Professional Documents
Culture Documents
PRICING SCHEDULE
Item
No. Description Unit Quantity Unit Price Total Price
1.
SECOND FLOOR (REGISTRY OFFICE)
Supply and install partition wall (2.40m
high) with: bottom track plugged and top
track fixed to suspended ceiling tees
1.1 (Skirting). m 10.12 R R
Supply and install partition wall (2.40m
high): bottom track plugged and top track
fixed to suspended ceiling tees (Skirting).
1.2 (partition 4.61 m x 2). m 4.61 x 2 R R
Supply and install wooden doors with
aluminium frame and locking mechanism.
1.3 Size: 81cm x 2,34m (h). no 3 R R
Supply painting doors both sides with
1.4 SANC colours (81cm x 2,34m high). no 3 R R
Supply painting of the wall partition both
1.5 sides (SANC will provide colour). m 10.12 R R
Remove and dispose the existing
1.6 partitions and doors. m 10.12 R R
Supply painting of the wall partition both
1.7 sides (SANC will provide colour). 4.61 x 2 R R
Page 11 of 20
INVITATION TO BID: RFQ 01/2024-25/SANC – APPOINTMENT OF A SERVICE PROVIDER TO REARRANGEMENT OF SECOND FLOOR PROVIDER
AFFAIRS OFFICES LAYOUT AT CECILIA MAKIWANE BUILDING
Item
No. Description Unit Quantity Unit Price Total Price
Page 12 of 20
INVITATION TO BID: RFQ 01/2024-25/SANC – APPOINTMENT OF A SERVICE PROVIDER TO REARRANGEMENT OF SECOND FLOOR PROVIDER
AFFAIRS OFFICES LAYOUT AT CECILIA MAKIWANE BUILDING
Item
No. Description Unit Quantity Unit Price Total Price
Page 13 of 20