Moving Mold -Move to the Line Mold storage Depot Mold Parts
(Attach a tag after completion of
Vendor(Materials Team)
Checking/Maintenance )
Mold Test -After Checking/Maintenance, make sure to Manufacturing & Mold -Mold History Card
test it and organize its result (when problems Parts (Manufacturing)
occur, handle them on the spot)
Mass-
manufacturing
Time Check for abnormality or not
of Quality & Mold
Manufacturing
& Vendor
<Recycle Syste
- After the repair, make sure to test it and Manufacturing & -Mold History Card
(stage 7) Mold Test
organize its result (when problems occur, handle Mold Parts (Manufacturing)
Mass- them on the spot)
Time Check for abnormality or not of Manufacturing &
manufacturing Quality & Mold Vendor <Recycle Syste
Completion of Mold -After the completion of the approval, when Manufacturing company/ Mass- -Spare Part List (STARION Form)
moving the Mold, transferring/taking over manufacturing company -Spare Part Management Log
approval -STARION Mold Parts -Spare Part Management Log
Spare Parts (based on documents)
Mass- -If mold structural defects occur during the Mass- LG Electronics/Mass- -Minutes of meeting (MOM) (STARION Form)
manufacturing (MP No. 1~ MP No. 3) stages, manufacturing company/
manufacturing (MP based on the MOM, decide the manufacturing of -Counter
Manufacturing company
No.1 ~ 3) additional Spare Parts
1) P,D : 5000~15000 shots -LG Electronics Mold Gr
2) M,D : 5000~10000 shots -STARION Mold Parts
※However, if the fundamental correction of the
problem is not possible, regardless of the
warranty period, take care of it permanently.
-Based on the problems during the regular Mass-
Regular Mass- Mass-manufacturing company -Spare Part Management Log
manufacturing stage, prepare the spare parts for
manufacturing the main (core) parts in advance. -STARION (Spare Part storage box)
--If there is a cost involved in making Manufacturing & Mold Parts -Report for Approval
(manufacturing) Parts or outsourcing for purchased
goods, proceed after the basic internal Request for
Approval.
-During the Preventive Maintenance, conduct the Mass-manufacturing -Spare Part Management
Normal Management maintenance of parts & exchanges of spare parts.. company/ LG Electronics standard (STARION Form)
However, general Maintenance ; Mass- (Manufacturing company) -Spare Part Management
manufacturing company
Log (LG Electronics Form)
regular Maintenance ; Mold Manufacturing -LG Electronics Mold Gr
company -STARION Mold Parts -Mold History Card
(F/U by LG Electronics Mold Gr)
Mass-manufacturing
Maintenance company
Basic -Manufacturing & <Recycle System>
Mold Parts
Management
2 Is the parallelization of top/bottom types good? Visual inspection & steel ruler
3 Is the Guide Set of top/bottom types good? Visual inspection & measuring device
4 Is the mid Guide Pin & Bush good? Visual inspection & measuring device
5 Are the Base Block flatness & parallelization of top/bottom types good? Visual inspection & steel ruler/Oil Stone
6 Are the Holder flatness & parallelization of top/bottom types good? Visual inspection & steel ruler/Oil Stone
7 Are the Stripper flatness & parallelization of top type good? Visual inspection & steel ruler/Oil Stone
9 Is the bolt-tightening state of parts inside the Mold good? Visual inspection & L-wrench
19 Is other plastic area’s Punch/Die state good? Visual inspection & scraping
20 Are all types of Spring(Gas) states good? Visual inspection & tightening vice
21 Is dowel pin-locking state good? Visual inspection & dowel pin disassembly tool
23 Is the setting of Die Height correct? Visual inspection & Height measuring device
24 Is the state of top/bottom type’s Lift & push pin good? Visual inspection & manual operation
25 Are the states of guide gauges for deciding all types of locations good? Visual inspection & manual operation/measuring device
26 Is the state of the System of hydraulic & Air device good? Visual inspection & simple Tester
27 Are the states of Heating & cooling devices good? Visual inspection & simple Tester
28 Is the state of Cam Unit operation good? Visual inspection & manual operation
29 Are the states of Scap device & purge good? Visual inspection & Scrap removal tool
Were 2 pieces inserted for processing & were there any errors for the
30 Metal plate Operator & worker inquiry
correct location?
