General Notes

1. Do not scale drawings. Dimensions govern.


2. All dimensions are in millimetres unless noted otherwise.
3. All levels are in metres unless noted otherwise.
4. All dimensions shall be verified on site before proceeding with the work.
5. Any areas indicated on this sheet are approximate and indicative only.

C0 22-Apr-2024 ISSUED FOR APPROVAL HZ


Rev. Date Reason For Issue Chk

SHOP DRAWING
Key Plan.

General Contractor

Client

Project

Central Transportation Hub and


Hygiene & Quality Control Lab
Main Construction and Fit out works

Drawing Title

CENTRAL TRANSPORTATION HUB


HV CLEANING
CAGED LADDER

Model File Reference


R12-S07C02- YFM-20-MOD-ST-02001
Drawn By Checked By Approved By

EHS HZ MQ
N Project No. Issue Date Scale at ISO A0
R12-S07C02 22-Apr-2024 1:100
Drawing Number Revision
R12-S07C02-YFM-20-XX-SDW-ST-50001 C0