You are on page 1of 57

GOVERNMENT OF KARNATAKA

PUBLIC WORKS DEPARTMENT


DEPARTMENT
DHARWAD-DIVISION
DHARWAD

: Name of Work :

Construction of 6 Class rooms to Govt Urdu High School At Sadashivanagar


In Hubballi City.
KPWD/2022-23/BD/WORK_INDENT156796

AGENCY: : Sri Rajasab Allisab Nadaf

FUND HEAD : Under H/A 8443 Deposit Contribution

R.A. BILL NO- 1st AND Part

MEASUREMENT BOOK

Page No: to

PUBLIC WORKS DEPARTMENT


DEPARTMENT
SUB-DIVISION
HUBBALLI
.- : CERTIFICATE :-

1. Payment of items of works included in this bill has not been claimed
in any other scheme and the payment on the items of work already done
2. All the items of work claimed in this bill have been executed as per
specification. I recorded the measurement of the all items included in

Section Officer
P.W.D Sub-Division,
Hubballi

3. I personally checked all the measurements of all the items of work


from page to in this bill. All the items of works have been executed

Assistant Executive Engineer


P.W.D Sub-Division,
Hubballi

4. I personally checked the measurement 25% of the items claimed in


this bill and these have been executed as per specification.

Executive Engineer.
P.W.D Sub-Division,
Dharwad.
adashivanagar
SL NO Description No L B D QTY units Remarks Rate Amount
Finishing walls with 100% Premium acrylic
emulsion paint having VOC less than 50 gm/litre
and UV resistance as per IS 15489:2004,
Alkali & fungal resistance, dirt resistance exterior
paint of required shade (Company Depot Tinted)
with silicon additives, New work (Two coats
applied @ 1.43 litre/ 10 m². Over and including
priming coat of exterior primer applied @ 0.90
litre/10 m² with paint of approved quality to give
an even shade, after thoroughly brooming the
surface to remove
1 all dirt, dust, mortar drops and foreign matter
including preparing the surface even and sand
paper smooth, cost of materials, labour complete
as per specifications and as per directions of
Engineer-in-charge.

Inside painting For Ground Floor


Class Room 1 1 28.72 3.33 95.638
Class Room 2 1 28.72 3.33 95.638
Class Room 3 1 28.72 3.33 95.638
BLACK BOARD 6 2.4 1.2 17.280
304.193
Deduction for Ground Floor
Doors 3 1.2 2.1 7.56
Windows (W1) 6 1.8 1.27 13.716
Windows (W1) 3 1.25 1.2 4.5
25.776
Total = 278.417

Inside Painting For First Floor


Class Room 1 1 28.72 3.33 95.638
Class Room 2 1 28.72 3.33 95.638
Class Room 3 1 28.72 3.33 95.638
SL NO Description No L B D QTY units Remarks Rate Amount
BLACK BOARD 6 2.4 1.2 17.280
304.193
Deduction for First Floor
Doors 3 1.2 2.1 7.56
Windows (W1) 6 1.8 1.27 13.716
Windows (W1) 3 1.25 1.2 4.5
25.776
Total = 278.417
Grand Total= 556.834 Sqm 117.60 65483.631
Finishing walls with water proofing cement paint
of required shade:Old work (one coats applied @
2.20 kg/10 m²) over priming coat of primer
applied @ 0.80 litrs/10 m² complete including cost
of Priming coat including preparing the surface
after thoroughly
cleaning the surface to remove all dirt, dust and
foreign matter, cost of materials, labour complete
as per specifications and as per directions
2 of Engineer-in-charge.

out side painting For Ground Floor


Rooms out side 1 61.82 3.3 204.006
Corridor 1 41.62 1.3 54.106
Columns 7 0.92 3.3 21.252
279.364
Deduction for Ground floor
Doors 3 1.2 2.1 7.56
Windows (W1) 6 1.8 1.27 13.716
Windows (W1) 3 1.25 1.2 4.5
SL NO Description No L B D QTY units Remarks Rate Amount

25.776
Total = 253.588
out side painting For First Floor
Rooms out side 1 56.12 3.3 185.196
Corridor 1 41.62 1.3 54.106
Columns 7 0.92 3.3 21.252
260.554
Deduction for First floor
Doors 3 1.2 2.1 7.56
Windows (W1) 6 1.8 1.27 13.716
Windows (W1) 3 1.25 1.2 4.5
25.776
Total = 234.778
Grand Total = 488.366 Sqm
Stairs
Ground floor to first floor
1st flight 1 6.35 1.95 12.3825
2nd flight 1 6.35 1.95 12.3825
First floor to Terrace
1st flight 1 6.35 1.95 12.3825
2nd flight 1 6.35 1.95 12.3825
Parapet 1 60.58 2.03 122.9774
Chajja 12 3.9 0.15 7.02
Total = 179.527 Sqm
Grand Total = 667.893 69.30 46285.01
Painting Steel work with Deluxe Multi Surface
Paint to give an evenshade. Two coat applied @
0.90 ltr/10 m² over an under coat of primer
applied @ 0.80 ltr/10 m² of approved brand and
manufacture including preparing the surface after
3 thorougly cleaning oil, grease, dirt and foreign
matter, cost of materials, labour complete as per
specifications and as per directions of Engineer-in-
charge.

MS Grill oil painting for (GF )


SL NO Description No L B D QTY units Remarks Rate Amount

Windows (W1) 6 1.8 1.27 13.716


Windows (W1) 3 1.25 1.2 4.5
18.216
MS Grill oil painting for (FF )
Windows (W1) 6 1.8 1.27 13.716
Windows (W1) 3 1.25 1.2 4.5
18.216
Total = 36.432 Sqm 111.300 4054.88
Providing & fixing of 2-track x 2-panel sliding
windows made out of multi chambered UPVC
(Matching to RAL-9016) sections and with
minimum TiO2(Titanium Dioxide) at 6PHR with
TPE(Thermo Plastic Elastomer) and lead free,
gaskets -grey colour having isolated drainage and
reinforced with Galvanized Iron profile through-
out the window frame. The outer frame having an
4 overall size of 50mm width x 42mmheight with
reinforcement of 1mm thickness and Sash with
overall size of 31mm X 57mm with Gi
reinforcement of 1mm for the frame and 1.5 mm
for the sash. Coextruded Glazing bead for fixing of
glass shall be of size 21.5mm x 9.5 mm. Windows
shall be provided with 5mm plain float glass,
standard hardware& single point locking system
with touch lock.Wall thickness of frame & sash
SL NO Description No L B D QTY units Remarks Rate Amount
Ground Floor
Windows (W1) 6 1.8 1.27 13.716
Windows (W1) 3 1.25 1.2 4.5
18.216

First Floor
Windows (W1) 6 1.8 1.27 13.716
Windows (W1) 3 1.25 1.2 4.5
18.216
Total = 36.432 Sqm 6134.10 223477.53
Providing and laying water proofing treatment to
the Roof with PU based single component
elastomeric pure polyurethane based coating on
New terrace/Chajjas/Sunken portion of
WC:Bathroom, cold applied PU waterproofing
5 membrane that is highly elastic with elongation
greater than 400% and tensile strength greater
than 2MPa as per ASTM D412. The waterproofing
membrane to be applied in 2coats @ 1.6kg per m2
to achieve final DFT (dry film thickness) of 1mm
including prime coat of epoxy primer @150 g per
Water proofing
Terrace 2 19.91 11.3 449.966
Total = 449.966 790 355473.14
Providing and laying Vitrified tiles in different sizes
(thickness to be specified by the manufacturer),
with water absorption less than 0.08% and
conforming to IS: 15622, of approved brand &
manufacturer, in all colours and shade, in skirting,
riser, treads of steps, laid with cement based high
6 polymer modified quick set tile adhesive (water
based) conforming to IS: 15477, in average 6 mm
thickness, including grouting of joints as per
direction of Engineer in charge.

