You are on page 1of 18

No.

SDC/ of 2024
Office of the,
Sub Divisional Engineer,
P.W. Sub Division No.1, Shirpur
Date :- / / 2024
To,
The Executive Engineer,
P.W. (North) Division, Dhule.

Sub :- Submission of R.A. / F & F bill for the work of

Construction of Internal Cement Concrete Road In Janhavi Park in Dalit Vasti


at Village Shingave, Tal. Shirpur & Dist. Dhule.

Ref :- B-1/EE/118/2023-24

The following First & Final bill/ R.A.bill/ R.A.& Final bill submited herewith

each n duplicate for favour of information and further disposal please.

D. A. :-
1) Bill in duplicate
2) Check list Sub Divisional Engineer,
3) MB No 0455750 to 0455800 (Small Size) P.W. Sub Division No.1, Shirpur
4) P.R.Analysis
5) Consump.statement
6) Royalty Statement
7) Ex/Saving statement
8) Recovery statement
9) Drawings &plan
सा.बाां. (उत्तर) विभाग, धुळे
देर्क क्रमाांक:- देर्क
उपविभागीर् कार्ालर्ाचे भरािर्ाची माविती

1 उपविभागाचे नाांि : P.W. Sub Division No.1, Shirpur


2 कांत्राटदाराचे नाांि : Shri.Vishal Prakash Sonawane, 54,
Pramod Nagar, Nakane Road, Deopur,
Dhule, Tal. & Dist. Dhule.

3 कामाचे नाांि : Construction of Internal Cement Concrete


Road In Janhavi Park in Dalit Vasti at
Village Shingave, Tal. Shirpur & Dist. Dhule.

4 वनविदा क्रमाांक : B-1/EE/118/2023-24


5 ले खाविर्ष ि कार्षक्रम :

6 ताांवत्रक मांजरु ीचा क्रमाांक ि वदनाांक ि रक्कम :

7 वनविदेत नमुद केले ल्र्ा कामाची अांदावजत ककमत :

8 कामाची वनविदा रक्कम :

9 मुळ काम करण्र्ाची विवित मुदत :

10 अ) मुदत िाढीचा तपविल :


