Professional Documents
Culture Documents
7sd522 Siemens
7sd522 Siemens
7sd522 Siemens
Contract No:
PIC P - 7703
Name of Substation: 10J SUBSTATION
Description: LINE DIFFRENTIAL RELAY SIEMENS 7SD522 TEST REPORT
Panel: Location: Page 1 of 17
1. RELAY INFORMATION:
3. ELECTRICAL TESTS:
Note:
Contact Status
Output Remarks
Relay De-Energized Relay Energized
K3, K4 Closed () Open ()
TESTED BY WITNESSED BY
xx/xx/20xx
ALFANAR T&C SIEMENS MARAFIQ RCA
Name Eng. Eng. Eng. Eng.
Signature
SITE INSPECTION AND TEST RECORD
Contract No:
PIC P - 7703
Name of Substation: 10J SUBSTATION
Description: LINE DIFFRENTIAL RELAY SIEMENS 7SD522 TEST REPORT
Panel: Location: Page 2 of 17
BO 1 K5, K6 PRINTED
BO 2 K5, K7 PRINTED
BO 3 K5, K8 PRINTED
TESTED BY WITNESSED BY
xx/xx/20xx
ALFANAR T&C SIEMENS MARAFIQ RCA
Name Eng. Eng. Eng. Eng.
Signature
SITE INSPECTION AND TEST RECORD
Contract No:
PIC P - 7703
Name of Substation: 10J SUBSTATION
Description: LINE DIFFRENTIAL RELAY SIEMENS 7SD522 TEST REPORT
Panel: Location: Page 3 of 17
MEASUREMENTS:
Note: This test is intended to verify the CT/VT inputs, measurement and CTR, VTR
setting in the local relay.
Step1: Apply rated voltage and current to the relay CT/VT inputs.
TESTED BY WITNESSED BY
xx/xx/20xx
ALFANAR T&C SIEMENS MARAFIQ RCA
Name Eng. Eng. Eng. Eng.
Signature
SITE INSPECTION AND TEST RECORD
Contract No:
PIC P - 7703
Name of Substation: 10J SUBSTATION
Description: LINE DIFFRENTIAL RELAY SIEMENS 7SD522 TEST REPORT
Panel: Location: Page 4 of 17
Note:
Open DIGSI® 4/5 Measurement primary value operational value primary after connecting to
the relay& observe the reading, in primary values.
TESTED BY WITNESSED BY
xx/xx/20xx
ALFANAR T&C SIEMENS MARAFIQ RCA
Name Eng. Eng. Eng. Eng.
Signature
SITE INSPECTION AND TEST RECORD
Contract No:
PIC P - 7703
Name of Substation: 10J SUBSTATION
Description: LINE DIFFRENTIAL RELAY SIEMENS 7SD522 TEST REPORT
Panel: Location: Page 5 of 17
NOTE: The Sensitivity and timing tests are conduct with DIFF.TEST Mode: ON
2-Timing test
The following procedure checks the time characteristic for the protection stage (trip
command must relate to the time stop trigger):
1- Inject a current of 2 times the set pickup threshold (the stage Must pickup –watch the
LED and trip after the delay time; the trip command stops the time measurement of the
test equipment)
2- Check the measured time against the expected trip time and write down the result
3- Preset the injection level to the next test current and repeats the test
TESTED BY WITNESSED BY
xx/xx/20xx
ALFANAR T&C SIEMENS MARAFIQ RCA
Name Eng. Eng. Eng. Eng.
Signature
SITE INSPECTION AND TEST RECORD
Contract No:
PIC P - 7703
Name of Substation: 10J SUBSTATION
Description: LINE DIFFRENTIAL RELAY SIEMENS 7SD522 TEST REPORT
Panel: Location: Page 6 of 17
We use automatic ramp to get reset value. Setting is pole open current threshold value (reset value
setting)
Timing test: At setting 0.2
PHASE Inject current (A) Delay Time (ms) Operating Time (ms)
0.40 Zero (Inst)
R 0.40 500
0.40 5000
0.40 Zero (Inst)
Y 0.40 500
0.40 5000
0.40 Zero (Inst)
B 0.40 500
0.40 5000
TESTED BY WITNESSED BY
xx/xx/20xx
ALFANAR T&C SIEMENS MARAFIQ RCA
Name Eng. Eng. Eng. Eng.
Signature
SITE INSPECTION AND TEST RECORD
Contract No:
PIC P - 7703
Name of Substation: 10J SUBSTATION
Description: LINE DIFFRENTIAL RELAY SIEMENS 7SD522 TEST REPORT
Panel: Location: Page 7 of 17
When switching on long, unloaded cables, overhead lines and arc-compensated lines,
Pronounced higher-frequency transient reactions may take place. Although these are
Damped considerably by means of digital filters in the differential protection,
• A pickup value (I-DIF>SWITCH ON) (address 1213) can be set to reliably prevent single-
sided pick up of the protection.
