Steel Melting Shop

Naimish Agrawal
3203810059
FEATURES
ANNUAL CAPACITY 1.0 MT
PRODUCTION 2010-11 113035 T
ELECTRIC ARC FURNACE 01 NO.
LADLE REFINING FURNACE 01 NO.
VACUUM DEGASSER 01 NO.
CONTINUOUS CASTER 01 NO.
Sections of sms

1.Electric arc furnace


2.Ladle refining furnace
3.Vaccum degasser
4.Caster
FUNCTION……
Pig iron, sponge iron, limes and ferroalloy is charged
from the top of Electric Arc Furnace.

Arcing melt the contents and Oxygen is blown.

Steel is tapped and chemistry correction is done


in ladle refining furnace.

Liquid steel is casted and then Slag is taken out from


slag door.
1.
ELECTRIC ARC
FURNACE
Electric Arc Furnace
EQUIPMENT CAPACITY

Electric Arc Furnace Alternating Current By DANIELI

Tapping Weight 100MT

Transformer Capacity 100MVA

Active Power Input 23MW

Secondary Voltage 500 V

Secondary Current 33KA

Shell Diameter 5.6 meter

Electrode Diameter 24 inch


 METALLIC INPUTS:
• Hot metal from blast furnace : 30 to 70%
• %C : 3.8 to 4.2%
• %Si : 0.3 TO 1.0 %
• %P : 0.13 max
• Temperature : 1280 deg min
• DRI (Lumps +Fines) from DRI Plant : 40 to 49%
• %C : 0.1 max
• %Fe(met) : 81 min
• %SiO2 : 3.5
• Scrap : 1 to 5% (optional)

 FLUX:
• Lime from LDP (Lime and Dololime
Plant)
• Burned dolomite from LDP

 OTHER INPUTS:
• Oxygen from Oxygen plant.
• CPC (Calcined petroleum coke)
SPECIFICATIONS.....
Tap to tap time : 53 min
EBT filling time : 3 min
Slag pot changing/ pit cleaning time : 13 min
Hot metal pouring time : 5 min
Arc time : 29 min
Tapping time : 3 min
Tapping Temperature : 1620°C
FUNCTIONS OF EAF
 Melting of inputs and homogenization of
steel bath.
 Raising the temperature of the melt to
≈16200C for tapping.
 Decarburisation.
 Dephosphorisation.
 Slag free and compact stream tapping
2P+5/2O2 = P2O5
P2O5+CaO = (CaO)x(P2O5)y
C+O2 = CO2

SCHEMATIC DIAGRAM OF EAF


2.
LADDLE REFINING
FURNACE
Ladle Refining Furnace

EQUIPMENT CAPACITY
Ladle Furnace 100T
Transformer Capacity 18MVA
Electrode Diameter 16inch
Treatment Time 30-35 min
FUNCTIONS OF LRF
Refining of steel

Achieving desired chemistry.

Desulphurization

Thermal and Chemical Homogenization.

Raising desired temperature for casting.


3.

VACCUM
DEGASSER
VACUUM DEGASSER (V.D.)

 Design, Engg and Supply : Metec


 Suction Capacity : 350 Kg/hr at 0.5
torr
 Pump down time : 5 minutes to 0.5 torr
 Argon Stirring : Continuous
16 Nm3/hrs max
FUNCTION OF V.D.
 Creating vacuum upto 2%.
 Removal of entrapped gases like-

N2 –upto 80ppm
O2-upto 5ppm
H2-upto 2ppm
 Removal of Sulphur
by slag-metal reactions
LADLE
promoted by Argon purging.
4.

CASTER
Caster

EQUIPMENT CAPACITY
Beam 4 strand 12
Blank/Bloom/Rou meter radius
nd
Slab Caster 12 meter
Billet 12 meter 6
strand
PRODUCTS
PRODUCTS
130x130mm, 150x150mm

200x200 mm
THANKS…………