Professional Documents
Culture Documents
General Experience
Bidder’s Legal Name: Totten Infrastructure Ltd Date: 16th July 2023
JV Partner Legal Name: N/A Bidding No.: ONB/MU/002/05/23
Page ____1___ of ___1____ pages
Starting Ending
Contract Identification Role of Bidder
Month / Month / Years*
Year Year
Contract name: Construction of Mini Hospitals
2020 2023 3 Brief Description of the Works performed by the Earthworks,Concrete
Bidder: Earthworks, slabs and access roads ,borehole drilling,Sub
Name of Employer: NMS Infrastructure ltd Contractor
Address: Malaiti Road, Lusaka.
Contract name: Construction of Embassy of
2018 2019 1 Saudi Arabia
Brief Description of the Works performed by the Concrete placing
Bidder: Concrete works subcon
Name of Employer: Seinsa Spain
Address:
Contract name:Construction of Multi Purpose Main Contractor,
2018 2020 1.5 hall for Legacy missions Lusaka. structural steel,
Brief Description of the Works performed by the concrete,Earthworks,
Bidder: Totten Infrastructure Ltd electrical
Name of Employer: Legacy missions church.
Address:Lusaka
Contract name: Isoka water supply
2019 2020 1 improvement Sub Contractor
Brief Description of the Works performed by the
Bidder: Civilworks, water tanks,
Name of Employer: CTR Drilling Ltd
Address: Kasama
Contract name: Refurbishment of store for
2021 2022 1 choppies in Chongwe Subcontractor
Brief Description of the Works performed by the
Bidder: Structural steel, earthworks, concrete
Name of Employer: Lakeman consultancy
Address:Lusaka
Contract name:
______ ______ Brief Description of the Works performed by the _________
Bidder:
Name of Employer:
Address:
*List calendar year for years with contracts with at least nine (9) months activity per year starting with the earliest year
Form EXP – 2.4.2(a)
Specific Experience
Bidder’s Legal Name: Totten Infrastructure Ltd Date: 16th June 2023
JV Partner Legal Name: ___N/A_____________ Bidding No.: ONB/MU/002/05/23
Page ____1___ of __2_____ pages
Bidder’s Legal Name: Totten Infrastructure Ltd Page ____2___ of ___2____ pages
JV Partner Legal Name: ____N/A_____________________
Information
Contract Identification TENDER NO. MTC/WORKS/39499/1/55/2023
Award date ____February2023__
Completion date June 2023
Role in Contract X Subcontractor
Contractor Management
Contractor
Total contract amount ZMK 2,456,780.00 US$ 125,988
If partner in a JV or subcontractor,
specify participation of total contract __________% _____________ US$________
amount
Employer’s Name: Nms Infrastructure Ltd
Address: ____malaiti Road_______________
_______________________________________
Telephone/fax number: paul.makota@nmsigrp.com
E-mail: _______________________________________
Form EXP – 2.4.2 (b)(cont.)
Bidder’s Legal Name: Totten Infrastructure Ltd Page ____2___ of ___2____ pages
JV Partner Legal Name: _______N/A___________________
Subcontractor’s Legal Name: _NONE_________________________
Information
Description of the key activities in Culvert installation on access road, earthworks,
accordance with Sub-Factor 2.4.2b) of concrete base slab, survey,
Section III (Evaluation and Qualification
Criteria):
Infrastructure Zambia Limited
Plot No. L/2322/M/A Malaiti Road, New Kasama, Lusaka, Zambia
Dear Sir/Madam,
Totten Infrastructure Ltd have been engaged to participate as a civil works contractor and
borehole drilling and rehabilitation sub-contractor for the following contract from 2021
to date;
email: group@nmsigrp.com
www.nmsinfrastructure.com
LCO No - 120180004890
A member of the NMS International Group of Companies
+260972037329,
+2607628180886
Lakeman720@gmail.com.
Lusaka, Zambia.
Lusaka, Zambia.
8 June 2023.
Please accept this letter as my recommendation of the construction firm, Totten Infrastructure Ltd. We have had the
opportunity to work with them over the past one year carrying out civil Works in a number of projects which
included works such as concrete works and steel works with a total project value of 3.4million Kwacha.
Valuing their work as subcontractors Totten Infrastructure has managed these works in a manner that allowed them
to be completed on or ahead of schedule while maintaining an excellent relationship with the client, employer and
our construction teams on site. On-site coordination was handled very professionally and all of the required
paperwork and queries were responded to promptly.
Understanding that it takes highly qualified personnel to maintain good relationships, Totten has provided
exceptional staffs that stay involved and accessible throughout a Project. We welcome the opportunity to work with
them on any future construction projects and we highly recommend them to you. If you need further Information
kindly contact us.
Sincerely,
Lweendo Banda,
Managing Director,