Flooring staircase below 1 6.35 5.1 32.385


Total = 32.385 Sqm 1233.00 39930.705
SL NO Description No L B D QTY units Remarks Rate Amount
Concealed Conduit System :Supplying heavy gauge
PVC conduit pipe ...... mm dia..........mm thick
confirming to IS 2509 with suitable size bends,
metal/PVC Junction boxes, adhesive paste etc.,
and running before concreting the slab. The
conduit should be tied to the reinforcement rods
7 by using binding wires and unused ways of
junction boxes and pipe ends should be covered
using PVC end enclosures, run with 18SWG GI fish
wire wherever necessary25mm dia 2mm thick

Ground Floor (PVC pipe )


Class Room 1 1 21.77 21.77
Class Room 2 1 21.77 21.77
Class Room 3 1 21.77 21.77
Corridor 1 22.31 22.31
Stair case 1 8.85 8.85
First Floor (PVC pipe )
Class Room 1 1 21.77 21.77
Class Room 2 1 21.77 21.77
Class Room 3 1 21.77 21.77
Corridor 1 22.31 22.31
Stair case 1 8.85 8.85
Total = 192.94 m 70.00 13505.8

Medium point above 3Mtr upto 6Mtr from


8 tapping point to out let via switch box

Ground Floor
Classs Room 1 2 2
Classs Room 2 2 2
Classs Room 3 2 2
Corridor 1 1
First Floor
SL NO Description No L B D QTY units Remarks Rate Amount

Classs Room 1 2 2
Classs Room 2 2 2
Classs Room 3 2 2
Corridor 1 1
14 Points 361.00 5054.00

Wiring for lighting/power circuit using one of FRLS


PVC insulated 1100V grade,1.5 SQMM multistrand
Copper with low conductor resistance single core
9 wire in open or concealed system of wiring with
specified IS-694:1990 & confirming to GTP.

Ground Floor Wire)


Class Room 1 1 21.77 21.77
Class Room 2 1 21.77 21.77
Class Room 3 1 21.77 21.77
Corridor 1 22.31 22.31
Stair case 1 8.85 8.85
First Floor (wire )
Class Room 1 1 21.77 21.77
Class Room 2 1 21.77 21.77
Class Room 3 1 21.77 21.77
Corridor 1 22.31 22.31
Stair case 1 8.85 8.85
Total = 192.94 m 26.00 5016.44
Supplying and fixing of 6AmpsLamp holder on
10 existing board.
Ground Floor (Holder)
Class Room 1
Led Light 4 4
Tube light 2 2
Class Room 2
Led Light 4 4
Tube light 2 2
SL NO Description No L B D QTY units Remarks Rate Amount
Class Room 3
Led Light 4 4
Tube light 2 2
Corridor 6 6
Stair case 3 3
First floor (Holder )
Class Room 1
Led Light 4 4
Tube light 2 2
Class Room 2
Led Light 4 4
Tube light 2 2
Class Room 3
Led Light 4 4
Tube light 2 2
Corridor 6 6
Stair case 3 3
Total = 54 Each 63.00 3402.00
11 Supplying and fixing of of 9watts LED Bulbs.
Ground Floor
Class Room 1
Led Light 4 4
Tube light 2 2
Class Room 2
Led Light 4 4
Tube light 2 2
Class Room 3
Led Light 4 4
Tube light 2 2
Cooridor 6 6
Stair case 3 3
SL NO Description No L B D QTY units Remarks Rate Amount
First floor
Class Room 1
Led Light 4 4
Tube light 2 2
Class Room 2
Led Light 4 4
Tube light 2 2
Class Room 3
Led Light 4 4
Tube light 2 2
Cooridor 6 6
Stair case 3 3
Total = 54 Each 160.00 8640.00
Supplying and fixing of modular stepped
12 electronic fan regulator on existing modular
switch plate as per and IS 1293.

Ground Floor
Class Room 1 2 2
Class Room 2 2 2
Class Room 3 2 2
First Floor
Class Room 1 2 2
Class Room 2 2 2
Class Room 3 2 2
Total = 12 Each 313.00 3756.00
Supplying capacitor type ceiling fan complete with
down rod blades, shackle, canopies etc., for
operation on 230 volts, 50 cycles. Single phase AC
13 supply conforming to ISS-374-1979 and with
double ball bearing system. 48" Sweep (1200mm)
Economy model

Ground Floor
Class Room 1 2 2
SL NO Description No L B D QTY units Remarks Rate Amount

Class Room 2 2 2
Class Room 3 2 2
First Floor
Class Room 1 2 2
Class Room 2 2 2
Class Room 3 2 2
Total = 12 Each 2085.00 25020.00
Supplying and fixing of6/16amps modular
14 Universal Socket on existing modular switch plate
as per IS 3854 and IS 1293.

Ground Floor
Class Room 1 2 2
Class Room 2 2 2
Class Room 3 2 2
Corridor 1
First Floor
Class Room 1 2 2
Class Room 2 2 2
Class Room 3 2 2
Corridor 1
Total = 12 Each 162.00 1944.00
Supplying and fixingof 6to32 Amps Double pole
miniature circuit breakers on existing MCB
distribution boards using necessary fixing
materials and 'C' Type curve, indicator ON/OFF,
15 energy cross-3 with Short circuit breaking capacity
of 10K and complete wiring as required confirming
to IEC 60898.

Ground Floor 4 4
First Floor 4 4
Total = 8 Each 1103.00 8824.00
SL NO Description No L B D QTY units Remarks Rate Amount
Providing fixing on wall face plasticised Rigid PVC
rain water pipes confirming to IS:13592 type A
including jointing with seal ring confirming to
16 IS:5382, leaving 10 mm gap for thermal expansion,
(i) Single socketed pipes 100 mm diameter

. 1 20.05 20.05 m 268.31 5379.615


Total = 815,246.76
Name of the Work: Construction of 6 Class rooms to Govt Urdu High School At Sadashivanagar In Hubballi
City.KPWD/2022-23/BD/WORK_INDENT156796
AGENCY : Sri RajaSab Nadaf of Hubballi
AGREMENT NO : IR/SE/56/2022-23 Dated:23-02-2023
DATE OF COMMENCEMENT : 24-02-2023
DATE OF COMPLETION AS PER AGREEMMENT :23-08-2023
RUNNING ACCOUNT BILL- R.A. BILL -2nd & Part
TENDER AMOUNT: RS. Rs.8249998.99 (-) 0.31 % Lakhs
DATE OF MEASUREMENTS:
Item Item Description Unit Nos Nos Measurements Quantity Total Remarks
NO. Code Length Breadth Depth Quantity
1 1.14/ Earth work excavation for Foundation
vol1 by mechanical means for all works &
depth upto 3 m, as per drawing and
technical specifications, including
setting out, shoring, strutting,
barricading, caution lights, including
dressing of excavated surfaces,
disposing off or levelling the excavated
earth or sorting & stacking the selected
earth for reuse in a radius of 50 m and
lift upto 1.5 m including cost of labour,
tools, usage of machinery & other
appurtenaces required to complete the
work

Toilet block
Column 1 6 1.1 1.1 1 7.26
LW 2 7.76 0.6 0.6 5.59
SW 3 1.68 0.6 0.6 1.81
Septic tank 1 1 2.7 1.5 1.8 7.29
Total = 21.95 21.952

16 of 57
Name of the Work: Construction of 6 Class rooms to Govt Urdu High School At Sadashivanagar In Hubballi
City.KPWD/2022-23/BD/WORK_INDENT156796
AGENCY : Sri RajaSab Nadaf of Hubballi
AGREMENT NO : IR/SE/56/2022-23 Dated:23-02-2023
DATE OF COMMENCEMENT : 24-02-2023
DATE OF COMPLETION AS PER AGREEMMENT :23-08-2023
RUNNING ACCOUNT BILL- R.A. BILL -2nd & Part
TENDER AMOUNT: RS. Rs.8249998.99 (-) 0.31 % Lakhs
DATE OF MEASUREMENTS:
Item Item Description Unit Nos Nos Measurements Quantity Total Remarks
NO. Code Length Breadth Depth Quantity
Providing and laying in position plain
cement concrete for levelling course for
all works in foundation. The
granite/trap/basalt crushed graded
coarse aggregates and fine aggregates as
per relevant IS Codes achine mixed, laid
in layers not exceeding 150 mm
thickness, well compacted using plate
vibrators, including all lead & lifts, cost
of all materials of quality, labour, Usage
charges of machinery, curing, and all
the other purtenances required to
complete the work as per technical
specifications. (The cost of steel
reinforcement & formwork shall be paid
separately) Mix 1:3:6 (M10) Using 40
mm nominal size graded crushed coarse
aggregates

Column 1 6 1.1 1.1 0.1 0.73


LW 2 7.76 0.6 0.1 0.93
SW 3 1.68 0.6 0.1 0.30
Septic tank 1 1 2.7 1.5 0.1 0.41
Total = 2.36 2.3646

