1. log book-0 / For PM issue logging by PM 1-9 team /Hard copy // -------------------kept in Technical Block . Book-O
2. Digital log book-1 / For Shift BD issue logging Excel by SI / ERP by Rotating SI // --------kept in Shift PC book-1
3. Log book -2/For daily condition monitoring of trafo & DC motor/hard copy & excell by Jr. Eng/ ERP data book-2
Loader BY Rotating SI weekly--------------------------------------------------------------------------------kept in Shift PP
4. Log book -3/For weekly condition monitoring of all equipment's /hard copy by shift Jr. Eng / excell by G-
shift Weekly // ERP data Loader BY G-Shift weekly / MRM PPP By G-shift -at M.E ----kept in Technical Block book-3
5. Log book-4/For faulty equipment repair and kept in defined almira / Hard copy By Jr. Eng/excell By G- book-4
shift / ERP data loader by G-shift /MRM PPP By G-shift // ----------------------------------------------kept in LAB.
6. Log book -5/ For Motor winding Log / Hard copy By G-shift/ Excel by G-shift / ERP data Loader By G-
shift /MRM PPP BY G-shift //------------------------------------------------------------------------------ kept in winding book-5
section
Machine maintenance Strategy and
assigned responsibility:
Resister definition :
// Register -1 -24 Dc motor condition monitoring attendance –by Shift Team _location Near motor
//Resister -25 ( Main PP attendance) –By Shift Team –location 10 PP
// Resister-26 ( 50 PP attendance) –By Shift Team -location50 PP
///Resister-27( 60 PP-attendance) –BY Shift Team –location 60 PP
//Resister-28( consumption follow-up attendance) –By G-Shift Team –location Tech block
//Resister-29(Utility Energy )—By Shift Team –location Tech block
///Resister-30( Resister & log book Monitor attendance) –By G-Shift Team –location Tech block
Machine maintenance Strategy and
assigned responsibility:
Area Definition :
///Area-1 ="Furnace entry area to Std#1 entry PR''
///Area -2=" From stand #1 to Shear#3 "
///Area-3 =" From Shear#3 to Cold Shear "
///Area-4 = From ''Cold Shear to Finished bed "
/// Area-5 =" FURNACE & WTP ALL PANEL & FILED EQUIPMENTS “
///Area -6 ="RM panel room ECR01/ECR02 "
///Area -7 =''Work shop ALL PANEL & MACHINE “
///Area -8=''All Crane & Compressor, DG ''
///Area-9=''All MV SG/Trafo/MCC''
Machine maintenance Strategy and
assigned responsibility:
OEE ( over all Equipment Efficiency) = Availability X Quality X BD, Bench mark >92 %>>>>