ब) वनविदा ितष क्र.2 खालील केलेल्र्ा कार्षिािीचा तपविल
11 दे र्का सोबत खालील कागदपत्र सादर केली आिे त कार् 1 :
मोजणी पुस्तक क्रमाक : 0455750 to 0455800 (Small Size)
क्षेत्रीर् पुस्तक क्रमाांक :
इमारती पुल ि पाईप मो-र्ाांचे कामाांचे बाबतीत फाऊांडे िन :
प्लॅन/रे कॉडष प्लॅन/रे कॉडष ड्रॉईांग
रस््र्ाची खोदाई/भरािर्ाच्र्ा बाबतीत लांबछे द / काटछे द. : सोबत जोडले आिे /आिश्र्कता नािी
अांि दराच्र्ा कारणासिीत अांिदर विश्लेर्ण तक्ता : सोबत जोडले आिे /आिश्र्कता नािी
बाांधकाम सावि्र्ाचे प्रर्ोगिाळा चाचणी अििाल सोबत : सोबत जोडले आिे /आिश्र्कता नािी
जोडले आिे त कार् 1
(वनविदा पवरमाणापेक्षा अवधक/कमी पवरमाणाचा तक्ता : सोबत जोडले आिे /आिश्र्कता नािी
(अवधक/कमी पवरमाणाच्र्ा स्पष्ट कारणासि)
अनुसच
ु ी अ नुसार वदलेल्र्ा सावि्र्ाचा खपाचा तक्ता : आिश्र्कता नािी
( कमी जास्त खपाच्र्ा कारणासि )
िासवकर् र्ांत्र सामुग्रीच्र्ा भाडर्ाच्र्ा िसुलीचा तक्ता ि : आिश्र्कता नािी
लॉगबुकचा साांक्षावकत ऊतारा/ छार्ाांकीत प्रत
अनुसच
ु ी अ नुसार वदलेल्र्ा सावि्र्ाचा िसुलीचा तक्ता : आिश्र्कता नािी
अमुद्ाांकीत पाि्र्ा : आिश्र्कता नािी
वडसमेंन्टल सावि्र्ाचा नोंदििीचा ऊतारा : आिश्र्कता नािी
आर.एम.आर नोंदििीचा ऊतारा : आिश्र्कता नािी
वसमेन्ट/स्टील साप्ताविक खपाचा नोंदििीचा ऊतारा : आिश्र्कता नािी
आर.सी.सी.पाईप ककिा इतर सावि्र् : आिश्र्कता नािी
12 अांिदर मुक्त करुन पूणष दर प्रस्तावित केल्र्ास ्र्ा बाबतची : आिश्र्कता नािी
कारणे मोजणी पुस्तकात ि दे र्कात सांबांधीत बाबी समोर
नमुद केली आिे त कार् ?
13 अ) र्ा कामाच्र्ा बाबतीत दक्षता ि गुण वनर्ांत्रण मांडळाच्र्ा : नािी
वनवरक्षण अििालात िेरे प्रलांवबत आिे त कार् 1 असल्र्ास
िेरे पुतषते बाबत कार् कार्षिािी केली 1(ब) वनवरक्षण
अििालातील सिष सुचनाांचे अांवतमवर्र्ा अनुपालन केल्र्ाचे
14 अ) र्ा कामाच्र्ा बाबतीत मुख्र् अवभर्ांता/अवधक्षक : आिश्र्कता नािी
अवभर्ांता/कार्षकारी अवभर्ांता र्ाांच्र्ा वनवरक्षण वटप्पणीतील
िेरे प्रलांवबत आिे त कार् 1 असल्र्ास िे -र्ाांचे पुतषते बाबत
कार् कार्षिािी केली 1 (ब) वनवरक्षण वटप्पणीतील सिष
सुचनाांचे अांवतमवर्र्ा अनुपालन केल्र्ाचे प्रमाणपत्र
दे र्कािर नमुद केले आिे कार् ?
15 चालु/अांवतम देर्कात प्रस्तावित केलेल्र्ा अांवतम : नािी
मोजमापाांची उपअवभर्ांता र्ाांनी ित प्रवतित तपासणी केली
आिे कार् ?
(तपासणीच्र्ा सिष तारखा ि मोजणी पुस्तक क्रमाांक /पृष्ठ
16 आिश्र्क तेथै कार्षकारी अवभर्ांता र्ाांचेकडू न मोजमापाची िोर्
वकमान पाच प्रवतित तपासणी तसेच रु.50,000/- पेक्षा
जास्त कमेच्र्ा बाबीिर तपासणी करुन घेतली आिे कार् ?
17 खडीच्र्ा प्रांंांलबीत सळर्ाांच्र्ा मोजमापाांची दुस-र्ा :
अवभर्ां्र्ाकडू न फेरतपासणी करुन घेतली आिे कार् ? (
फेर तपासणीच्र्ा तारखा मोजमाप पुस्तकात ि देर्कात नमुद
करािेत)
18 िासन पवरपत्रक क्र.सा.बाां.विभाग क्र.आरएमआर/1090/ : िोर्
162/का-रस्ते-1 वद. 26-7-91 नुसार बाांधकामाच्र्ा
पार्ाच्र्ा भुस्तराचे काम कार्षकारी अवभर्ांता/उपअवभर्ांता
र्ाांनी सांमत केल्र्ाचे प्रमाणपत्र देर्कािर नमुद आिे कार्?
19 मोजमापे सांकत असल्र्ाने दिषक म्िणून मोजणी पुस्तकात ि : िोर्
दे र्कािर ठे केदाराच्र्ा सिर्ा घेतल्र्ा आिे त कार् ?
20 मोजणी पुस्तकाांत प्र्र्ेक मोजमाप सुरु िोण्र्ाच्र्ा अगोदर : िोर्
कामाचे ंे पूणष नाि,लेखाविर्ष ,ठे केदाराचे पूणष नाांि ि पत्ता,
वनविदा क्रमाांक ि िर्ष, काम सुरु करण्र्ाच्र्ा आदेिाचा
विवित वदनाांक , मुदतिाढ, काम प्र्र्क्षात पूणष झाल्र्ाचा
वदनाांक र्ा बाबी स्पष्टपणे नमुद केल्र्ा आिे त कार् ?
21 मोजमापाांच्र्ा आकडे िारीची अांकगवणतीर् तपासणी : िोर्
केल्र्ाचे प्रमाणपत्र उपविभागीर् वलपीकाने मोजणी पुस्तकात
नोंदविले आिे कार् ?
22 काम पूणष झाल्र्ािर देर्क सादर करण्र्ास एक मविन्र्ापेक्षा :
अवधक विलांब झाला असल्र्ास ्र्ा बाबत स्पष्टीकरण
23 विभागीर् कार्ालर्ाचे पत्रें क्र.ई-6/2588/1993 वद. 20-4- : िोर्
93 चे तांतोतांत पालन केलेले आिे कार् ?
24 काम पूणष झाले असेल तर काम पूणष झाल्र्ाचे प्रमाणपत्र
नमुद क्र.सा.बाां.वि 261 ककिा 561 सोबत जोडला आिे
कार्?