17 of 57
Name of the Work: Construction of 6 Class rooms to Govt Urdu High School At Sadashivanagar In Hubballi
City.KPWD/2022-23/BD/WORK_INDENT156796
AGENCY : Sri RajaSab Nadaf of Hubballi
AGREMENT NO : IR/SE/56/2022-23 Dated:23-02-2023
DATE OF COMMENCEMENT : 24-02-2023
DATE OF COMPLETION AS PER AGREEMMENT :23-08-2023
RUNNING ACCOUNT BILL- R.A. BILL -2nd & Part
TENDER AMOUNT: RS. Rs.8249998.99 (-) 0.31 % Lakhs
DATE OF MEASUREMENTS:
Item Item Description Unit Nos Nos Measurements Quantity Total Remarks
NO. Code Length Breadth Depth Quantity
Providing and laying in position plain
cement concrete for levelling course for
all works in foundation. The
granite/trap/basalt crushed graded
coarse aggregates and fine aggregates as
per relevant IS Codes achine mixed, laid
in layers not exceeding 150 mm
thickness, well compacted using plate
vibrators, including all lead & lifts, cost
of all materials of quality, labour, Usage
charges of machinery, curing, and all
the other purtenances required to
complete the work as per technical
specifications. (The cost of steel
reinforcement & formwork shall be paid
separately) Mix 1:3:6 (M10) Using 40
mm nominal size graded crushed coarse
aggregates

Column footing 1 6 1.1 1.1 0.1 0.73


Total = 0.73 0.726

18 of 57
Name of the Work: Construction of 6 Class rooms to Govt Urdu High School At Sadashivanagar In Hubballi
City.KPWD/2022-23/BD/WORK_INDENT156796
AGENCY : Sri RajaSab Nadaf of Hubballi
AGREMENT NO : IR/SE/56/2022-23 Dated:23-02-2023
DATE OF COMMENCEMENT : 24-02-2023
DATE OF COMPLETION AS PER AGREEMMENT :23-08-2023
RUNNING ACCOUNT BILL- R.A. BILL -2nd & Part
TENDER AMOUNT: RS. Rs.8249998.99 (-) 0.31 % Lakhs
DATE OF MEASUREMENTS:
Item Item Description Unit Nos Nos Measurements Quantity Total Remarks
NO. Code Length Breadth Depth Quantity
As per recommendations of Technical
working group, rates for formwork shall
be added on percentage basis to the
finished concrete item rate. For
foundation isolaed footing form works
consider 8% (As per appendix-I)

Same as concrete qty 0.73


Total = 0.73 0.726

19 of 57
Name of the Work: Construction of 6 Class rooms to Govt Urdu High School At Sadashivanagar In Hubballi
City.KPWD/2022-23/BD/WORK_INDENT156796
AGENCY : Sri RajaSab Nadaf of Hubballi
AGREMENT NO : IR/SE/56/2022-23 Dated:23-02-2023
DATE OF COMMENCEMENT : 24-02-2023
DATE OF COMPLETION AS PER AGREEMMENT :23-08-2023
RUNNING ACCOUNT BILL- R.A. BILL -2nd & Part
TENDER AMOUNT: RS. Rs.8249998.99 (-) 0.31 % Lakhs
DATE OF MEASUREMENTS:
Item Item Description Unit Nos Nos Measurements Quantity Total Remarks
NO. Code Length Breadth Depth Quantity
Providing and laying in position
Reinforced cement concrete for all Sub
structures of building, Irrigation works,
Sub structure works of bridges, Drain
works & other parallel works from
0.50m to 3.50 m height. The
granite/trap/basalt crushed graded
coarse aggregates and fine aggregates as
per relevant IS Codes machine mixed
with super plasticisers, laid in layers,
well compacted using needle vibrators,
providing weep holes wherever
necesary, including all lead & lifts, cost
of all materials of quality, confirming to
the requirements of relevant IS codes,
labour, Usage charges of machinery,
curing and all other appurtenances
required to complete the work as per
technical specifications. (The cost of
steel reinforcement & formwork to be
paid separately M25 Design Mix Using 20
mm nominal size graded crushed coarse
Column 1 6 0.23 0.23 1.8 0.57
Total = 0.57 0.5713

20 of 57
Name of the Work: Construction of 6 Class rooms to Govt Urdu High School At Sadashivanagar In Hubballi
City.KPWD/2022-23/BD/WORK_INDENT156796
AGENCY : Sri RajaSab Nadaf of Hubballi
AGREMENT NO : IR/SE/56/2022-23 Dated:23-02-2023
DATE OF COMMENCEMENT : 24-02-2023
DATE OF COMPLETION AS PER AGREEMMENT :23-08-2023
RUNNING ACCOUNT BILL- R.A. BILL -2nd & Part
TENDER AMOUNT: RS. Rs.8249998.99 (-) 0.31 % Lakhs
DATE OF MEASUREMENTS:
Item Item Description Unit Nos Nos Measurements Quantity Total Remarks
NO. Code Length Breadth Depth Quantity
As per recommendations of Technical
working group, rates for formwork shall
be added on percentage basis to the
finished concrete item rate. For form
works consider 70% (As per appendix-I)

Same as concrete qty 0.57


Total = 0.57 0.5713
Providing Thermo-Mechanically Treated
bars of grade Fe-550 Steel
reinforcement for R.C.C. work including
straightening,cutting, bending, placing
in position, binding and anchoring to
adjacent members whereever necessary
complete as per Design including cost of
material, labour, usage charges
complete as per specifications. (The
laps and wastages shall not be measured
separately)

Footing
Main bar 16 mm Φ 6 13 1.2 93.60
16 mm Φ 1.58 kg /rmt 93.6 1.58 147.89
Distribution bar 16 mm Φ 6 13 1.2 93.60

21 of 57
Name of the Work: Construction of 6 Class rooms to Govt Urdu High School At Sadashivanagar In Hubballi
City.KPWD/2022-23/BD/WORK_INDENT156796
AGENCY : Sri RajaSab Nadaf of Hubballi
AGREMENT NO : IR/SE/56/2022-23 Dated:23-02-2023
DATE OF COMMENCEMENT : 24-02-2023
DATE OF COMPLETION AS PER AGREEMMENT :23-08-2023
RUNNING ACCOUNT BILL- R.A. BILL -2nd & Part
TENDER AMOUNT: RS. Rs.8249998.99 (-) 0.31 % Lakhs
DATE OF MEASUREMENTS:
Item Item Description Unit Nos Nos Measurements Quantity Total Remarks
NO. Code Length Breadth Depth Quantity
16 mm Φ 1.58 kg /rmt 93.6 1.58 147.89

Column
Main bar 16 mm Φ 6 8 4.4 211.20
16 mm Φ 1.58 kg /rmt 211.2 1.58 333.7
Striups 8 mm Φ 6 45 1.44 388.80
8 mm Φ 0.395 kg/rmt 388.8 0.395 153.58
Slab
Main bar 12 mm Φ 1 75 2.51 188.25
12 mm Φ 0.89 kg /rmt 188.25 0.89 167.54
Distribution bar 12 mm Φ 1 27 7.39 199.53
12 mm Φ 0.89 kg /rmt 199.53 0.89 177.58
Total = 1128.2 1128.172

22 of 57
Name of the Work: Construction of 6 Class rooms to Govt Urdu High School At Sadashivanagar In Hubballi
City.KPWD/2022-23/BD/WORK_INDENT156796
AGENCY : Sri RajaSab Nadaf of Hubballi
AGREMENT NO : IR/SE/56/2022-23 Dated:23-02-2023
DATE OF COMMENCEMENT : 24-02-2023
DATE OF COMPLETION AS PER AGREEMMENT :23-08-2023
RUNNING ACCOUNT BILL- R.A. BILL -2nd & Part
TENDER AMOUNT: RS. Rs.8249998.99 (-) 0.31 % Lakhs
DATE OF MEASUREMENTS:
Item Item Description Unit Nos Nos Measurements Quantity Total Remarks
NO. Code Length Breadth Depth Quantity
Providing Half brick masonry with
common burnt clay Non Modular bricks
of class designation 3.5 in uperstructure
above plinth level up to floor 1 level
cement mortar 1:4 (1 cement :4 coarse
sand) including cost of all materials,
labour, scaffolding and usage charges of
machinery & other incidental charges
complete as per the direction of
engineer incharge of work.

