FEATURES
ANNUAL CAPACITY 1.0 MT
PRODUCTION 2010-11 113035 T
ELECTRIC ARC FURNACE 01 NO.
LADLE REFINING FURNACE 01 NO.
VACUUM DEGASSER 01 NO.
CONTINUOUS CASTER 01 NO.
Sections of sms
FLUX:
• Lime from LDP (Lime and Dololime
Plant)
• Burned dolomite from LDP
OTHER INPUTS:
• Oxygen from Oxygen plant.
• CPC (Calcined petroleum coke)
SPECIFICATIONS.....
Tap to tap time : 53 min
EBT filling time : 3 min
Slag pot changing/ pit cleaning time : 13 min
Hot metal pouring time : 5 min
Arc time : 29 min
Tapping time : 3 min
Tapping Temperature : 1620°C
FUNCTIONS OF EAF
Melting of inputs and homogenization of
steel bath.
Raising the temperature of the melt to
≈16200C for tapping.
Decarburisation.
Dephosphorisation.
Slag free and compact stream tapping
2P+5/2O2 = P2O5
P2O5+CaO = (CaO)x(P2O5)y
C+O2 = CO2
EQUIPMENT CAPACITY
Ladle Furnace 100T
Transformer Capacity 18MVA
Electrode Diameter 16inch
Treatment Time 30-35 min
FUNCTIONS OF LRF
Refining of steel
Desulphurization
VACCUM
DEGASSER
VACUUM DEGASSER (V.D.)
N2 –upto 80ppm
O2-upto 5ppm
H2-upto 2ppm
Removal of Sulphur
by slag-metal reactions
LADLE
promoted by Argon purging.
4.
CASTER
Caster
EQUIPMENT CAPACITY
Beam 4 strand 12
Blank/Bloom/Rou meter radius
nd
Slab Caster 12 meter
Billet 12 meter 6
strand
PRODUCTS
PRODUCTS
130x130mm, 150x150mm
200x200 mm