You are on page 1of 1

General Notes

1. Do not scale drawings. Dimensions govern.


2. All dimensions are in millimetres unless noted otherwise.
3. All levels are in metres unless noted otherwise.
4. All dimensions shall be verified on site before proceeding with the work.
5. Any areas indicated on this sheet are approximate and indicative only.

19300 (O/O OF STEEL LINE)

18680 (O/O OF COLUMN FLANGES)

6340 6000 6340

410 4@675 4@675 410


2@795 5@660 =2700 5@660 =2700 5@660 2@795
=1590 =3300 =3300 =3300 =1590

5390
C0 22-Apr-2024 ISSUED FOR APPROVAL HZ
Rev. Date Reason For Issue Chk

SHOP DRAWING
Key Plan.
@ E.E

Makkah
16500

15880

5100
N

5390

@ E.E

410 4@675 4@675 410


2@795 5@660 =2700 5@660 =2700 5@660 2@795
=1590 =3300 =3300 =3300 =1590

PLATFORM FLOOR PLAN


AT 4.610M LVL General Contractor

Client

Project

Central Transportation Hub and


Hygiene & Quality Control Lab
Main Construction and Fit out works

Drawing Title

CENTRAL TRANSPORTATION HUB


SECTION A-A HV CLEANING
PLATFORM FLOOR PLAN
@+4.61M LVL.
Model File Reference

Makkah R12-S07C02- YFM-20-MOD-ST-02001


Drawn By Checked By Approved By

EHS HZ MQ
N Project No. Issue Date Scale at ISO A0
R12-S07C02 22-Apr-2024 1:100
Drawing Number Revision
R12-S07C02-YFM-20-XX-SDW-ST-10005 C0

You might also like