उपविभागीय अवभयां ता,


सा. बाां. उपविभाग क्र.1, विरपूर
प्रकल्प िाखेत ताांवत्रक तपासणी िेरे
1 र्ा कामािरील एकुण खचष अांदाजपत्रकीर् वकमतीपेक्षा ( :
विवित प्रमाणापेक्षा) जास्त आिे त कार् ? असल्र्ास
प्रस्तावित केले ली कार्षिािी.
2 चाचणी अििाल समाधानकारक आिे त कार् ? :
3 इतर िेरे :

प्रकल्प अवभयां ता ( प्रकल्प िाखा) उपकायय कारी अवभयां ता


चालु देर्कात अांवतम दे र्का सोबत प्राप्त झालेल्र्ा रे कॉडष :
ड्राईांगनुसार पी.आर.बी.रवजष्टरमध्र्े / मेसनरी रवजष्टरमध्र्े /
रे कॉडष ड्राईांग रवजष्टरमध्र्े आिश्र्क ्र्ा नोंदी घेतल्र्ा
आिे त कार् ?

लेखा िाखा आरे खक


1 चालु वित्तीर् मांजरू अनुदान. :
2 र्ा कामािरील चालु विवत्तर् िर्ातील एकुण खचष . :
3 र्ा दे र्कासिीत एकूण खचष . :
4 र्ा कामािरील एकुण अदर्ाित खचष . :
5 कांत्राटदाराच्र्ा खातेििीचा पृष्ठ क्रमाांक नोंदी घेतलेल्र्ा :
आिे त कार् ?
6 प्रस्तूत देर्काची ढोबळ रक्कम. :
7 िजाती :
अनुसवू चत अ सावि्र्ाची िसुली : 1) S.D.
अनामत रक्कम : 2) Issu.
आर्कर 2.30 टक्के प्रमाणै : 3) Sub Tex.
िासकीर् र्ांत्रसामुग्रीची भाडे िसुली : 4) I.T.
वनविदा खांड 2 नुसार विलांब भरपाईची िसुली : 5) G.S.T. (V)
सांकीणष िसुली : 6) Royalty
इतर िसुली : 7) 10% Royalty
: 8) Other
एकुण िजाती
8 वनव्िळ देर्क रक्कम :

लेखापवरक्षक विभागीय लेखावधकारी


दे र्क पावरत करण्र्ाबाबत ि प्रदानाबाबत कार्षकारी
अवभर्ांता र्ाांचे आदेि.
कायय कारी अवभयां ता,
सा.बाां. (उत्तर) विभाग, धुळे
DIVISION : P.W. (North) Division, Dhule.
SUB-DIVISION : P.W. Sub-Division No.1, Shirpur
FORM - 47
RUNNING ACCOUNT BILL
(Referred to in paragraph 10-2-11 of P.W.A. Code)

Cash Book Voucher No.