Toilet
Below ground level 2 7.39 0.75 11.08
2 2.05 0.75 3.07
Above ground level 2 7.39 2.77 40.94
3 2.05 2.77 17.04
Deductions
For door -2 0.9 2.1 -3.78
-2 0.9 1.8 -3.24
Ventilator -6 0.45 0.45 -1.22
Total = 63.90 63.9011

23 of 57
Name of the Work: Construction of 6 Class rooms to Govt Urdu High School At Sadashivanagar In Hubballi
City.KPWD/2022-23/BD/WORK_INDENT156796
AGENCY : Sri RajaSab Nadaf of Hubballi
AGREMENT NO : IR/SE/56/2022-23 Dated:23-02-2023
DATE OF COMMENCEMENT : 24-02-2023
DATE OF COMPLETION AS PER AGREEMMENT :23-08-2023
RUNNING ACCOUNT BILL- R.A. BILL -2nd & Part
TENDER AMOUNT: RS. Rs.8249998.99 (-) 0.31 % Lakhs
DATE OF MEASUREMENTS:
Item Item Description Unit Nos Nos Measurements Quantity Total Remarks
NO. Code Length Breadth Depth Quantity
Providing 20 mm cement plaster of
mix :1:6 (1 cement: 6 fine sand) to
brick/stone masonary including
rounding off corners wherever required
smooth rendering, providing and
removing scaffolding, including cost of
materials, labour, curing complete as
per specifications and as per directions
of Engineer-in-charge.

Inside plaster
Above ground level 2 7.39 2.77 40.94
4 2.05 2.77 22.71
Deductions
For door -2 0.9 2.1 -3.78
-2 0.9 1.8 -3.24
Ventilator -6 0.45 0.45 -1.22
Total = 55.42 55.4196

24 of 57
Name of the Work: Construction of 6 Class rooms to Govt Urdu High School At Sadashivanagar In Hubballi
City.KPWD/2022-23/BD/WORK_INDENT156796
AGENCY : Sri RajaSab Nadaf of Hubballi
AGREMENT NO : IR/SE/56/2022-23 Dated:23-02-2023
DATE OF COMMENCEMENT : 24-02-2023
DATE OF COMPLETION AS PER AGREEMMENT :23-08-2023
RUNNING ACCOUNT BILL- R.A. BILL -2nd & Part
TENDER AMOUNT: RS. Rs.8249998.99 (-) 0.31 % Lakhs
DATE OF MEASUREMENTS:
Item Item Description Unit Nos Nos Measurements Quantity Total Remarks
NO. Code Length Breadth Depth Quantity
Providing and laying in position
Reinforced cement concrete for all
Super structures of building , Road
works, Water works, Irrigation works &
super structure works of bridges upto
3.50 m height. The granite/trap/basalt
crushed graded coarse aggregates and
fine aggregates as per relevant IS Codes
machine mixed with super plasticisers
laid in layers, well compacted using
needle vibrators. The cost includes all
lead & lifts, cost of all materials, quality
confirming to the requirements of
relevant IS codes , labour, Usage
charges of machinery, curing and all
other appurtenances required to
complete the work as per technical
specifications. (The cost of steel
reinforcement, dowel bars & formwork
to be paid separately)

Toilet slab 1 7.39 2.05 0.1 1.51


Total = 1.51 1.51495

25 of 57
Name of the Work: Construction of 6 Class rooms to Govt Urdu High School At Sadashivanagar In Hubballi
City.KPWD/2022-23/BD/WORK_INDENT156796
AGENCY : Sri RajaSab Nadaf of Hubballi
AGREMENT NO : IR/SE/56/2022-23 Dated:23-02-2023
DATE OF COMMENCEMENT : 24-02-2023
DATE OF COMPLETION AS PER AGREEMMENT :23-08-2023
RUNNING ACCOUNT BILL- R.A. BILL -2nd & Part
TENDER AMOUNT: RS. Rs.8249998.99 (-) 0.31 % Lakhs
DATE OF MEASUREMENTS:
Item Item Description Unit Nos Nos Measurements Quantity Total Remarks
NO. Code Length Breadth Depth Quantity
65 12.86.2 Providing & fixing of 2-track x 2-panel
/vol2 sliding windows made out of multi
chambered UPVC (Matching to RAL-
9016) sections and with minimum
TiO2(Titanium Dioxide) at 6PHR with
TPE(Thermo Plastic Elastomer) and lead
free, gaskets -grey colour having
isolated drainage and reinforced with
Galvanized Iron profile through-out the
window frame. The outer frame having
an overall size of 50mm width x
SQM
42mmheight with reinforcement of
1mm thickness and Sash with overall
size of 31mm X 57mm with Gi
reinforcement of 1mm for the frame
and 1.5 mm for the sash. Coextruded
Glazing bead for fixing of glass shall be
of size 21.5mm x 9.5 mm. Windows
shall be provided with 5mm plain float
glass, standard hardware& single point
locking system with touch lock.Wall
thickness of frame & sash shall be of
Ground Floor
Windows (W1) 6 1.8 1.27 13.716
Windows (W1) 3 1.25 1.2 4.5
18.216

First Floor

26 of 57
Name of the Work: Construction of 6 Class rooms to Govt Urdu High School At Sadashivanagar In Hubballi
City.KPWD/2022-23/BD/WORK_INDENT156796
AGENCY : Sri RajaSab Nadaf of Hubballi
AGREMENT NO : IR/SE/56/2022-23 Dated:23-02-2023
DATE OF COMMENCEMENT : 24-02-2023
DATE OF COMPLETION AS PER AGREEMMENT :23-08-2023
RUNNING ACCOUNT BILL- R.A. BILL -2nd & Part
TENDER AMOUNT: RS. Rs.8249998.99 (-) 0.31 % Lakhs
DATE OF MEASUREMENTS:
Item Item Description Unit Nos Nos Measurements Quantity Total Remarks
NO. Code Length Breadth Depth Quantity
Windows (W1) 6 1.8 1.27 13.716
Windows (W1) 3 1.25 1.2 4.5
18.216
Total = 36.432 36.432
68 8.51/ Providing and applying white cement
vol2 based putty of average thickness 1 mm,
of approved brand and manufacturer,
over the plastered wall surface to
prepare the surface even and smooth
complete as per specifications and as
per directions of Engineer in charge.

Inside plaster
Class room 1
SW 2 5.91 2.7 31.914
LW 2 8.45 2.7 45.63
Class room 2
SW 2 5.91 2.7 31.914
LW 2 8.45 2.7 45.63
Class room 3
SW 2 5.91 2.7 31.914
LW 2 8.45 2.7 45.63
BLACK BOARD 3 2.4 1.2 8.64

3 5.91 8.45 149.8185

27 of 57
Name of the Work: Construction of 6 Class rooms to Govt Urdu High School At Sadashivanagar In Hubballi
City.KPWD/2022-23/BD/WORK_INDENT156796
AGENCY : Sri RajaSab Nadaf of Hubballi
AGREMENT NO : IR/SE/56/2022-23 Dated:23-02-2023
DATE OF COMMENCEMENT : 24-02-2023
DATE OF COMPLETION AS PER AGREEMMENT :23-08-2023
RUNNING ACCOUNT BILL- R.A. BILL -2nd & Part
TENDER AMOUNT: RS. Rs.8249998.99 (-) 0.31 % Lakhs
DATE OF MEASUREMENTS:
Item Item Description Unit Nos Nos Measurements Quantity Total Remarks
NO. Code Length Breadth Depth Quantity
1 19.91 2.4 47.784
Total 438.8745 438.87
69 8.32/ Finishing walls with 100% Premium
vol2 acrylic emulsion paint having VOC less
than 50 gm/litre and UV resistance as
per IS 15489:2004, Alkali & fungal
resistance, dirt resistance exterior
paint of required shade (Company
Depot Tinted) with silicon additives,
New work (Two coats applied @ 1.43
SQM
litre/ 10 m�. Over and including
priming coat of exterior primer applied
@ 0.90 litre/10 m� with paint of
approved quality to give an even shade,
after thoroughly brooming the surface
to remove all dirt, dust, mortar drops
and foreign matter including preparing
the surface even and sand paper
Inside painting For Ground Floor
Class Room 1 1 28.72 2.43 69.790
Class Room 2 1 28.72 2.43 69.790
Class Room 3 1 28.72 2.43 69.790
BLACK BOARD 3 2.7 1.3 10.530
Passage portion 2 28.72 3.33 191.275
2 2.4 3.33 15.984
Celling paint
Class Room 1 1 5.91 8.45 49.939

