Argues
There are fewer faults on busbars than on other parts of the power system. No risk of dislocation of system due to accidental operation of busbar protection.
08/02 2 05/02/03
2
F1
F2
Drawbacks
Slow fault clearance. Busbar faults at F1 and F2 are cleared by remote time delayed protection on circuits feeding the faults: Time Delayed Overcurrent or Time Delayed Distance Protection
08/02 3 05/02/03
3
08/02 4 05/02/03
Where busbars are sectionalised, Protection can limit the amount of system disruption for a busbar fault
08/02 5 05/02/03
SS 2
SS 3
21
21
08/02 6 05/02/03
21
21
08/02 7 05/02/03
21
21
21
21
21
08/02 8 05/02/03
21
21
21
21
21
08/02 9 05/02/03
21
21
21
21
21
21
08/02 1005/02/03
21
10
Therefore :
Circuit breakers should be tripped and locked out by busbar protection
08/02 1105/02/03
11
STABLE False tripping can cause widespread interruption of supplies to customers / possible power system instability DISCRIMINATING Should trip the minimum number of breakers to clear the fault FAST To limit damage and possible power system instability
08/02 1205/02/03
12
Insulation
Differential Protection :
08/02 1305/02/03
13
14
>I
Insulation
08/02 1505/02/03
15
>I
08/02 1605/02/03
16
>I
08/02 1705/02/03
17
>I
>I
08/02 1805/02/03
18
Can detect only earth faults Switchgear must be insulated from earth (by standing on concrete plinth) Only one single earth conductor allowed on switchgear All cable glands must be insulated Switchgear sections must be insulated
08/02 1905/02/03
19
>I
>I
08/02 2005/02/03
20
>I
>I
08/02 2105/02/03
21
>I
>I
08/02 2205/02/03
22
23
>I
>I
>I
>I
>I
08/02 2405/02/03
24
>I
>I
>I
>I
>I
08/02 2505/02/03
25
>I
>I
>I
>I
>I
08/02 2605/02/03
26
27
08/02 2805/02/03
28
P1
S1
P1
S1
P1
S1
P2
S2
P2
S2
P2
S2
08/02 2905/02/03
29
08/02 3005/02/03
30
08/02 3105/02/03
31
08/02 3205/02/03
32
08/02 3305/02/03
33
P1 S1 P2 S2 P1 S1 P1 S1 P1 S1 P2 S2 P1 S1
P2
S2
P2
S2
P2
S2
a b
Current
08/02 3405/02/03
34
Current a b
08/02 3505/02/03
35
a b
Current
08/02 3605/02/03
36
a b
Current
08/02 3705/02/03
37
a b
Current
08/02 3805/02/03
38
a b
Current
08/02 3905/02/03
39
Tripping a b a Current b
08/02 4005/02/03
40
08/02 4105/02/03
41
a Current b
08/02 4205/02/03
42
Current
a b
Current
a b
08/02 4305/02/03
43
a Current b
08/02 4405/02/03
44
a Current b
08/02 4505/02/03
45
a Current b
08/02 4605/02/03
46
a Current b
08/02 4705/02/03
47
Current a b
08/02 4805/02/03
48
a Current b
08/02 4905/02/03
49
a Current b
08/02 5005/02/03
50
Trip Bus A
Zone A Zone B
08/02 5105/02/03
Trip Bus B
51
08/02 5205/02/03
Trip Bus B
52
Trip Bus A
Zone A Zone B
Check Zone
08/02 5305/02/03
53
Trip Bus B
Trip Bus A
Zone A Zone B
08/02 5405/02/03
Trip Bus B
54
Trip Bus B
55
08/02 5605/02/03
56
S1
P1
S2
P2
Bus A
P1 S1 P2 S2 P2 S2 P1 S1
Bus B
08/02 5705/02/03
57
Bus A
Bus B
08/02 5805/02/03
58
Bus A
Bus B
08/02 5905/02/03
59
Bus A
Bus B
08/02 6005/02/03
60
Bus A
Bus B
08/02 6105/02/03
61
Bus A
Bus B
08/02 6205/02/03
62
Bus A
P1 S1 P2 S2 P2 S2 P1 S1
Bus B
P1 S1
P2 S2
P2 S2
P1 S1
08/02 6305/02/03
63