For

Name of Contractor or Supplier

Shri.Vishal Prakash Sonawane, 54, Pramod Nagar,


Nakane Road, Deopur, Dhule, Tal. & Dist. Dhule.

Name of work :-
Construction of Internal Cement Concrete Road In
Janhavi Park in Dalit Vasti at Village Shingave, Tal.
Shirpur & Dist. Dhule.

Serial No. of this bill :- Ist R.A. Bill


No.& date of previous bill for this work
Reference to agreement :- B-1/EE/118/2023-24

Accepted by :- Executive Engineer, P.W. (North) Division,


Dhule.
Date of written order to connence work
Transactions of road side material
entered in the statement of receipt Date of completion as stipulated in the months
issue and balances of road metal. Contract.

Extension granted upto

Date of actual completion of work

Contractor's ledger folio No.


Clerk Account

(For use Accountant General's office )


For use in Divisional office

Audited Reviewed

Superintendent
Account Clerk Divnl.Accountant

Auditor Gazeted officer


PART I - Account of work executed.
Advance Payment for Items of work Grouped under sub-heads or sub- Payment on the basic of actual Remarks (with
Quantity
work done not yet works of estimate. measurement reasons for
executed
measured delay in
upto
Item Total Since Total Rate Unit Upto date Since previous adjusting)
date as
No. Previous Previ upto bill payments
per
bill ous date shown in
measure
bill cloumn 1)
ment
1 2 3 4 5 6 7 8 9 10 11

1 150.35 Excavation for roadway in earth, soil of all sorts, 119.00 One 17891.65 17891.65 0.00
sand, gravel or soft murum including dressing Cubic
section to the required grade, camber and side Metre
slopes and conveying the excavated materials
with all lifts upto a lead of 50m. and spreading for
embankment or stacking as directed.

2 150.35 Providing dry/ trap/ granite/ quartzite/ gneiss 1768.39 One 265877.44 265877.44 0.00
rubble stone soling 15 cm to 20 cm thick Cubic
including hand packing and compacting etc. Metre
complete.

Page 6
1 2 3 4 5 6 7 8 9 10 11
3 99.89 Construction of dry lean cement concrete Sub- 3733.98 One 372987.26 372987.26 0.00
base over a prepared sub-grade with coarse and Cubic
fine aggregate ( natural sand/ VSI grade finely Metre
washed crushed sand) conforming to IS: 383, the
size of coarse aggregate not exceeding 25 mm, ,
cement content not to be less than 150 kg/ cum,
optimum moisture content to be determined during
trial length construction, concrete strength not to
be less than 10 Mpa at 7 days, mixed in a
batching plant/ Weigh batch mixer, transported to
site with all leads and lifts, laid with a paver with
electronic sensor /by suitable means as approved
by Engineer-in-charge , compacting with
vibratory roller, finishing, curing and including
preparation of sub-grade surface if required etc.
complete. with fully automatic micro processor
based PLC with SCADA enabled reversible Drum
Type mixer/ concrete Batch mix plant (Pan mixer)
etc. complete.