28 of 57
Name of the Work: Construction of 6 Class rooms to Govt Urdu High School At Sadashivanagar In Hubballi
City.KPWD/2022-23/BD/WORK_INDENT156796
AGENCY : Sri RajaSab Nadaf of Hubballi
AGREMENT NO : IR/SE/56/2022-23 Dated:23-02-2023
DATE OF COMMENCEMENT : 24-02-2023
DATE OF COMPLETION AS PER AGREEMMENT :23-08-2023
RUNNING ACCOUNT BILL- R.A. BILL -2nd & Part
TENDER AMOUNT: RS. Rs.8249998.99 (-) 0.31 % Lakhs
DATE OF MEASUREMENTS:
Item Item Description Unit Nos Nos Measurements Quantity Total Remarks
NO. Code Length Breadth Depth Quantity
Class Room 2 1 5.91 8.45 49.939
Class Room 3 1 5.91 8.45 49.939
576.976
Deduction for Ground Floor
Doors 3 1.2 2.1 7.56
Windows (W1) 6 1.8 1.27 13.716
Windows (W1) 3 1.25 1.2 4.5
25.776
551.200

Inside Painting For First Floor


Class Room 1 1 28.72 2.43 69.790
Class Room 2 1 28.72 2.43 69.790
Class Room 3 1 28.72 2.43 69.790
BLACK BOARD 3 2.7 1.3 10.530
Passage portion 2 28.72 3.33 191.275
2 2.4 3.33 15.984
Celling paint
Class Room 1 1 5.91 8.45 49.939
Class Room 2 1 5.91 8.45 49.939
Class Room 3 1 5.91 8.45 49.939
576.976
Deduction for First Floor
Doors 3 1.2 2.1 7.56
Windows (W1) 6 1.8 1.27 13.716

29 of 57
Name of the Work: Construction of 6 Class rooms to Govt Urdu High School At Sadashivanagar In Hubballi
City.KPWD/2022-23/BD/WORK_INDENT156796
AGENCY : Sri RajaSab Nadaf of Hubballi
AGREMENT NO : IR/SE/56/2022-23 Dated:23-02-2023
DATE OF COMMENCEMENT : 24-02-2023
DATE OF COMPLETION AS PER AGREEMMENT :23-08-2023
RUNNING ACCOUNT BILL- R.A. BILL -2nd & Part
TENDER AMOUNT: RS. Rs.8249998.99 (-) 0.31 % Lakhs
DATE OF MEASUREMENTS:
Item Item Description Unit Nos Nos Measurements Quantity Total Remarks
NO. Code Length Breadth Depth Quantity
Windows (W1) 3 1.25 1.2 4.5
25.776
551.200
Stairs
Ground floor to first floor
1st flight 1 6.35 1.95 12.3825
2nd flight 1 6.35 1.95 12.3825
First floor to Terrace
1st flight 1 6.35 1.95 12.3825
2nd flight 1 6.35 1.95 12.3825
Parapet 1 60.58 1 60.58
Chajja 12 3.9 0.15 7.02
117.130
Total= 1219.531 1219.531

30 of 57
Name of the Work: Construction of 6 Class rooms to Govt Urdu High School At Sadashivanagar In Hubballi
City.KPWD/2022-23/BD/WORK_INDENT156796
AGENCY : Sri RajaSab Nadaf of Hubballi
AGREMENT NO : IR/SE/56/2022-23 Dated:23-02-2023
DATE OF COMMENCEMENT : 24-02-2023
DATE OF COMPLETION AS PER AGREEMMENT :23-08-2023
RUNNING ACCOUNT BILL- R.A. BILL -2nd & Part
TENDER AMOUNT: RS. Rs.8249998.99 (-) 0.31 % Lakhs
DATE OF MEASUREMENTS:
Item Item Description Unit Nos Nos Measurements Quantity Total Remarks
NO. Code Length Breadth Depth Quantity
69 8.32/ Finishing walls with water proofing
vol2 cement paint of required shade:Old
work (one coats applied @ 2.20 kg/10
m²) over priming coat of primer applied
@ 0.80 litrs/10 m² complete including
cost of Priming coat including preparing
the surface after thoroughly
cleaning the surface to remove all dirt, SQM
dust and foreign matter, cost of
materials, labour complete as per
specifications and as per directions
of Engineer-in-charge.

out side painting For Ground Floor


Rooms out side 1 61.82 3.3 204.006
Corridor 1 41.62 2.4 99.888
Columns 7 0.92 3.3 21.252
325.146
Deduction for Ground floor
Doors 3 1.2 2.1 7.56
Windows (W1) 6 1.8 1.27 13.716
Windows (W1) 3 1.25 1.2 4.5
Corridor grill 1 19.61 1.2 23.5
49.308
Total = 275.838

31 of 57
Name of the Work: Construction of 6 Class rooms to Govt Urdu High School At Sadashivanagar In Hubballi
City.KPWD/2022-23/BD/WORK_INDENT156796
AGENCY : Sri RajaSab Nadaf of Hubballi
AGREMENT NO : IR/SE/56/2022-23 Dated:23-02-2023
DATE OF COMMENCEMENT : 24-02-2023
DATE OF COMPLETION AS PER AGREEMMENT :23-08-2023
RUNNING ACCOUNT BILL- R.A. BILL -2nd & Part
TENDER AMOUNT: RS. Rs.8249998.99 (-) 0.31 % Lakhs
DATE OF MEASUREMENTS:
Item Item Description Unit Nos Nos Measurements Quantity Total Remarks
NO. Code Length Breadth Depth Quantity
out side painting For First Floor
Rooms out side 1 56.12 3.3 185.196
Corridor 1 41.62 2.4 99.888
Columns 7 0.92 3.3 21.252
306.336
Deduction for First floor
Doors 3 1.2 2.1 7.56
Windows (W1) 6 1.8 1.27 13.716
Windows (W1) 3 1.25 1.2 4.5
Corridor grill 1 19.61 1.2 23.5
49.308
257.028
Total = 532.866
Grand Total = 532.866 532.866

32 of 57
Name of the Work: Construction of 6 Class rooms to Govt Urdu High School At Sadashivanagar In Hubballi
City.KPWD/2022-23/BD/WORK_INDENT156796
AGENCY : Sri RajaSab Nadaf of Hubballi
AGREMENT NO : IR/SE/56/2022-23 Dated:23-02-2023
DATE OF COMMENCEMENT : 24-02-2023
DATE OF COMPLETION AS PER AGREEMMENT :23-08-2023
RUNNING ACCOUNT BILL- R.A. BILL -2nd & Part
TENDER AMOUNT: RS. Rs.8249998.99 (-) 0.31 % Lakhs
DATE OF MEASUREMENTS:
Item Item Description Unit Nos Nos Measurements Quantity Total Remarks
NO. Code Length Breadth Depth Quantity
Painting Steel work with Deluxe Multi
Surface Paint to give an evenshade.
Two coat applied @ 0.90 ltr/10 m �
over an under coat of primer applied @
0.80 ltr/10 m� of approved brand and
manufacture including preparing the
8.33.3/ surface after thorougly cleaning oil,
73 SQM
vol2 grease, dirt and foreign matter, cost of
materials, labour complete as per
specifications and as per directions of
Engineer-in-charge.

MS Grill oil painting for (GF )


Windows (W1) 12 1.8 1.27 27.432
Windows (W1) 6 1.25 1.2 9.0
Corridor grill 2 24.41 1.2 58.6
Gate painting 2 3 2.1 12.6
107.616
MS Grill oil painting for (FF )
Windows (W1) 12 1.8 1.27 27.432
Windows (W1) 6 1.25 1.2 9.0
Corridor grill 2 24.41 1.2 58.6
Stair case grill 4 6.3 2.4 60.5
155.496
Total = 263.112 263.112

33 of 57
Name of the Work: Construction of 6 Class rooms to Govt Urdu High School At Sadashivanagar In Hubballi
City.KPWD/2022-23/BD/WORK_INDENT156796
AGENCY : Sri RajaSab Nadaf of Hubballi
AGREMENT NO : IR/SE/56/2022-23 Dated:23-02-2023
DATE OF COMMENCEMENT : 24-02-2023
DATE OF COMPLETION AS PER AGREEMMENT :23-08-2023
RUNNING ACCOUNT BILL- R.A. BILL -2nd & Part
TENDER AMOUNT: RS. Rs.8249998.99 (-) 0.31 % Lakhs
DATE OF MEASUREMENTS:
Item Item Description Unit Nos Nos Measurements Quantity Total Remarks
NO. Code Length Breadth Depth Quantity
Providing and laying Vitrified tiles in
different sizes (thickness to be
specified by the manufacturer), with
water absorption less than 0.08% and
conforming to IS: 15622, of approved
brand & manufacturer, in all colours
and shade, in skirting, riser, treads of
9.19/ steps, laid with cement based high
80 Sqm
vol2 polymer modified quick set tile
adhesive (water based) conforming to
IS: 15477, in average 6 mm thickness,
including grouting of joints as per
direction of Engineer in charge.