• This pickup value is always active when a device has recognized the connection of a
deadline at its end. For the duration of the seal-in time SI Time all close.
Which was set with the general protection data under address 1132A.
I-Test Procedure
Note: We will use Freja 3rd page (sequence page)
1. On the sequence page, you will generate the settings from 1ST and 2ND state.
2. The sequence page is useful for relays, which require a Pre fault condition before
fault condition, to “reset the relay”.
3. Define the number of cycles for each state. The cycles in 2ND state must be more
than the trip time; a normal value is 200 cycles. Freja will normally not generate all
cycles, it
Will stop after the trip with the number of “Off-delay” cycles
• The following procedure checks the protection function by single-phase operation.
1st test 1- Inject a current of 1.2 times the set pickup threshold using Freja page (2)
only 2-Check the measured time against the expected trip time and write down the
result
2nd test 1- Set Freja page (1) At value below the ID> setting 2- Set Freja page (2)
1.2 times the set pickup threshold using 3- Inject using Freja page (3) 4- Check the
measured time against the expected trip time and write down the result
PHASE Inject current (A) Delay Time (ms) Operating Time (ms)
R 0.5 Zero (Inst)
TESTED BY WITNESSED BY
xx/xx/20xx
ALFANAR T&C SIEMENS MARAFIQ RCA
Name Eng. Eng. Eng. Eng.
Signature
SITE INSPECTION AND TEST RECORD
Contract No:
PIC P - 7703
Name of Substation: 10J SUBSTATION
Description: LINE DIFFRENTIAL RELAY SIEMENS 7SD522 TEST REPORT
Panel: Location: Page 8 of 17
1 Zero (Inst)
2 Zero (Inst)
0.5 Zero (Inst)
Y 1 Zero (Inst)
2 Zero (Inst)
0.5 Zero (Inst)
B 1 Zero (Inst)
2 Zero (Inst)
Current flow or Manual close BI in state 1 for time more than add. 1132 after that
inject current as per tables below in state 2
(*) inject current in between setting of (Idiff> and Idiff>under switch on condition )
This time is the summation of time in add.1217 plus add.1150 (1.0 sec).
(**) Inject current more than Idiff> under switch on condition
TESTED BY WITNESSED BY
xx/xx/20xx
ALFANAR T&C SIEMENS MARAFIQ RCA
Name Eng. Eng. Eng. Eng.
Signature
SITE INSPECTION AND TEST RECORD
Contract No:
PIC P - 7703
Name of Substation: 10J SUBSTATION
Description: LINE DIFFRENTIAL RELAY SIEMENS 7SD522 TEST REPORT
Panel: Location: Page 9 of 17
Timing test
PHASE Inject current (A) Delay Time (ms) Operating Time (ms)
2.4 Zero (Inst)
R
4 Zero (Inst)
6 Zero (Inst)
2.4 Zero (Inst)
Y 4 Zero (Inst)
6 Zero (Inst)
2.4 Zero (Inst)
B 4 Zero (Inst)
6 Zero (Inst)
Contract No:
PIC P - 7703
Name of Substation: 10J SUBSTATION
Description: LINE DIFFRENTIAL RELAY SIEMENS 7SD522 TEST REPORT
Panel: Location: Page 10 of 17
SETTING
Idiff>> switch on Measured Pick Up Value Operating Time (ms)
PHASE
cond. add 1235 (A) @ 2×setting
(A)
1
R 1.5
2
1
Y 1.5
2
1
B 1.5
2
Contract No:
PIC P - 7703
Name of Substation: 10J SUBSTATION
Description: LINE DIFFRENTIAL RELAY SIEMENS 7SD522 TEST REPORT
Panel: Location: Page 11 of 17
Inject one phase current (1A-60HZ and 0.22A-120HZ) and another phase by
(1A-60HZ). the relay will trip after the summation of time in
(add.2310+add.1217)
SETTING:
CTR: 3000/1
LOCAL CT ERROR:3%
REMOTE CT ERROR:3%
SYSTEM ERROR:1-2%
At setting 0.3
Using communication channel between two relays and by injected current in both relays by 180º
ANGLE difference.