F.R. 3930.50 One


Cubic
Metre

Page 7
1 2 3 4 5 6 7 8 9 10 11
4 139.80 Providing and laying in-situ M30 Grade 7593.89 One 1061625.82 1061625.82 0.00
unreinforced plain cement concrete pavement Cubic
over a prepared sub base with 43 grade cement , Metre
coarse and fine aggregate ( natural sand/ VSI
grade finely washed crushed sand) conforming to
IS 383, using fine and coarse aggregates
combined gradation as per Table 600-3 of
MORTH Specification 2013, mixed in a Tilting type
Concrete Mixer as per approved mix design,
admixtures, spreading, laying compacting and
finished in a continuous operation without paver
machine, finishing to lines and grades as directed
by Engineer-in-charge and curing by curing
compound /by providing cement vata in cement
Mortar 1:8 @0.6m X 0.6m centre to centre,
admeasuring 80 mm at bottom and 40 mm at top
with depth of 75mm and maintaining the same
throughout curing period by any other method
approved by Engineer-in-charge. with fully
automatic micro processor based PLC with
SCADA enabled reversible Drum Type mixer/
concrete Batch mix plant (Pan mixer) etc.
complete.
F.R. 7993.57 One
Cubic
Metre
5 208.00 Cutting transverse contraction joints 3 to 4 mm 76.00 One 15808.00 15808.00 0.00
wide and depth 60mm. .in concrete slab using Running
concrete cutting machine with diamond studded Metre
saw within 48 hours of casting of bay / slab etc.
complete including subsequent widening of the
groove 8 to 10 mm. wide at top having depth of 15
mm. as directed by Engineer incharge.
12 932.00 Providing and laying 125 micron Low Density 30.00 One 27960.00 27960.00 0.00
Polyethylene (LDPE) sheet confirming to IS 3395 : Square
1997 below concrete pavement including all Metre
materials and labour complete.

Page 8
1 2 3 4 5 6 7 8 9 10 11
18 106.37 Royalty Charges for Sand (Royalty + Surcharge (2 237.37 One 25249.05 25249.05 0.00
per cent) + District Mineral Foundation Cess (10 Cubic
percent) 211.95 + 4.23 + 21.19 = 237.37 per Cubic Metre
Meter.
19 180.41 Royalty Charges for other material Royalty + 216.18 One 39001.03 39001.03 0.00
Surcharge (2 per cent). Cubic
211.95 + 4.23 = 216.18 per Cubic Meter Metre

TOTAL RS 1826400.25 1826400.25 0.00


SAY RS 1826400.00 1826400.00 0.00

Sub Divisional Engineer,


P.W. Sub Division No.1, Shirpur

Page 9
NAME OF WORK :- Construction of Internal Cement Concrete Road In Janhavi Park in Dalit Vasti at Village Shingave, Tal. Shirpur & Dist. Dhule.

AGENCY :- Shri.Vishal Prakash Sonawane, 54, Pramod Nagar, Nakane Road, Deopur, Dhule, Tal. & Dist. Dhule.

TENDER NO. :- B-1/EE/118/2023-24 BILL NO:- Ist R.A. Bill

EXCESS SAVING STATEMENT

I. As per Tender Executed Excess Saving


Item of Work Remarks
No. Qty. Rate Amount Qty. Amount Qty. Amount Qty. Amount
1 2 3 4 5 6 7 8 9 10 11 12
Excavation for roadway in
1 197.80 119.00 23538.20 150.35 17891.65 - - -47.45 5646.55
earth, soil of all sorts, sand,
Providing dry/ trap/
2 118.68 1768.39 209872.53 150.35 265877.44 31.67 56004.91 - -
granite/ quartzite/ gneiss
Construction of dry lean
3 79.12 3930.50 310981.16 99.89 392617.65 20.77 81636.49 - -
cement concrete Sub- base
Providing and laying in-situ
4 110.40 7993.57 882490.13 139.80 1117501.09 29.40 235010.96 - -
M30 Grade unreinforced
Cutting transverse
5 168.00 76.00 12768.00 208.00 15808.00 40.00 3040.00 - -
contraction joints 3 to 4 mm
Supplying hard murum/
6 33.12 687.22 22760.73 0.00 0.00 - - -33.12 22760.73
kankar at the road site,
Spreading hard murum/
7 33.12 79.00 2616.48 0.00 0.00 - - -33.12 2616.48
soft murrum/ gravel or
Compacting the hard
8 220.80 21.00 4636.80 0.00 0.00 - - -220.80 4636.80
murum side widths
Providing and laying
9 8.60 1949.00 16761.40 0.00 0.00 - - -8.60 16761.40
cement concrete pipe of IS
Providing and fixing 75
10 17.20 607.00 10440.40 0.00 0.00 - - -17.20 10440.40
mm dia stabiliser pipe/
Providing and fixing board
11 1.00 9963.00 9963.00 0.00 0.00 - - -1.00 9963.00
displaying information,
Providing and laying 125
12 736.00 30.00 22080.00 932.00 27960.00 196.00 5880.00 - -
micron Low Density
Water Absorption, Specific
13 1.00 2600.00 2600.00 0.00 0.00 - - -1.00 2600.00
Gravity, Impact Value