Flooring staircase below 1 6.35 5.1 32.385


Total = 32.385 32.385

34 of 57
Name of the Work: Construction of 6 Class rooms to Govt Urdu High School At Sadashivanagar In Hubballi
City.KPWD/2022-23/BD/WORK_INDENT156796
AGENCY : Sri RajaSab Nadaf of Hubballi
AGREMENT NO : IR/SE/56/2022-23 Dated:23-02-2023
DATE OF COMMENCEMENT : 24-02-2023
DATE OF COMPLETION AS PER AGREEMMENT :23-08-2023
RUNNING ACCOUNT BILL- R.A. BILL -2nd & Part
TENDER AMOUNT: RS. Rs.8249998.99 (-) 0.31 % Lakhs
DATE OF MEASUREMENTS:
Item Item Description Unit Nos Nos Measurements Quantity Total Remarks
NO. Code Length Breadth Depth Quantity
Flooring with 25mm thick polished
tandur blue stone slabs using cement
9.34/ mortar 1:6, 25mm thick over existing
vol2 cement concrete bed or top of roof laid
(2nd to line and level and jointed with
quarter cement slurry mixed with pigment to
96 Sqm
Issue match the shade of the slab, , including
rate cost of materials, labour, curing,
dt7.7.2 polishing complete as per
022) specifications.

Hand wash area 1 10 0.9 9


vetical 7 0.45 1.2 3.78
Total = 12.78 12.78

35 of 57
Name of the Work: Construction of 6 Class rooms to Govt Urdu High School At Sadashivanagar In Hubballi
City.KPWD/2022-23/BD/WORK_INDENT156796
AGENCY : Sri RajaSab Nadaf of Hubballi
AGREMENT NO : IR/SE/56/2022-23 Dated:23-02-2023
DATE OF COMMENCEMENT : 24-02-2023
DATE OF COMPLETION AS PER AGREEMMENT :23-08-2023
RUNNING ACCOUNT BILL- R.A. BILL -2nd & Part
TENDER AMOUNT: RS. Rs.8249998.99 (-) 0.31 % Lakhs
DATE OF MEASUREMENTS:
Item Item Description Unit Nos Nos Measurements Quantity Total Remarks
NO. Code Length Breadth Depth Quantity
Providing and laying water proofing
treatment to the Roof with PU based
single component elastomeric pure
polyurethane based coating on New
terrace/Chajjas/Sunken portion of
15.1/ WC:Bathroom, cold applied PU
SQM
vol2 waterproofing membrane that is highly
elastic with elongation greater than
400% and tensile strength greater than
2MPa as per ASTM D412. The
waterproofing membrane to be applied
in 2coats @ 1.6kg per m2 to achieve
final DFT (dry film thickness) of 1mm
Water proofing
Terrace (incl parapet wall 300mm depth) 1 19.79 11.9 235.501
Chajjas 12 1.8 0.6 12.96
Total = 248.461 248.461

36 of 57
Name of the Work: Construction of 6 Class rooms to Govt Urdu High School At Sadashivanagar In Hubballi
City.KPWD/2022-23/BD/WORK_INDENT156796
AGENCY : Sri RajaSab Nadaf of Hubballi
AGREMENT NO : IR/SE/56/2022-23 Dated:23-02-2023
DATE OF COMMENCEMENT : 24-02-2023
DATE OF COMPLETION AS PER AGREEMMENT :23-08-2023
RUNNING ACCOUNT BILL- R.A. BILL -2nd & Part
TENDER AMOUNT: RS. Rs.8249998.99 (-) 0.31 % Lakhs
DATE OF MEASUREMENTS:
Item Item Description Unit Nos Nos Measurements Quantity Total Remarks
NO. Code Length Breadth Depth Quantity
Concealed Conduit System :Supplying
heavy gauge PVC conduit pipe mm dia
mm thick confirming to IS 2509 with
suitable size bends, metal/PVC Junction
boxes, adhesive paste etc., and running
before concreting the slab. The conduit
should be tied to the reinforcement
rods by using binding wires and unused
1 1.2.1 ways of junction boxes and pipe ends Mtr
should be covered using PVC end
enclosures, run with 18SWG GI fish wire
wherever necessary19/20mm dia 2mm
thick

Ground Floor (PVC pipe )


Class Room 1 1 40 40
Class Room 2 1 40 40
Class Room 3 1 40 40
Corridor 1 28 28
First Floor (PVC pipe )
Class Room 1 1 40 40
Class Room 2 1 40 40
Class Room 3 1 40 40
Corridor 1 28 28
Total = 296 296

37 of 57
Name of the Work: Construction of 6 Class rooms to Govt Urdu High School At Sadashivanagar In Hubballi
City.KPWD/2022-23/BD/WORK_INDENT156796
AGENCY : Sri RajaSab Nadaf of Hubballi
AGREMENT NO : IR/SE/56/2022-23 Dated:23-02-2023
DATE OF COMMENCEMENT : 24-02-2023
DATE OF COMPLETION AS PER AGREEMMENT :23-08-2023
RUNNING ACCOUNT BILL- R.A. BILL -2nd & Part
TENDER AMOUNT: RS. Rs.8249998.99 (-) 0.31 % Lakhs
DATE OF MEASUREMENTS:
Item Item Description Unit Nos Nos Measurements Quantity Total Remarks
NO. Code Length Breadth Depth Quantity
Medium point above 3Mtr upto 6Mtr
7 2.2.2 from tapping point to out let via switch Point
Box
Ground Floor
Classs Room 1 5 5
Classs Room 2 5 5
Classs Room 3 5 5
First Floor
Classs Room 1 5 5
Classs Room 2 5 5
Classs Room 3 5 5
30 30
Wiring for lighting/power circuit using
one of FRLS PVC insulated 1100V
grade,2.5 SQMM multistrand Copper
with low conductor resistance single
10 2.3.3 core wire in open or concealed system Mtr.
of wiring with specified IS-694:1990 &
confirming to GTP.

Ground Floor Wire)


Class Room 1 2 40 80
Class Room 2 2 40 80
Class Room 3 2 40 80
Corridor 2 28 56

38 of 57
Name of the Work: Construction of 6 Class rooms to Govt Urdu High School At Sadashivanagar In Hubballi
City.KPWD/2022-23/BD/WORK_INDENT156796
AGENCY : Sri RajaSab Nadaf of Hubballi
AGREMENT NO : IR/SE/56/2022-23 Dated:23-02-2023
DATE OF COMMENCEMENT : 24-02-2023
DATE OF COMPLETION AS PER AGREEMMENT :23-08-2023
RUNNING ACCOUNT BILL- R.A. BILL -2nd & Part
TENDER AMOUNT: RS. Rs.8249998.99 (-) 0.31 % Lakhs
DATE OF MEASUREMENTS:
Item Item Description Unit Nos Nos Measurements Quantity Total Remarks
NO. Code Length Breadth Depth Quantity
First Floor (wire )
Class Room 1 2 40 80
Class Room 2 2 40 80
Class Room 3 2 40 80
Corridor 2 28 56
Total = 592 592
Supplying and fixing of 6AmpsLamp
26 3.14.6 holder on existing board. Each
Class Room 1
Led Light 6 6
Class Room 2
Led Light 6 6
Class Room 3
Led Light 6 6
Corridor 6 6
First floor (Holder )
Class Room 1
Led Light 6 6
Class Room 2
Led Light 6 6
Class Room 3
Led Light 6 6
Corridor 8 8
Total = 50 50

39 of 57
Name of the Work: Construction of 6 Class rooms to Govt Urdu High School At Sadashivanagar In Hubballi
City.KPWD/2022-23/BD/WORK_INDENT156796
AGENCY : Sri RajaSab Nadaf of Hubballi
AGREMENT NO : IR/SE/56/2022-23 Dated:23-02-2023
DATE OF COMMENCEMENT : 24-02-2023
DATE OF COMPLETION AS PER AGREEMMENT :23-08-2023
RUNNING ACCOUNT BILL- R.A. BILL -2nd & Part
TENDER AMOUNT: RS. Rs.8249998.99 (-) 0.31 % Lakhs
DATE OF MEASUREMENTS:
Item Item Description Unit Nos Nos Measurements Quantity Total Remarks
NO. Code Length Breadth Depth Quantity
Supplying and fixing of of 9watts LED
38 11.11.4 Bulbs. Each
Class Room 1
Led Light 6 6
Class Room 2
Led Light 6 6
Class Room 3
Led Light 6 6
Cooridor 6 6
First floor
Class Room 1
Led Light 6 6
Class Room 2
Led Light 6 6
Class Room 3
Led Light 6 6
Cooridor 8 8
Total = 50 50
Supplying and fixing of modular stepped
electronic fan regulator on existing
22 3.6.4 modular switch plate as per and IS Each
1293.

