Jha Energization
Jha Energization
Asd
Contact resistance test
Preparation of equipment 2.1 Ergonomic hazard. Manual handling / lifting L4 2.1.1 Conduct separate toolbox meeting with L1
2.2 Tripping hazard due to scattered materials. regards to the activity involving all personnel
2 involve in the activity (Pre-job Briefing)
2.3 Manual handling
2.1.2 Engineering control. Use wheel borrow for
hauling of materials
2.2.1 Conduct housekeeping. Remove all
unwanted materials on the walkways.
2.3.1 Implement buddy system to minimized
bearing of weight.
2.4.1 Designate watcher spotter to warn all workers
passing by the area.
2.4.2 Enclose area with warning signs and
barricade.
2.5.1 ensure the ground are levelled prior to start
the unloading.
2.6.1 Ensure that supervisors are in the activity to
monitor the activity.
Connection of equipment 3.1 Ergonomic hazard from awkward positioning. 3.1.1 Conduct frequent stretching. L4 L1
3.2.1 Provision of as temporary shed.
3 3.2 Prolonged exposure to high temperature (heat 3.2.2 Frequent break
stress) 3.2.3 Provide sufficient drinking water at
3.3 Weather condition. Rain. workstation.
3.4 Fall hazard 4.3.1 No activity to be perform when raining.
3.5Contact with Energized cable 3.4.1 Provision of catch basin during the hose
3.6 Poor coordination connection.
3.7 Poor supervision 3.5.1 Ensure wearing of hand gloves and long
sleeve uniform.
3.4.1 Provision of adequate working platform and
“Everyone has the STOP WORK AUTHORITY” wearing of full body harness as required.
GEN-SQ-FRM-002
Unrestricted © 2019 by Fluence. All rights reserved.
Rev 0_ Nov 2019 Any reproduction, modification, or electronic transmission of this publication requires the prior written authorization of Fluence. Page 1 of 5
Job Safety Analysis (JSA)
Asd
Contact resistance test
3.5.1 Ensure That the cable is tested to ensure
that the cable was not energize prior to
terminate
3.6.1 Supervisor to coordinate the activity to all
personnel / authorized personnel.
3.6.2 Conduct Pre-job briefing prior to start the
activity.
3.7.1 Supervisor / Engineers must be on the
activity area to supervise the activity.
Conduct resistance test 4.1 Unauthorized interaction to activity. L4 4.1.1 Administrative control. Ensure to conduct L1
4 4.2 Inadequate supervision pre-job briefing and discuss all associated hazard
4.3 Poor cable management (extension cord) prior to start the activity.
4.4 Damage extension cord 4.1.2 Provide suitable barricade and signages on
4.5 Inadequate supervision the area.
4.1.3 Designate / assigned watcher to prevent the
unauthorized interaction.
4.1.4 Ensure that the person performing the activity
is authorized and certified.
4.2.1 Ensure supervisor in charge is in the activity
area to monitor the activity.
4.3.1 Elevate extension cord at least 7ft above the
ground
4.4.1 Inspect extension cord prior to use.
Replacement of damage cable.
4.5.1 Ensure supervisor in-charge to monitor the
activity.
Energization of auxiliary 5.1 Unauthorized interaction 5.1.1 Ensure provide hard barricade and
5 transformer 5.2 Weather condition signages at auxiliary transformer.
5.1.2 Watcher must provide to warn all
personnel.
5.1.3 Activity near the transformer must be
immediately stop.
5.1.4 No energization during wet / raining
condition