Excess Saving 10
I. As per Tender Executed Excess Saving
Item of Work Remarks
No. Qty. Rate Amount Qty. Amount Qty. Amount Qty. Amount
1 2 3 4 5 6 7 8 9 10 11 12
Gradation of Sand
14 1.00 1380.00 1380.00 0.00 0.00 - - -1.00 1380.00
Standard Consistancy
15 1.00 3770.00 3770.00 0.00 0.00 - - -1.00 3770.00
Fineness, Specific
Compressive Strength of
16 3.00 690.00 2070.00 0.00 0.00 - - -3.00 2070.00
Cement Concrete Cube (Set
Concrete Mix Design (With
17 1.00 13755.00 13755.00 0.00 0.00 - - -1.00 13755.00
all test on basic materials)
Royalty Charges for Sand
18 84.11 237.37 19965.19 106.37 25249.05 22.26 5283.86 - -
(Royalty + Surcharge (2 per
Royalty Charges for other
19 175.54 216.18 37948.24 180.41 39001.03 4.87 1052.79 - -
material Royalty +

TOTAL 1610397.26 1901905.91 387909.01 96400.36


-291508.65 291508.65

Sub Divisional Engineer,


P.W. Sub Division No.1, Shirpur

Excess Saving 11
D B Total Toal Value of work done to the (A)
Deduct Value of work shown on previous bill
Figure (D) in words Net Value of work since previous bill (F) Figure (F) in words

Part II - Account of Secured advance allowed on the security of materials brought to site

Quantity Deduct Qty. Full rate Reduced Reference to Reason fpr

Qty. brought to site


since previous bill
out utilized in brought including as rate of divisional mpm
Qty.outstanding

standing work assessed which officer's written clearance of


Upto date
from measured by the advance is order advance
Description of materials Unit amount of
previous since divisional made authorising the when out
advance
bill previous bill officer advance standing for
more than
three months.
No. Date

Total amount outstanding as per this bill (C)


Deduct amount outstanding as per entry (C) of previous bill Figure(E) in words
Net amount since previous bill (E)
PART- III Certified and Signature
(1) Entrees in coloumns 4 to 9 of part I are based on measurement recorded by (Name & Designation) Shri. K.M. Patil, Jr. Engr. In M.B.No. 0455750 Page No. 751 to 754 and
checked 100 % by the Sub-Divisional Officer on _________________
(2) Certicfied (i) that in addition to and quite a part from the quantities of work actually executed as shown in coloumn 4 of part I. some work has been actually done in connection
with cleral item and the value of such work ( after deducting therefrom the proportionate amount of secured advance if any ultimately recoverable on account of the quantities of
mater also used their in ) is in on case less than the advance payments as per coloumn 3 of part I mode of proposed to be made for the convenience of the ______________
contractor the anticipation of and subject to the result of detailed measurement which will be made as soon as possible.
(3) Certified (i) that the plus quantities of materials shown in coloumn 3 of part II above have been actualy brought by the contractor to the site of the work & contractors has not
previously received any advance on their security(ii) that these materials are of an imperisbable nature and are all required by the contractor for use in the work in connection
with items for which rates for finished work have been agreed upon and (iii) that a formal agreement in from 50 signed and executed by the contractor in accordance with
paragraph 10.2.19 of the M.P.W.A.Code is accorded in the divisional officer.
*Dated Signature of the Contractor
* This signature is necessary only when the officer preparing the bill is not the officer authorising payment.
Sub Divisional Engineer,
P.W. Sub Division No.1, Shirpur
Rs. Ps.
1. Total Value of work actually Measured as per Part-I coloumn 8 coloumn 8,
entry (A)
2. Total upto date advance payment for work not you measured as per
part I Coloumn 3 entry (B)