Ground Floor
Class Room 1 2 2
Class Room 2 2 2

40 of 57
Name of the Work: Construction of 6 Class rooms to Govt Urdu High School At Sadashivanagar In Hubballi
City.KPWD/2022-23/BD/WORK_INDENT156796
AGENCY : Sri RajaSab Nadaf of Hubballi
AGREMENT NO : IR/SE/56/2022-23 Dated:23-02-2023
DATE OF COMMENCEMENT : 24-02-2023
DATE OF COMPLETION AS PER AGREEMMENT :23-08-2023
RUNNING ACCOUNT BILL- R.A. BILL -2nd & Part
TENDER AMOUNT: RS. Rs.8249998.99 (-) 0.31 % Lakhs
DATE OF MEASUREMENTS:
Item Item Description Unit Nos Nos Measurements Quantity Total Remarks
NO. Code Length Breadth Depth Quantity
Class Room 3 2 2
First Floor
Class Room 1 2 2
Class Room 2 2 2
Class Room 3 2 2
Total = 12 12
Supplying capacitor type ceiling fan
complete with down rod blades,
shackle, canopies etc., for operation on
230 volts, 50 cycles. Single phase AC
36 6.3.1 supply conforming to ISS-374-1979 and Each
with double ball bearing system. 48"
Sweep (1200mm) Economy model

Ground Floor
Class Room 1 2 2
Class Room 2 2 2
Class Room 3 2 2
First Floor
Class Room 1 2 2
Class Room 2 2 2
Class Room 3 2 2
Total = 12 12

41 of 57
Name of the Work: Construction of 6 Class rooms to Govt Urdu High School At Sadashivanagar In Hubballi
City.KPWD/2022-23/BD/WORK_INDENT156796
AGENCY : Sri RajaSab Nadaf of Hubballi
AGREMENT NO : IR/SE/56/2022-23 Dated:23-02-2023
DATE OF COMMENCEMENT : 24-02-2023
DATE OF COMPLETION AS PER AGREEMMENT :23-08-2023
RUNNING ACCOUNT BILL- R.A. BILL -2nd & Part
TENDER AMOUNT: RS. Rs.8249998.99 (-) 0.31 % Lakhs
DATE OF MEASUREMENTS:
Item Item Description Unit Nos Nos Measurements Quantity Total Remarks
NO. Code Length Breadth Depth Quantity
Supplying and fixing of6/16amps
modular Universal Socket on existing
25 3.6.11 modular switch plate as per IS 3854 and Each
IS 1293.

Ground Floor
Class Room 1 2 2
Class Room 2 2 2
Class Room 3 2 2
First Floor
Class Room 1 2 2
Class Room 2 2 2
Class Room 3 2 2
Total = 12 12
Supplying and fixing 12way regular MCB
distribution boards on wall / wood
board / flush mounting using required
clamps, bolts, nuts etc., with provision
for fixing suitable type capacity MCB's
30 5.18.9 single phase / 3 phase / single door with Each
powder coated painting. Made out of 14
SWG MS enclosure.I - doble Door12way
sp&n

Ground Floor 5 5
First floor 5 5

42 of 57
Name of the Work: Construction of 6 Class rooms to Govt Urdu High School At Sadashivanagar In Hubballi
City.KPWD/2022-23/BD/WORK_INDENT156796
AGENCY : Sri RajaSab Nadaf of Hubballi
AGREMENT NO : IR/SE/56/2022-23 Dated:23-02-2023
DATE OF COMMENCEMENT : 24-02-2023
DATE OF COMPLETION AS PER AGREEMMENT :23-08-2023
RUNNING ACCOUNT BILL- R.A. BILL -2nd & Part
TENDER AMOUNT: RS. Rs.8249998.99 (-) 0.31 % Lakhs
DATE OF MEASUREMENTS:
Item Item Description Unit Nos Nos Measurements Quantity Total Remarks
NO. Code Length Breadth Depth Quantity
Total = 10 10
Providing fixing on wall face plasticised
13.48 / Rigid PVC rain water pipes confirming to
VOL2 IS:13592 type A including jointing with
1st seal ring confirming to IS:5382, leaving
Corrge 10 mm gap for thermal expansion, (i)
ndum Single socketed pipes 100 mm diameter
Order
28 of m
Commo
n SR
Volume
- 1, 2
and 3
SR

4 7 28 28

43 of 57
Name of the Work: Construction of 6 Class rooms to Govt Urdu High School At
AGENCY : Sri RajaSab Nadaf ofCity.KPWD/2022-23/BD/WORK_INDENT156796
Hubballi

R.A. Bill No.2nd & Part

Abstract of Quantities

Item Item
Description Unit
No. Code

Earth work excavation for Foundation by mechanical


means for all works & depth upto 3 m, as per drawing and
technical specifications, including setting out, shoring,
strutting, barricading, caution lights, including dressing of
excavated surfaces, disposing off or levelling the
excavated earth or sorting & stacking the selected earth
for reuse in a radius of 50 m and lift upto 1.5 m including
cost of labour, tools, usage of machinery & other
appurtenaces required to complete the work

Providing and laying in position plain cement concrete for


levelling course for all works in foundation. The
granite/trap/basalt crushed graded coarse aggregates and
fine aggregates as per relevant IS Codes achine mixed,
laid in layers not exceeding 150 mm thickness, well
compacted using plate vibrators, including all lead & lifts,
cost of all materials of quality, labour, Usage charges of
machinery, curing, and all the other purtenances required
to complete the work as per technical specifications. (The
cost of steel reinforcement & formwork shall be paid
separately) Mix 1:3:6 (M10) Using 40 mm nominal size
graded crushed coarse aggregates

Providing and laying in position plain cement concrete for


levelling course for all works in foundation. The
granite/trap/basalt crushed graded coarse aggregates and
fine aggregates as per relevant IS Codes achine mixed,
laid in layers not exceeding 150 mm thickness, well
compacted using plate vibrators, including all lead & lifts,
cost of all materials of quality, labour, Usage charges of
machinery, curing, and all the other purtenances required
to complete the work as per technical specifications. (The
cost of steel reinforcement & formwork shall be paid
separately) Mix 1:3:6 (M10) Using 40 mm nominal size
graded crushed coarse aggregates
As per recommendations of Technical working group,
rates for formwork shall be added on percentage basis to
the finished concrete item rate. For foundation isolaed
footing form works consider 8% (As per appendix-I)

Providing and laying in position Reinforced cement


concrete for all Sub structures of building, Irrigation
works, Sub structure works of bridges, Drain works &
other parallel works from 0.50m to 3.50 m height. The
granite/trap/basalt crushed graded coarse aggregates and
fine aggregates as per relevant IS Codes machine mixed
with super plasticisers, laid in layers, well compacted
using needle vibrators, providing weep holes wherever
necesary, including all lead & lifts, cost of all materials of
quality, confirming to the requirements of relevant IS
codes, labour, Usage charges of machinery, curing and all
other appurtenances required to complete the work as
per technical specifications. (The cost of steel
reinforcement & formwork to be paid separately M25
Design Mix Using 20 mm nominal size graded crushed
coarse aggregate

As per recommendations of Technical working group,


rates for formwork shall be added on percentage basis to
the finished concrete item rate. For form works consider
70% (As per appendix-I)

Providing Thermo-Mechanically Treated bars of grade Fe-


550 Steel reinforcement for R.C.C. work including
straightening,cutting, bending, placing in position, binding
and anchoring to adjacent members whereever necessary
complete as per Design including cost of material, labour,
usage charges complete as per specifications. (The laps
and wastages shall not be measured separately)

Providing Half brick masonry with common burnt clay Non


Modular bricks of class designation 3.5 in uperstructure
above plinth level up to floor 1 level cement mortar 1:4
(1 cement :4 coarse sand) including cost of all materials,
labour, scaffolding and usage charges of machinery &
other incidental charges complete as per the direction of
engineer incharge of work.
Providing 20 mm cement plaster of mix :1:6 (1 cement: 6
fine sand) to brick/stone masonary including rounding off
corners wherever required smooth rendering, providing
and removing scaffolding, including cost of materials,
labour, curing complete as per specifications and as per
directions of Engineer-in-charge.

