You are on page 1of 4

CURRICULUM VITAE

ABDUL AZIZ
PIPING FORMANE
CONTACT: 0573252680
E-MAIL: mdazizulhoque720@gmail.com

OBJECTIVE
I am self-motivated, hardworking with positive attitude towards my career and in my life. i am
more flexible and adaptable to work in any kind of environment
To work as a Piping Supervisor in the oil and gas industry. To take up challenging jobs all the
Time and crossing success as milestones in every moment of my professional life by utilizing my
technical skills and experience gained from the industry while working in a professionally
managed environment of your esteemed organization.

CAREER SUMMERY
Have an overall 7 Years' Experience in Piping Foreman/Monitoring with Construction, gas and
fertilizer Companies in Saudi Arabia. Supervised Erection/Installation/Inspection of the
following: Piping, Pre-Fabrication activities of piping systems, Pre-shutdown and shutdown
activates. Critical Pipe Supports, Special pipe supports, Material traceability, Dimensional
Checking, involved in heat treatment, Line checks prior to Hydro testing, pre- commissioning,
commissioning, support install.

PERSONAL INFORMATION:
Name : ABUUL AZIZ
Fathers Name : ABDUL HAKIM
Nationality : BANGLADESHI
Religion : ISLAM
Date of birth : 20TH MAY 1993
Blood group : A+ (positive)
Marital status : Unmarried
Sex : Male
Height : 5 Feet 6 Inches
IQAMA NUMBER : 2444038752
Passport Number : BL0246353
Language : ENGLISH, HINDI, BENGALI, ARABIC & Little bite CHINESE Speaking.
Present address : JUBAIL CITY CENTER
Permanent address : JUBAIL CITY CENTER
EDUCATIONAL QUALIFICATION:
EXAM PASSING YEAR RESULT SUBJECT COLLEGE/SCHOOL
SECONDERY SCHOOL 2015 GPA 2.71 COMMERCE MOJIR UDDIN HIGH SCHOOL
CERTIFICATE

COMPUTER SKILL:
SOFTWER : ADOVE PHOTOSHOP
OPERATING SYSTEM : WINDOWS,10,11
MICROSOFT OFFICE PACAGE : MS WORD, MS EXCEL & INTERNET BROWSING

WORK EXPERIENCE:

 PIPING FABRICATOR: 8th FEBRUARY 2017-10th DECEMBER 2018


SEPCOIII PP-14 Power Block Project RIYADH AL-KHARJ
DEPARTMENT: Piping

 PIPING FABRICATOR: 15th DECEMBER 2018-30th JULY 2019


SEPCOII JIGCC EPC #2 power block project JAZAN
DEPARTMENT: Piping

 PIPING FOREMAN: 10th august 2019-21st march 2020


SEPCO ARABIA JIGCC EPC #4 power block project JAZAN
DEPARTMENT: Turbine

 PIPING FOREMAN: 6th SEPTEMBER 2020-31st MAY 2021


SEPCOIII pp-14 power block project RIYADH AL-KHARJ
DEPARTMENT: Boiler

 PIPING FOREMAN: 15th JUN 2021-20st MAY 2022


Ras Al-Khair Soda Ash and Calcium Chloride Project of ELECO

DEPARTMENT: Boiler, Brine section crystallization


 PIPING FOREMAN: 8th JUN 2022-18st MAY 2023
 Red Sea Public Utility Asset And Infrastructure PPP Project

DEPARTMENT: Boiler

 PIPING FOREMAN: 28th MAY 2023-8st JAN 2024


Alucor Arabia Limited Co/TANAJIB INDEPENDENT POWER PLANT

DEPARTMENT: Piping

DUTIES AND RESPONSIBILITIES:


 Monitoring piping installation in accordance with P & ID general arrangement diagram
 Supervision of Fabrication works
 Progress monitoring & maintaining manpower, equipment, material
requirements to meet the project schedule.
 • Daily planning of site activities
 Supervision and witness hydro testing, pneumatic testing and flushing of piping system
and prepare the necessary documents
 Preparation of work procedure and inspection test plan
 Studies drawings and Specification and explain to the crew the task require
 To witness the hydro test of the completed piping
 Checking and preparing the hydro test completed piping
 Prepare piping test package and hydro testing
 Prepare and submit work completion report to pre commissioning Manager Preparing
the punch lists and recommending to concerned department for them
 in complete works . Inspection and witness hydro testing, pneumatic testing and
flushing of piping system and prepare the necessary documents.
 14. Putting forward to schedule the test circuits for inspection (Mechanical Clearance)
from client
 Marking the test circuit lines ready and conducting hydro test as per schedule
 Implementing safety awareness to provide safe working environment
 Check all items equipment tools and work areas clean and orderly
 Check all fire extinguishers located in the area and check the expirations regularly
 Piping material identification according to standards
 Allocation of materials according to applications
Identifying the materials according to isometric drawings and corresponding bill of materials

Identifying the type of welding joints according to size, materials and weather conditions

• Supervision of spool fabrication, which include dimensional and quality checking

• Prepare & submit work completion report to fabrication in charge

The ways in which fittings, elbows and valves are fitted in the line are checked according to
isometric drawing

Surveying installation, erection piping & pipe support works

 To carry out dimensional & visual inspection of pipe supports after fabrication
 Erection of piping as per drawing and relevant standards
 Manpower planning checking the safety clearance and executing the work with safety
standards
 Materials take off from isometric drawing
 Calculation of pipe supports from relevant drawings & supervise the pipe supports
fabrication and erection
 Supervise erection of any prefabricated parts in job site
 Inspection and witness hydro testing, pneumatic testing and flushing of piping system
and prepare the necessary documents
 Inspect and check installation and alignment of piping system
 Up-date as built drawings regarding the actual revision and changes of all fabricated
erected installation works
 Preparation of daily, weekly and monthly completed job reports and submitting

DECLARATION:
I am confident of my ability to work in a team and I have a good leadership quality. I
hereby declare that the information furnished above is true to the best of my
knowledge. If employed, I am willing to relocate immediately.

You might also like