFICATIONS
Pump : Double acting cylinder operated 320 rpm
Piston stroke:40 mm
Piston diameter: 45 mm
Suction Pipe :1 inch
Delivery Pipe: ¾ inch
Pressure gauge: 0-2 kg/cm²
Vacuum gauge : 0-760 mm hg
DC Motor: 1 HP
Stop watch: Electronic
Electrical Input: 220 V (AC) and 50 Hz
Valves: total 3 valves made of gun metal
Piping and fitting: Galvanized iron
Storage tank: 600 mm x300 mm x300 mm
Measuring tank: 300 mm x300 mm x300 mm
MCB: 16 Amps.
Water measurement: Piezometer tube fitted with measuring tank
Energy measurement: Digital Voltmeter and ammeter
DESCRIPTION
The present experiment setup consists of a Single Stage Reciprocating Pump . Suction pipe
is connected to the sump tank and suction pressure can be measured by using suction
gauge fitted on it. Discharge pressure can be measured by pressure gauge fitted on the
discharge pipe. The discharge is measured by measuring cylinder. The flow rate of pump is
controlled by the control valve to take readings at various flow rates.
PROCEDURE
1. Fill the sump tank with clean water.
2. Switch ‘ON’ the main and select the desired speed of pump.
2
3. Now for a particular value of discharge opening note down the suction and delivery
pressure.
4. Using hopper fixed at measuring tank collect water in measuring tank and calculates
discharge of water.
FORMULA
Axh
1. Discharge Q = --------
t
where
A = Area of collecting tank base (m2)
Size of Collecting tank = 0.30 m x 0.30 m = 0.09 m2
t = time sec.
BP = ρ g Q H
Where ρ = Density of water,(kg/m3) – 1000 kg/m3
g=Acceleration due to gravity (m/s2) 9.81 kg/s2
B.P.
6. Pump = ------------ x 100%
I.P. Shaft
3
B.P.
7. Pump (overall) = ------------ x 100%
I.P. elect
OPERATING INSTRUCTIONS
1. The water in the sump should be free from foreign particles.
2. Open both control valves at delivery & suction line before switch on the mains
After the experiment is over open all the delivery and suction valves and switch ‘OFF’ the on
control panel and then mains
DISCHARGE
Time
vacuu Initial Final Height of Taken
S. Pressure Total
m Level Level water for water Discharg RPM
No. Gauge head H
gauge level e
m3/sec
Q = Ah/t
b1 b2 h=b2-b1 30 Sec
2
3
Brake Efficiency
Power Input Shaft Pump overall
Input Electrical KW
Deivered (Kw) Efficiency
by Pump
Pump
Input efficiency
S.No. BP = I-
V- Q=V.I/1000 Electricalx.8 = (BP/Input BP/Input
(Current
.Q.H (voltage)
)
(KW) Shaft) x 100 elect.) x 100
(%) (%)
`
4
General Calculation:
1. Area of measuring tank =0.09 m2
A x h 0.09 x5
2. Discharge Q = -------- = ---------- = 0.00015
t 100x30
=0.233/0.26 = 86%