You are on page 1of 3

(St) Proj Unit Type Dev.

Serial Rev
(2) SA010 00 0804 SC 0033 00
Contract No.: 6600049184
Document ID: SA010-00-0804-SC-0033
Quality Control Procedures for Civil and
Document Title:
Structural Works
Upgrade Uthmaniyah-Abqaiq Pipelines Systems BI-10-01196 / 0001

QUALITY CONTROL PROCEDURE for CIVIL


AND STRUCTURAL WORKS
Document # SA010-00-0804-SC-0033 Rev. 00

UPGRADE UTHMANIYAH-ABQAIQ PIPELINES PROJECT


BI # 10-01196 / 0001
Contract # 6600049184

Issued for Review and BG SH LP GF


00 Approval
04-11-21
QCS QCM QAM PM
Rev. Description Prepared Reviewed Approved Approved Date

This document is the property of CONTRACTOR who will safeguard its rights according to the civil and penal provisions of the law.
The only controlled version of this document resides in the CONTRACTOR Electronic Document Management System.
Any copies made of this document will be considered UNCONTROLLED unless it is being viewed on screen on the CONTRACTOR
INTRANET.

745692459.docx
Page 1 of 3
(St) Proj Unit Type Dev. Serial Rev
(2) SA010 00 0804 SC 0033 00
Contract No.: 6600049184
Document ID: SA010-00-0804-SC-0033
Quality Control Procedures for Civil and
Document Title:
Structural Works
Upgrade Uthmaniyah-Abqaiq Pipelines Systems BI-10-01196 / 0001

CONTENTS SUMMARY
REVISION
PROCEDURE NO DESCRIPTION
STATUS
CIVIL WORKS

QCP-SA010-C-01 SURVEYING AND SETTING OUT 00

QCP-SA010-C-02 EXCAVATION AND BACKFILLING 00

QCP-SA010-C-03 RIGHT OF WAY AND BERMING 00

QCP-SA010-C-04  CONCRETE WORKS 00

QCP-SA010-C-05 CEMENTITIOUS GROUTING 00

QCP-SA010-C-06  ASPHALT CONCRETE PAVING 00

STRUCTURAL STEEL WORKS

QCP-SA010-S-01  STRUCTURAL STEEL FABRICATION AND ERECTION 00

745692459.docx
Page 2 of 3
(St) Proj Unit Type Dev. Serial Rev
(2) SA010 00 0804 SC 0033 00
Contract No.: 6600049184
Document ID: SA010-00-0804-SC-0033
Quality Control Procedures for Civil and
Document Title:
Structural Works
Upgrade Uthmaniyah-Abqaiq Pipelines Systems BI-10-01196 / 0001

REVISION HISTORY
NEW
REVISION SECTIONS
DOC NO. REVISION NATURE OF CHANGES
DATE CHANGED
NO.
This QCP is for Civil and Structural Scope of Works.
Comments incorporated based on Saudi Aramco review
comments on the Quality Control Procedure (Document
Number SA010-00-0804-SC-028 rev 00).
New Document Number as per Discipline wise QC
Procedures.
Specific QC procedures were identified with unique
SA010-00-0804-SC- Document number and Document Name in Document
00 03-Nov-2021 ALL
0033 Title.
All QCP’s are developed in reference with Project
Standard Cut Off Date (June 2017), Scope of Work and
relevant applicable International Standards.
QCP’s were reviewed by Contractor Quality Control and
Quality Assurance personnel.
Added new Quality Control Procedure (QCP-SA010-C-03
QCP) for Right-of-way and Berming.

745692459.docx
Page 3 of 3