You are on page 1of 3

RENCANA PENGENDALIAN LALU LINTAS

HSE
Traffic Control Plan

No. Dokumen Tanggal Efektif Revisi No.


PGP-HSE-FRM-178 7 Apr 2023 0.0

Rev Date Prepared by Reviewed by Approved by

0.0 2 Apr 2023 Name Sign Name Sign Name Sign

Nur Annisa Luli Abdul Rahman

for Steven Tumalun Widji Pramadjati

1. TRAFFIC CONTROL PLAN DETAILS

Site Name: Pani Gold Project Responsible Department: Management

Location: PBC Application Dates 7 Apr 2023


(From-To/ Permanent):

Brief Description Untuk mengurangi resiko interaksi antar alat bergerak, serta alat bergerak dan personal/ hak
of reason for TCP: milik di dalam PBC.
To reduce the risk of interaction between mobile eq., and mobile equipment & personnel/
property.
Departments/ Semua karyawan/ pengunjung PGP, termasuk Kontraktornya.
Stakeholders to All PGP employees/ visitors, including its Contractors.
be Notified:

2. DESCRIPTION OF CONDITIONS
Speed Limit and • Batas kecepatan maksimal di dalam PBC 10 km/ jam.
Operating Conditions The speed limit inside PBC is 10 kph.
Traffic Volumes • LV, Manhaul. Telehandler.
LV, Manhaul. Telehandler.
Parking Areas • LV, Manhaul, Light Truck, sepeda motor parkir di area yang ditentukan.
LV, Manhaul, Light Truck, motorcycles park at designated area.
• Dilarang parkir di depan Klinik PBC, Fuel Station, dan Ruang Genset; serta di
antara Mess Nanasi dengan Mess Perempuan.
No parking in front of PBC Clinic, Fuel Station, and Genset house; and between
Nanasi Camp and Girls Camp.
• Parkir mundur.
Reverse parking.
Pedestrians • Menggunakan jalur pejalan kaki yang tersedia.
Use the provided pedestrian walk.
Public Transport • LV, Truck Ringan, sepeda motor yang diizinkan.
Authorized LV, Light Truck, motorcycles.
Drainage • Sesuai desain.
As per design.
3. LONG / SHORT TERM CONSIDERATIONS
Long Term Peta Rencana Pengendalian Lalu Lintas akan diperbaharui secara berkala saat ada
perubahan.
The Traffic Control Plan map will be updated regularly when changes occur.
Short Term • Membuat Rencana Pengendalian Lalu Lintas untuk Area PBC yang harus
ditaati semua karyawan/ pengunjung PGP, termasuk Kontraktornya, sebagai
berikut:
Create a PBC Area Traffic Control Plan to be adhered to by all PGP employees/
visitors, including its Contractors, as follows:
a. Semua karyawan/ pengunjung PGP, termasuk Kontraktornya harus
mengenakan APD harus saat memasuki area harus APD.

DOKUMEN INI TIDAK TERKENDALI DALAM BENTUK SALINAN CETAK Hal. 1 dari 3
RENCANA PENGENDALIAN LALU LINTAS
HSE
Traffic Control Plan

No. Dokumen Tanggal Efektif Revisi No.


PGP-HSE-FRM-178 7 Apr 2023 0.0
All PGP employees/ visitors, including its Contractors must wear PPEs
when enteting mandatory PPE area.
b. Dilarang memasuki area helipad/ HGS bagi yang tidak berkepentingan.
No unauthorized access to helipad/ HGS area.
c. Pengunjung dan karyawan baru harus melapor ke Pos Security sebelum
memasuki PBC, serta didampingi oleh Security.
Visitors and new employees must report to Security Post before entering
PBC and accompanied by the Security.
d. Kendaraan tanpa stiker komisioning (kendaraan logistik, truk pengangkut
LB3, dll.) yang memasuki PBC harus terlebih mendapat Kartu Izin Akses
Sementara dari Pos Security.
Vehicles without commissioning stickers (logistics vehicle, Hazmat
transport truck, etc.) entering PBC must initially obtain Temporary Access
Permit Card from the Security Post.
e. Kendaraan logistik harus disertai dan diarahkan oleh Spotter.
Logistics vehicle must be accompanied and directed by a Spotter.
f. Sepeda motor dilarang masuk melewati gerbang PBC.
Motorcycles are prohibited from entering through PBC gate.
g. Melengkapi rambu- rambu petunjuk keselamatan.
Completing the safety signs.
h. Membarikade area yang berpotensi bahaya
Barricading potentially hazardous area.
• Mengikuti arahan spotter yang ditempatkan.
Follow the directions of spotter.
4. TRAFFIC IMPACTS
Roadway Capacity Semua unit
All Units.
Traffic Signal Rambu MAKS. 10km/ jam.
Capacity MAX. 10KM/ HR sign
Traffic Generation/ TCP disosialisasikan ke semua karyawan/ pengunjung PGP, termasuk
Re-distribution Kontraktornya.
TCP socialized to all PGP employees/ visitors, including its Contractors
Modeling N/A

5. TRAFFIC MANAGEMENT & ROAD SAFETY


Safety Barriers and
N/A
Terminal Treatments
Speed Zone • Batas kecepatan maksimal di area PBC 10 km/ jam.
Management The speed limit at PBC Area is 10 kph.
Agreed Lane Closure • Rencana Pengendalian Lalu Lintas akan diterapkan 7 Apr 2023.
Times Traffic Control Plan to be implemented on 7 Apr 2023.
Road Closures and
N/A
Detours
Other Road Users Public

DOKUMEN INI TIDAK TERKENDALI DALAM BENTUK SALINAN CETAK Hal. 2 dari 3
RENCANA PENGENDALIAN LALU LINTAS HSE
Traffic Control Plan

No. Dokumen Tanggal Efektif Revisi No.


PGP-HSE-FRM-178 7 Apr 2023 0.0

6. TCP DIAGRAM AND SUMMARY


PBC AREA Item Detail

1. TCP Revision No: 0.0


2. Location PBC
3. Brief Description of Untuk mengurangi resiko interaksi antar alat
Reason for TCP bergerak, serta alat bergerak dan personal/ hak
milik di dalam PBC.
To reduce the risk of interaction between mobile
eq., and mobile equipment & personnel/ property.
4. Application Dates 7 Apr 2023
5. No. & Post of Traffic N/A
Controllers
6. Speed Limit zones 10km/ jam
10km/ hr
7. Signage type & Rambu MAKS. 10km/ jam di Pos Security
Location MAX. 10KM/ HR sign at Security Post
8. Barrier types to be N/A
used
9. Communication N/A
10. Lighting Positions N/A
11. Other Road Users Public
12. Other Notes: Kendaraan yang melintasi Fuel Station harus
sangat berhati-hati.
Vehicles passing Fuel Station to use extra caution.

LEGEND:
: Parkir LV
: Parkir Ambulance
: Area Bongkar-Muat BBM
: Area Perbaikan LV
: Parkir Sepeda Motor
: Parkir LV non PGP

DOKUMEN INI TIDAK TERKENDALI DALAM BENTUK SALINAN CETAK Hal. 3 dari 3

You might also like