Ok allowed.
@Prasanta Kumar Dasto check safe working condition before issuing of the work permit at site and as a owner's engineering services
RCE personnel will be responsible for the areawise activities, may inform the respective area incharge of vedanta in case of any doubt.
All Area in-charges – to coordinate performance and safety with TCE.
@Vllsecurity Controlroom is requested, on behalf of Bx handling Team, - to allow the exit of the team as well as vehicle as per the
trailing request.
On behalf of all area incharges, I am forwarding the permission mail.
CAUTION:- Email originated from outside of the organization. Do not click links or open attachments unless
you recognize the sender and know the content is safe.
Dear Sir,
Extended construction work at following areas has been planned for tonight.
Details as below:
Date :12-04-2024
SL NO. AREA MANPOWER INCHARGE TYPE OF WORK PERMISSION UPTO
1 Silo 45 Mr. Sikhar Welding, Fit-up & Erection Till 07:00 AM
2 Crusher House 16 Mr. Khokhan Assembly, Welding & Erection Till 07:00 AM
3 Wagon Tipler 9 Mr. Bikram Assembly, Welding & Erection Till 07:00 AM
TT 13N / TN
4 9 Mr. Aditya Assembly, Welding & Erection Till 07:00 AM
12 N
5 TT 7 N 8 Mr. Sikhar Assembly, Welding & Erection Till 07:00 AM
6 TT 1N / 2N 12 Mr. Bikram Assembly, Welding & Erection Till 07:00 AM
7 BC 17 10 Mr. Sikhar Assembly, Welding & Erection Till 07:00 AM
Fabrication
8 22 Mr. Anurag Assembly, Welding & Erection Till 07:00 AM
Yard
Store / Wagon
9 11 Mr. Jitendra Material Loading & Unloading Till 07:00 AM
Tipler
10 Crusher House 10 Mr. Jitendra Cable Tray Installation, Lighting and Earthing work Till 07:00 AM
SS-8E / Cable
11 21 Mr. Chandrashekar Material Shifting Till 06:00 AM
Rack
about:blank 1/2
4/12/24, 6:32 PM Yahoo Mail - Re: Permission Request for extended hour working at BHS area
12 BC 3N / 4N 8 Mr. Bikram Assembly, Welding, Erection & Material Shifting Till 06:00 AM
DH 2 / BC9 / Graduating work, Reinforcement Shuttering RCC &
13 15 Mr. Nirajan Till 06:00 AM
BC10 / Drain PCC
14 Stacker 14 Mr. Soumya Assembly, Welding & Erection Till 06:00 AM
SS-8E / Cable Scaffolding, Material Shifting, Plaster work & Brick
15 14 Mr. Vipul Till 06:00 AM
Rack Work
BC 01AN / 02 Excavation Reinforcement, Steel Shuttering, RCC &
16 12 Mr. Nirmal Till 07:00 AM
AN PCC
17 TT 4N 8 Mr. Saikiran Assembly, Welding, Erection & Excavation Work Till 07:00 AM
Material Loading, Unloading, Excavation, Leveling,
18 TT 3N Road 9 Mr. Nirmal Till 07:00 AM
Concreting & Gravel filling Work
Assembly, Welding, Erection, Concrete, Shuttering &
19 BC 5N / 6N 11 Mr. Kundan Till 07:00 AM
Excavation