DRILL PERFORMANCE REPORT Cod : ENRG-HSE-HOO-019

Date : 04-08-2021

Project: REPLACEMENT 80KM OF 36” AMAL-RAS LANUF PIPELINE Rev: 00

EXERCISE DATE 23-03-2022 Timing : 09:30 am FROM :09:30 TO: 09:45

1. Details of simulated emergency :


Personnel evacuation test in CPPE bechr's camp
2. The purpose of this test drill was to:
To check efficiency of the emergency response plan
To check awareness, response and actions of the employees in case of evacuation.
-To check the response and coordination of all emergency team
-To familiarize employees with emergency cases.
To ensure fast, organized and smooth evacuation by all concerned parties during emergencies.
To test the working conditions and the method and the possibility of evacuation on scaffolding inside the FWT.
To check alarm camp system
3.Personnel concerned:
Camp and administration staff
4. Drill's time scale:
09:30 am : Starting the drill by pressing the alarm
09:32 am : Analysing people reaction
09:40 am : Master check and head account
09: 45 am : End of the drill
9:50 am : Briefing with all involved persons
10: 00 am : TBT and answers to employee questions
5.Photos

04/22/2024 PAGE 1 OF 2
747256774.xlsx
DRILL PERFORMANCE REPORT Cod : ENRG-HSE-HOO-019

Date : 04-08-2021

Project: REPLACEMENT 80KM OF 36” AMAL-RAS LANUF PIPELINE Rev: 00

EXERCISE DATE 23-03-2022 Timing : 09:30 am FROM :09:30 TO: 09:45

GENERAL EVALUATION:

Assessment Yes N0 Assessment Yes N0

Was drill conducted as per drill guideline ? X Was degree of participation of personnel adequate ? X

Were emergency response as per standard procedures ? X Was diligence, in general, satisfactory ? X

Were standard operating procedures effective ? X Did all equipment function adequately ? X

Was drill conducted safely ? X Was the de-brief conducted X

Were all personnel familiar with their assigned duties ? X

LESSONS LEARNED/ OBESERVATIONS MADE:


Positive observation:

The Drill was a very good opportunity to identify the difficulties we can face in similar case .
The emergency response Plan and the responsibilities of the evacuation team was undestood by the supervisors .
Negative observation:
The alarm sound installed in the guardian cabinet is too low
The alarm installed near the restaurant is not functionning .
9 employees did not response to the evacuation alarm due to non hearing the alarm for the management personnel and lack of awareness for the other employees .

ACTION PLAN :
ACTIONS CONCERNED FOLLOW UP

To provide and install adequate alarm speakers in order to reach all camp parts CPPE site logistic HSSE Site Coordinator

To conduct an awareness session for all employess regarding Emergency response plan and
assign responsibilities in any emergency situation . HSE Site Coordinator HSE Manager

Emergency contact to be communicated to all workforce via TBT's and to be displayed on the
HSE Site Coordinator HSE Manager
camp .

Transmitted by Verified by Approved by


Rev. Date
Name Visa Name Visa Name Visa

0 3/23/2022 Farid Zrida Bilel Besbes Bilel Besbes