31 Was there any abnormal noise during the production? Metal plate Operator & worker inquiry
32 Is the purge state of the materials for processing good? Metal plate Operator & worker inquiry
33 Is the matching of press spec against the Mold spec normal? Check total demanding force & Size
remark
Req- Req-
Mold Group Injection Mold Preventive Maintenance Log (Completion_●)]
Model Injection molder Injection molding company/Dept. [Preventive Maintenance observance point]
10 Is the operation state of Core Unit in the inclined side good? Manual operation
16 Are the states of all Pins good? Visual inspection & parallel ruler
17 Are the states of all Springs good? Visual inspection & vice tightening
21 Is the scraping state of the bar Hole area good? Manual operation
remark
Re- Sec-
Issue Request Repair quest ple- ess Team
Model Part Name P/N Requests spon- tion Remark
NO date Dept. ed tion sta- leader
sibility leader
date date tus
Mold 1)Request for scraping & Checking of the Slide
1 2/14 GR-182 Top Table MGB000000 2/15 2/16
Group Core on the Operation side
2)Request for the replacement of inclination pin.
[2013_Mold Group]
2013 Press Die Spare Parts Management Log
Person in Team
Model 42PM45 charge Leader
Item BACK COVER Spare Part List of Mold Part
Sang
Drawing No MCK669298(RA) Cheon
Manufactur- Lee
Dong Gu Company
ing company Date : Feb. 14, 2012 / Written by: Seung Il Kwon
NO Part Name Process Material Type Size Quantity Unit Price Amount Remark
Mold Checking Cycle Mold Part Exchange Cycle (Grade
A)
Checking
NO Checking Item Remark
Cycle Exchange Material for
1 Molding area NO Part Name
Cycle processing
2 Operation area
100,000 1 Piercing Punch&Die 500,000 EGI
3 Fixed area
Shot
4 Guide & purge area 2 Burring Punch 250,000 EGI
5 Others 3 Guide Post/Bushing 500,000
Refer-
But, if less than 100,000 shots, check every 3 months 4 Guide Pin&Bush 500,000
ence
Parting Line Scraping Cycle
Mold Part Exchange Cycle (Grade
A)
NO Part Name Cycle Remark
N Exchange Material for
1 Main Core 10,000 Part Name
O Cycle processing
2 Slide Core 10,000
1 O-Ring 50,000
3 Eject Core 10,000
2 Coil Spring 50,000
3 Gas Spring 300,000
4 Inclination pin 300,000
Growth of People Growth of Business Manufacturing Cost 1230
[Attachment 14] Tag to indicate the completion status of Mold
Manufacturing or Repair (Checking)
The tags below are Changwon standard and according to a subsidiary, the phrase in the local language should be located in the
center.
84mm
In English
In English
In English
Overseas
Subsidiari
Complete
Under Repair
es write it
Repair
in
Standby
Repair
Korean.
193mm
Write it in
the local
Model
language Model Model
English
Standby
The same letters in the front/back
Repair
200mm
190mm
MDL
Set Press Die Height (+10mm) Up to 12 o’clock direction comparing with Mold Die Height
Check cleaning status of Press Bolster & Slide and installation Check the locking status Check stroke end block
surface roughtness after clamping (8parts) touch by fine control of
press slide (paper or lead)
Install Check inserting amount of guide
mold Must remove stroke end block post
stopper
Falling after setting press 촌동 (1Step-By- Press is falling
Control press
Step Descent) towards 5 o’clock
slide(Adjust)
direction
Check to see if there is a
Press is rising towards 12 Install mold using the same problem on the parts’
o’clock direction(ascent) method on each process assmbling status and
cleaning status inside on
Check to see if there is a problem on 1) If there is a problema, must
inspect and repair to proceed each process
the parts’ assembling status and Excerpt process simple
cleaning status inside on each process (10ea/process) by inputting material
2) Must check material size sequentially from the primary
1)Press 1Cycle setting
before working on No.11 process.
No.12: Create keynote data comparing domestic 1) Determine direction of revising data Repeat testing & revising
simple standard and measuring the simple product’s standard cycle until basic quality is
floor plan standard size on each process 2) Development, quality, molding, approved
production, _4 departments
Mark(stamping method) on the front
Conduct test to see if there is a problem Matching Test on T.P.L
surface of Die Height’s mold on each
with scrap extraction from punching specification
process after self approval of basic
quality process
1)Operate robot feeding
manually
Identify and revise matching problems Test T.P.L manually 20 times or over after 2) Align arm finger
on T.P.L specification inputting material 3) check the vaccum status of
the arm vacuum pad
Identify/revise final matching problems on T.P.L specification Conduct final mass production verification test and
and molding problems produce sample for approval