Providing and laying in position Reinforced cement


concrete for all Super structures of building , Road works,
Water works, Irrigation works & super structure works of
bridges upto 3.50 m height. The granite/trap/basalt
crushed graded coarse aggregates and fine aggregates as
per relevant IS Codes machine mixed with super
plasticisers laid in layers, well compacted using needle
vibrators. The cost includes all lead & lifts, cost of all
materials, quality confirming to the requirements of
relevant IS codes , labour, Usage charges of machinery,
curing and all other appurtenances required to complete
the work as per technical specifications. (The cost of steel
reinforcement, dowel bars & formwork to be paid
separately)

Providing & fixing of 2-track x 2-panel sliding


windows made out of multi chambered UPVC
(Matching to RAL-9016) sections and with minimum
TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo
Plastic Elastomer) and lead free, gaskets -grey colour
having isolated drainage and reinforced with
Galvanized Iron profile through-out the window
frame. The outer frame having an overall size of
50mm width x 42mmheight with reinforcement of
1mm thickness and Sash with overall size of 31mm X
57mm with Gi reinforcement of 1mm for the frame
and 1.5 mm for the sash. Coextruded Glazing bead
for fixing of glass shall be of size 21.5mm x 9.5 mm.
12.86.2/ Windows shall be provided with 5mm plain float
65 SQM
vol2 glass, standard hardware& single point locking
system with touch lock.Wall thickness of frame &
sash shall be of 1.8+-0.2 mm. Maximum possible size
– 1519mm x 1519mm. (The cost is inclusive of all
fixtures and separate charges for minor T&P's shall
not be made)
Providing and applying white cement based putty of
average thickness 1 mm, of approved brand and
8.51/ manufacturer, over the plastered wall surface to
68 prepare the surface even and smooth complete as Sqm
vol2
per specifications and as per directions of Engineer
in charge.

Finishing walls with 100% Premium acrylic emulsion


paint having VOC less than 50 gm/litre and UV
resistance as per IS 15489:2004, Alkali & fungal
resistance, dirt resistance exterior paint of required
shade (Company Depot Tinted) with silicon additives,
New work (Two coats applied @ 1.43 litre/ 10 m�.
Over and including priming coat of exterior primer
8.32/ applied @ 0.90 litre/10 m� with paint of approved
69 quality to give an even shade, after thoroughly SQM
vol2
brooming the surface to remove all dirt, dust,
mortar drops and foreign matter including preparing
the surface even and sand paper smooth, cost of
materials, labour complete as per specifications and
as per directions of Engineer-in-charge.

Finishing walls with water proofing cement paint of


required shade:Old work (one coats applied @ 2.20
kg/10 m²) over priming coat of primer applied @
0.80 litrs/10 m² complete including cost of Priming
coat including preparing the surface after thoroughly
8.32/ cleaning the surface to remove all dirt, dust and
69 SQM
vol2 foreign matter, cost of materials, labour complete as
per specifications and as per directions
of Engineer-in-charge.

Painting Steel work with Deluxe Multi Surface Paint


to give an evenshade. Two coat applied @ 0.90
ltr/10 m� over an under coat of primer applied @
0.80 ltr/10 m� of approved brand and manufacture
8.33.3/ including preparing the surface after thorougly
73 SQM
vol2 cleaning oil, grease, dirt and foreign matter, cost of
materials, labour complete as per specifications and
as per directions of Engineer-in-charge.
Providing and laying Vitrified tiles in different sizes
(thickness to be specified by the manufacturer),
with water absorption less than 0.08% and
conforming to IS: 15622, of approved brand &
manufacturer, in all colours and shade, in skirting,
9.19/ riser, treads of steps, laid with cement based high
80 Sqm
vol2 polymer modified quick set tile adhesive (water
based) conforming to IS: 15477, in average 6 mm
thickness, including grouting of joints as per
direction of Engineer in charge.

9.34/ Flooring with 25mm thick polished tandur blue stone


vol2 slabs using cement mortar 1:6, 25mm thick over
(2nd existing cement concrete bed or top of roof laid to
quarter line and level and jointed with cement slurry mixed
96 Sqm
Issue with pigment to match the shade of the slab, ,
rate including cost of materials, labour, curing, polishing
dt7.7.20 complete as per specifications.
22)

Providing and laying water proofing treatment to the


Roof with PU based single component elastomeric
pure polyurethane based coating on New
terrace/Chajjas/Sunken portion of WC:Bathroom,
cold applied PU waterproofing membrane that is
highly elastic with elongation greater than 400% and
tensile strength greater than 2MPa as per ASTM
D412. The waterproofing membrane to be applied in
2coats @ 1.6kg per m2 to achieve final DFT (dry film
thickness) of 1mm including prime coat of epoxy
15.1/ primer @150 g per m2 and protection with 120gsm SQM
vol2 Geo-textile over the waterproofing membrane. The
finished cost to include surface preparation, making
coving at Junction, Bore Packing, treatment of
construction joints completely as per specification &
with a 10 years warranty on product & work from
certified manufacturers as per the
direction of the Engineer In charge.

Concealed Conduit System :Supplying heavy gauge


PVC conduit pipe mm dia mm thick confirming to IS
2509 with suitable size bends, metal/PVC Junction
boxes, adhesive paste etc., and running before
concreting the slab. The conduit should be tied to
1 1.2.1 the reinforcement rods by using binding wires and Mtr
unused ways of junction boxes and pipe ends should
be covered using PVC end enclosures, run with
18SWG GI fish wire wherever necessary19/20mm dia
2mm thick
Medium point above 3Mtr upto 6Mtr from tapping
7 2.2.2 Point
point to out let via switch Box

Wiring for lighting/power circuit using one of FRLS


PVC insulated 1100V grade,2.5 SQMM multistrand
10 2.3.3 Copper with low conductor resistance single core Mtr.
wire in open or concealed system of wiring with
specified IS-694:1990 & confirming to GTP.

Supplying and fixing of 6AmpsLamp holder on


26 3.14.6 Each
existing board.

38 11.11.4 Supplying and fixing of of 9watts LED Bulbs. Each

Supplying and fixing of modular stepped electronic


22 3.6.4 fan regulator on existing modular switch plate as per Each
and IS 1293.

Supplying capacitor type ceiling fan complete with


down rod blades, shackle, canopies etc., for
operation on 230 volts, 50 cycles. Single phase AC
36 6.3.1 supply conforming to ISS-374-1979 and with double Each
ball bearing system. 48" Sweep (1200mm) Economy
model

Supplying and fixing of6/16amps modular Universal


25 3.6.11 Socket on existing modular switch plate as per IS Each
3854 and IS 1293.

Supplying and fixing 12way regular MCB distribution


boards on wall / wood board / flush mounting using
required clamps, bolts, nuts etc., with provision for
30 5.18.9 fixing suitable type capacity MCB's single phase / 3 Each
phase / single door with powder coated painting.
Made out of 14 SWG MS enclosure.I - doble
Door12way sp&n
13.48
/VOL2
1st Providing fixing on wall face plasticised Rigid PVC
Corrgen rain water pipes confirming to IS:13592 type A
dum including jointing with seal ring confirming to
28 Order of IS:5382, leaving 10 mm gap for thermal expansion, m
Common (i) Single socketed pipes 100 mm diameter
SR
Volume -
1, 2 and
3 SR
o Govt Urdu High School At Sadashivanagar In Hubballi
D/WORK_INDENT156796

No.2nd & Part

of Quantities

Remarks
QTY Rate Amount

21.9516 100 2195.16

2.3646 6000 14187.6

0.726 7600 5517.6


0.726 500 363

0.57132 7600 4342.032

0.57132 4500 2570.94

1128.1722 90 101535.498

63.90 1000 63901.1


55.4196 330 18288.468

1.51495 7600 11513.62

36.432 6134 223473.888


438.8745 80 35109.96

1219.531 117.6 143416.8456

532.866 69.3 36927.6138

263.112 111.3 29284.3656


32.385 1295 41938.575

12.78 1200 15336

248.461 790.1 196309.0361

296 61 18056
30 361 10830

592 40 23680

50 63 3150

50 160 8000

12 313 3756

12 2085 25020

12 249 2988

10 2067 20670

28 268.3 7512.4

Total = 1,069,873.70

192,577.27

8275575.00
6702419.89
1,573,155.10
310,704.13
Nos Nos Measurements Quantity Total Remarks
Length Breadth Depth Quantity
2 2.15 0.15 0.65 0.65
2 2.15 0.15 0.65 0.65
2 2.00 2.00 2.00 16.00 16.00
2 2 2.00 2.00 2.00 32.00 32.00
2 2.00 4.00 4.00