PLEATS IN SEAM

SKIRT
TOOLS AND MATERIALS NEEDED
•Tape measure
•Pencil
•Scissors
•L-square
•Pattern paper
•Foundation pattern
QUESTION

•Are these tools and materials


important in pattern making?
Support your answer.
SAFETY/WORK PRACTICES

•Scissors should be closed when not in use.


•Place the tape measure around your neck.
•Measure accurately.
•Practice thriftiness all the time
STEPS IN MAKING PATTERN FOR
PLEATS IN SEAM SKIRT
1. Trace the skirt sloper with the dart
2. A-B = 10 Inches (approximately)
3. A-C = 2 inches
B-D = 2 inches
4. Trace it on a centerfold along line CD
5. Provide the necessary allowances and cut
•Why do we need to always
observe safety/work practices
inside the laboratory room
(Dressmaking room)?
QUIZ
•Arrange the steps in making
pattern for pleats in seam skirt.
Write 1 for the first, 2 for the
second and so on.
•1. From point A to point B is equal to 10
inches.
•2.Trace the skirt sloper with the dart.
•3. A to C is 2 inches, B to D is 2 inches
also.
•4. Provide the necessary allowances
•5.Trace it on a centerfold (CF) along
line CD.
ANSWER

• 1. 2
• 2. 1
• 3. 3
• 4. 5
• 5. 4
PERFORMANCE TASK
1. MAKE A PATTERN FOR PLEATS IN SEAM SKIRT.
RUBRIC for Highly Skilled Skilled Moderately Skilled Unskilled No Attempt
PERFORMANCE 5 4 3 2 1

1. Use of tools, equipment Appropriate selection, Appropriate selection, Not so appropriate selection, Inappropriate selection, No attempt to use tools/
and materials preparation and use of preparation and use of preparation and use of preparation and use materials equipment
materials and tools/equipment materials and tools/equipment materials and tools/equipment and
all the time. Most of the time oftentimes Tools/
equipment

2. Application of Systematic application of Systematic application of Systematic application of Never follow systematic No attempt to apply
procedure procedures all the time procedures most of the time procedures sometimes with application of procedures and procedures to project
without supervision with minimum supervision constant supervision need close supervision at all
time

3. Safety/work habits Highly self-motivated and Self-motivated and observes Self-motivated and observes Needs to be motivated and No motivation and totally
observes all safety precautions most safety precautions most sometimes some safety does not observe safety disregards precaution
at all times of the time precautions precaution

4. Speed/time Work finished ahead of time Work finished meets deadline Work finished close to Work finished way beyond No concept of time
deadline deadline