You are on page 1of 6

Project: Four Storey Reception and Acting Center

Location: Brgy. San Andres Cainta Rizal


Desccription Reception and Acting Center
Phase Code Desciption Qty
A. CIVIL WORKS
Layout & Staking 800.00
Excavation 1,200.00
Gravel Fill, 100mm thk 80.00
Backfill / Levelling / Compaction 1,028.80
Haul out & Disposal 1,200.00
Soil Poisoning 800.00
Polyethylene Sheet 800.00
B. FOUNDATION
B.1 ISOLATED FOOTING, 52 sets
Reinforcing Steel
Grade 60; (16mm )
Grade 60; Isolated Footing 8,198.00
Structural Formwork
Isolated Footing 237.00
Structural Concrete
Isolated Footing; 5000 psi (Dense) 171.20
Lean Concrete; 1000 psi 80.00
B.2 CONCRETE PEDESTAL
Reinforcing Steel
Grade 40
Grade 40;Concrete Pedestal 6,199.00
Structural Concrete
Concrete Pedestal; 5000 psi (Dense) 39.00
C. BUILDING
C.1 STRUCTURAL WORKS
Wide Flange
Column
W12X35 156
W10X30 134
W12X19 85
W12X45 398
W10X30 269
W12X22 197
W12X19 169
W12X45 199
W10X30 403
W12X45 199
W10X30 134
W12X22 98
W10X30 134
W10X30 403
W12X19 762
W10X68 302
Beam
W 12X14 26,880.00
W 12X16 7,616.00
W 12X19 8,716.00
W 12X22 471.00
Bracing
HSS60X0.500 1,305.00
HSS60X0.500 2,609.00
Connections
Beam to Flange
Steel 1,372.80
Welds 252.72
Beam to Web
Steel 3,565.76
Welds 598.40
Bevel 28.16
Composite to Girder
Steel 512.40
Welds 25.20
Bolts 137.20
Base Plate to Column
Steel 546.52
Welds 16.64
Bolts 51.48
Base Plate to Brace
Steel 26,073.60
Welds 853.44
Bolts 1,910.40
Brace to Girder
Steel 1,225.44
Welds 80.64
Bolts 84.48
Reinforcing Steel
Grade 40
Grade 40; Beam 9,517.00
Structural Formwork
Formworks ; Steel Deck 800.00
Structural Concrete
Concrete ; Concrete Slab 360.00
Concrete ; Beams 95.00
Concrete Surface Preparation
Rubbed Concreting Works 1,255.00
Exterior/Interior Wall
150mm thk CHB
at Exterior 1,440.00
100mm thk CHB
at Interior 260.00
C.2 Archtectural Works
Exterior Plastering to Masonry Surfaces, 20mm thk
at Exterior 2,880.00
Interior Plastering to Masonry Surfaces, 20mm thk
at Exterior 520.00
Floor Finishes
at Interior 800.00
150 mm thk. Concrete Topping
Ceramic Tiles
400mm x 400mm Ceramic Tiles 800.00
Ceiling Finishes
C.3 Painting Works
at Exposed Beam 7.60
at Exterior 230.40
at Interior 64.00

TOTAL COST
Labor Cost per hour 100

Unit Material Cost

sqm. 56,000.00
cum. 408,468.00
cum. 42,400.00
cum. 614,194.00
cum. 243,660.00
sqm. 1,600,000.00
sqm. 120,000.00

kgs. 353,580.00

sqm. 34,365.00

cum. 996,384.00
cum. 240,000.00

kgs. 261,846.00

cum. 226,980.00

kgs 11,423.00
kgs 9,804.00
kgs 6,178.00
kgs 29,056.00
kgs 19,608.00
kgs 14,373.00
kgs 12,355.00
kgs 14,528.00
kgs 29,411.00
kgs 14,528.00
kgs 9,804.00
kgs 7,187.00
kgs 9,804.00
kgs 29,411.00
kgs 55,594.00
kgs 22,069.00

kgs 1,962,240.00
kgs 555,968.00
kgs 636,268.00
kgs 34,383.00

kgs 95,265.00
kgs 190,457.00

kgs 171,600.00
kgs 17,185.00

kgs 445,720.00
kgs 40,692.00
kgs 1,915.00

kgs 64,050.00
kgs 1,714.00
kgs 6,860.00

kgs 68,315.00
kgs 1,215.00
kgs 2,574.00

kgs 3,259,200.00
kgs 58,034.00
kgs 95,520.00

kgs 153,180.00
kgs 5,484.00
kgs 4,224.00

kgs. 401,999.00

sq.m. 656,000.00

cu.m 2,095,200.00
cu.m 552,900.00

sq.m 69,025.00

sq.m. 3110.4

sq.m. 561.6

sq.m 345,600.00

sq.m 91,200.00
sqm. 96,000.00

sqm. 400,000.00

sqm. 5,206.00
sqm. 157,824.00
sqm. 43,840.00

19,956,740.00