Professional Documents
Culture Documents
KAPURTHALA
(PUNJAB)
1
UJJALA QUALITY CIRCLE
WELCOMES
2
A PRODUCTION UNIT
OF
INDIAN RAILWAYS
3
2021
MAJOR 2019
AC ECONOMY CLASS
MILESTONES
MEMU 3PHASE
2017
TEJUS EXPRESS
RAKE
2016
EXPORT OT
BANGLADESH
2012
AC DOUBLE
DECKER
2006
GARIB RATH
2004
LHB RAJDHANI RAKE
2002
LHB DESIGN RACK
1994
AC3 TIER COACH
1988
PRODUCTION
STARTED
1985
FOUNDATION
STONE
4
PRODUCT RANGE
NEW TYPE COACHES
HUMSAFAR TEJAS
5
PRODUCT RANGE
LHB TYPE COACHES
6
PRODUCT RANGE
8
QUALITY CIRCLE PROFILE
9
ABOUT OUR QUALITY CIRCLE
PROBLEMS IDENTIFIED
TYPE OF
S.NO. PROBLEMS IDENTIFIED
PROBLEM
1 TO PROVIDE SAFETY AT VARIOUS WELDING MANIPULATOR. A
2 NEED OF ALTERNATOR TENSION BRACKET OXY-CUTTING A
3 SIDE FRAME FIAT BOTTOM BENDING IMPROPER A
PROBLEM OF LEFT OVER OFF-CUT OF 8MM CORTEN STEEL SHEET DURING CUTTING OF LVP
4 A
SOLE BAR
13
PROBLEMS IDENTIFIED
TYPE OF
S.NO. PROBLEMS IDENTIFIED
PROBLEM
31 SIDE FRAME HEIGHT IS OBSERVED MORE. B
32 POSITION OF SCREW PIECE HOLE IN THE SIDE FRAME SHIFTED A
33 GOOD QUALITY OF ADOPTER IS REQUIRED FOR CO2 GAS CONNECTION B
34 SAFETY CAPS ARE REQUIRED ON DA AND O2 CYLINDERS B
35 SOLENOID VALVE OF THE WELDING SETS ARE NOT WORKING B
36 QUALITY OF HAND GLOVES IS VERY POOR. B
37 PROFILE REQUIRED ON THE RIBS OF DMC SIDE FRAME FOR EASY REOMVAL OF GASES B
38 POOR QUALITY OF WHITE GLASS GOGGLES B
39 WATER FILTERS ARE REQUIRED ON WATER COOLERS B
40 EDGE PREPARATION OF RADIOGRAPHY JOINTS IS VERY POOR A
41 QUALITY OF DA & O2 GAS PIPE IS VERY POOR. B
42 BENDING QUALITY OF TRANSOM TOP FOR 13T & 16T BOGIE FRAME IS DEFECTIVE. A
43 DIMENSION VARIATION OBSERVED IN THE RIBS AT STAGE 2 REQUIRED OXY CUTTING A
44 BURR ON COMPONENTS EFFECTING THE WELDING QUALITY A
45 UNEVEN NOTCHING OF THE RIBS SUPPLIED BY MACHINE SHOP A
46 PRESS BREAK MACHINES REQUIRED IN THE BOGIE SHOP C
14
PROBLEMS IDENTIFIED
TYPE OF
S.NO. PROBLEMS IDENTIFIED
PROBLEM
47 GOOD QUALITY OF BEVELING CUTTERS ARE REQUIRED FOR BEVELLING MACHINE B
48 HIGH TEMPRATURE SCALING ON THE SHEETS EFFECTING THE WELDING QULAITY B
49 WATER COOLED WELDING SETS ARE REQUIRED IN FIAT BOGIE FABRICATION SECTION. B
50 LAYER TO LAYER WINDING REQUIRES ON CO2 WIRE SPOOLS B
51 DIGITIAL MEASURING TAPES ARE REQUIRED FOR BETTER ACCURACY. A
52 GOOD QUALITY TRY SQUARE ARE REQUIRED. A
53 PROBLEM OF DISLOCATION OF COMPONENT IN LHB BOGIE FRAME A
54 ELECTRICAL DISTRIBUTION BOARDS ARE REQUIRED ON PILLARS NEAR WORK STATION B
55 PROBLEM OF IMPROPER MACHINING FOR PIN BRACKET OF LHB BOGIE BOLSTER A
56 POBLEM OF WELDING WIRE SCRAP DUE TO NOT PROPERLY USED A
57 DIGITAL MEASURING TAPE ARE REQUIED FOR BETTER ACCURACY B
58 GOOD QUALITY TRY SQUARE ARE REQUIRED B
59 PROBLEM OF POOR VESIBILITY OF PRESS BREAK MACHINE IN NIGHT SHIFT B
PROBLEM OF REJECTION OF FIAT BOGIE BOLSTER DUE TO LESS THICKNESS OF PIN BKT
60 A
AFTER MACHINING.