3. Total upto date Secured advance on Security of materials as per


Part-II Col.8 entry (C)

4. Total ( Items 1 + 2 + 3 )

5. Deduct Amount with head

Figure for work Rs. Ps.


abstract.
Rs. Ps. a) From previous bil as per last running bill

1) S.D. b) From this Bill

2) Issu. 6. Balance I.e.upto date payments


(Item 4 -- 5 )
3) Sub Tex.
7. Total Amount of payments already made
4) I.T. as per entry (K) of last
running account bill No.________ of
5) G.S.T. (V) _________forwarded with Account for.

6) Royalty 8. Payment now to be made as detailed


below.
7) 10% Royalty
Rs. Ps. Rs. Ps.
8) Other (a) By recovery of amount creditable to {
{ a)

Total 5 (b) + 8 (a) {G}

(b) By recovery of amounts creditable {


to other works of heads of account { (a)
(a) By Cheque

Total 8 (b) + (C)


Pay Rs.________________( ) by cheque/Cash
* Here specify the net amount payble ( Item 8© Dated initials of the disbursing officer

Received Rs. ( ) as per above

memorandum on account of this work


Stamp
Dated

Witness
Paid by me vide cheque No._______________ Dated_______________

Dated initials of the person actually making the payment.


Part- 5 Remarks
(This space is reserved for any remarks the disbursing officer or the divisional officer may wish to
record in respect of the execution of work. Measurement of the state of Contractor's accounts.)
NAME OF WORK :
Construction of Internal Cement Concrete Road In Janhavi Park in Dalit Vasti at Village
Shingave, Tal. Shirpur & Dist. Dhule.

Agency : Shri.Vishal Prakash Sonawane, 54, Pramod Nagar, Nakane Road, Deopur,
Dhule, Tal. & Dist. Dhule.
Agr. No. : B-1/EE/118/2023-24
Bill No. : Ist R.A. Bill

PART RATE ANALYSIS

Item No. 3 Construction of dry lean cement concrete Sub- base over a prepared sub-grade
with coarse and fine aggregate ( natural sand/ VSI grade finely washed crushed
sand) conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, ,
cement content not to be less than 150 kg/ cum, optimum moisture content to be
Rate as per Tender Rs. 3930.50 Cum.

Deduct for workis under observation Rs. -196.53 Cum.

Hence proposed part rate 3733.98 Cum.

Item No. 4 Providing and laying in-situ M30 Grade unreinforced plain cement concrete
pavement over a prepared sub base with 43 grade cement , coarse and fine
aggregate ( natural sand/ VSI grade finely washed crushed sand) conforming to IS
383, using fine and coarse aggregates combined gradation as per Table 600-3 of
Rate as per Tender Rs. 7993.57 Cum.

Deduct for workis under observation Rs. -399.68 Cum.

Hence proposed part rate 7593.89 Cum.

Sub Divisional Engineer,


P.W. Sub Division No.1, Shirpur
NAME OF WORK :
Construction of Internal Cement Concrete Road In Janhavi Park in Dalit Vasti at Village Shingave, Tal. Shirpur & Dist. Dhule.

