MUNICIPALITY INFORMATION
 Name of Municipality: Budhanilkantha
Municipality
 District: Kathmandu
 No. of Wards: 13
 Area: 34.8 Sq.km.
 Population: 1,07,918 (Year 2011A.D)
NEED OF MASTER PLAN STUDY
 Existing water supply system
doesn’t provide the sufficient
quantity of water for people.
 Present water supply
schemes will be insufficient
for future population.
 Long term sustainable
development needed.
 It is necessary for
identification, prioritization
and future plan of existing
and potential water sources.
OBJECTIVES OF THE STUDY

 Main objective is to prepare the Master


Plan for water supply system for
Budhanilkantha Municipality (for 20 years).
 Other related objectives are:
1. Identification of water sources and their
discharge capacity
2. Planning for components for water supply
scheme
3. Water supply distribution layout
4. Preliminary costing for the project
SCOPE OF THE WORK

1. Data Collection and Analysis


2. Estimation of Population
3. Estimation of water demand
4. Study of existing facilities
5. Study of water sources
6. Rough estimation of cost for construction ,
operation and maintenance
7. Planning of appropriate water supply system
8. Study of organization, operation and maintenance
plan
9. Preparation of implementation program
APPROACH AND METHODOLOGY

Data collection and analysis

Water demand calculation

Field Visit

Water source identification and measurement

Planning for layout of components and distribution


system

Cost estimate for project

Report preparation and submission


DATAS TO BE COLLECTED

 Topographical map of the area


 Population data
 Household data (residential, institutional, hotels
etc)
 Water use data
 Existing water supply information
 Hydrological and hydrogeological information of
the area
 All relevant reports on water resource projects at
project area (if any)
PURPOSE OF FIELD VISIT

 Water sources identification and measurement of


discharge capacity
 Sample collection of water for quality test
 GPS location of the sources and major project
components (elevation levels)
 Alignment fixation for transmission of water
from source
 Location of storage tanks, treatment plants etc.
 Planning for layout of distribution system
PLANNING & LAYOUT CRITERIAS

 Planning and layout of water supply system will be


based on following:
1. Defining the service areas (Zoning)
2. Forecasting the population served and water
requirement
3. Selection of water sources
4. Rehabilitation, improvement and expansion of
existing system
5. Determine treatment process based on raw water
quality
6. Propose the water supply system to be constructed
7. Estimate construction cost
8. Prepare overall implementation schedule
IMPLEMENTATION/INVESTMENT PLAN

 Stagewise construction to be carried out to avoid


heavy investment at one time
 Cost distribution at each stage of implementation
will be provided
 Time period required for each step of project
development such as detailed design, procedures
for loan procurement, tendering and construction
will be determined.
 Implementation schedule will be provided in the
plan.
OUTCOMES OF STUDY

 Plan for water supply system for population of


Budhanilkantha Municipality
 Overall plan shown in a map
 Capacity of storage tanks and other components
required for the supply system
 Water sources to be used for the supply
 Location of major components of project
 Preliminary cost estimate for the project
 Schedule for implementation of the project