PROBLEM OF REQUIRED HEIGHT OF BUFFIER FROM RAIL LEVEL FOR CONVENTIONAL
61 A
COACH
62 PROBLEM OF BOT PROPERLY BENDING OF TOP & BOTTOM WEB OF FIAT BOGIE FRAME A
15
PROBLEMS IDENTIFIED
TOTAL ……..62 NOS.
SOLVED …...10 NOS.
RELATED TO OUR
A 27
DEPARTMENT
ASSISTANCE OF
OTHER B 32
DEPARTMENTS
CATEGOR
NATURE TOTAL NOS. SOLVED
Y
RELATED TO OUR
A 07
DEPARTMENT
RELATED TO
OTHER B 05
DEPARTMENTS
17
P- Ii
E
ST
SELECTION OF PROBLEM
PARAMETERS FOR RATING
IMPACT ON ENVIRONMENT
WASTAGE OF MATERIAL
PRODUCTIVITY
SAFETY
QUALITY IMPROVEMENT
18
.
WEIGHT INDEX
BY FIVE POINT RATING METHOD
BASED ON THE SELECTION FACTOR WHICH ARE HENCE, EVALUATION BY THE
IDENTIFIED BY THE MEMBERS DURING BRAIN MEMBERS FOR THE SELECTION OF
STORMING, MEMBERS ARE ALLOTED TO CASE STUDY UNDER CATEGORY
FRANCHISE THEIR OPINION BY ALLOTING THE REPRESENTED IN THE BAR CHARTS
MARKS THROUGH SELECTION FORMAT AS
PROBLE TOTA
M NO SK RK SP BS AK L
30
1 4 3 4 5 3 19
20
2 2 3 3 2 2 12
10
Marks
3 3 4 1 3 2 13
0
4 5 5 5 4 4 23 1 2 3 4 5
5 2 5 4 5 2 18 Problem
S.NO. ACTIVITY 1 2 3 4 5 6 7 8 9 10 11 12
1 IDENTIFICATION OF PROBLEM
2 SELECTION OF PROBLEM
6 DATA ANALYSIS
8 DEVELOPING SOLUTION
FORESEEING PROBABLE
9 RESISTANCE
11 REGULAR IMPLEMENTATION
12 FOLLOW UP / REVIEW
20
SELECTION OF THE PROBLEM
21
SELECTION OF THE PROBLEM
22
-
T EP
S Iii
24
E P-
ST
IMPACT OF PROBLEM
IV
WORKMAN MANAGEMENT
MORE TIME TO COMPLETE THE JOB WASTAGE INCREASED DUE TO
LEFT OVER OFF-CUT
MENTAL STRESS
INCREASE IN NON PERFORMING
BAD IMPRESSION ASSETS.
25
LEFT OVER OFF-CUT (8X1250X1500) MM OF
THREE SHEET IN EVERY LVPH COACH
26
IMPACT OF PROBLEM
27
IMPACT OF PROBLEM
28
TARGETS
29
BRAIN
BRAIN STORMING
STORMING SESSION
SESSION
TO IDENTIFY THE PROBABLE CAUSES OF PROBLEM
30
V
E P-
PROBABLE CAUSES
S T
MACHINE MATERIAL
32
DATA COLLECTION
DATA COLLECTION FOR BREAK DOWN OF 800 TONS PRESS
BREAK MACHINE
S. MONTH LVD PRESS BREAK LVD PRESS BREAK
NO & MACHINE 800 TON -I MACHINE 800 TON -II
YEAR
1 JAN.,21 624
2 FEB.,21 576
3 MAR.,21 600
4 APR.,21 576
5 MAY.,21 600
6 JUNE.,21 REDUCED CAPCITY UPTO 6MM 600
THINKNESS SHEET FOR
7 JULY,21 BENDING 600
8 AUG.,21 576
9 SEPT.,21 624
10 OCT.,21 600
11 NOV.,21 504
12 DEC.,21 469
METHOD
1 CONPONENT OF CORTEN STEEL INVALID REASON,
8MM NOT LOADED IN BOGIE
MEN
1 LACK OF AWARENESS INVALID REASON
2 NO COUNSELLING OF WORKER VALID REASON.
35
5 W ANLYSIS
RAW MATERIAL PROVIDED IN 5500MM & 6300 MM LENGTH.