Agency : Shri.Vishal Prakash Sonawane, 54, Pramod Nagar, Nakane Road, Deopur, Dhule, Tal. & Dist. Dhule.
Agr. No. : B-1/EE/118/2023-24
Bill No. : Ist R.A. Bill
ROYALTY STATEMENT
Sr. Description of the material with Actual quantities used Metal which is Rate Challan for Proposed Recovery D.E.Recomondation for making
No. item No. as per tender as per M'ment Book applicable under 141.34/Cum Royalty paid by (if not produced payment of Royalty charges as
Royalty charges( 50.00/Brass contractor (Plase challan or partely per actual consumption of
Qty. Rate of
in Cu.M./Brass attached produced material
consumption
1 2 3 4 5 6 7 8 9
18 For Sand
Construction of dry lean cement
3 concrete Sub- base over a prepared 99.89 0.47 46.95
sub-grade withlaying
Providing and coarse and fine
in-situ M30 Grade
4 unreinforced plain cement concrete 139.80 0.425 59.42
pavement over a prepared sub base
Total 106.37 237.37 25249.05
19 For Other
Providing dry/ trap/ granite/ quartzite/
2 gneiss rubble stone soling 15 cm to 150.35 1.2 180.42
20 cm thick
Supplying including
hard murum/hand packing
kankar at theand
6 road site, including conveying and 0.00 1 0.00
stacking complete.
Total 180.41 216.18 39001.03

Total Rs. 64250.08


Deduct previous paid Rs. 0.00
Total Recovery proposed Rs. 64250.08

Sub Divisional Engineer,


P.W. Sub Division No.1, Shirpur
NAME OF WORK :
Construction of Internal Cement Concrete Road In Janhavi Park in Dalit Vasti at Village Shingave, Tal. Shirpur & Dist. Dhule.

Agency : Shri.Vishal Prakash Sonawane, 54, Pramod Nagar, Nakane Road, Deopur, Dhule, Tal. & Dist. Dhule.
Agr. No. : B-1/EE/118/2023-24
Bill No. : Ist R.A. Bill

CEMENT CONSUMPTION STATEMENT


Sr.No. Item of work Quantity Rate of consumption Therotical used Actual
executed consumption
1 2 3 4 5 6
Construction of dry lean cement concrete
3 Sub- base over a prepared sub-grade with 99.89 4.400 Bag/Cum. 439.52 440.00
coarse and
Providing finelaying
and aggregate
in-situ( natural sand/
M30 Grade
4 unreinforced plain cement concrete 139.80 8.000 Bag/Cum. 1118.40 1118.00
pavement over a prepared sub base with 43
TOTAL 1558.00
I.E. 1558.00

Sub Divisional Engineer,


P.W. Sub Division No.1, Shirpur
NAME OF WORK :
Construction of Internal Cement Concrete Road In Janhavi Park in Dalit Vasti at Village Shingave, Tal. Shirpur & Dist. Dhule.

Agency : Shri.Vishal Prakash Sonawane, 54, Pramod Nagar, Nakane Road, Deopur, Dhule, Tal. & Dist. Dhule.
Agr. No. : B-1/EE/118/2023-24
Bill No. : Ist R.A. Bill

STEEL CONSUMPTION STATEMENT


Item No. Item of work Quantity Rate of consumption Therotical used Actual
executed (MT) consumption
(MT)
1 2 3 4 5 6

1 TMT Steel 0 1 MT 0 0.00

Total Qty. in M.T. 0.00

Sub Divisional Engineer,


P.W. Sub Division No.1, Shirpur
NAME OF WORK :
Construction of Internal Cement Concrete Road In Janhavi Park in Dalit Vasti at Village Shingave, Tal. Shirpur & Dist. Dhule.

Agency : Shri.Vishal Prakash Sonawane, 54, Pramod Nagar, Nakane Road, Deopur, Dhule, Tal. & Dist. Dhule.
Agr. No. : B-1/EE/118/2023-24
Bill No. : Ist R.A. Bill

RECOVERY STATEMENT
Sr. Description of the Material Total Required Total Rate Challans for Proposed D.E.
No. with Item No. as per Tender Quantities Material Consumption 7.67 / Cum royalty paid recovery (if Recomondation
as per Consumption 100.00 / by contractor not produced for making
Tender (Sand / Brass (Please challan or payment of
Metal) attached) partely Royalty charges
Produced) As per actual
consumption of
material

1 2 3 4 5 6 7 8 9

…………...………………. निरं क ………………………….


0.00

Total Qty. in M.T. 0.00

Sub Divisional Engineer,


P.W. Sub Division No.1, Shirpur

You might also like