Contract No:
PIC P - 7703
Name of Substation: 10J SUBSTATION
Description: LINE DIFFRENTIAL RELAY SIEMENS 7SD522 TEST REPORT
Panel: Location: Page 12 of 17
2.458 2
3.53 3
1.385 1
Y 2.458 2
3.53 3
1.385 1
B 2.458 2
3.53 3
IREST = IDIFF Set. + (CT ERROR*ILOCAL) + (CT ERROR*IREMOTE) +SYS Error*(ILOCAL +IREMOTE)
STABILITY TEST:
B. IN ZONE FAULT: current of 1.0 A on remote end and 1.0 A on local end
with 0º phase shift between the two currents. The differential and restraining
currents are observed in both the relays.
TESTED BY WITNESSED BY
xx/xx/20xx
ALFANAR T&C SIEMENS MARAFIQ RCA
Name Eng. Eng. Eng. Eng.
Signature
SITE INSPECTION AND TEST RECORD
Contract No:
PIC P - 7703
Name of Substation: 10J SUBSTATION
Description: LINE DIFFRENTIAL RELAY SIEMENS 7SD522 TEST REPORT
Panel: Location: Page 13 of 17
ON ON
ON OFF
OFF ON
OFF OFF
SWITCH ON TO FAULT
Test Procedure
50HS INS. SOTF-O/C I>>> add. 2404:
1- DISABLES ALL THE OTHER FUNCTION
2- Normalize the connection with fiber cable between two relay.
3- Activate CB OPEN POS. BI in two relay.
4- At FREJA Pag. 2 inject current of phase near setting
5- Increase value and inject from Pag.2 until get stable value and inst. Trip time
The trip time must be instantaneously, not delayed (only the inherent delay time of
Approx 45ms applies)
Set value of I>>> = 4.0 A
OPERATING TIME @
Setting R Y B
2×setting
4.0 A
OPERATING TIME @
Setting R Y B
2×setting
5.0 A
Indications:
Function Test result
TESTED BY WITNESSED BY
xx/xx/20xx
ALFANAR T&C SIEMENS MARAFIQ RCA
Name Eng. Eng. Eng. Eng.
Signature
SITE INSPECTION AND TEST RECORD
Contract No:
PIC P - 7703
Name of Substation: 10J SUBSTATION
Description: LINE DIFFRENTIAL RELAY SIEMENS 7SD522 TEST REPORT
Panel: Location: Page 14 of 17
CHARGING CURRENT
Connect fiber between two relays or set relay under test at DIFF TEST
I diff>PU=0.3 A
ICH ICH
I INJECTED Voltage injected
PH Calculated Measured
[A] [V]
% [A] % [A]
R 0.0 66.4 0.28
Y 0.0 66.4 0.28
B 0.0 66.4 0.28
Which:
R 30 V
TESTED BY WITNESSED BY
xx/xx/20xx
ALFANAR T&C SIEMENS MARAFIQ RCA
Name Eng. Eng. Eng. Eng.
Signature
SITE INSPECTION AND TEST RECORD
Contract No:
PIC P - 7703
Name of Substation: 10J SUBSTATION
Description: LINE DIFFRENTIAL RELAY SIEMENS 7SD522 TEST REPORT
Panel: Location: Page 15 of 17
Y
B
Time (sec)
Phase Set Voltage (V) P/U Voltage (V)
Set Meas.
R, Y, B 5.0 3.0
Final setting:
TESTED BY WITNESSED BY
xx/xx/20xx
ALFANAR T&C SIEMENS MARAFIQ RCA
Name Eng. Eng. Eng. Eng.
Signature
SITE INSPECTION AND TEST RECORD
Contract No:
PIC P - 7703
Name of Substation: 10J SUBSTATION
Description: LINE DIFFRENTIAL RELAY SIEMENS 7SD522 TEST REPORT
Panel: Location: Page 16 of 17
SWITCH ON TO FAULT
TESTED BY WITNESSED BY
xx/xx/20xx
ALFANAR T&C SIEMENS MARAFIQ RCA
Name Eng. Eng. Eng. Eng.
Signature
SITE INSPECTION AND TEST RECORD
Contract No:
PIC P - 7703
Name of Substation: 10J SUBSTATION
Description: LINE DIFFRENTIAL RELAY SIEMENS 7SD522 TEST REPORT
Panel: Location: Page 17 of 17
SETTING:
FOR BOTH RELAY LOCAL AND REMOTE:
CTR: 3000/1 A
K_alf/K_alf nominal add. 0251= 2.0
CT ERROR in % at K_alf/K_alf nominal add. 0253 =3%
CT ERROR in % at K_alf nominal add. 0254= 10%
SYSTEM ERROR: 2%
At setting Idiff> 0.3
Using communication channel between two relays and by injected current in both relays by
180º ANGLE difference.
TESTED BY WITNESSED BY
xx/xx/20xx
ALFANAR T&C SIEMENS MARAFIQ RCA
Name Eng. Eng. Eng. Eng.
Signature