WHY
RAW MATERIAL NOT PURCHASE IN 4000MM LENGTH
HOW
NOT READY FOR BREAK DOWN OF MACHINE
WHAT
RAW MATERIAL PURCHASED IN 4000MM LENGTH FOR 8MM
THICK SOLE BAR
WHAT
RAW MATERIAL USED IN 4000MM & 5500MM LENGTH
WHEN
BOGIE MANUFACTURE SECTION
36
5 W ANALYSIS
BREAK DOWN OF 800 TON PRESS BREAK MACHINE.
WHY
MAY BE NOT FOLLOWED OF MAINTIANCE SEHEDULE
HOW
PLANT DEPARMENT
WHAT
FOLLOWED OF MAINTIANCE SEHEDULE STRICKLY
WHERE
PRESS BREAK SECTION IN SHEET METAL SHOP
.
37
PARETO ANALYSIS
SAME REASONS LISTED IN CAUSES REPRESENTED IN PARETO
DIAGRAM UNDER “VITAL
“ FEW TRIVAL MANY” CONCEPT
BASED ON THE DATA COLLECTION FROM FOUR MAIN CAUSES, WE
HAD THE DISCUSSION WITH THE CONCERNED DEPARTMENT AND
FOUND THE PERCENTAGE INVOLVEMENT ON EACH CASE.
100
90
80
70
60
MACHINE 45%
50
40 MATERIAL 40%
30
METHOD 10%
20
10 MEN 5%
0
MACHINE MATERIAL MATHOD MEN
38
-
T EP I
S II
V
DEVELOPMENT OF SOLUTION
PURCHASE 0F CORTEN STEEL OF LENGTH 4000 mm WHILE
MACHINE BREAK DOWN.
39
DEVELOPMENT OF SOLUTION
SOLE BAR CUTTING AND BENDING AS PER UNDER FOLLOWED
40
DEVELOPMENT OF SOLUTION
SOLE BAR CUTTING AND BENDING AS PER UNDER FOLLOWED
41
DEVELOPMENT OF SOLUTION
SUGGESTION FOR NON LEFT OVER OFF-CUT
42
DEVELOPMENT OF SOLUTION
OFF-CUT USED OF OTHER SHOP
43
DEVELOPING SOLUTIONS
OFF-CUT CAN BE USED IN OTHER SHOP E.G SHEET METAL SHOP.
OFF CUT CAN BE SALE OTHER RAILWAY UNIT E.G DIVISION WORKSHOP.
44
DEVELOPING SOLUTIONS
EXISTING PROPOSED
THE OFF-CUT NOT USED OFF-CUT USED IN SHEET METAL
SHOP OF CNC PLASMA PROFILE
CUTTING MACHINE (PARI).
45
-
T EP
S IX
46
DEMING WHEEL
PLAN
ACT
DO
CHECK
47
DEMING WHEEL
48
X
E P-
TRIAL IMPLEMENTATION
S T
49
IMPLEMENTATION & PERFORMANCE
TRIAL IS SUCCESSFUL: OFF-CUT PIECES ARE USED
TO MAKE COMPONENTS FOR OTHER SHOPS
BEFORE AFTER
NOT USED OFF-CUT, SO • OFF- CUT USED IN SMS. SO
ACCMULATED IN SHOP. N.P.A REDUCED.
51
-
T EP
S XJ
REGULAR IMPLEMENTATION
52
COMPARISON
BEFORE AFTER
53
-
T EP
S XII
FOLLOW UP & REVIEW
S.NO. ACTIVITY 1 2 3 4 5 6 7 8 9 10 11 12
1 IDENTIFICATION OF PROBLEM
2 SELECTION OF PROBLEM
6 DATA ANALYSIS
8 DEVELOPING SOLUTION
11 REGULAR IMPLEMENTATION
12 FOLLOW UP / REVIEW
55
CONCLUSION
56
OUR SOCIETY GAIN
MATERIAL IS CONSERVED LIKE CORTEN STEEL SHEET.
THE EMMISSION OF GREENHOUSE GASES DURING
PRODUCTION OF RAW MATERIAL IS REDUCED .
DUE TO REDUCTION IN GREENHOUSE GASES OUR
ENVIRONMENT BECOMES HEALTHY.
57
TANGIBLE GAIN
OFF CUT CORTEN SHEET WEIGHT
(8X1250X1500MM) ::: 117.75KGS
TOTAL COST OF LEFT OVER OFF-CUT IN YEAR 2020 (1200 NOS SHEET) :::
1200X7065= ` 84,78,000/-
58
INTANGIBLE GAIN
IMPROVED PRODUCTIVITY.
GOOD WORKING ENVIRONMENT
DEVELOPED.
REDUCTION OF PHYSICAL EXERTION.
CUSTOMER SATISFACTION.
WORK SATISFACTION.
SELF SATISFACTION.
INSPIRATION FOR OTHERS.
APPRECIATION FROM MANAGEMENT.
60
SHRI BELI RAM, DY.CME/BOGIE
61